NRC Generic Letter 1989-16

From kanterella
(Redirected from ML031140220)
Jump to navigation Jump to search
NRC Generic Letter 1989-016: Installation of a Hardened Wetwell Vent
ML031140220
Person / Time
Site: Beaver Valley, Millstone, Hatch, Monticello, Calvert Cliffs, Dresden, Davis Besse, Peach Bottom, Browns Ferry, Salem, Oconee, Mcguire, Nine Mile Point, Palisades, Palo Verde, Perry, Indian Point, Fermi, Kewaunee, Catawba, Harris, Wolf Creek, Saint Lucie, Point Beach, Oyster Creek, Watts Bar, Hope Creek, Grand Gulf, Cooper, Sequoyah, Byron, Pilgrim, Arkansas Nuclear, Three Mile Island, Braidwood, Susquehanna, Summer, Prairie Island, Columbia, Seabrook, Brunswick, Surry, Limerick, North Anna, Turkey Point, River Bend, Vermont Yankee, Crystal River, Haddam Neck, Ginna, Diablo Canyon, Callaway, Vogtle, Waterford, Duane Arnold, Farley, Robinson, Clinton, South Texas, San Onofre, Cook, Comanche Peak, Yankee Rowe, Maine Yankee, Quad Cities, Humboldt Bay, La Crosse, Big Rock Point, Rancho Seco, Zion, Midland, Bellefonte, Fort Calhoun, FitzPatrick, McGuire, LaSalle, 05000000, Zimmer, Fort Saint Vrain, Washington Public Power Supply System, Shoreham, Satsop, Trojan, Atlantic Nuclear Power Plant, Clinch River
Issue date: 09/01/1989
From: Partlow J
Office of Nuclear Reactor Regulation
To:
References
GL-89-016, NUDOCS 8909010375
Download: ML031140220 (16)


UNITED STATES

NUCLEAR REGULATORY COMMISSION

WASHINGTON, D. C. 20555 September 1, 1989 TO: ALL HOLDERS OF OPERATING LICENSES FOR NUCLEAR POWER REACTORS

WITH MARK I CONTAINMENTS

SUBJECT: INSTALLATION OF A HARDENED WETWELL VENT (GENERIC LETTER 89-16)

As a part of a comprehensive plan for closing severe accident issues, the staff undertook a program to determine if any actions should be taken, on a generic basis, to reduce the vulnerability of BWR Mark I containments to severe accident challenges. At the conclusion of the Mark I Containment Performance Improvement Program, the staff identified a number of plant modifications that substantially enhance the plants' capability to both prevent and mitigate the consequences of severe accidents. The improvements that were recommended include (1) Improved hardened wetwell vent capability,

(2 'improved reactor pressure vessel depressurization system reliability,

(3 an alternative water supply to the reactor vessel and drywell sprays, and

(4 updated emergency procedures and training. The staff as part of that effort also evaluated various mechanisms for implementing of these plant improvements so that the licensee and the staff efforts would result in a coordinated coherent approach to resolution of severe accident issues in accordance with the Commission's severe accident policy.

After considering the proposed Mark I Containment Performance Program (described in SECY 89-017, January 1989), the Commission directed the staff to pursue Mark I enhancements on a plant-specific basis in order to account for possible unique design differences that may bear on the necessity and nature of specific safety improvements. Accordingly, the Commission concluded that the recommended safety improvements, with one exception, that is, hardened wetwell vent capability, should be evaluated by licensees as part of the Individual Plant Examination (IPE) Program. With regard to the recommended plant improvement dealing with hardened vent capability, the Commission, in recognition of the circumstances and benefits-associated with this modification, has directed a different approach. Specifically, the Commission has directed the staff to approve installation of a hardened vent under the provisions of

10 CFR 50.59 for licensees, who on their own Initiative, elect to incorporate this plant improvement. The staff previously inspected the design of such a system that was installed by Boston Edison Company at the Pilgrim Nuclear Power Station. The staff found the installed system and the associated Boston Edison Company's analysis acceptable.

A copy of Boston Edison Company's description of the vent modification is enclosed for your information. For the remaining plants, the staff has been directed to initiate plant-specific backfit analyses for each of the Mark I

plants to evaluate the efficacy of requiring the installation of hardened wetwell vents. Where the backfit analysis supports imposition of that requirement, the staff is directed to issue orders for modifications to install a reliable hardened vent.

-_,

V

If Generic Letter 89-16 -2- September 1, 1989 The staff believes that the available information provides for installation of a hardened vent. First, it is recognized strong incentive plants have in place emergency procedures directing that all affected the certain circumstances (primarily to avoid exceeding the operator to vent under primary pressure limit) from the wetwell airspace. Thus, incorporation containment designated capability consistent with the objectives of a of the guidelines is seen as a logical and prudent plant improvement. emergency procedure reliance on pre-existing capability (non-pressure-bearing Continued may jeopardize access to vital plant areas or other vent path) which equipment complication that threatens accident management strategies. is an unnecessary implementation of reliable venting capability and procedures Second, likelihood of core melt from accident sequences involving can reduce the decay heat removal by about a factor of 10. Reliable loss of long-term venting also beneficial, depending on plant design and capabilities, capability is likelihood of core melt from other accident initiators, in reducing the blackout and anticipated transients without scram. As for example, station a reliable wetwell vent provides assurance of pressure a mitigation measure, with significant scrubbing of fission products and relief through a path can releases even for containment failure modes not associated result in lower (i.e., liner meltthrough). Finally, a reliable hardened with pressurization for consideration of coordinated accident management wetwell vent allows design capability consistent with safety objectives. strategies by providing reasons, the staff concludes that a plant modification For the aforementioned and-a prudent engineering solution of issues sur.roundingis highly desirable phenomena. Therefore, the staff strongly encourages complex and uncertain licensees requisite design changes, utilizing portions of existing to implement greatest extent practical, under the provisions of 10 systems to the CFR 50.59.

As' noted previously, for facilities not electing to voluntarily design changes, the Commission has directed the staff incorporate backfit analyses. In an effort to most accurately reflectto perform plant-specific the staff herein requests that each licensee provide plant specificity, implementation of a hardened vent by pipe replacement, cost estimates for

89-017. In addition, licensees are requested to indicate as described in SECY

of installing an ac independent design in comparison the incremental cost to a availability of ac power. In the absence of such information; design relying on use an estimate of $750,000. This estimate is based the staff will prevalent existing designs to bypass the standby gas on modification of treatment and includes piping, electrical design changes, and modifications system ducting and training. to procedures The NRC staff requests that each licensee with a Mark notification of its plans for addressing resolution of I plant provide this issue. If the licensee elects to voluntarily proceed with plant modifications, be so noted, along with an estimated schedule, and no it should necessary. Otherwise, the NRC staff requests that the further information is be provided. In either event, it requests that each above cost information

45 days of receipt of this letter. licensee respond within

-3- September 1, 1989 Generic Letter 89-16 This request is covered by Office of Management and Budget Clearance Number

3150-0011, which expires December 31, 1989. The estimated average burden hours are 100 person hours per licensee response, including searching data sources, gathering and analyzing the data, and preparing the required letters. These estimated average burden hours pertain only to the identified response-related matters and do not include the time for actual implementation of the requested actions. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Record and Reports Management Branch, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555; and to the Paperwork Reduction Project (3150-0011), Office of Management and Budget, Washington, D.C. 20503.

If you have any questions regarding this matter, please contact the NRC Lead Project Manager, Mohan Thadani, at (301) 492-1427.

Sincerely,

  • ~ ' t: 5 Ja s 6. Partlow Ass cate Director for Projects Office of Nuclear Reactor Regulation Enclosures:

1. Description of Vent Modification at the Pilgrim Nuclear Power Station

2. List of Most Recently Issued Generic Letters

'I Enclosure 1

9OST0NCO

Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Missachusetts 02360

Ralph G. Bird Senior Vice Presiaert - Nuclear BECo 88-126 August 18, 1988 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 License DPR-35 Docket 50-293 REVISED INFORMATION REGARDING PILGRIM STATION

SAFETY ENHANCEMENT PROGRAM

Dear Sir:

Enclosed is a description of a revised design for the Direct-Torus Vent System (DTVS) that was described in the "Report on Pilqrim'Station Safety Enhancements' dated July 1, 1987 and transmitted to the NRC with Mr. Bird's letter (BECo 87-111) to Mr. Varga dated July 8, 1987. This revision supersedes in its entirety the Section 3.2 included in the July 1, 1987 report.

On March 7, 1988 Boston Edison Company (BECo) personnel met with Dr. Hurley, Mr. Russell, and Dr. Thadani and provided a tour of SEP modifications and an informal presentation of the quantification of competing risks associated with venting the containment and conclusions drawn from these results. This presentation provided BECo the opportunity to respond to questions posed under Item 1 Section 3.2 - "Installation of A Direct Torus Vent System WDTVS)" in Mr.

Varga's letter to Mr. Bird of August 21, 1987 "Initial Assessment of Pilgrim Safety Enhancement Program". The material presented was made available to the resident Inspector and was included as Attachment II in NRC Inspection.Report

  1. 88-12, dated May 31, 1988.

As you are aware from plant inspections we have installed the DTVS piping and portions of related control wiring. Currently, the DTVS is isolated from the Standby Gas Treatment System (SBGTS) by blind flanges installed in place of Valve AO-5025 and the DTVS rupture disk. This configuration was inspected by NRR in the performance of a technical review which focused on System, Mechanical Design and Structural Design issues. The review took place on March

2-3, 1988 as documented in NRC Inspection Report #88-07, dated May 6, 1988 and determined the installation configuration to be acceptable. He now plan to remove these blind flanges and proceed with installation of Valve AO-5025 and the DTVS rupture disk. We conclude the valve and rupture disk provide equivalent physical isolation of the DTVS piping from the SBGTS and appropriately ensure the operational integrity of the SBGTS under design basis accident conditions. Following completion of this work, we will perform a local leak rate test to verify that Valve AO-5025 is acceptably leak tight using the same method previously utilized in testing the blind flange. He also plan to complete all remaining electrical work on the DTVS in accordance with the revised design.

PDR ADOCK 05000293

BOSTON EDISON COMPANY

August 18, 1988 U.S. Nuclear Regulatory Commission Page 2 On the basis of the revised Section 3.2, we conclude that the DTVS design as described In the enclosure does not require any change to the Technical Specifications and that we can proceed with installation without prior NRC

approval.

Please feel free to contact me or Mr. J. E. Howard, of my staff at (617)

849-8900 if you have any questions pertaining to the design details of the DTYS.

G. rd Attachment: Section 3.2 Revision 1 NInstallation Of A Direct Torus Vent System (DTVS)"'

JEH/amm/2282 cc: Mr. D. McDonald, Project Manager Divisi'on'of Reactor Projects II.

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Station P1-137 Washington, D.C. 20555 U. S. Nuclear Regulatory Commission Region I

475 Allendale Road King of Prussia, PA 19406 Senior NRC Resident Inspector Pilgrim Nuclear Power Station

Attachment to BECo Letter 88-126 Section 3.2 Revision 1 "Installation Of A Direct Torus Vent System (DTVS)N

pages 14, 15, 16, 17, 18, 19, 19A, 198 K

3.2 INSTALLATION OF A DIRECT TORUS VENT SYSTEM COTVS)

3.2.1 Obiective of Design Change This design change provides the ability for direct venting of the torus' to the main 'stack'. Cbntainment venting is one core damage prevention strategy utilized in the SWHROwners Group Emergency Procedure Guidelines (EPGs) as previously approved by the NRC and is required in plant-specific Emergency Operating Procedures (EOPs).

The torus vent line connecting the torus to the main stack will provide an alternate vent path for implementing EOP requirements and represents a significant improvement relative to existing plant vent capability. For 56 psi saturated steam conditions in the torus, apporoximately 11 decay heat can be vented.

3.2.2 Design Change Description This design change (Figure 3.2-1) provides a direct vent path from the torus to the main stack bypassing the Standby Gas Treatment System (SBGTS). The bypass is an

8" line whose upstream end is connected to the pipe between primary containment isolation valves AO-5042 A &

B. The downstream end of the bypass is connected to the

20" main stack line downstream of SBGTS valves AON-108 and AON-112. An 8" butterfly valve (A0-5025), which can be remotely operated from the main control room, is added downstream of 8" valve AO-5042B. This valve acts as the primary containment outboard isolation valve for the direct torus vent line and will conform to NRC

requirements for sealed closed isolation valves as defined in NUREG 0800 SRP 6.2.4. The new pipe is ASME

III Class 2 up to and inclusive of valve AO-5025. Test connections are provided upstream and downstream of AO-5025.

The design change replaces the existing AC solenoid valve for AO-5042B with a DC solenoid valve (powered from essential 125 volt DC), to ensure operability without dependence on AC power. The new isolation valve, AO-5025, is also provided with a DC solenoid powered from the redundant 125 volt DC source. Both of these valves are normally closed and fail closed on loss of electrical and pneumatic power. One inch nitrogen lines are added to provide nitrogen to valves AO-5042B and AO-5025. New valve AO-5025 will be controlled by a remote manual key-locked control switch. During normal operation, power to the AO-5025 DC solenoid will also be disabled by removal of fuses in the wiring to the solenoid valve.

This satisfies NUREG 0800 SRP 6.2.4, Containment Isolation System acceptance criteria for a sealed closed barrier. An additional fuse will be installed and remain in place to power valve status indication for AO-5025 in the main control room.

-14- Rev. 1 (7/25/88)

NUREG 0800, SRP 6.2.4, Item 1I.6.F allows the use of sealed closed barriers in place of automatic isolation valves. Sealed closed barriers include blind flanges and sealed closed isolation valves which may be closed remote-manual valves. SRP 6.2.4 calls for administrative control to assure that sealed closed isolation valves cannot be inadvertently opened. This includes mechanical devices to seal or lock the valve closed, or to prevent power from being supplied to the valve operator.

Consistent with SRP 6.2.4, valve AO-5025 will be a sealed closed remote manual valve under administrative control to assure that it cannot be inadvertently opened.

Administrative control will be maintained by a key-locked remote manual control switch and a fuse removed to prevent power from being supplied to the valve operator.

In accordance with NUREG 0737, Item II.E.4.2.7 Position

6, AO-5025 will be sealed closed and verified as such at least every 31 days.

A 20"S pipe will replace the existing 20N diameter duct between SBGTS valves AON-108, AON-112 and the existing

20" pipe to the main stack. The existing 20" diameter duct downstream of AO-5042A is shortened to allow fitup of the new vent line branch connection.

A rupture disk will be included in the 8S piping

  • downstream of valve AO-5025. The rupture disk will provide a second leakage barrier. The rupture disk is designed to open below containment design pressure, but will be intact up to pressures equal to or greater than those which cause an automatic containment isolation during any accident conditions.

The two Primary Containment Isolation Valves (PCIMs)

AO-50428 and AO-5025 are placed in series with the rupture disk. No single operator error in valve operation can activate the DTVS. The rupture disk has a rupture pressure above the automatic containment high pressure trip point. Thus, the inboard PCIV (AO-5042B)

will receive an automatic isolation prior to disk rupture. The inboard PCIV (AO-5042B) requires physical electrical jumper installation to open at primary containment pressure above the automatic high pressure trip point.

Valve AO-5025 will be closed whenever primary containment integrity is required and'DC power to its solenoid control valve will be disconnected. Indication of valve position will be provided in the main control room even with the valve power removed. Use of the direct torus vent will be in accordance with approved EPG requirements and controlled by EOPs in the same manner as other existing containment vent paths. Prior to opening the vent valves the SBGT system will be shutdown and valves AON-108 and AON-112 (the outlet of SBGT) placed in a-,,

closed position. V

-15- Rev. 1 (7/25/88)

New 8" vent pipe (8"-HBS-44), including valve AO-5025 is safety related. Vent piping downstream of AO-5025, including SBGTS discharge piping to main stack, is also safety related. All safety related piping will be supported as Class I. Nitrogen piping is non-safety related and will be supported as Class II/I.

The Interpretation of the Class II/I designation through this report is given below:

All Class II items which have the potential to degrade the integrity of a Class I item are analyzed. Such Class II items do not require dependable mechanical or electrical functionality during SSE. only that all of the following conditions prevail:

1. The Class II items create no missiles which impact unprotected Class I Items safety functions.

2. The Class II item does not deform in a way which would degrade a Class I item.

3. If the Class II item fails, then the Class I item is protected against the full impact of all missiles generated by the assumed failure of Class II items.

All electrical portions of this design are safety related except for the indicating lights on the MIMIC panel C904, the tie-ins to the annunciator, and interface with the plant computer.

3.2.3 Design Change Evaluation

3.2.3.1 Systems/Components Affected Containment Atmospheric Control System (CACS)

The torus purge exhaust line inboard isolation valve AO-50428 and the associated 80 pipe are the components of the CACS affected by the design modification. With incorporation of the subject modification, the CACS will depend on both essential AC (for valve AO-5042A) and essential DC (far AO-5042B) to perform its purging function.

The new 8" torus vent line will be connected to existing 8" CACS piping between valves AO-50429 and AO-5042A.

-16- Rev. 1 (7/25/88)

Standby Gas Treatment System (SBGTS)

The SBGTS fan outlet valves (AON-108 and AON-112), ductwork from these valves to the 20"

line leading to the main stack, and the 20K

line leading to the main stack are the components of this system affected by the proposed change.

Valve AON-108 is normally closed, fail-open.

Valve AON-112 is normally closed, fail-closed, and these valves are provided with essential DC

power and local safety related air supplies.

Primary Containment Isolation System (PCIS)

Valve AO-5042B is affected by the change from AC to DC power for the solenoid and by replacement of the existing air supply with nitrogen. The addition of containment outboard isolation valve (AO-5025) will not affect the PCIS.

Primary Containment System (PCS)

Valve AO-5025 acts as the primary containment outboard isolation valve for the direct torus vent line and will conform to NRC requirements for sealed closed isolation valves as defined in NUREG 0800 SRP 6.2.4.

3.2.3.2 Safety Functions of Affected Systems/Components Containment Atmospheric Control System This system has the safety function of reducing the possibility of an energy release within the primary containment from a Hydrogen-Oxygen reaction following a postulated LOCA combined with degraded Core Standby Cooling System.

Standby Gas Treatment System This system filters exhaust air from the reactor building and discharges the processed air to the main stack. The system filters particulates and iodines from the exhaust stream in order to reduce the level of airborne contamination released to the environs via the main stack. The SBGTS can also filter exhaust air from the drywell and the suppression pool.

_1 7_ -17- Rev. 1 (7125188)

4. .,

Primary ntainment Isolation System This system provides timely protection against the onset and consequences of design basis accidents involving the gross release of radioactive materials from the primary containment by initiating automatic isolation of appropriate pipelines which penetrate the primary containment whenever monitored variables exceed pre-selected operational

111its.

Primary Containment System The primary containment system, in conjunction with other safeguard features, limits the release of fission products In the event of a postulated design basis accident so that offsite doses do not exceed the guideline values of 10 CFR 100.

3.2.3.3 Potential Effects on Safety Functions Containment Atmospheric Control SystemStandby Gas Treatment System. Primary Containment Isolation System and Primary Containment System The improvements change the AO-50428 solenoid control from AC to DC enabling it to open (from its normally closed position) with no dependence on AC power availability. The existing air supply to AO-5042B is being replaced by nitrogen.

Ductwork at the outlet of the SBGTS is replaced with pipe and the new vent line is connected to the 200 line at the outlet of the SBGTS.

Addition of a new 80 vent line with containment isolation valve AO-5025 offthe existing torus vent line could introduce a flow path under design basis conditions that could vent the containment directly to the stack bypassing the SBGTS.

3.2.3.4 Analysis of Effects on Safety Functions An analysis of the effects on the safety functions of CACS, SBGTS, PCIS and PCS for the installation of the direct torus vent is described as follows:

The change from AC to DC control and the replacements of air with nitrogen on AO-5042B

does not adversely affect the ability to open AO-50428 when the containment is being purged, or to isolate under accident conditions.

-18- Rev. 1 (7/25/88)

The modifications to the ductwork and 200 line leading to the main stack do not affect the design basis safety function of any of the safety related systems.

During normal plant operations, the CACS and the SBGTS do not use the torus 200 purge and vent line to perform their safety functions.

The containment isolation valves are in their normally closed position, thus maintaining primary containment boundary integrity.

There are no adverse affects on the primary containment system by the addition of the DTVS. Valve AO-5025 will conform to NRC

criteria for sealed closed isolation valves as defined in NUREG 0800 SRP 6.2.4 and will not affect design basis accidents. Use of the DTVS

will be in accordance with the containment venting provisions of EPGs as approved by the NRC and controlled by EOPs in the same manner as other existing containment vent paths. The effects on the torus of the new 80 piping and AO-5025 have been evaluated for Mark I program loadings, using ASME BPVC Section III

criteria. The remaining piping including the rupture disk was evaluated using ANSI B31.1 requirements.

During plant startup and shutdown (non-emergency condition) when the purge and vent line is in use, valve AO-5025 remains closed. In addition, the rupture disk downstream Qf valve AO-5025 will provide a second positive means of preventing leakage and prevent direct release up to the stack during containment purge and vent at plant startup or shutdown.

During containment high pressure conditions, the torus main exhaust line is automatically isolated by the PCIS. There is no change to the existing primary containment isolation system function for AO-5042A or AO-5042B. The sealed closed position of valve AO-5025 and the additional assurance added by the rupture disk downstream will prevent any inadvertent discharge up the stack for all design basis accident conditions.

3.2.3.5 Design Change Evaluation Summary Conclusions

- Installation of the DTVS does not adversely affect the safety functions of the CACS, SBGTS,

PCIS or the integrity of primary containment or any other safety related systems.

-19- Rev. 1 (7/25/88)

Use of the DTVS will be In accordance with the containment venting provisions of EPGs as approved by the NRC and controlled by EOPs in the same manner as other existing containment vent paths. The DTVS provides an improved containment venting capability for decay heat removal which reduces potential onsite and offsete impacts relative to the existing containment venting capability.

-19A- Rev. 1 (7/25/88)

U,

-DIRECT 7ORUS VEwNT SYSTEM

FIGURE 32-1 REMOTE

K"NUAL

SW sr I

I (

I /(DISKC

RUPTURE

.4 1 I

-eoog OaY M . /

F .( .

OMCTPIPE -

-~ EXISTING

9AE97ya NEW PIPE

RPF.V X.

IL 2/ i

4. i Enclosure 2 LIST OF RECENTLY ISSUED GENERIC LETTERS

Generi c Date of Letter No. SubJect Issuance Issued To

89-16 INSTALLATION OF A HARDENED 09/01/89 ALL GE PLANTS

WETWELL VENT (GENERIC

LETTER 89-16)

88-20 GENERIC LETTER 88-20 08/29/89 ALL LICENSEES

SUPPLEMENT 1 SUPPLEMENT NO. 1 HOLDING OPERATING

(INITIATION OF THE INDIVIDUAL LICENSES AND

PLANT EXAMINATION FORSEVERE CONSTRUCTION

VULNERA8ILITIES 10 CFR 50.54(f)) PERMITS FOR

NUCLEAR POWER

REACTOR FACILITIES

89-15 EMERGENCY RESPONSE DATA 08/21/89 ALL HOLDERS OF

SYSTEM GENERIC LETTER NO. OPERATING LICENSES

89-15 OR CONSTRUCTION

PERMITS FOR NUCLEAR

POWER PLANTS

CORRECT ACCESSION NUM8ER IS 8908220423

89-07 SUPPLEMENT 1 TO GENERIC 08/21/89 ALL LICENSEES OF

LETTER 89-07 'POWER REACTOR OPERATING PLANTS,

SAFEGUARDS CONTINGENCY APPLICANTS FOR

PLANNING FOR SURFACE OPERATING LICENSES,

VEHICLE BOMBS- AND HOLDERS OF

CONSTRUCTION PERMITS

89-14 LINE-ITEMS TECHNICAL SPECIFI- 08/21/89 ALL LICENSEES OF

CATION IMPROVEMENT - REMOVAL OPERATING PLANTS,

OF 3.25 LIMIT ON EXTENDING APPLICANTS FOR

SURVEILLANCE INTERVALS OPERATING LICENSES,

(GENERIC LETTER 89-14) AND HOLDERS OF

CONSTRUCTION PERMITS

89-13 GENERIC LETTER 89-13 7/18/89 LICEMIEES TO ALL

SERVICE WATER SYSTEMS POWEWtREACTORS

PROBLEMS AFFECTING BWRS, PWRS, AND

SAFETY-RELATED EQUIPMENT VENDORS IN ADDITION

TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

89-12 GENERIC LETTER 89-12: 7/6/89 LICENSEES TO ALL

OPERATOR LICENSING POWER REACTORS

EXAMINATIONS BYRS. PWRS, AND

VENDORS IN ADDITION

TO GENERAL CODES

APPLICABLE TO

GENERIC LETTERS

UNITED STATES FIRST CLASS MAIL

NUCLEAR REGULATORY COMMISSION POSTAGE & FEES PAID

WASHINGTON, D.C. 20556 USNRC

PERMIT No. 047 OFFICIAL BUSINESS

PENALTY FOR PRIVATE USE, $300

_ - e 5 cc w/enclosure:

J. Taylor H. Thompson ivision Directors, NRR

A sociate Directors, NRR

Pr ject Directors, NRR

Reg onal Administrators J. C nran, CRGR

C. Be linger S. Tre 4 N'd'

SPLB:D SP T SPLB:DEST SAD:DEST NRR:OGCB

CLi;cfM 1 JKudrick CMcCracken AThadani CBerlinger

8/of/89 8cv\/89 8/Z 189 8/ /89 8/ /89 NRR:DOEA NRR:PD1-2 NRR:DRP RR:ADT NRR:ADP

CRossi MThadani SVarga F!iraglia JPartlow

8/ /89 8/ /89 8/ /89 8/\ /89 8/ /89

Template:GL-Nav