ML031560702
| ML031560702 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/29/2003 |
| From: | Susquehanna |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML031560702 (21) | |
Text
May.
29, 2003 Page 1 of 1 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-25984 USER INFORMATION:
Name nACH*R Address:
Phone 4-TRANSMITTAL INFORMATION:
EMPL#:28401 TO:
LIVi00H
- w-05/29/2003 LOCATION:
USNRC FROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO'THE-;HARDCOPY+OR ELECTRONIC MANUAL ASSIGNED TO YOU:
TRM2 -
TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/22/2003 ADD MANUAL TABLE OF CONTENTS DATE: 05/28/2003 CATEGORY:
DOCUMENTS TYPE: TRM ID:
TRM2 REPLACE:
REV:N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
O I
CA#:0363
TRM APPROVED AMENDMENT TO UNIT 2 TECHNICAL REQUIREMENTS MANUAL EFFECTIVE DATE 0511612003 Replace the following pages of the Technical Requirements Manual with the enclosed pages.
The revised pages are identified by Effective Date and contain vertical lines indicating the area of change.
EFFECTIVE
-REMOVE PAGES INSERT PAGES DATE TRM /LOES-1 through TRM I LOES-6 TRM /LOES-1 through TRM I LOES-6 05/16/03 Table of Contents, pages i through vi Table of Contents, pages i through vi 05116/03 3.3-22 TRM / 3.3-22 05/16/03 TRM /3.3-23 and TRM /3.3-24 TRM /3.3-23 and TRM / 3.3-24 05/16/03 B 3.3-20 TRM / B 3.3-20 05/16/03 TRM I B 3.3-21 through TRM / B 3.3-23 TRM I B 3.3-21 through TRM / B 3.3-23 05/16/03 g:\\Lic Docs\\TRMWord\\TRM Remove nsert\\Rem1nsShel1Unit1,2:doc 5115103
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title TOC Effective Date TABLE OF CONTENTS 1.0 05/16/2003 USE AND APPLICATION Page TRM /1.0-1 Page TRM /1.0-2 Page TRM / 1.0-3 2.0 PLANT PROGRAMS Page 2.0-1 Pages TRM / 2.0-2 through TRM / 2.0-4 Pages TRM / 2.0-5 through TRM / 2.0-7 Page TRM 12.0-8
- Page TRM 1 2.0-9 Pages TRM 1 2.0-10 through TRM / 2.0-12 Page TRM / 2.0-13 3.0 APPLICABILITY Pages TRM / 3.0-1 Page TRM / 3.0-3 Page TRM 1 3.0-4 3.1 3.2 3.3 and TRM / 3.0-2'i 08/31/1998 10/04/2002 08/31/1998 08/31/1998 06/25/2002 04/12/1999 08/30/2001 09/06/2002 04/12/1999 06/16/2000 04/08/1999 03115/2002 04/08/1999 08/31/1998 06/05/2002 02/18/1999 02/18/1999 08/31/1998 03/10/2003 07/16/1999.
11/28/2000 08/31/1998 12/117/1998 12/17/1998 03/30/2001 12/14/1998 06/27/2001 06/1412002 12/14/1998 08/31/1998 05/16/2003 04/02/1999 REACTIVITY CONTROL SYSTEMS7.
Pages 3.1-1 through 3.1-6) ;,
Pages TRM I 3.1-7,,and,RM3.1-8 Pages TRM / 3.1-9 and TRM 3.1-9a Page TRM3.410 CORE OPERATIG LIMITS REPORT Page 3.-1,
-o---
PageTRM 12-2 through TRM /3.2-35 I NSTRUMEN4TATION Q:;
Page'TRM / 3.3-1 through TRM / 3.3-3
\\P~e >*PgTRM / 3.3-4 ages 3.3-5 through 3.3-8 Pages TRM / 3.3-9 and TRM / 3.3-9a Pages TRM / 3.3-10 and TRM 3.3-11 Page TRM 1 3.3-12 Pages TRM 3.3-13 through TRM / 3.3-15 Page TRM / 3.3-16 Pages TRM / 3.3-17 and TRM / 3.3-18 Pages TRM / 3.3-19 through TRM 1 3.3-20 Page 3.3-21 Pages TRM / 3.3-22 through TRM / 3.3-24 Page TRM / 3.3-25 SUSQUEHANNA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 05/16/2003 SUSQUEHANNA - UNIT 2 TRM LOES-1 EFFECTIVE DATE 05112003
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title 3.4
-Effective Date REACTOR COOLANT SYSTEM Pages 3.4-1 through 3.4-5 Pages 3.4-6 through 3.4-13 3.5 10/23/1998 08/31/1998 EMERGENCY CORE COOLING AND RCIC Pages 3.5-1 through 3.5-3 Page TRM / 3.5-4 Pages 3.5-5 through 3.5-7 3.6 08/31/1998 04/17/2000 08/31/1998 CONTAINMENT Pages 3.6-1 through 3.6-4 Page TRM / 3.6-5 Page 3.6-6
- Pages TRM / 3.6-7 through TRM / 3.6-9 3.7 3.8 08/3111998 01/07/2002 08/3111998 12/3112002 PLANT SYSTEMS Pages TRM 3.7-1 and TRM / 3.7-2 Page 3.7-3 Pages TRM / 3.7-4 through TRM / 3.7-10 Page TRM / 3.7-11 Pages TRM 3.7-12 through TRM / 3.7-27 Pages TRM / 3.7-28 through TRM 3.7-32 Page TRM / 3.7-33 Pages TRM / 3.7-34 through TRM / 3.7-36 Pages 3.7-37 through 3.7-39 Pages TRM / 3.7-40 and TRM / 3.7-40a Pages 3.7-41 and 3.7-42 Pages 3.7-43 through 3.7-47 Page TRM /3.7-48 Pages TRM / 3.7-49 and TRM / 3.7-50 Pages TRM / 3.7-51 and TRM / 3.7-52 Page TRM / 3.7-53 07/29/1999 08/31/1998 08/02/1999 01/21/2000 08/02/1999 11/16/2001 10/05/2002 02/01/1999 08/31/1998 08/11/2000 08/31/1998 10/13/1998 03/08/2003 03/09/2001 04/15/2003 07/29/1999 ELECTRICAL POWER Pages TRM / 3.8-1 and TRM / 3.8-2 Page 3.8-3 Page TRM / 3.8-4 Pages TRM 3.8-5 and TRM / 3.8-6 Pages TRM / 3.8-7 through TRM / 3.8-8 Page TRM / 3.8-9 Page 3.8-10 Page TRM / 3.8-11 Page TRM / 3.8-11 a Pages 3.8-12 through 3.8-14 Pages TRM / 3.8-15 through TRM / 3.8-17 Page 3.8-18 04/02/2002 08/31/1998 12/31/2002 04/02/2002 08/31/1998 08/24/2001 08/31/1998 04/02/2002 04/02/2002 08/31/1998 04/02/2002 02/01/1999 EFFECTIVE DATE 05/16/2003 SUSQUEHANNA - UNIT 2 TRM / LOES-2
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page TRM I 3.8-19 Page TRM / 3.8-20 Pages TRM / 3.8-21 through TRM / 3.8-23 Pages 3.8-24 and 3.8-25 Effective Date 04/02/2002 02/01/1999 06/06/1999 08/31/1998 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 MISCELLANEOUS Pages 3.10-1 through 3.10-4 Page TRM / 3.10-5 Page TRM / 3.10-6 Page TRM / 3.10-7 Page TRM / 3.10-8 08/31/1998 08/30/1998 03/08/2003 06/05/2002 04/07/2000 Corrected 04/17/2002
-RADIOACTIVE EFFLUENTS Pages 3.11-1 through 3.11-12 Pages 3.11-13 through 3.11-16 Pages 3.11-17 through 3.11-21 Pages TRM /3.11-22 through TRM 1 3.11-24 Pages 3.11-25 through 3.11-32 Pages 3.11-33 through 3.11-47 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-5 ADMINISTRATIVE CONTROLS Pages 4.0-1 through 4.0-8 08/31/1998 09/01/1998 08/31/1998 04/02/2002 09/01/1998 08/31/1998 02/05/1999 08/31/1998 SUSQUEHANNA - UNIT 2 TRM / LOES-3 EFFECTIVE DATE 05/16/2003 3.9 3.10 3.11 3.12 4.0 I
SUSQUEHANNA - UNIT 2 EFFECTIVE DATE 0511612003 TRM / LOES-3
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Effective Date B 3.0 B 3.1 APPLICABILITY BASES Pages B 3.0-1 through B 3.0-10 Pages TRM / B 3.0-11 through TRM B 3.0-15 REACTIVITY CONTROL SYSTEMS BASES Pages TRM / B 3.1-1 through TRM / B 3.1-3 Page B 3.1-4 Pages TRM / B 3.1-5 through TRM / B 3.1-7 Page TRM B 3.1-8 08/31/1998 03/15/2002 07113/1999 08/31/1998 07/13/1999 02118/1999 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 INSTRUMENTATION BASES Page TRM/B 3.3-1 Page B 3.3-2 Pages TRM/B 3.3-3 and TRM / B 3.3-3A Pages TRM I B 3.3-4 through TRM B 3.3-6 Pages TRM I B 3.3-7 through TRM B 3.3-9 Pages B 3.3-10 through B 3.3-13 Page TRM B 3.3-14 Page TRM B 3.3-14a Page TRM B 3.3-14b Page B 3.3-15 Page TRMIB 3.3-16 Page B 3.3-17 Pages TRM B 3.3-20 through TRM B 3.3-23 REACTOR COOLANT SYSTEM BASES Pages B 3.4-1 through B 3.4-4 Page TRM B 3.4-5 Page B 3.4-6 04/07/2000 08131/1998
-12129/2000 03/21/2003 03/30/2001 08131/1998 06125/2002 06/14/2002 06/14/2002 08/31/1998 04/07/2000 08/31/1998 05/16/2003 08/31/1998 10/15/1 999 08/31/1998 ECCS AND RCIC BASES Pages B 3.5-1 through B 3.5-5 08/31/1998 CONTAINMENT BASES Page TRM / B 3.6-1 Page TRM / B 3.6-2 Page B 3.6-3 Page TRM / B 3.6-4 Page TRM / B 3.6-5 Pages TRM / B 3.6-6 through TRM / B 3.6-11 07/26/2001 02/01/1999 08/31/1998 09/23/1999 01/07/2002 12/31/2002 EFFECTIVE DATE 05/16/2003 B 3.2 B 3.3 B 3.4 B 3.5 B 3.6 SUSQUEHANNA - UNIT 2 TRM / LOES-4
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title B 3.7 B 3.8 B.3.9 Effective Date PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 Pages TRM / B 3.7-3 through TRM / B 3.7-7 Page TRM / B 3.7-7a Pages TRM / B 3.7-8 through TRM / B 3.7-10 Page TRM I B 3.7-1 Oa Pages TRM / B 3.7-11 through TRM / B 3.7-14 Page TRM / B 3.7-14a Pages TRM / B 3.7-15 and TRM / B 3.7-16 Pages B 3.7-17 through B 3.7-20 Pages TRM / B 3.7-21 through TRM/B 3.7-21 a Pages TRM/B 3.7-22 and TRM/B 3.7-23 Pages B 3.7-24 through B 3.7-30 Pages TRM / B 3.7-31 and TRM / B 3.7-32 Page TRM / B 3.7-33 Pages TRM / B 3.7-34 and TRM / B 3.7-35 ELECTRICAL POWER BASES Pages TRM / B 3.8-1 and TRM / B 3.8-2 Page TRM / B 3.8-2a Page TRM I B 3.8-3 Page TRM I B 3.8-3a Page TRM I B 3.8-4 Page TRM I B 3.8-4a Page TRM I B 3.8-5 Pages TRM I B 3.8-6 through TRM / B 3.8-17 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 Pages B 3.9-3 through B 3.9-7 08/31/1998 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 08/02/1999 02/01/1999 08/31/1998 05/11/2001 04/07/2000 08/31/1998 03/09/2001 04/15/2003 07/05/2000 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 04/02/2002 08/31/1998 04/02/2002 08/31/1998 10/23/1998 B 3.10 MISCELLANEOUS BASES Pages B 3.10-1 through B 3.10-2 Page TRM / B 3.10-3 Pages TRM / B 3.10-4 and TRM / B 3.10-5 Pages TRM / B 3.10-6 and TRM 1 3.10-7 08/31/1998 03/08/2003 08/23/1999 04/17/2002 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 Pages TRM / B 3.11-10 Pages TRM/B 3.11 -11 and TRM/B 3.11 -1 a Pages TRM/B 3.11-12 and TRM/B 3.11-13 Page TRM / B 3.11-14 Page TRM / B 3.11-15 Pages B 3.11-16 through B 3.11-19 Page TRM / B 3.11-20 08/31/1998 02/01/1999 04/07/2000 02/01/1999 11/01/1999 02/01/1999 08/3111998 04/02/2002 SUSQUEHANNA - UNIT 2 TRM I LOES-5 EFFECTIVE DATE 05/16/2003 SUSQUEHANNA - UNIT 2 TRM / LOES-5 EFFECTIVE DATE 05/16/2003
SUSQUEHANNA STEAM ELECTRIC STATION LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)
Section Title Page TRM / B 3.11-20a Pages TRM / B 3.11-21 through TRM /B 3.11-23 Page TRM / B 3.11-23a Page TRM / B 3.11-24 Page TRM / B 3.11-25 Pages B 3.11-26 through B 3.11-35 Pages TRM / B 3.11-36 B.3.12 LOADS CONTROL PROGRAM BASES Pages TRM / B 3.12-1 through TRM / B 3.12-3 Effective Date 04/02/2002 04/02/2002 04/02/2002 03/21/2003 04/1 5/2003 08/31/1998 02/12/1999 02/05/1999 (g:tUc DocsJTRM-Word/rRMManual/O.OOUstsfU nit 2lU2TRM-LOES.doc)
SUSQUEHANNA - UNIT 2 TRM / LOES-6 EFFECTIVE DATE 05/16/2003 SUSQUEHANNA - UNIT 2 TRM /LOES-6 EFFECTIVE DATE 05116/2003
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 1.0 USE AND APPLICATION.............................................
1.0-1 1.1 Definitions............................................
TRM/1.0-2 2.0 PLANT PROGRAMS............................................
2.0-1 2.1 Plant Programs............................................
2.0-1 2.2 Instrument Trip Setpoint Table............................................ TRM/2.0-5 3.0 APPLICABILITY.:............................................
TRM/3.0-1 3.0 (TRO) - TR for Operation (TRO) Applicability............................... TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability................................... TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS............................................
3.1-1 3.1.1 Alternate Rod Injection............................................
3.1-1 3.1.2 CRD Housing Support.............................................
3.1-4 3.1.3 Control Rod Block Instrumentation.............................................
3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve.......
TRM/3.1-9 3.2 CORE OPERATING LIMITS REPORT.......
3.2-1 3.2.1 Core Operating Limits Report.......
3.2-1 3.3 INSTRUMENTATION..............
TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation......
TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation......
TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation......
3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation......
TRM/3.3-9 3.3.5 Section Not Used.
TRM/3.3-12 3.3.6 TRM Containment Isolation Instrumentation.TRM/3.3-13 3.3.7 Turbine Overspeed Protection System.TRM/3.3-17 3.3.8 TRM Reactor Protection System (RPS) Instrumentation.TRM/3.3-19 3.3.9 LPRM Upscale Alarm Instrumentation..Upscale.Alarm.Instrumentation3.3 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops.......
TRM/3.3-22 3.3.11 MVP Isolation Instrumentation.......
TRM/3.3-24 3.4 REACTOR COOLANT SYSTEM.............................
3.4-1 3.4.1 Reactor Coolant System Chemistry.3.4-1 3.4.2 Structural Integrity.3.4-6 3.4.3 High/Low Pressure Interface Leakage Monitors...
3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit...
3.4-12 3.4.5 Reactor Vessel Material Surveillances Program...
3.4-13 3.5 EMERGENCY CORE COOLING AND RCIC...
3.5-1 3.5.1 ADS Manual Inhibit 3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation...
3.5-3 3.5.3 Long Term Nitrogen Supply to ADS...
3.5-6 SUSQUEHANNA - UNIT 2 i
EFFECTIVE DATE 05/16/2003
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.6 CONTAINMENT.......................................
3.6-1 3.6.1 VENTING or PURGING.......................................
3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.......................................
3.6-3 3.6.3.
Suppression Pool Alarm Instrumentation.......................................
3.6-4 3.6.4 Primary Containment Closed System Boundaries......................... TRM/3.6-7 3.7 PLANT SYSTEMS.......................................
TRM/3.7-1 3.7.1 Emergency Service Water System (Shutdown)............................ TRM/3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level....................................... 3.7-3 3.7.3.1 Fire Suppression Water Supply System....................................... TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems.......................................
TRM/3.7-8 3.7.3.3 C02 systems.......................................
TRM/3.7-12 3.7.3.4 Halon Systems.......................................
TRM/3.7-16 3.7.3.5 Fire Hose Stations.
TRM/3.7-1 8 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses............................. TRM/3.7-22 3.7.3.7 Fire Rated Assemblies...............................
TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation...............................
TRM/3.7-26 3.7.4 Solid Radwaste System...............................
TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor...............................
3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture...............................
3.7-39 3.7.5.3 Liquid Holdup Tanks...............................
TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation...............................
3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation............................
3.7-42 3.7.8 Snubbers............................
3.7-44 3.7.9 Control Structure HVAC............................
TRM/3.7-50 3.7.10 Spent Fuel Storage Pools (SFSPs)........
.................... TRM/3.7-51 3.8 ELECTRICAL POWER............................
TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices.
TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous......
TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
Automatic....................................
TRM/3.8-11 3.8.3 Diesel Generator (DG) Maintanence Activities....................................
3.8-13 3.8.4 24VDC Electrical Power Subsystem.................................... TRM/3.8-15 3.8.5 Degraded Voltage Protection....................................
TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling....................................
3.8-24 3.9 REFUELING OPERATIONS....................................
3.9-1 3.9.1 Decay Time.................................
3.9-1 3.9.2 Communications.................................
3.9-2 3.9.3 Refueling Plafform.................................
3.9-3 SUSQUEHANNA - UNIT 2 ii EFFECTIVE DATE 05/16/2003 SUSQUEHANNA - UNIT 2 ii EFFECTIVE DATE 05/16/2003
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE 3.10 MISCELLANEOUS..........................................
3.10-1 3.10.1 Sealed Source Contamination..........................................
3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation........................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI).................... TRM/3.10-7 3.10.4 Leading Edge Flow Meter (LEFM)...........................................
TRM/3.10-8 3.11 RADIOACTIVE EFFLUENTS 3.11-1 3.11.1 Liquid Effluents........
3.11-1 3.11.1.1 Liquid Effluents Concentration.......................
3.11-1 3.11.1.2 Liquid Effluents Dose.3.11-4 3.11.1.3 Liquid Waste Treatment System 3.11-6 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation.....
3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation.....
3.11-13 3.11.2 Gaseous Effluents.....
3.11-17 3.11.2.1 Dose Rate.....
3.11-17 3.11.2.2 Dose - Noble Gases.....
3.11-21 3.11.2.4 Gaseous Radwaste Treatment System........
TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System........
TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation...............................
3.11-26 3.11.3 Total Dose...............................
3.11-33 3.11.4 Radiological Environmental Monitoring...............................
3.11-35 3.11.4.1 Monitoring Program...............................
3.11-35 3.11.4.2 Land Use Census...............................
3.11-45 3.11.4.3 Interlaboratory Comparison Program................................
3.11-47 3.12 LOADS CONTROL PROGRAM...............................
TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool...............................
TRM/3.12-1 3.12.2 Heavy Loads Requirements................................
TRM/3.12.3 3.12.3 Light Loads Requirements................................
TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS................................
4.0-1 4.1 Organization...............................
4.0-1 4.2 Reportable Event Action...............................
4.0-2 4.3 Safety Limit Violation...............................
4.0-3 4.4 Procedures and Programs...............................
4.0-4 4.5 Reporting Requirements...............................
4.0-5 4.6 Radiation Protection Program...............................
4.0-7 4.7 Training............................
4.0-8 SUSQUEHANNA - UNIT 2 iii EFFECTIVE DATE 05/16/2003 SUSQUEHANNA -UNIT 2 iii EFFECTIVE DATE 05J16/2003
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION TITLE PAGE B 3.0 (TRO) - TR for Operation (TRO) Applicability..................................... B 3.0-1 B.3.0 (TRS) - TR Surveillance (TRS) Applicability B 3.0-9 B 3.1.1 Alternate Rod Injection.....................................
TRMIB 3.1-1 B 3.1.2 CRD Housing Support....
B 3.1-4 B 3.1.3 Control Rod Block Instrumentation.....................................
TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and Check Valve....
TRM/B 3.1-8
.~~~~~~~~~~~n h
c av TRMIB.......................
.1 B 3.2.1 Core Operating Limits Report (COLR).B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation.TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation.B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation.TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation.TRM/B 3.3-4 B 3.3.5 Section Not Used.TRM/B 3.3-7 B 3.3.6 TRM Containment Isolation Instrumentation.B 3.3-10 B 3.3.7 Turbine Overspeed Protection System.TRM/B 3.3-14 B 3.3.8 TRM Reactor Protection System (RPS) Instrumentation...................... B 3.3-15 B 3.3.9 LPRM Upscale Alarm Instrumentation.........................................
B 3.3-18 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops.TRM/B 3.3-20 B 3.3.11 MVP Isolation Instrumentation.......................................
TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry.B 3.4-1 B 3.4.2 Structural Integrity.B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors
.B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit.TRMlB 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program
.B 3.4-6 B 3.5.1 ADS Manual Inhibit.B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation.B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS.B 3.5-4 B 3.6.1 VENTING or PURGING.TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Indication.B 3.6-3 B 3.6.3 Suppression Pool Alarm Instrumentation.B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries.TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown)
.B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level.B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System............................
TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems.TRM/B 3.7-5 B 3.7.3.3 C02 systems.TRM/B 3.7-7 B 3.7.3.4 Halon Systems.TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations.TRM/B 3.7-10 SUSQUEHANNA-UNIT 2 iv EFFECTIVE DATE 05/16/2003
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
TITLE PAGE Yard Fire Hydrants and Hydrant Hose Houses............................ TRM/B 3.7-11 Fire Rated Assemblies.............................................
TRM/B 3.7-12 Fire Detection Instrumentation.............................................
TRM/B 3.7-14 Solid Radwaste System.............................................
TRM/B 3.7-15 Main Condenser Offgas Hydrogen Monitor............................................ B 3.7-17 Main Condenser Explosive Gas Mixture............................................. B 3.7-19 Liquid Holdup Tanks.............................................
B 3.7-20 ESSW Pumphouse Ventilation............................................
TRM/B 3.7-21 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation..................
TRM/B 3.7-22 Snubbers..................
B 3.7-24 Control Structure HVAC..................
TRM/B 3.7-31 Spent Fuel Storage Pools..................
TRM/B 3.7-33 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices TRM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -
Continuous......
TRM/B 3.8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -
Automatic.TRM/B 3.8-4 B 3.8.3 Diesel Generator (DG) Maintanence Activities.TRM/B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem.TRM/B 3.8-6 B 3.8.5 Degraded Voltage Protection.TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling.TRM/B 3.8-17 Decay Time.....................
B 3.9-1 Communications....................
B 3.9-2 Refueling Plafform....................
B 3.9-3 Sealed Source Contamination....................
B 3.10-1 MODE 5 Shutdown Margin Test RPS Instrumentation.......................... B 3.10-2 Independent Spent Fuel Storage Installation (ISFSI)................... TRM/B 3.10-4 Leading Edge Flow Meter (LEFM).........................................
TRM/B 3.10-6 Liquid Effluents Concentration........................................
B 3.11 -1 Liquid Effluents Dose........................................
B 3.11-4 Liquid Waste Treatment System........................................
B 3.11-6 Liquid Radwaste Effluent Monitoring Instrumentation........................... B 3.11-7 Radioactive Liquid Process Monitoring Instrumentation............... TRM/B 3.11-10 Dose Rate........................................
TRM/B 3.11-12 Dose - Noble Gases........................................
B 3.11-16 Dose - Iodine, Tritium, and Radionuclides in Particulate Form........................................
B 3.11-18 Gaseous Radwaste Treatment System....................................... TRM/B 3.11-20 Ventilation Exhaust Treatment System........................................ TRM/B 3.11-21 SUSQUEHANNA - UNIT 2 V
EFFECTIVE DATE 05/16/2003 SECTION B 3.7.3.6 B 3.7.3.7 B 3.7.3.8 B 3.7.4 B 3.7.5.1 B 3.7.5.2 B 3.7.5.3 B 3.7.6 B 3.7.7 B 3.7.8 B 3.7.9 B 3.7.10 B.3.9.1 B 3.9.2 B 3.9.3 B 3.10.1 B 3.10.2 B 3.10.3 B 3.10.4 B 3.11.1.1 B 3.11.1.2 B 3.11.1.3 B 3.11.1.4 B 3.11.1.5 B 3.11.2.1 B 3.11.2.2 B 3.11.2.3 B 3.11.2.4 B 3.11.2.5 SUSQUEHANNA - UNIT 2 EFFECTIVE DATE 05/16/2003 v
SUSQUEHANNA STEAM ELECTRIC STATION TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)
SECTION B 3.11.2.6 B 3.11.3 B 3.11.4.1 B 3.11.4.2 B 3.11.4.3 B 3.12 B.3.12.1 B.3.12.2 B.3.12.3 TITLE PAGE Radioactive Gaseous Effluent Monitoring Instrumentation.............................
B 3.11-24 Total Dose.............................
B 3.11-26 Monitoring Program.............................
B 3.11-28 Land Use Census.............................
B 3.11-34 Interlaboratory Comparison Program.............................
TRMB 3.11-36 LOADS CONTROL PROGRAM.............................
TRM/B 3.12-1 Crane Travel - Spent Fuel Storage Pool.............................
TRM/B 3.12-1 Heavy Loads Requirements.............................
TRM/B 3.12-2 Light Loads Requirements.............................
TRM/B 3.12-3 (g:/Lic DocsrTRM-WordrTRM Manual/O.OOLists/Unit2U2TRM-TOC.doc)
SUSQUEHANNA - UNIT 2 vi EFFECTIVE DATE 05/16/2003 SUSQUEHANNA - UNIT 2 EFFECTIVE DATE 05116/2003 vi
\\~~~~~-
- -~
X,...
..1 -
I...-
..1
-I -
1 1 -...
Reactor Recirculation Pump MG Set Stops 3.3.10
-3.3 Instrumentation 3.3.10 Reactor Recirculation Pump MG Set Stops TRO 3.3.10 Each Reactor Recirculation pump MG set scoop tube electrical and mechanical stop shall be OPERABLE with overspeed setpoints corresponding to a core flow of:
Electrical Stop: < 109.5 million I bm/hr, and Mechanical Stop: s 110.5 million Ibm/hr APPLICABILITY:
MODES 1 and 2 ACTIONS
~~~~~~~~NOTE-----7------ ----
Separate Condition entry allowed for each recirculation pump MG set.
CONDITION REQUIRED ACTION COMPLETION TIME A.
One electrical or A.1 Restore the inoperable stop(s)
Next scheduled mechanical stop for either to OPERABLE status.
performance of or both reactor recirculation TRS 3.3.10.1 pump MG set scoop tube(s) inoperable.
B. Both electrical and NOTE----
mechanical stops for either Scoop tube may be unlocked Reactor Recirculation pump intermittently under administrative MG set scoop tube control.
B.1 Initiate actions to lock the scoop Immediately tube on the affected Reactor Recirculation MG Set in place.
EFFECTIVE DATE 05116/2003 SUSQUEHANNA - UNIT 2 TRM / 3.3-22
Reactor Recirculation Pump MG Set Stops 3.3.10 TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.3.10.1 Demonstrate each Reactor Recirculation pump MG 24 months set scoop tube electrical and mechanical stop to be OPERABLE.
EFFECTIVE DATE 05/16/2003 SUSQUEHANNA - UNIT 2 TRM 3.3-23
Mechanical Vacuum Pump (MVP) Isolation Instrumentation 3.3.11 3.3 Instrumentation 3.3.11 MVP Isolation Instrumentation TRO 3.3.11 The MVP Isolation Instrumentation for each Function in Table 3.3.11 -1 shall be OPERABLE.
APPLICABILITY:
MODE 1 or 2 with one or more Main Steam Isolation Valves open and mechanical vacuum pump in service.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.
One or more required A.1 Place channel in trip.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> channel inoperble.
B. MVP isolation capability not B.1 Restore MVP Isolation 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> maintained.
capability.
C. Required Action and C.1 Shut down the MVP and close Immediately associated Completion the MVP suction valve.
Time of Condition A or B not met.
TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.3.11.1 Perform CHANNEL FUNCTIONAL TEST.
92 days TRS 3.3.11.2 Perform CHANNEL CALIBRATION.
24 months TRS 3.3.11.3 Perform LOGIC SYSTEM FUNCTIONAL TEST.
24 months EFFECTIVE DATE 05/16/2003 1.
SUSQUEHANNA - UNIT 2 TRM / 3.3-24
Reactor Recirculation Pump MG Set Stops B 3.3.10 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES TRO In the case of recirculation control system failures (e.g., transistors, resistors, etc.) causing upscale signal failure, the reactor is protected by high pressure or high flux scram. Such faults have been analyzed in Chapter 15 and include both MG sets going to full speed simultaneously.'
For this analysis, the master flow controller is assumed to fail such that it causes a speed increase for both recirculation pumps.
Pump overspeed occurs during the course of a LOCA due to blowdown through the broken loop pump. Design studies determined that rotating component failure missiles caused by the overspeed was not sufficient to cause damage to the containment or to vital equipment, consequently no protective or preventative provision is made for this pump overspeed condition.
No credit is taken for electrical or mechanical stops to limit the speed of the recirculation pumps in these analyzed events.
Normally, operator implementation or procedural controls maintains the recirculation system within the system design limits and initial conditions of analyzed events. The reactor recirculation pump MG set stops are set with some operating margin above these limits. As such, the stops serve as backups to the operator control over normal operation. Additionally, in the event of a fault that results in inadvertent MG set speed increases above the normal operating limits, the stops can provide protection from the automatic reactor scram that terminate the analyzed worse case events. Therefore, the MG set stops also serve to provide additional plant reliability protection.
The electrical stop is the primary means for backing up procedural controls and for automatically limiting recirculation flow. The mechanical stop provides a diverse and redundant automatic backup to the electrical stop flow limiting mechanism.
ACTIONS The Actions are modified by a Note allowing separate Condition entry for each recirculation pump. The Required Actions provide appropriate compensatory measures for each recirculation loop independent of the other loop.
(continued)
EFFECTIVE DATE 05/16/2003 SUSQUEHANNA - UNIT 2 TRM B 3.3-20
Reactor Recirculation Pump MG Set Stops B 3.3.1 0 B 3.3.10 Reactor Recirculation Pump MG Set Stops BASES ACTIONS A.1 (continued)
Either the electrical or the mechanical stop can provide backup protection to the procedural controls in place to maintain recirculation pump operation within the system design limits and initial conditions of analyzed events. In the event one of these un-creditied backup features is inoperable it is reasonable to extend the restoration time (in the event conditions do not permit more timely corrective action) until the next scheduled required calibration. With the backup protection of the electrical or mechanical stop remaining OPERABLE, backup protection remains and allows time to schedule and plan appropriate repairs. Since there is no assumed credit for either backup function, this Completion Time is considered appropriate.
B.1 With both the electrical and mechanical stops inoperable for any recirculation pump MG set, the automatic backup protection is not available.
In this case, the scoop tube is locked in place to protect against unintended /
inadvertent speed increases. This action conservatively compensates for lack of backup protection and allows continued operation until at least one MG set stop function (electrical or mechanical) is restored to operable status. The Required Action is modified by a Note allowing intermittent unlocking of the scoop tube. This may be required for power reductions or other power level adjustments. The administrative control consists of stationing a dedicated operator at the controls while the scoop tube is unlocked and the duration should be limited to the time necessary to complete the change in core flow.
TRS The TRS assures that the stops are demonstrated OPERABLE at least once per cycle. Normal scoop tube positioner calibration is performed after each refueling outage. Inoperable stops are detectable on line during scoop tube positioner calibration.
REFERENCES
- 1. FSAR Section 5.4.1.4.
- 2. FSAR Section 7.7.2.3.1.
- 3. FSAR Section 15.4.5.
EFFECTIVE DATE 05/1612003 TRM B 3.3-21 SUSQUEHANNA - UNIT 2
Mechanical Vacuum Pump (MVP) Isolation Instrumentation B 3.3.11 MVP Isolation Instrumentation The MVP Isolation instrumentation automatically shuts down the MVP and closes its suction valve. The purpose is to limit fission product release following a postulated Design Basis Control Rod Drop Accident with the MSIV's open and the MVP System in operation. The MVP draws gases from the main condenser and discharges to the Turbine Building vent stack, providing an unfiltered release path for fission product activity to the environment. Automatic Isolation of the MVP System in response to a Main Steam Line-High radiation trip is part of the design basis of the units as described in the FSAR.
The Isolation instrumentation includes the sensors, relays, and devices that are necessary to initiate the above actions. The input parameter to the isolation logic is main steam line (MSL) radiation. When the MSL Radiation
- High trip setpoint is reached on either MSL Radiation Monitor "A" or "B",
the sensor actuates, which then generates a shutdown signal to the MVP system control logic. There is only one trip system for the MVP Isolation.
The components associated with this trip channel are identified in Table B 3.3.11-1.
This TRO is only applicable when the MVP System is in service drawing or maintaining condenser vacuum with the reactor in Mode 1 or 2 and one or more MSIV's open. The time of exposure is relatively short, usually during startup from initial criticality up to a maximum of 5% reactor power. The Actions are defined to ensure that the capability to automatically isolate the MVP System is restored promptly if lost during MVP operation.
TRS The TRSs are defined to be performed at the specified Frequency to ensure that the MVP Isolation Function is OPERABLE prior to entering the applicable condition. The CHANNEL FUNCTIONAL TEST, CHANNEL CALIBRATION and LOGIC SYSTEM FUNCTIONAL TEST are performed at the same interval as the equivalent surveillance of the MSLRM channels for the RPS Trip and Primary Containment Isolation functions.
REFERENCES
- 1.
FSAR Section 7.3.1.1a.2.4.1.2.
2, FSAR Section 10.4.2.2.
- 3.
FSAR Section 11.5.2.1.
x-EFFECTIVE DATE 05/16/2003 B 3.3.11 BASES TRO ACTIONS K.
TRM / B3.3-22 SUSQUEHANNA - UNIT 2
/
/
Mechanical Vacuum Pump (MVP) Isolation Instrumentation B 3.3.11 Table B 3.3.11-1 MVP Isolation Components EFFECTIVE DATE 05/16/2003 Plant Systems Component Component Description Isolation Signal Number Function No.
(Table 3.3.1 1-1)
Vacuum Hogging HV-20731 MVP Suction Isolation Valve 1.
2P105 Mechanical Vacuum Pump 1
SUSQUEHANNA - UNIT 2 TRM / B3.3-23