CFR 50.59 Report (January-December 2001)
ML023610207
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/20/2002
From: Bauer S
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-04875-SAB/TNW/CJJ
Download: ML023610207 (37)


Text

ýL A F Scott A. Bauer 10 CFR 50.59 Department Leader Regulatory Affairs Tel 623/393-5978 Mail Station 7636 Palo Verde Nuclear Fax 623/393-5442 P 0 Box 52034 Generating Station e-mail sbauer@apsc corn Phoenix, AZ 85072-2034 102-04875-SAB/TNW/CJJ December 20, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2,-& 3 Docket Nos. STN 50-528/529/530 10 CFR 50.59 Report (January-December 2001)

Pursuant to 10 CFR 50.59(d)(2), Arizona Public Service Company is submitting the enclosed report. In the past the 50.59 Report contained only the 50.59s that had been statused as having the evaluated action completed in the plant. The enclosed report contains all 50.59s that have been written in previous years, but the evaluated action may not have been completed in the plant. Future reports will contain all 50.59s written in the specified year, regardless of the status of the evaluated action.

The enclosed report contains a brief description of the changes and a brief summary of the safety evaluation for each change.

No commitments are being made to the NRC by this letter.

Should you have any questions, please contact Thomas N. Weber at (623) 393-5764.

Sincerely, SAB/TNW/CJJ/kg

&O 1,.e Enclosure cc:

E. W. Merschoff J. N. Donohew N. L. Salgado A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway 0 Comanche Peak 9 Diablo Canyon

  • Palo Verde
  • South Texas Project 0 Wolf Creek

ENCLOSURE PALO VERDE NUCLEAR GENERATING STATION ACRONYM/ABBREVIATION DEFINITION SHEET AND 10 CFR 50.59 REPORT JANUARY - DECEMBER 2001

Acronym/Abbreviation Definition Sheet AC Altemate Current ADV Atmospheric Dump Valve BAMP Boric Acid Makeup Pump BDAS Boron Dilution Alarm System BOP Balance of Plant CD Condensate CEA Control Element Assembly CENTS Combustion Engineering Nuclear Transient Simulation COLSS Core Operating Limit Supervisory System CRACS Chemical and Radiological Analysis Computer System CRDR Condition Report/Disposition Request CS Containment Spray CTMT Containment CVCS Chemical Volume Control System CW Circulation Water DNBR Departure from Nuclear Boiling Rate DS Domestic Water System DW Demineralized Water System ED Extraction Steam System EDG Emergency Diesel Generator EQ Equipment Qualification ERFDADS Emergency Response Facility Data Acquisition Data System ESF Engineered Safety Features ESFAS Engineered Safety Feature Actuation System ESPS Essential Spray Pond System EW Essential Cooling Water FAC Flow Accelerated Corrosion HPSI High Pressure Safety Injection HVAC Heating, Ventilation, Air Conditioning IA Instrument Air ICI In-Core Instrumentation ISFSI Independent Spent Fuel Storage Installation ISI In-Service Inspection LBLOCA Large Break Loss-of-Coolant Accident LDCR Licensing Document Change Request LLRT Local Leak Rate Test LPSI Low Pressure Safety Injection MNSA Mechanical Nozzle Seal Assembly MSFIS Main Steam and Feedwater Isolation System MSSS Main Steam Support Structure NC Nuclear Cooling Water System PA Protected Area PASS Post Accident Sampling System PLHGR Peak Linear Heat Generation Heat Rate PPS Plant Protection System PREACS Pump Room Exhaust Air Cleanup System PU Power Uprate PVNGS Palo Verde Nuclear Generating Station RCP Reactor Coolant Pump RCS Reactor Coolant System RDT Reactor Drain Tank RMWP Reactor Makeup Water Pump RSG Replacement Steam Generator RTD Resistance Thermal Detection RWT Refueling Water Tank SDC Shutdown Cooling SESS Safety Equipment Status System SFP Spent Fuel Pool SGR Steam Generator Replacement SM Seismic Monitoring System SRM Startup Range Monitors STP Sewage Treatment Plan TMOD Temporary Modification TRH Temporary Reactor Head TRM Technical Requirements Manual TSP Tri-Sodium Phosphate UFM Ultrasonic Flow Measurement UGSLR Upper Guide Structure Lift Rig

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 95-00066 ENG 216569 This modification deleted the snubbers and replaced This does not introduce an unreviewed safety question. No them with rigid supports, deleted a rigid strut, and re-changes to the TSs are required. The probability/consequence enforced supports on ESF pump suction lines in the of accidents previously evaluated have not been increased. The Safety Injection system from containment penetration probability/consequence of a malfunction to equipment important to the low pressure safety injection (LPSI) pump, high to safety have not been increased. The possibility of a different pressure safety injection (HPSI) pump, and type of accident or malfunction has not been created. The containment spray (CS) pump suction nozzles.

margin of safety as defined in the basis of the TSs has not been reduced.

95-00194 ENG 216939 This modification implemented a snubber reduction This does not introduce an unreviewed safety question. No for the B ESF pump suction which included deleting, changes to the TSs are required. The probability/consequence replacing and re-enforcing various components of accidents previously evaluated have not been increased. The (snubbers).

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

95-00269 ENG 217327 This modification removed the handjack assembly for This does not introduce an unreviewed safety question. No valves CHBUVO515 & 16 and replaced the handjack changes to the TSs are required. The probability/consequence assembly on valve CHBUV0523.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

95-00323 ENG Various These modifications installed temperature monitors in This does not introduce an unreviewed safety question. No each unit. The purpose of these monitors was to changes to the TSs are required. The probability/consequence obtain actual temperature data for equipment within of accidents previously evaluated have not been increased. The the 10OCFR 50.49 EQ Program and to be used to probability/consequence of a malfunction to equipment important S*,

more accurately determine their qualified lives, to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

96-00219 ENG 218210 The purpose of this modification was to implement a This does not introduce an unreviewed safety question. No change to the Upper Guide Structure Lift Rig changes to the TSs are required. The probability/consequence (UGSLR) guide pin bushings that has been of accidents previously evaluated have not been increased. The developed and justified by the Vendor, ABB/CE; and probability/consequence of a malfunction to equipment important has been reviewed and approved by PVNGS to safety have not been increased. The possibility of a different Engineering.

type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 1

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 96-00221 ENG 217943 This modification provided the new stud design for This does not introduce an unreviewed safety question. No the steam generator 6 & 7" handholes, as well as the changes to the TSs are required. The probability/consequence proper tensioning pressure ranges for both 6 & 7" of accidents previously evaluated have not been increased. The handholes and the secondary manway.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

96-00256 ENG 217685 This modification eliminated the gate valve pressure This does not introduce an unreviewed safety question. No locking concern identified in Generic Letter 95-07 with changes to the TSs are required. The probability/consequence respect to the shutdown cooling outboard of accidents previously evaluated have not been increased. The containment isolation valves, 13JSIAUVO655 and probability/consequence of a malfunction to equipment important 13JSIBUVO656.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been

_reduced.

96-00262 LDCR 3611 This LDCR updated the UFSAR to reflect This does not introduce an unreviewed safety question.

No modification that added a flow path from the changes to the TSs are required. The probability/consequence Blowdown Heat Exchanger, CD/CW overboard, and of accidents previously evaluated have not been increased. The the condensate system to the retention basin.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

96-00265 ENG 218029 This modification removed components of the This does not introduce an unreviewed safety question. No CRACS that are no longer used by Chemistry.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

97-00099 ENG 218325 This modification replaced the nitrogen pressure This does not introduce an unreviewed safety question. No regulator to the Reactor Drain Tank (RDT).

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 2

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 97-00108 ENG 218621 This modification converted the refrigerant on the This does not introduce an unreviewed safety question.

No PVNGS normal chillers from Refrigerant 12 (CFC-changes to the TSs are required. The probability/consequence based) to R-134a (non CFC-based). The conversion of accidents previously evaluated have not been increased. The consisted of replacing the gearset, refrigerant, probability/consequence of a malfunction to equipment important refrigerant oil, and several O-rings.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

97-00129 ENG 218059 This modification to LPSI Flow Control valves This does not introduce an unreviewed safety question.

No (JSIBUV615/625 & JSIAUV635/645) slowed down the changes to the TSs are required. The probability/consequence stem travel speed by increasing the overall gear ratio of accidents previously evaluated have not been increased. The from 53.71 to 95.53. The change in the gear ratio probability/consequence of a malfunction to equipment important was accomplished by replacing the motor pinion and to safety have not been increased. The possibility of a different worm shaft clutch gears.

type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

97-00174 LDCR 3815 This LDCR updated the UFSAR to replace the This does not introduce an unreviewed safety question.

No existing class 1 E batteries (AT&T round cells) with changes to the TSs are required. The probability/consequence rectangular cells in all three units.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different

,A type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

97-00239 ENG 218724 This modification replaced the chemical waste This does not introduce an unreviewed safety question.

No neutralization tanks and neutralization transfer pump changes to the TSs are required. The probability/consequence piping in Units 1, 2 & 3 with Alloy 20 pipe.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

97-00266 ENG 218973 This modification provided a low point drain from the This does not introduce an unreviewed safety question.

No HVAC exhaust ductwork in the 'A' train concentrate changes to the TSs are required. The probability/consequence monitor tank room.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 3

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 98-00047 TMOD 1-Cl-1998-006, These TMODS temporarily defeated the Turbine This does not introduce an unreviewed safety question. No 2-Cl-1998-003 Building Acid Storage Tanks Low-Low level switch.

changes to the TSs are required. The probability/consequence The level switch was malfunctioning due to corrosion. of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

98-00055 LDCR 98-FOO5, 98-These LDCRs for the TS, TS Bases and the UFSAR This does not introduce an unreviewed safety question.

T002, 00-B014 incorporated new SG low flow reactor trip setpoints to Changes to the TSs have received NRC approval. The increase the allowable operating range.

probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

98-00101 CRDR 34371 This CRDR evaluated compensatory measures that This does not introduce an unreviewed safety question. No "were implemented to address leaking conduit seals changes to the TSs are required. The probability/consequence and to prevent the degradation of safety related of accidents previously evaluated have not been increased. The equipment on the 80 ft. elevation of the MSSS probability/consequence of a malfunction to equipment important building if a flood were to occur on the 100 ft.

to safety have not been increased. The possibility of a different elevation.

type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

98-00154 LDCR 98-F080, 98-These LDCRs made revisions to the UFSAR, TS This does not introduce an unreviewed safety question.

F120, 98-T008, Bases, and Technical Specifications. The revision Changes to the TSs have received NRC approval. The 98-B007 enhanced the means of complying with the probability/consequence of accidents previously evaluated have requirements of Regulatory Guide 1.93 for offsite not been increased. The probability/consequence of a power source.

malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

98-00177 CRDR 35638 This CRDR was for an Operability Evaluation. The This does not introduce an unreviewed safety question. No Evaluation provided the basis for determining changes to the TSs are required. The probability/consequence operability of the ESF PREACS (Engineered Safety of accidents previously evaluated have not been increased. The Feature Pump Room Exhaust Air Cleanup System) probability/consequence of a malfunction to equipment important during the performance of PM tasks.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 4

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 99-00019 LDCR 99-F007 This LDCR updated the UFSAR to document This does not introduce an unreviewed safety question.

No correction factors to COLSS to correct for the effects changes to the TSs are required. The probability/consequence of feedwater flow meter Venturi Fouling.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00021 ENG 806536 This modification installed and removed temporary This does not introduce an unreviewed safety question.

No power during the replacement of the 125 VDC, class changes to the TSs are required. The probability/consequence 1 E, PK system, AT&T round cell batteries and battery of accidents previously evaluated have not been increased. The racks with rectangular cell batteries and battery racks probability/consequence of a malfunction to equipment important in all 3 units.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00033 LDCR 99-F013 This revision to the UFSAR incorporated changes This does not introduce an unreviewed safety question.

No made by modification 736528. This modification changes to the TSs are required. The probability/consequence removed the humidifiers on the 140 foot elevation of of accidents previously evaluated have not been increased. The the Auxiliary Building.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00071 LDCR 98-F108 This LDCR for the UFSAR was issued to document This does not introduce an unreviewed safety question.

No revised calculated radionuclide inventories that reflect changes to the TSs are required. The probability/consequence implementation of 2% stretch power for the Palo of accidents previously evaluated have not been increased. The Verde units, and reflect small changes in isotopic probability/consequence of a malfunction to equipment important inventories within existing equipment.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00090 ENG 220697 This modification added a permanent ammonium This does not introduce an unreviewed safety question.

No chloride injection system to the condensate system to changes to the TSs are required. The probability/consequence reduce tube corrosion.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 5

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 99-00100 ENG 221063 This modification installed permanent personnel This does not introduce an unreviewed safety question. No access platforms adjacent to the steam generators.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00102 CMWRF 221713 This modification installed Cathodic Protection for the This does not introduce an unreviewed safety question. No new cooling tower make-up bypass line.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

99-00103 LDCRs 99-F030, 99-These LDCRs will revise the UFSAR, TS Bases and This does not introduce an unreviewed safety question.

B017, 99-TO1"0 the TSs as a result of changes related to Changes to the TSs have received NRC approval. The reclassification of HPSI hot and cold leg instrument probability/consequence of accidents previously evaluated have flow loops JSIB-FLOOP0311/0321, JSIA-not been increased. The probability/consequence of a FLOOP0331/0341, JSIA-FLOOP0390 and JSIB-malfunction to equipment important to safety have not been FLOOP0391 as Regulatory Guide 1.97 Type A-1 increased. The possibility of a different type of accident or variables from their current classification as malfunction has not been created. The margin of safety as Regulatory Guide 1.97 Type D-2 variables, defined in the basis of the TSs has not been reduced.

99-00112 ENG 219879 This modification replaced the domestic hot water This does not introduce an unreviewed safety question. No heaters on the 140 foot elevation of the Auxiliary changes to the TSs are required. The probability/consequence Building in all three Units.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00118 ENG 2220156 This modification on the BOP-ESFAS cabinets This does not introduce an unreviewed safety question. No enhanced the level of redundancy in the AC power changes to the TSs are required. The probability/consequence sources to the cabinet cooling fans.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 6

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 99-00126 CRDR 104202 This CRDR evaluated the introduction of transient This does not introduce an unreviewed safety question. No materials inside the Containment Building during changes to the TSs are required. The probability/consequence plant Modes 3 and 4 to facilitate outage related of accidents previously evaluated have not been increased. The activities, probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00131 ENG 219505 This modification will replace existing chiller control This does not introduce an unreviewed safety question. No panels on the normal chillers with microprocessor changes to the TSs are required. The probability/consequence based control units.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00141 ENG 218709 This modification increased the condensate sodium This does not introduce an unreviewed safety question. No analyzers measuring range from 1,000 ppb to 10,000 changes to the TSs are required. The probability/consequence ppb.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

99-00145 LDCR 99-F073 This LDCR updated the UFSAR to document This does not introduce an unreviewed safety question. No modifications to the RCS Hot Leg instrument nozzles. changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00147 LDCR 99-F061 This LDCR for the UFSAR reduced the credited This does not introduce an unreviewed safety question. No number of incore instrument strings used by COLSS changes to the TSs are required. The probability/consequence to determine core power distribution from 61 to 50.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 7

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 99-00157 PROC 74OP-9SPO1 This procedure provides instructions to install and This does not introduce an unreviewed safety question.

No operate chemical addition equipment at each spray changes to the TSs are required. The probability/consequence pond.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

99-00161 LDCR 01-F024 This LDCR updated the UFSAR to document that This does not introduce an unreviewed safety question.

No there is an evaluated exception, for certain cables, to changes to the TSs are required. The probability/consequence the UFSAR stated condition regarding the IEEE 383 of accidents previously evaluated have not been increased. The flame retardant rating.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

99-00167 ENG 219210 This modification replaced transmitters This does not introduce an unreviewed safety question.

No 1,2,3JRCNPT0100X and 1,2,3JRCNPT0100Y Barton changes to the TSs are required. The probability/consequence Model 763/763A Pressure Transmitters with of accidents previously evaluated have not been increased. The Rosemount Model 1152GP9N92PB.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00001 ENG 220997 This modification modifies the condensate This does not introduce an unreviewed safety question.

No demineralizer rinse line piping and valves to eliminate changes to the TSs are required. The probability/consequence vibration and water hammer concerns, of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00010 LDCR 00-FOO8 This LDCR revised the UFSAR to reflect that ASME This does not introduce an unreviewed safety question.

No Class MC components are examined in accordance changes to the TSs are required. The probability/consequence with ASME Code Section Xl, Subsection IWE, except of accidents previously evaluated have not been increased. The as modified and supplemented by 10 CFR 50.55a.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

Page 8

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00014 ENG 225835 This modification replaced Inconel A-600 RCS Hot This does not introduce an unreviewed safety question.

No Leg Instrument Nozzles in Unit 3.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00016 ENG 218214 This modification replaced the hydrogen purge This does not introduce an unreviewed safety question.

No system exhaust pressure regulating valve with an changes to the TSs are required. The probability/consequence equivalent valve in Unit 3.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00017 ENG 221147 This modification installed an impressed current This does not introduce an unreviewed safety question.

No Cathodic Protection System on Unit 3 Cooling Tower changes to the TSs are required. The probability/consequence 2 and installed sacrificial anodes on all of the columns of accidents previously evaluated have not been increased. The on Unit 3 Cooling Towers 1, 2, and 3 to protect the probability/consequence of a malfunction to equipment important underwater sections of the columns.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00018 LDCR 00-F012 This LDCR to the UFSAR documented upgrading the This does not introduce an unreviewed safety question.

No existing spent fuel pool gate seal design for the Cask changes to the TSs are required. The probability/consequence Loading Pit and Decon Washdown Area gates.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00019 ENG 218297 This modification removed the flow indicating This does not introduce an unreviewed safety question.

No switches on the condensate pump seal water and changes to the TSs are required. The probability/consequence replaced them with flow indicators (Unit 1 only).

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been ireduced.

Page 9

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00020 ENG 218695 This modification provided temporary power to six This does not introduce an unreviewed safety question. No loads during the replacement of the existing 125 changes to the TSs are required. The probability/consequence VDC, PK system, AT&T round cell batteries and of accidents previously evaluated have not been increased. The battery racks in all three units.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been

_ reduced.

00-00029 ENG 218271 This modification modified the vibration and loose This does not introduce an unreviewed safety question. No parts monitoring system to provide better system changes to the TSs are required. The probability/consequence reliability, of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00034 ENG 218452 This modification changed the level control setpoints This does not introduce an unreviewed safety question. No of the EW expansion tank.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00037 LDCR 00-F021 This LDCR revised the UFSAR to reflect an This does not introduce an unreviewed safety question. No organizational change within the Radiation Protection changes to the TSs are required. The probability/consequence Department.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00041 LDCR 99-BO16 This LDCR for the TS Bases identified solenoid This does not introduce an unreviewed safety question.

No operated Containment Isolation Valves with relay changes to the TSs are required. The probability/consequence driven SESS/ERFDADS indication and included a of accidents previously evaluated have not been increased. The discussion of the loss of control power's impact to probability/consequence of a malfunction to equipment important these valves SESS/ERFDADS indication, to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 10

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00045 ENG 225139 This modification replaced carbon steel piping This does not introduce an unreviewed safety question.

No components with stainless steel in the ED system to changes to the TSs are required. The probability/consequence address erosion/corrosion considerations.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

00-00049 LDCR 00-R004 This LDCR for the Technical Requirements Manual This does not introduce an unreviewed safety question.

No (TRM) eliminated Surveillance Requirement TSR changes to the TSs are required. The probability/consequence 3.8.101.3.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

00-00050 ENG 219026 This modification replaced 1-600 RCS Hot Leg This does not introduce an unreviewed safety question.

No Instrument Nozzles in Unit 2.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00052 DI 233788 This modification allowed operation of the fuel This does not introduce an unreviewed safety question.

No transfer system upender with a defective upender changes to the TSs are required. The probability/consequence limit switch of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00060 LDCR 00-T003, 00-These LDCRs revised LCO 3.9.5 and its associated This does not introduce an unreviewed safety question.

B005 bases. The revision added a note to the Technical Changes to the TSs have received NRC approval. The Specification LCO that existed in LCOs 3.4.7 and probability/consequence of accidents previously evaluated have 3.4.8 which allowed the non-operating SDC loop to be not been increased. The probability/consequence of a inoperable for up to two hours for surveillance testing. malfunction to equipment important to safety have not been The bases will be revised with supporting information, increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 11

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00062 LDCRs 00-BOl 5, 00-These LDCR revisions to the TS Bases and the This does not introduce an unreviewed safety question. No F046 UFSAR were the result of a revision to Calculation 13-changes to the TSs are required. The probability/consequence MC-CH-601. The TS Bases and the UFSAR of accidents previously evaluated have not been increased. The description of the time required to borate to 1% delta-probability/consequence of a malfunction to equipment important k/k of negative reactivity was changed from 35 to safety have not been increased. The possibility of a different minutes to "less than 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />."

type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

00-00063 ENG 219019 This modification removed obsolete digital pressure This does not introduce an unreviewed safety question. No indicators in the Auxiliary and Turbine Building Cold changes to the TSs are required. The probability/consequence Labs.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00066 LDCR 00-F017 This LDCR revised UFSAR Chapters 1 and 15 to This does not introduce an unreviewed safety question. No add an option to use the CENTS code for safety changes to the TSs are required. The probability/consequence analysis calculations in addition to the currently of accidents previously evaluated have not been increased. The licensed CESEC code.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00067 LDCR 00-F016, 00-These LDCRs for the TSs, the TRM and the UFSAR This does not introduce an unreviewed safety question.

B004, 00-TO01 were issued as a result of the DNBR Safety Limit Changes to the TSs have received NRC approval. The being increased from 1.30 to 1.34 to accommodate probability/consequence of accidents previously evaluated have increased DNBR sensitivity to uncertainties in inlet not been increased. The probability/consequence of a flow to the hot assembly and adjacent assemblies, malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00079 LDCR 00-T012, 00-These LDCRs for the TS, TRM and the UFSAR were This does not introduce an unreviewed safety question.

R009, 00-F048 the result of calculation revisions. The calculations Changes to the TSs have received NRC approval. The determine the maximum differential pressure drop probability/consequence of accidents previously evaluated have when the filters are dirty while maintaining the not been increased. The probability/consequence of a required minimum design airflow, malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 12

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00081 ENG 226818 This modification added Ultrasonic Flow This does not introduce an unreviewed safety question. No Measurement (UFM) devices to provide feedwater changes to the TSs are required. The probability/consequence flow information to the Core Operating Limit of accidents previously evaluated have not been increased. The Supervisory System (COLSS).

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

00-00091 LDCR 00-T007, 00-These LDCRs for the TS and the TS Bases clarified This does not introduce an unreviewed safety question.

B017 that the boron dilution alarm system (BDAS) is Changes to the TSs have received NRC approval. The required to be OPERABLE in Mode 6.

probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00094 SDOC MN725-AO0128 This subject vendor document revised the Natural This does not introduce an unreviewed safety question.

No Circulation Cooldown Analysis in preparation for Unit changes to the TSs are required. The probability/consequence 2 Steam Generator Replacement and Power Uprate. of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00095 LDCR 00-TO13, 00-These LDCRs for the TS and the TS Bases This does not introduce an unreviewed safety question.

B024 incorporated TSTF 273 Rev. 2 to clarify LCO 3.0.6.

Changes to the TSs have received NRC approval. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00097 ENG 228402 This modification changed existing breaker controls This does not introduce an unreviewed safety question. No and indications to allow installation of new breakers changes to the TSs are required. The probability/consequence and to provide synchronization capabilities for new of accidents previously evaluated have not been increased. The switchyard connections to the new Hassayampa 2 probability/consequence of a malfunction to equipment important line.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 13

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00103 ENG 2307494 This modification replaced or added several This does not introduce an unreviewed safety question.

No Extraction Steam (ED) System piping expansion changes to the TSs are required. The probability/consequence joints inside the main condenser in Unit 2 in order to of accidents previously evaluated have not been increased. The prevent recurrence of expansion joint failures.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00106 LDCR 00-F062 This LDCR revised the UFSAR as a result of a new This does not introduce an unreviewed safety question.

No PVNGS LBLOCA ECCS performance analysis, which changes to the TSs are required. The probability/consequence supplements the current PVNGS LBLOCA break of accidents previously evaluated have not been increased. The spectrum analyses.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00112 TMOD 2328673 This TMOD addressed the connection of service air This does not introduce an unreviewed safety question.

No to a flanged connection of the Refueling Water Tank changes to the TSs are required. The probability/consequence (RWT), which is below the tank water level, during of accidents previously evaluated have not been increased. The refueling operations. Discharge of air into the RWT probability/consequence of a malfunction to equipment important will be used to dilute high activity waste gas in the to safety have not been increased. The possibility of a different tank and displace it into the Fuel Building normal type of accident or malfunction has not been created. The ventilation system for eventual offsite discharge.

margin of safety as defined in the basis of the TSs has not been "reduced.

00-00113 LDCR 00-F063 This LDCR updated the UFSAR to incorporate power This does not introduce an unreviewed safety question. No uprate calculational changes, updated calculational changes to the TSs are required. The probability/consequence practices, the results of a licensing document of accidents previously evaluated have not been increased. The validation, incorporate CESSAR information, and to probability/consequence of a malfunction to equipment important incorporate current regulatory guidance.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00115 LDCR 00-F065 This LDOR updated UFSAR to incorporate revised This does not introduce an unreviewed safety question. No calculated reactor and spent fuel pool decay heat changes to the TSs are required. The probability/consequence loads.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 14

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00120 CRDRs

2319452, These CRDRs demonstrated that no unreviewed This does not introduce an unreviewed safety question. No
2326407, safety question existed from continued operation with changes to the TSs are required. The probability/consequence 2329337 small amounts of radioactivity in the Nuclear Cooling of accidents previously evaluated have not been increased. The (NC) Water System at Units 3 and 1.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

00-00124 TMOD 2333546 This TMOD was the result of pressurizer heater This does not introduce an unreviewed safety question. No 2MRCEB17 failing and being removed from service, changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00126 ENG 218313 This modification added a time delay relay to the This does not introduce an unreviewed safety question. No override circuit for radioactive drain tank/gas surge changes to the TSs are required. The probability/consequence header external containment isolation valve 1J-GRB-of accidents previously evaluated have not been increased. The UV-002.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

00-00127 TMOD 2335706 This TMOD was the result of pressurizer heater in This does not introduce an unreviewed safety question. No non-class back-up bank number 3 failing. This changes to the TSs are required. The probability/consequence TMOD lifts the power leads of the heater to the failed of accidents previously evaluated have not been increased. The heater.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00132 ENG 2310095 This modification added run time meters/cycle This does not introduce an unreviewed safety question. No counters to the IA system air compressor breakers.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 15

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00136 ENG 218265 This modification installs equivalent Fiber Optic This does not introduce an unreviewed safety question. No boards for the Emergency Diesel Generators due to changes to the TSs are required. The probability/consequence equipment obsolescence.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00137 ENG

224695, These modifications replaced carbon steel piping This does not introduce an unreviewed safety question.

No 224675, 224680 components with stainless steel components in the changes to the TSs are required. The probability/consequence main steam and extraction steam and drains systems of accidents previously evaluated have not been increased. The due to the erosion/corrosion phenomena.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00138 ENG 224682, 224684 These modifications replaced carbon steel piping This does not introduce an unreviewed safety question.

No components with stainless steel components in the changes to the TSs are required. The probability/consequence main steam system due to the erosion/corrosion of accidents previously evaluated have not been increased. The phenomena.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

00-00141 PROC 31MT-gDG03 This procedure provides instructions to chemically This does not introduce an unreviewed safety question. No clean the EDG intercoolers with zinc-phosphoric acid. changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different T',;

type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00142 TMOD 2346360 This TMOD bypassed the SC system acid day tank.

This does not introduce an unreviewed safety question. No changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

Page 16

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 00-00143 ENG 2345660 This modification replaced and added several This does not introduce an unreviewed safety question. No Extraction Steam (ED) System piping expansion changes to the TSs are required. The probability/consequence joints inside the main condenser in Unit 1 in order to of accidents previously evaluated have not been increased. The prevent occurrence of similar type expansion joint probability/consequence of a malfunction to equipment important failures which have occurred in Unit 2.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

00-00144 LDCR 00-F074 This LDCR updated the UFSAR to document the This does not introduce an unreviewed safety question. No substitution of Inconel X-750 for A565 Gr 616 Type changes to the TSs are required. The probability/consequence 422 stainless steel as used in the main steam safety of accidents previously evaluated have not been increased. The valve discs.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00001 ENG 2348862 This modification changed setpoints for the SM This does not introduce an unreviewed safety question. No system to compensate for the 40-degree error in the changes to the TSs are required. The probability/consequence accelerometer orientation, of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00004 ENG 2345288 This modification added replacement anode beds in This does not introduce an unreviewed safety question.

No the cathodic protection system throughout Units 1, 2 changes to the TSs are required. The probability/consequence and 3 as required.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00005 LDCR 01-RO01 This LDCR modified the TRM and associated bases This does not introduce an unreviewed safety question. No for TLCO 3.5.201, Shutdown Cooling System, to changes to the TSs are required. The probability/consequence make the specification more consistent and to allow of accidents previously evaluated have not been increased. The full use of Technical Specification 3.0.6 for those probability/consequence of a malfunction to equipment important systems that support SDC operation.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 17

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00006 TMOD 2350909 This TMOD modified Unit 3 RCP 1A vibration This does not introduce an unreviewed safety question.

No monitoring to eliminate spurious alarms.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00007 TMOD 2352090 This TMOD installed a PC based data acquisition This does not introduce an unreviewed safety question.

No system in the Control Room to record and analyze the changes to the TSs are required. The probability/consequence following Refueling Water Level Monitoring System of accidents previously evaluated have not been increased. The signals, during the Ul Refueling Outage: two narrow probability/consequence of a malfunction to equipment important range level signals, two wide range level signals, and to safety have not been increased. The possibility of a different the two Shutdown Cooling flow signals.

type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00008 TMOD 2352096 This TMOD installed a PC based data acquisition This does not introduce an unreviewed safety question.

No system in the Control Room to record and analyze the changes to the TSs are required. The probability/consequence following Refueling Water level Monitoring System of accidents previously evaluated have not been increased. The signals, during the U3 RCP Shaft Replacement probability/consequence of a malfunction to equipment important Outage: two narrow range level signals, two wide to safety have not been increased. The possibility of a different range level signals, and the two Shutdown Cooling type of accident or malfunction has not been created. The flow signals.

margin of safety as defined in the basis of the TSs has not been reduced.

01-00009 ENG 2319254 This modification replaced selected 1-600 RCS Hot This does not introduce an unreviewed safety question.

No Leg Instrumentation Nozzles in Unit 1.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00011 ENG 221240 This modification replaces existing Steam Generator This does not introduce an unreviewed safety question. No level transmitters with new level transmitters in changes to the TSs are required. The probability/consequence support of replacing the steam generators in Unit 2.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 18

2001-50.59 Report Log Number DocType Doc Number Description Summary 01-00012 ENG 222063 This modification replaced existing Spray Pond This does not introduce an unreviewed safety question.

No Temperature loop thermocouples, indicating changes to the TSs are required. The probability/consequence transmitters and analog indicators with resistance of accidents previously evaluated have not been increased. The temperature detectors (RTD), digital indicating probability/consequence of a malfunction to equipment important transmitters and digital indicators, to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00013 ENG 2304482 This modification replaced the thermal overload This does not introduce an unreviewed safety question.

No relays and adjusted the breaker instantaneous trip changes to the TSs are required. The probability/consequence settings for various motor-operated valves, of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00014 TMOD 2352067 This TMOD created redundancy in the 15 VDC power This does not introduce an unreviewed safety question.

No supply within the main steam and feedwater isolation changes to the TSs are required. The probability/consequence

cabinets, of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00015 DCP WDP-DW-551 This Design Change Package added permanent tees This does not introduce an unreviewed safety question.

No and valves to the DW system to allow use of changes to the TSs are required. The probability/consequence temporary demineralizers when needed.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00017 ENG

219983, These modifications added clips and Raychem This does not introduce an unreviewed safety question.

No

2308464, insulation to the RCP motor RTDs and changed the changes to the TSs are required. The probability/consequence 2307934 spare RTD wiring, of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 19

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00018 LDCR 01-F004, 01-These LDCRs made revisions to the UFSAR and the This does not introduce an unreviewed safety question.

No R002 TRM to document the replacement of the seismic changes to the TSs are required. The probability/consequence monitoring (SM) system in Unit 1 with a new digital of accidents previously evaluated have not been increased. The SM system.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00019 LDCR 01-F009, 01-These LDCRs revised the UFSAR and the TRM to This does not introduce an unreviewed safety question.

No R003 remove the requirement to perform Type C testing changes to the TSs are required. The probability/consequence (LLRT) on the valves in Penetrations 67 and 77 for of accidents previously evaluated have not been increased. The HPSI Long Term Cooling.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00020 ENG 216762 This modification installed Emergency Response This does not introduce an unreviewed safety question.

No Facility Data Acquisition Display System (ERFDADS) changes to the TSs are required. The probability/consequence inputs to monitor Atmospheric Dump Valve (ADV) of accidents previously evaluated have not been increased. The accumulator pressure.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00021 ENG 2351782 This modification conditionally released the This does not introduce an unreviewed safety question.

No installation of a spare, contingency Reactor Coolant changes to the TSs are required. The probability/consequence Pump (RCP) shaft into Unit 3 RCP 1 B for the of accidents previously evaluated have not been increased. The remainder of power cycle 10.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00022 LDCR 00-F045 This LDCR revised the UFSAR to clarify the use of This does not introduce an unreviewed safety question. No fluorescent lights that contain trace amounts of changes to the TSs are required. The probability/consequence mercury during maintenance. It also clarified the use of accidents previously evaluated have not been increased. The of refueling and spent fuel pool lights that contain probability/consequence of a malfunction to equipment important trace amounts of mercury.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 20

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00025 ENG 2314788 This modification will fabricate and install stainless This does not introduce an unreviewed safety question.

No steel boxes to store lead shielding and scaffolding changes to the TSs are required. The probability/consequence materials inside the Containment Building.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00026 LDCR 01-FO15 This LDCR revised the UFSAR to reflect the results This does not introduce an unreviewed safety question.

No of revised control room habitability analyses.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00027 LDCR 01-F012, 01-These LDCRs revised the UFSAR and the TRM to This does not introduce an unreviewed safety question.

No R005 reflect the elimination of PASS.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00028 ENG 218598 This modification addressed construction of a new This does not introduce an unreviewed safety question.

No Independent Spent Fuel Storage Installation (ISFSI) changes to the TSs are required. The probability/consequence at Palo Verde. The scope of this evaluation only of accidents previously evaluated have not been increased. The addresses construction of the ISFSI. This evaluation probability/consequence of a malfunction to equipment important does not include connecting the ISFSI to any PVNGS to safety have not been increased. The possibility of a different systems, structures or components, nor does it cover type of accident or malfunction has not been created. The the movement of any spent fuel assemblies or the margin of safety as defined in the basis of the TSs has not been use of any dry cask storage system.

reduced.

01-00030 LDCR 01-F020 This LDCR to the UFSAR was the result of a This does not introduce an unreviewed safety question.

No modification. This modification removed the RCS Hot changes to the TSs are required. The probability/consequence Leg 1 loop drain line in Unit 1.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 21

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00031 PROC 430P-3NC01 This procedure revision added provisions for pumping This does not introduce an unreviewed safety question.

No water treatment chemicals into the operating NC changes to the TSs are required. The probability/consequence system.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00032 PROC 78CP-9FH03 This procedure revision allows spent fuel disassembly This does not introduce an unreviewed safety question.

No and reconstitution in the Spent Fuel Pool (SFP) with changes to the TSs are required. The probability/consequence the SFP water level at or above plant elevation of accidents previously evaluated have not been increased. The 137'6".

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00035 TMOD 2380406 This TMOD increased the vibration trip setpoint for This does not introduce an unreviewed safety question.

No the Unit 3 Main Turbine #6 bearing from 12 mils to 14 changes to the TSs are required. The probability/consequence mils.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00037 LDCR 01-F023 This LDCR revised UFSAR Chapters 4, "Reactor,"

This does not introduce an unreviewed safety question.

No and 15, "Accident Analyses," to reflect the installation changes to the TSs are required. The probability/consequence of replacement full-length CEAs in Unit 1.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00038 ENG 2350163-66 These modifications provided direction to plug and This does not introduce an unreviewed safety question.

No stake steam generator tubes during Ul R9.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 22

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00039 ENG 2377838 This deficiency work order evaluated foreign material This does not introduce an unreviewed safety question.

No in the RCS. Three carbon steel ball bearings were changes to the TSs are required. The probability/consequence unrecoverable from the Refueling Pool during Ul1R9 of accidents previously evaluated have not been increased. The and were assumed to enter the reactor vessel, probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00040 LDCR 00-B007 This revision to the TS Bases was made to include This does not introduce an unreviewed safety question.

No information regarding the use of check valves for changes to the TSs are required. The probability/consequence containment penetration isolation and to clarify of accidents previously evaluated have not been increased. The PVNGS' philosophy regarding CTMT penetrations.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00041 LDCR 01-F025 This LDCR revised the UFSAR, based on Calculation This does not introduce an unreviewed safety question.

No 13-MC-RC-0313.R1. The UFSAR was updated to changes to the TSs are required. The probability/consequence reflect the revised main and bypass pressurizer spray of accidents previously evaluated have not been increased. The flow values.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00042 LDCR 01-F030 This LDCR revised the UFSAR as a result of MEE This does not introduce an unreviewed safety question.

No 03536. The MEE allowed the use of a 5 micron to 0.1 changes to the TSs are required. The probability/consequence micron filter element for the Fuel Pool Clean Up of accidents previously evaluated have not been increased. The Filters. The UFSAR was updated to reflect the new probability/consequence of a malfunction to equipment important filter sizes.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00043 DCP WDP-DS-387 This modification installed a backpressure This does not introduce an unreviewed safety question.

No control/backflow prevention valve in the DS System changes to the TSs are required. The probability/consequence RO Product to DS Filter line.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 23

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00044 ENG 2376951 This modification abandoned leaking fire protection This does not introduce an unreviewed safety question.

No piping in place.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00045 ENG 2384137 This modification evaluated a cylindrical metal object This does not introduce an unreviewed safety question.

No lodged in the Upper Flow Distribution Plate in the changes to the TSs are required. The probability/consequence Lower Support Structure Assembly of the Unit 1 of accidents previously evaluated have not been increased. The Reactor Vessel.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00046 ENG

2350362, These modifications eliminated the interference fit This does not introduce an unreviewed safety question.

No 2375436 between the Reactor Coolant Pump seal housing and changes to the TSs are required. The probability/consequence the seal housing adapter.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00047 ENG 2385012 This modification documented the acceptability of This does not introduce an unreviewed safety question.

No using lighter gauge Rosemount pressure transmitter changes to the TSs are required. The probability/consequence mounting plate/brackets with the Series D of accidents previously evaluated have not been increased. The Rosemount pressure transmitters.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00049 ENG 2388545 This deficiency work order substituted the good This does not introduce an unreviewed safety question.

No output of RCS Hot Leg Loop 1 RDT 111X for failed changes to the TSs are required. The probability/consequence RTD 112HC.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 24

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00050 TMOD 2388785 This TMOD provided temporary equipment to mix This does not introduce an unreviewed safety question.

No concentrated sulfuric acid with water and supply the changes to the TSs are required. The probability/consequence dilute acid to the existing condensate demineralizer of accidents previously evaluated have not been increased. The resin regeneration process.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00051 PROC 740P-This procedure provides instruction to install and This does not introduce an unreviewed safety question.

No 9SP02.R0 operate chemical addition equipment at each spray changes to the TSs are required. The probability/consequence pond.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00052 ENG 221238 This modification will re-establish a northern This does not introduce an unreviewed safety question.

No personnel and equipment access point into the changes to the TSs are required. The probability/consequence PVNGS protected area (PA) for the Replacement of accidents previously evaluated have not been increased. The Steam Generator (RSG) Project.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00054 ENG

242146, These modifications will replace carbon steel piping This does not introduce an unreviewed safety question.

No

242150, components with stainless steel components in the changes to the TSs are required. The probability/consequence
242156, main steam and extraction steam and heater drains of accidents previously evaluated have not been increased. The
252158, systems due to the erosion/corrosion phenomena.

probability/consequence of a malfunction to equipment important 242160, 242162 to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00055 ENG 242141 This modification replaces carbon steel piping This does not introduce an unreviewed safety question.

No components with stainless steel components in the changes to the TSs are required. The probability/consequence main steam system due to the erosion/corrosion of accidents previously evaluated have not been increased. The phenomena.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 25

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00056 ENG 2304433 This modification replaced the existing diesel This does not introduce an unreviewed safety question.

No generator analog frequency meter with a new digital changes to the TSs are required. The probability/consequence meter.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00057 LDCR 01-F032 This revision to the UFSAR updated text in Appendix This does not introduce an unreviewed safety question.

No 5C. The text was amended to note that once the changes to the TSs are required. The probability/consequence charging pump breakers are "anti-pumped," they of accidents previously evaluated have not been increased. The must be manually reset in order to restart the pump.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00058 ENG 2316467 This modification replaces the existing containment This does not introduce an unreviewed safety question. No spray (CS) pump discharge flow orifices with changes to the TSs are required. The probability/consequence annubars, in support of the Unit 2 Steam Generator of accidents previously evaluated have not been increased. The Replacement (SGR) and Power Uprate (PU) Project. probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00061 ENG 2340883 This modification modified the 4" inlet nozzles for This does not introduce an unreviewed safety question.

No normal and abnormal blowdown to the Blowdown changes to the TSs are required. The probability/consequence Flash Tank to prevent erosion due to flow accelerated of accidents previously evaluated have not been increased. The corrosion (FAC).

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00062 DCP WDP-DS-This Design Change permanently installed a pressure This does not introduce an unreviewed safety question.

No 239.RO reducing control valve in the discharge from the changes to the TSs are required. The probability/consequence deepwell pump of the DS system.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 26

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00064 LDCR 01-F033 This LDCR revised the UFSAR to clarify the Chemical This does not introduce an unreviewed safety question.

No and Volume Control System (CVCS) capabilities with changes to the TSs are required. The probability/consequence respect to controlling concentrations of radioactivity in of accidents previously evaluated have not been increased. The the reactor coolant as a function of failed fuel fraction. probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00065 LDCR 01-F035 This LDCR revised the UFSAR to reflect that the This does not introduce an unreviewed safety question.

No existing control system for the sanitary waste return changes to the TSs are required. The probability/consequence pumps was replaced with ultrasonic controllers.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00066 ENG 220055 This modification will replace the automatic jacket This does not introduce an unreviewed safety question.

No water makeup control valve and its associated changes to the TSs are required. The probability/consequence bypass valve on the emergency diesel generator with of accidents previously evaluated have not been increased. The a single manual valve, probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00067 ENG 218266 This modification removed the emergency diesel This does not introduce an unreviewed safety question.

No generator fuel oil pressure booster relays and changes to the TSs are required. The probability/consequence abandoned in-place the associated local indicators, of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00068 ENG 2342016 This modification installed redundant power supplies This does not introduce an unreviewed safety question.

No into the Main Steam and Feedwater Isolation System changes to the TSs are required. The probability/consequence (MSFIS) cabinets 1, 2, 3J-SGA-CO1 and 1, 2, 3J-SGB of accidents previously evaluated have not been increased. The Col.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 27

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00069 LDCR 01-F038 This LDCR revised the UFSAR to more fully describe This does not introduce an unreviewed safety question.

No several PPS/ESFAS trips that use a variable setpoint. changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00070 LDCR 01-F006 This LDCR revised the UFSAR to reflect the removal This does not introduce an unreviewed safety question.

No of various Portable Process radiation monitoring changes to the TSs are required. The probability/consequence skids.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00071 LDCR 01-F042 This LDCR revised the UFSAR to reflect the This does not introduce an unreviewed safety question.

No radiological impact of the operation of the Redhawk changes to the TSs are required. The probability/consequence Makeup Line.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00072 ENG 2402290 This modification replaced the Unit 3 Main Step-up This does not introduce an unreviewed safety question.

No Transformer with the spare transformer.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00073 DCP WDP-TB-574 This Design Change Package was issued for the This does not introduce an unreviewed safety question.

No design and construction of a redundant CW system changes to the TSs are required. The probability/consequence blowdown line.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 28

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00075 DCP WDP-TB-559 This Design Change Package was for the installation This does not introduce an unreviewed safety question. No of a new makeup water pipeline to the new Redhawk changes to the TSs are required. The probability/consequence Combined Cycle Power Plant from the PVNGS of accidents previously evaluated have not been increased. The makeup reservoir.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00076 LDCR 99-F073 This LDCR revised the UFSAR and updated Table This does not introduce an unreviewed safety question. No 5.1-2 to reflect changes made as a result of the A-changes to the TSs are required. The probability/consequence 600 RCS hot leg instrument nozzle replacement of accidents previously evaluated have not been increased. The program.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00082 LDCR 01-F043 This LDCR revised the UFSAR to clarify the Chemical This does not introduce an unreviewed safety question. No and Volume Control System (CVCS) capabilities and changes to the TSs are required. The probability/consequence requirements for supporting normal plant heat up and of accidents previously evaluated have not been increased. The cooldown rates.

probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00083 LDCR 01-F044 This LDCR revised the UFSAR to correct statements This does not introduce an unreviewed safety question. No regarding Boric Acid Makeup Pump (BAMP) and changes to the TSs are required. The probability/consequence Reactor Makeup Water Pump (RMWP) flow capacity. of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00084 CMWRF 2377199 This modification extended the cathodic protection This does not introduce an unreviewed safety question. No system to encompass all of the old cooling tower changes to the TSs are required. The probability/consequence make-up line.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 29

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00085 LDCR 01-F046 This LDCR made a revision to the UFSAR. The This does not introduce an unreviewed safety question. No revision was the result of a modification that replaced changes to the TSs are required. The probability/consequence and rerouted selected portions of the existing mortar-of accidents previously evaluated have not been increased. The lined ductile iron fire main piping with epoxy-lined probability/consequence of a malfunction to equipment important reinforced fiberglass pipe.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00087 LDCR 01-R014 This LDCR revised the TRM to eliminate the This does not introduce an unreviewed safety question.

No shutdown requirements for TLCO 3.3.105.

changes to the TSs are required. The probability/consequence of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

01-00089 LDCR 01--B003, 01-These LDCRs made revisions to the TS Bases and This does not introduce an unreviewed safety question. No F003 the UFSAR. The revisions were the result of a changes to the TSs are required. The probability/consequence revision to Calculation 13-MC-SI-016. The of accidents previously evaluated have not been increased. The calculation provides the basis for the design probability/consequence of a malfunction to equipment important requirements on minimum and maximum volumes of to safety have not been increased. The possibility of a different Tri-Sodium Phosphate (TSP) to be stored on the 80' type of accident or malfunction has not been created. The Elevation of Containment.

margin of safety as defined in the basis of the TSs has not been reduced.

01-00090 TMOD 2394147 This TMOD installed a PC based data acquisition This does not introduce an unreviewed safety question. No system in the Control Room to record and analyze the changes to the TSs are required. The probability/consequence following Refueling Water Level Monitoring System of accidents previously evaluated have not been increased. The signals during the U3 refueling outage: two narrow probability/consequence of a malfunction to equipment important range level signals, two wide range level signals, and to safety have not been increased. The possibility of a different the two Shutdown Cooling flow signals.

type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00091 PROC 31 MT-9RC29, This 50.59 evaluated changes to various station This does not introduce an unreviewed safety question. No 78MT-9RI01, procedures based on the proposed use of a changes to the TSs are required. The probability/consequence 78MT-9RI02 Temporary Reactor Head (TRH) and In-Core of accidents previously evaluated have not been increased. The Instrumentation (ICI) seal table plugs during the probability/consequence of a malfunction to equipment important U3R9 Refueling Outage.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

Page 30

2001-50.59 Report Log Number Doc Type Doc Number Description Summary 01-00092 PROC 33MT-9EC02 This new procedure is for the installation and removal This does not introduce an unreviewed safety question.

No of automatic vent valves on selected EC system changes to the TSs are required. The probability/consequence vents while the plant is in Mode 5, 6 or de-fueled.

of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00093 ENG 221935 This modification includes the addition of new power, This does not introduce an unreviewed safety question.

No control and instrumentation cables inside containment changes to the TSs are required. The probability/consequence for future SG downcomer blowdown MOVs and of accidents previously evaluated have not been increased. The termination of these cables to a spare containment probability/consequence of a malfunction to equipment important penetration.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00095 ENG 221890 This modification is to facilitate replacement of the This does not introduce an unreviewed safety question.

No Unit 2 steam generators during U2R1 1. Modifications changes to the TSs are required. The probability/consequence will be made to the secondary shield walls, the steam of accidents previously evaluated have not been increased. The generator upper keyway brackets, polar crane bridge probability/consequence of a malfunction to equipment important girder support brackets, and the polar crane equalizer to safety have not been increased. The possibility of a different beams during U2R1O.

type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00096 ENG 218315 This modification involved the service/breathing air This does not introduce an unreviewed safety question.

No system in Units 2 and 3 and added additional stages changes to the TSs are required. The probability/consequence of pressure regulation to stabilize air sample flow of accidents previously evaluated have not been inc&reased. The rate, and to install control room annunciation for loss probability/consequence of a malfunction to equipment important of the breathing air monitors.

to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been reduced.

01-00101 ENG 2305728 This modification relocates feedwater oxygen and This does not introduce an unreviewed safety question.

No corrosion products monitors closer to their associated changes to the TSs are required. The probability/consequence sample points, of accidents previously evaluated have not been increased. The probability/consequence of a malfunction to equipment important to safety have not been increased. The possibility of a different type of accident or malfunction has not been created. The margin of safety as defined in the basis of the TSs has not been "reduced.

Page 31

2001-50.59 Report Log Number Doc Type Doc Number Description Summary E-01-0002 TMOD 2429847 This temporary modification installed a hand switch This change does not require prior NRC approval in accordance as a compensatory measure to bypass the fuel with 10CFR50.59(c)(1).

transfer system "carriage home" limit switch. The "carriage home" limit switch is malfunctioning due to a failed limit switch actuator.

E-01 -0003 CALC 13-CA-ZC-012 This calculation provided a revised method to This change does not require prior NRC approval in accordance disassemble and assemble CEAs using temporary with 10CFR50.59(c)(1).

equipment and specialized tools.

E-01-0004 ENG 2427755 This modification installed a mechanical nozzle seal This change does not require prior NRC approval in accordance assembly (MNSA) on an RCS hot leg instrumentation with 10CFR50.59(c)(1).

RTD nozzle.

E-01-0005 ENG 221891 These plant modifications were made during the This change does not require prior NRC approval in accordance U2R1O outage to facilitate steam generator with 10CFR50.59(c)(1).

replacement during the U2R11 outage. The scope of the work for these modifications involved relocation of commodities located on the secondary shield walls which would interfere with SG replacement activities.

E-01 -0006 LDCRs 01-TO14, 01-These LDCRs for the TS and the TS Bases will allow This change requires prior NRC approval.

B018 more MSSVs to be INOPERABLE in Mode 3.

Specifically TS 3.7.1 is being modified to allow more than four MSSVs to be Inoperable in Mode 3. This change will match NUREG 1432 guidance.

E-01 -0008 TMOD 2441542 This Temporary Modification substituted a non-class This change does not require prior NRC approval in accordance RCS hot leg loop 1 RTD for a Class 1 E RCS hot leg with 10CFR50.59(c)(1).

loop 1 RTD as the input to the Unit 2 CPC Channel C.

E-01 -0009 LDCR 01-FO58 This LDCR made revisions to the UFSAR as a result This change does not require prior NRC approval in accordance of the implementation of the CENTS computer code.

with 10CFR50.59(c)(1).

This revision adds a new appendix to UFSAR Chapter 15.

Page 32

2001-50.59 Report Log Number Doc Type Doc Number Description Summary E-01-0010 LDCR 00-RO01 This LDCR revised TRM Section 3.1, Boration This change does not require prior NRC approval in accordance Systems, to make the text congruent with applicable with 10CFR50.59(c)(1).

sections of the UFSAR and supporting design calculations.

E-01 -0011 ENG 2376926 This modification is for the replacement of the Alloy This change does not require prior NRC approval in accordance 600 inservice RCS hot leg instrumentation nozzles with 10CFR50.59(c)(1).

with the Alloy 690 3/4 RTD nozzle design.

Page 33

Acronym/Abbreviation Definition Sheet AC Alternate Current ADV Atmospheric Dump Valve BAMP Boric Acid Makeup Pump BDAS Boron Dilution Alarm System BOP Balance of Plant CD Condensate CEA Control Element Assembly CENTS Combustion Engineering Nuclear Transient Simulation COLSS Core Operating Limit Supervisory System CRACS Chemical and Radiological Analysis Computer System CRDR Condition Report/Disposition Request CS Containment Spray CTMT Containment CVCS Chemical Volume Control System CW Circulation Water DNBR Departure from Nuclear Boiling Rate DS Domestic Water System DW Demineralized Water System ED Extraction Steam System EDG Emergency Diesel Generator EQ Equipment Qualification ERFDADS Emergency Response Facility Data Acquisition Data System ESF Engineered Safety Features ESFAS Engineered Safety Feature Actuation System ESPS Essential Spray Pond System EW Essential Cooling Water FAC Flow Accelerated Corrosion HPSI High Pressure Safety Injection HVAC Heating, Ventilation, Air Conditioning IA Instrument Air ICI In-Core Instrumentation ISFSI Independent Spent Fuel Storage Installation ISI In-Service Inspection LBLOCA Large Break Loss-of-Coolant Accident LDCR Licensing Document Change Request LLRT Local Leak Rate Test LPSI Low Pressure Safety Injection MNSA Mechanical Nozzle Seal Assembly MSFIS Main Steam and Feedwater Isolation System MSSS Main Steam Support Structure NC Nuclear Cooling Water System PA Protected Area PASS Post Accident Sampling System PLHGR Peak Linear Heat Generation Heat Rate PPS Plant Protection System PREACS Pump Room Exhaust Air Cleanup System PU Power Uprate PVNGS Palo Verde Nuclear Generating Station RCP Reactor Coolant Pump RCS Reactor Coolant System RDT Reactor Drain Tank RMWP Reactor Makeup Water Pump RSG Replacement Steam Generator RTD Resistance Thermal Detection RWT Refueling Water Tank SDC Shutdown Cooling SESS Safety Equipment Status System SFP Spent Fuel Pool SGR Steam Generator Replacement SM Seismic Monitoring System SRM Startup Range Monitors STP Sewage Treatment Plan TMOD Temporary Modification TRH Temporary Reactor Head TRM Technical Requirements Manual TSP Tri-Sodium Phosphate UFM Ultrasonic Flow Measurement UGSLR Upper Guide Structure Lift Rig