Final as - Administered Walkthrough Jpms for the Braidwood Initial Examination - July 2002
ML022890351
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 07/25/2002
From: Caniano R, Grobe J
Division of Reactor Safety III
To: Skolds J
Exelon Generation Co, Exelon Nuclear
References
50-456/02301, 50-457/02301
Download: ML022890351 (74)


Text

FINAL AS-ADMINISTERED WALKTHROUGH JPMS FOR THE BRAIDWOOD INITIAL EXAMINATION - JULY 2002

JOB PERFORMANCE MEASURE TASK TITLE: Align Train A of RHR for Cold Leg Injection JPM No.: N-30a REV: 0 TPO No.: IV.4C.RH-6 K&A No.: (006A4.04)

TASK No.: RH-008 K&A IMP: 3.7/3.6 TRAINEE:

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 2,4,5 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME 13 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP RH-il Securing the RH System from Shutdown Cooling MATERIALS:

Copy of BwOP RH-1i TASK STANDARDS:

1. Perform the actions of BwOP RH-11 to realign RH to Cold Leg Injection
2. Demonstrates the use of good Core Work Practices.

TASK CONDITIONS:

1. You are an extra NSO.
2. A unit startup/heatup is in progress per iBwGP 100-i
3. RHR is being removed from shutdown cooling
4. BwOP RH-li has been performed through step 10
5. Both PORVs are Operable for ARM Low Temp conditions.

INITIATING CUES:

1. The US has directed you to continue performing BwOP RH-il at step 11 to realign Train A of RHR to Cold Leg Injection. 1A RH pump has been shutdown, temperatures have stabilized, all Prerequisites, Precautions, Limitations and Actions have been met. No CCW pumps will be stopped at this time.

N-30 (6/21/01)

ZD73EXAM

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME

1. Refer to BwOP RH-11 Continue performing BwOP 11 0 11 RH-11 at step 11 (CUE: Hand candidate copy of BwOP RH-li. Place kept through step 10.)
  • 2. Align Train A of RH to At IPM06J:

0 11 E5 Cold Leg Injection

"* PLACE IRH01PA, 1A RH Pump to PTL

"* CLOSE IRH8701A&B

"* PLACE IRH618 in MANUAL at 0%- demand

"* OPEN 1RH606 by placing the controller at 100%

demand o VERIFY/CLOSE 1SI8840

"* OPEN 1SI8809A

"* OPEN 1SI8716A o VERIFY/CLOSE 1CV8804A

3. Maintain affected RH Pump Verify RH System is below 260°F by:

01 01 01 in PTL until temps are below 26 0 °F "o Closure of 1RH8701A or 1RH8702A prior to RCS Th reaching 260'F "o Closure of 1RH8701A or 1RH8702A 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> prior to realigning to the RWST "o Verify RH suction piping is below 260'F

  • 4. Complete valve alignment Complete Cold Leg 01 0 0l for Cold Leg Recirc Injection Valve alignment:

(CUE: IRH8734A is locked closed) "* OPEN 1S18812A

"* CLOSE and LOCK CLOSED 1RH8734A

"* CLOSE 1CC9412A 2

N-30 (6/21/01)

ZD73EXAM

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 5. Complete RH System Complete RH System alignment:

E0 E 0 alignment "o STOP a CC Pump if (Cue: Stopping a CC pump is not desired desired at this time. "O Verify 1RH8735 locked 1RH8735 is locked closed) closed

"* Place lRH01PA control switch to NORMAL/AFTER TRIP (CUE: Another operator will be assigned to vent CC,RH and "o VERIFY power available SI and realign the CC to 1S18811A System)

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME __________

COMMENTS:

3 N-30(6/21/01)

ZD73EXAM

SIMULATOR SETUP INSTRUCTIONS PM NO: New REQUIRED SIMULATOR MODE(S) :Plant startup/heatup in progress MALFUNCTION #'S: none COMMENTS:

1) Start simulator from IC
2) Stabilize RCS temperatures with steam dumps
3) Perform BwOP RH-1l through step 10 with placekeeping
4) Place RH parameters on trend:

"* TOG30 RH Pump Discharge Temperature

"* T0404,T0409 RCS Th

"* F0601 RH Pump miniflow

"* F0626 RH Hx Discharge Flow 5

N-30 (6/21/01)

ZD73EXAM

TASK CONDITIONS:

1. You are an extra NSO.
2. A unit startup/heatup is in progress per lBwGP 100-1
3. Train A of RHR is being removed from shutdown cooling
4. BwOP RH-li has been performed through step 10
6. Both PORVs are Operable for ARM Low Temp conditions.

INITIATING CUES:

1. The US has directed you to continue performing BwOP RH-li at step 11 to realign Train A of RHR to Cold Leg Injection. lA RH pump has been shutdown, temperatures have stabilized, all Prerequisites, Precautions, Limitations and Actions have been met. No CCW Pumps will be stopped at this time.

4 N-30(6/21/01)

ZD73EXAM

BwOP RH-1 1 Revision 17 Reference Use SECURING THE RH SYSTEM FROM SHUTDOWN COOLING A. STATEMENT OF APPLICABILITY This procedure provides the steps necessary to shutdown an operating RH Loop, when swapping loops, or securing from Shutdown Cooling.

B. REFERENCES

1. Station Procedures:
a. BwOP CC-9, Realigning CC System from Shutdown Cooling MODE.
b. BwOP RH-6, Placing the RH System in Shutdown Cooling.
c. BwAP 330-1 1A1, Shift Manager's Locked Safety Related Valve Log.
2. Station Drawings:
a. M-61 (M-136), Diagram of Safety Injection System
b. M-62 (M-137), Diagram of Residual Heat Removal System
3. Tech Specs:
a. 3.4.6 e. 3.5.3
b. 3.4.7 f. 3.9.5
c. 3.4.8 g. 3.9.6
d. 3.5.2 h. 3.4.12
4. Station Commitments:
a. 020-251-84-131, Step C.3.
b. 457-200-90-00602, Step E.9 and E.10.
5. Westinghouse Technical Bulletin ESBU-TB-96-03-RO.

1

BwOP RH-11 Revision 17 Reference Use C. PREREQUISITES

,1. The RH Train is in Shutdown Cooling per BwOP RH-6.

The opposite RH Train is IN OPERATION if required by Tech Specs 3.4.6, 3.4.7, 3.4.8, 3.9.5, or 3.9.6.

  • .x A steam bubble exists in the Pressurizer prior to securing the Shutdown Cooling completely.
  • . Notify the Radiation Protection Department that this procedure is being performed and the purpose of the performance.

D. PRECAUTIONS X. Closure ofRH606/607, RH HX _A/B Outlet Flow Control Valve, will render its' respective RH Train inoperable. VERIFY that this will meet applicable Tech Specs for the plant condition, before the respective RH Train is disabled.

2 Operate _RH606/607, RH HX _A/B Outlet Flow Control Vlv, SLOWLY, to prevent RCS pressure transients.

3( When only the "D" RCP is running with an idle RH Pump aligned to the RCS

(_RH8701A/B, _RH8702A/B, S18809A/B are open as applicable), the potential exists for forward flow to pass through the idle RH Pump and possibly cause the pump to rotate. It is advisable to periodically monitor the idle RH Pump when in this configuration. If the RH Pump rotates in the forward direction, it is acceptable to start the rotating RH Pump. If the RH Pump rotates in the reverse direction, actions shall be taken to prevent the rotating RH Pump from being started.

(. IF RH Pump discharge temperature is > 260°F when the system is being removed from shutdown cooling, THEN the system must be cooled down at a rate not to exceed 100°F/HR to reduce the potential for pump seizure. IF during the cooldown of the system, RH pump discharge temperature decreases by more than 25 0 F in a 15 minute period, then RH pump discharge temperature must be held stable for at least 10 minutes. This cooldown limitation only applies when RH pump discharge temperature is > 2600 F.

5f. It is expected that when the RH Pump miniflow valve is opened, the cooldown rate will exceed 25 0 F in 15 minute period. If this happens, RH pump discharge temperature must be allowed to stabilize and the system allowed to soak for at least 10 minutes. This limitation only applies when RH pump discharge temperature is _>2600F.

2

BwOP RH-i 1 Revision 17 Reference Use E. LIMITATIONS AND ACTIONS

,1. In MODE 5, with the Reactor Coolant Loops filled, at least 1 RH Loop SHALL be OPERABLE and IN OPERATION, and either:

a. One additional RH Loop SHALL be OPERABLE, or
b. The Secondary Side Narrow range level of at least 2 Steam Generators SHALL be greater than 18%.

. In MODE 5, with the Reactor Coolant Loops not filled, 2 RH Loops SHALL be OPERABLE and at least 1 RH Loop SHALL be IN OPERATION.

X. In MODE 6, when the water level above the top of the Reactor Vessel Flange is

Ž>23 feet, at least I RH Loop SHALL be OPERABLE and IN OPERATION.

4. In MODE 6, when the water level above the top of the Reactor Vessel Flange is less than 23 feet, 2 RH Loops SHALL be OPERABLE and at least 1 RH Loop SHALL be IN OPERATION.

,A RH to CV Letdown must be established and maintained from at least one RH Train, whenever the RCS is in Water Solid condition.

8. In modes 1-3, _RH8701A, and _RH8702A or _RH8701B and _RH8702B must be removed from service to prevent overpressurizing the RH system due to spurious opening of the RH loop suction valves due to a hot short on the control cables.

,7. In MODE 4, while RH is being utilized for decay heat removal, at least one of the RH8716 valves must be closed, but be capable of being opened from the MCB.

Z8. In MODE 4, while RH is not being utilized for decay heat removal, the

_RH8716A and B may be closed, provided they are capable of being opened from the MCB.

X In MODE 4, the _RH8735, RH Supply to SI Pump Suct Hdr, (Recirc to RWST) may be open provided ALL of the following conditions are met:

a. _RH8701A&B/_RH8702A&B for the train that is NOT in shutdown cooling MODE is CLOSED.
b. Personnel are stationed near _RH8735 with communications established with the Control Room.
c. The Shift Manager or designee has been informed PRIOR to opening the RH8735.
d. When-locking. or unlocking -RH8735, complete BwAP-330-hlA1-.-- .

3

BwOP RH-i 1 Revision 17 Reference Use

  • E. ý0. In MODE 5 or 6, the _RH8735, RH Supply to SI Pump Suct Hdr (Recirc to RWST), may be open provided ALL of the following conditions are met:
a. _RH8716A/B valve is administratively Tagged Out CLOSED on the train in/being placed in shutdown cooling.
b. Personnel are stationed near _RH8735 with communications established with the Control Room.
c. The Shift Manager or designee has been informed PRIOR to opening the

_RH8735.

d. When locking or unlocking _RH8735, complete BwAP 330-1 1A1, Shift Manager's Locked Safety Related Valve Log.

A"'. IfRCS Hot Leg Temperature is > 260 0 F, steam binding of the RH pump suction may occur when switching to the RWST suction due to lower RWST pressure.

Switchover should not be performed when RCS hot leg temperature is > 260°F or RH pump may be rendered inoperable. (Consult _BwGP 100-1 and

_BwGP 100-5.)

4

BwOP RH-11 Revision 17 Reference Use F. MAIN BODY ryA* If swapping RH trains, PERFORM the following:

a. VERIFY/PLACE in OPERATION the opposite RH Train per BwOP RH-6.
b. PLACE RH letdown in service on the RH train that is to remain in shutdown cooling per BwOP CV-17.
  • PERFORM one of the following:

IF RH pump discharge temperature is > 260 0 F, GO TO EjIII.3 IF RH pump discharge temperature is < 2600 F, GO - pF7 N 3 VERIFY/PLACE the following parameters on trend so that RH system cooldown

?f can be monitored:

  • RH pump discharge temperature "O T0630 (Train A)

"O T0631 (Train B)

"* RCS Hot Leg Temperature "O T0404, T0409 (Train A)

"O T0444, T0449 (Train B)

"* RH pump miniflow "O F0601 (Train A)

"O F0602 (Train B)

"* RH Hx discharge flow to the RCS o F0626 (Train A) 0 F0627 (Train B) 5

BwOP RH-11 Revision 17 Reference Use NOTE It is expected the RH pump discharge temperature will decrease when the RH Pump miniflow valve is opened.

F. PERFORM the following to DEENERGIZE the RH Pump Minflow Vlv in the i

bý OPEN position for the RH train to be removed from shutdown cooling:

MA a. PLACE the control switch for the RH Pump Miniflow VIv on the affected train to the OPEN position and HOLD:

O _RH610 0 _RH611

b. DEENERGIZE the RH Pump Miniflow Valve in the OPEN position for the affected train:

O 1RH610, MCC 131X1, Compt F2 O 1RH61 1, MCC 232X1, Compt C4 O 2RH610, MCC 231X1, Compt F2 O 2RH61 1, MCC 232X1, Compt C4

c. RELEASE the control switch for the RH Pump Miniflow VIv.

6

BwOP RH-11 Revision 17 Reference Use NOTE The following step is only required if RH pump discharge temperature decreased by more than 25 0 F when the Miniflow valve was opened.

F. 5. DETERMINE if RH system soak is required:

a. CHECK RH Pump discharge temperature change.
b. IF RH pump discharge temperature has DECREASED by > 25 0 F in a 15 minute period, PERFORM the following:
1) ALLOW RH pump discharge temperature to STABILIZE.
2) MAINTAIN RH pump discharge temperature STABLE for at least 10 minutes.

CAUTION IF RH pump discharge temperature decreases by more than 25 0 F in a 15 minute period, THEN the cooldown of the system must be stopped and temperature held stable for at least 10 minutes.

CAUTION When throttling on the RH flow control valves, the cooldown of the RH system must be closely monitored due to the delay time in valve response.

PERFORM the following to initiate a cooldown of the RH train to be removed from shutdown cooling:

a. PLACE the RH HX Bypass Flow Cont VIv in MANUAL for the affected train:

"0 RH618 "O RH619 7

BwOP RH-1 1 Revision 17 Reference Use F. 6 b. THROTTLE CLOSED the RH HX Bypass Flow Cont VIv in small increments (-5%) to initiate a cooldown of the RH system at rate not to exceed 100°F/HR:

O _RH618 O _RH619

c. WHEN the RH HX Bypass Flow Cont VIv is fully CLOSED, THROTTLE CLOSED the RH HX Outlet Flow Cont VIv to continue the cooldown of the RH system at rate not to exceed 100°F/HR:

O _RH606 o _RH607

d. WHEN RH Pump discharge temperature is <260 0 F, PERFORM the following:
1) ALLOW RH Pump discharge temperature to STABILIZE.
2) MAINTAIN RH Pump discharge temperature stable for at least 10 minutes.
3) THROTTLE CLOSED RH HX Outlet Flow Cont VIv:

O _RH606 O _RH607

4) ENERGIZE the RH Pump Miniflow Valve for the affected train:

O 1RH610, MCC 131X1, Compt F2 O 1RH611, MCC 232X1, Compt C4 O 2RH610, MCC 231X1, Compt F2

0) 2RH61 1, MCC 232X1, Compt C4 8

BwOP RH-i 1 Revision 17 Reference Use F. 6 WN d. 5) VERIFY the RH Pump Miniflow VIv is OPEN:

S6 o RH610 0 _RH611

6) GO TO Step F.8.

7 PERFORM the following to remove the RH train from shutdown cooling:

a THROTTLE CLOSED RH HX Outlet Flow Cont VIv:

O _RH606 o _RH607

b. PLACE the RH HX Bypass Flow Cont VIv in MANUAL for the affected train:

Q _RH618 O _RH619

c. THROTTLE CLOSED the RH HX Bypass Flow Cont VIv:

0 _RH618 O _RH619

d. VERIFY the RH Pump Miniflow VIv OPENS:

0 _RH610 0 _RH611 9

BwOP RH-11 Revision 17 Reference Use F. ,. ALLOW the affected RH train to run in recirculation until either of the following conditions are observed:

O RH pump discharge temperature indicates < 180°F:

0 _TR-612 O _TR-613 o IF RH pump discharge temperature stabilizes at > 180'F, then all of the following conditions must be met:

"* CC to RH HX flow is indicating in the green band:

o _FI-688 o _FI-689

"* RH pump suction is > 50°F subcooled as indicated by the following:

O _TR-612 and computer point P0601 0 _TR-613 and computer point P0602

"* The Unit Supervisor/Shift Manager concurs and grants permission to continue with this procedure.

  1. STOP the RH pump being removed from shutdown cooling:

0 _RH01PA 0 _RH01PB

10. VERIFY/RETURN TO SERVICE the following valve(s) as required:

S' 0 _RH8701A, Loop A to RH Pp _A Suction Isol VIv (No C/O card on Main Control Board C/S - MCB placard acceptable).

0 _RH8702A, Loop _C to RH Pp _B Suction Isol VIv (No C/O card on Main Control Board C/S - MCB placard acceptable).

10

BwOP RH-11 Revision 17 Reference Use NOTE Steps F.1 1 through F.22 are only required if aligning the RH Train for Cold Leg Injection. If it is desirable to secure CC to the RH Hx perform steps F.15, F.16, and F.21.

F. 11. ALIGN the RH train for Cold Leg Injection:

NOTE Depending on plant status, appropriate LCOARS may need to be entered prior to placing RH pump in pull-to-lock.

0 Train A:

1) VERIFY/PLACE _RH01PA, _A RH Pump, to PTL at _PM06J.

NOTE Closure of _RH8701A or _RH8701 B will make the associated RH Train unavailable for Cold Overpressure Protection. Refer to LCO 3.4.12.

2) VERIFY/CLOSE the following valves:

O _RH8701A, RC Loop A to RH Pp _A Suct Isol VIv O _RH8701 B, RC Loop A to RH Pp _A Suct Isol VIv

3) PLACE _RH618, RH HX -A Bypass Flow Cont VIv, in MANUAL at 0% demand.
4) OPEN _RH606, RH HX _A Outlet Flow Cont VIv, by placing the controller at 100% demand.
5) VERIFY/CLOSE _SI8840, RH to Hot Leg A & C Isol VIv.

11

BwOP RH-i 1 Revision 17 Reference Use F. 11. 0 Train A

6) VERIFY/OPEN the following:

"* _S18809A, RH to Cold Legs A & D Isol VIv.

"* _RH8716A, RH HX _A Discharge Crosstie VIv.

NOTE

_S18812A is interlocked with _CV8804A so that _SI8812A will not open unless the _CV8804A is closed.

7) VERIFY/CLOSE _CV8804A, _A RH HX to CV Pump Suct Isol VIv.

12

BwOP RH-11 Revision 17 Reference Use F. 11. 0 Train B:

1) VERIFY/PLACE RH01PB, _B RH Pump, to PTL at _PM06J.

NOTE Closure ofRH8702A or _RH8702B will make the associated RH Train unavailable for Cold Overpressure Protection. Refer to LCO 3.4.12.

2) VERIFY/CLOSE the following valves:

"* _RH8702A, RC Loop _B to RH Pp _B Suct Isol VIv

"* _RH8702B, RC Loop -A to RH Pp _B Suct Isol VIv

3) PLACE _RH619, RH HX _B Bypass Flow Cont VIv, in MANUAL at 0% demand.
4) OPEN _RH607, RH HX _B Outlet Flow Cont VIv, by placing the controller at 100% demand.
5) VERIFY/CLOSE _SI8840, RH to Hot Leg A & C Isol VIv.
6) VERIFY/OPEN the following:

"* _SI8809B, RH to Cold Legs B & C Isol VIv.

"* _RH8716B, RH HX _B Discharge Crosstie VIv.

NOTE

_SI8812B is interlocked with _S18804B so that S18812B will not open unless the _S18804B is closed.

7) VERIFY/CLOSE _SI8804B, _B RH HX to CV Pump Suct Isol VIv.

13

BwOP RH-1 1 Revision 17 Reference Use CAUTION If RCS Hot Leg Temperature is greater than 2600F, steam binding of the RH pump suction may occur when switching to the RWST suction due to lower RWST pressure. Switchover should not be performed when RCS Hot Leg Temperature is greater than 260°F or RH pump may be rendered inoperable. (consult

_BwGP 100-1 and _BwGP 100-5).

F. 12. MAINTAIN the affected RH Pump in pull-to-lock until the RH system is below 260'F in accordance with one of the following criteria:

Q Stopping the RH pump and closing at least one of the Hot Leg Suction Valves, _RH8701A/B or _RH8702A/B, prior to the RCS Hot Leg Temperature reaching 260°F on heatup (preferred method).

O Stopping the RH pump and closing RH8701A/B OR _RH8702A/B 15 hours1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> prior to re-aligning the RH train to RWST suction. The 15 hour1.736111e-4 days <br />0.00417 hours <br />2.480159e-5 weeks <br />5.7075e-6 months <br /> time may be reduced by one hour for each 61F that the RCS Hot Leg temperature is below 3501F at the time when the RH pump is stopped and isolated from the RCS.

O Verifying by measurement that the appropriate RH suction piping at the CWA side of Penetration P-68 (A Train) or P-75 (B Train) is below 260 0 F.

13. OPEN RH Pp Suct From RWST Isol Vlvs:

O -S18812A o -S18812B

14. Locally CLOSE and LOCK CLOSED RH Trains to CV Letdown HXs Isol, O _RH8734A O _RH8734B
15. VERIFY/CLOSE CC to RH HX _A/B Isol VIv:

O _CC9412A 0 CC9412B 14

BwOP RH-11 Revision 17 Reference Use F. 16. STOP a Component Coolant Pump, if desired.

17. VERIFY/LOCK CLOSED _RH8735, RH Recirc to RWST Isol VIv.
18. Place RH pump control switch to normal after trip:

O _RH01PA O RH01PB

19. VERIFY that the power is available to the following Cnmt Sump Isol Vlvs:

" -S18811A

"* SI8811B

    • ~While Venting the _SI059A/B, take extra caution for Hot ,

'" Temperature and High Pressure.  ::

NOTE Step F.20 should be performed when the suction piping is less than 212'F. Consult step E. 11 or Step F.12 for temperature indication.

20. To VENT downstream of the _SI881 1A/B PERFORM the following:
a. REMOVE the pipe cap downstream of Cnmt Recirc Sump to CS/RH Test Conn Isol VIv:

O -S1059A O SI059B

b. ATTACH poly bottle or vent hose (directed to floor drain) to, Cnmt Recirc Sump to CS/RH Test Conn Isol VIv:

O _SI059A

0) S1059B 15

BwOP RH-i 1 Revision 17 Reference Use F. 20. c. OPEN _A/B Cnmt Recirc Sump to CS/RH Test Conn Isol VIv, and VENT any air from the line:

0 _S1059A O _S1059B

d. CLOSE Cnmt Recirc Sump to CS/RH Test Conn Isol VIv.

O _S1059A O _S1059B

e. Remove poly bottle or hose installed in step F.20.b.
f. REPLACE the pipe cap removed in step F.20.a.
g. LOG venting complete in Unit NSO Log.
21. REALIGN the CC System per BwOP CC-9, Realigning CC System From Shutdown Cooling MODE, if desired.
22. IF RH is being secured in preparation for a MODE change to Mode 3, Tag Out the following valves (No C/O card on Main Control Board C/S - MCB placard acceptable):

"* _RH8701A, RC loop _A to RH Pp -A Suct Isol VIv

"* _RH8702A, RC loop _C to RH Pp _B Suct Isol VIv (Final) 16

JOB PERFORMANCE MEASURE TASK TITLE: Synchronize a SAT to a Bus Being Fed by an Emergency Diesel Generator JPM No.: N-84 REV: 8 TPO No.: IV.D.AP-03 K&A No.: (064A4.09)

TASK No.: AP-013 K&A IMP: 3.2/3.3 TRAINEE:

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 3,4 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 1i MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP AP-32, Rev. 2, Synchronizing a SAT to a Bus Being Fed by a DG.

MATERIALS:

Copy of BwOP AP-32.

TASK STANDARDS:

1. Correctly synchronize SAT 142-2 to a bus being fed by the lB DG.
2. Demonstrates the use of good Core Work Practices.

TASK CONDITIONS:

1. You are an assist NSO.
2. Both Units are at 100%- power.
3. The lB D/G was manually started, and is currently supplying bus 142.
4. Breaker 1424 is closed to prevent equipment sequencing onto bus 142.

INITIATING CUES:

1. The US has directed you to synchronize SAT 142-2 back to the lB D/G per BwOP AP-32, step F.4.

I N-84 (7/21/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME Note: Provide a copy of BwOP AP-32 to the examinee.

1. Refer to BwOP AP-32. Open BwOP AP-32. 01 01 0l (CUE: All Prerequisites, Precautions, Limitations and Actions have been met.)
2. Verify lB D/G is operating VERIFY lB D/G is El operating properly as 0 0 properly.

follows:

"* lB D/G frequency is approximately 60 hz.

"* lB D/G voltage is approximately 4160 volts.

  • 3. Prepare lB D/G for Prepare lB D/G for parallel 01 01 0 parallel operation with operations as SAT 142-2. follows:

"* TURN ACB 1422 Synchroscope Switch ON.

"* USING the lB D/G voltage adjust control, adjust the "RUNNING" voltage slightly HIGHER than the "INCOMING" voltage (0-4 volts).

o VERIFY the same voltage on 'AB', 'BC',

and 'CA' with the lB D/G Voltmeter selector switch.

  • USING the lB D/G governor adjust control, ADJUST generator speed such that the synchroscope is rotating slowly in the SLOW direction.
  • 4. Parallel the lB D/G to SAT Parallel the lB D/G to 01 01 01 142-2. SAT 142-2 as follows:
  • When the synchroscope is slightly before the 12 O'clock position, CLOSE ACB 1422.

o VERIFY the synchroscope has LOCKED IN at the 12 O'clock position.

o TURN the synchroscope switch for ACB 1422 to OFF.

2 N-84 (7/21/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

5. Restore breaker positions. Restore breaker positions as follows: El 0 0 (CUE: a OPEN ACB 1424 When asked, ACB 2424 is in after trip.) 0 PLACE ACB 2424 in AFTER TRIP.
6. Unload lB D/G per BwOP DG Refer to BwOP DG-12 to unload lB D/G. El 0 0 12.

(CUE: The US will direct another NSO to unload the lB D/G.)

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME CUUMIV11V'*IS:

3 N-84(7/21/01)

SIMULATOR SETUP INSTRUCTIONS PM NO: N-84 REQUIRED SIMULATOR MODE(S): Any 'At Power' IC.

MALFUNCTION #'S: N/A COMMENTS:

1) Swap to lB SX pump to put load on Bus 142.
2) Start 1B D/G and sync to grid. Leave Syncscope Key Switch in 1423 but OFF.
3) Load 1B D/G until SAT feed amps = 0.
4) Close ACB 1424.
5) Open 1422.
6) Ensure the Governor Adjuster and the Voltage Adjuster are not "set" at values that happen to be exactly what the examinee needs (i.e. the intent is to force the examinee to manipulate the controls).

N-84(7/21/01)

TASK CONDITIONS:

1. You are an assist NSO.
2. Both Units are at 100% power.
3. The lB D/G was manually started, and is currently supplying bus 142.
4. Breaker 1424 is closed to prevent equipment sequencing onto bus 142.

INITIATING CUES:

1. The US has directed you to synchronize SAT 142-2 back to the lB D/G per BwOP AP-32, step F.4.

4 H-84 (7/21/01)

JOB PERFORMANCE MEASURE TASK TITLE: Perform an Emergency Boration with a plugged AB filter, for 2 stuck rods following a normal reactor trip.

PM No.: N-27c REV: 0 TPO No.: IV.D.OA-8 K&A No.: (024AA1.17)

TASK No.: OA-099 K&A IMP: 3.9/3.9 TRAINEE:

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 3,4,7,8 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME 16 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. lBwOA PRI-2, Emergency Boration.
2. lBwEP ES-0.1, Reactor Trip Response MATERIALS:

Copy of lBwOA PRI-2. and Copy of Step 4 of lBwEP ES-0.1 TASK STANDARDS:

1. Perform actions necessary to initiate emergency boration flow of 30 gpm of 7000 ppm Boric Acid or equivalent to raise RCS Boron concentration.

TASK CONDITIONS:

1. You are the Unit NSO.
2. Unit 1 is in Mode 3 following a turbine trip / reactor trip.
3. Data A and Data B failures exist on two control rods
4. Current RCS Boron Concentration is 1030 ppm.

INITIATING CUES:

1. Following a turbine trip / reactor trip, the crew is performing steps of lBwGP 100-5. DRPI for two (2) rods on the trip indicated Data A and Data B failures. After investigation it has been determined that these two rods my be partially withdrawn or stuck. You have been directed to emergency borate for this condition per lBwGP 100-5 step F.11 CAUTION statement using lBwOA PRI-2.

N-27B (5/25/01)

ZD73EXAM

RECORD START TIME

1. Refer to IBwEP ES-0.1 step Locate and Open 1BwEP ES 1 El 0 4 and open and refer to 0.1 and lgwhA PRI 2.

lBwOA PRI-2.

(CUE: After the correct procedure is located, provide a copy.)

2. Check at least 1 Charging Determine at least 1 0l 01 01 pump is running. Charging pump is running:
  • RUN light lit, and amps or flow indicated.

N-27B (5/25/01)

ZD73EXAM

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 3. Establish Boration Flow Perform the following to 11 El El from the BAT. establish boration flow from the BAT:

"* OPEN lCV8104, or 1CV11OA and lCVllOB.

"* START boric Acid Transfer Pump.

(Note: Alternate Path begins here o CHECK emergency when 30gpm cannot be boration flow > 30 attained) gpm.

  • Determine < 30 gpm boration flow is occurring.

o Dispatch Operator to locally check lineup.

  • 4. Align alternate boration Perform the following to 01 01 01 flow path from the RWST. align an alternate boration flow path from the RWST:

"* STOP the Boric Acid Transfer pump.

"* OPEN 1CV112D and /or lCV1I2E.

"* CLOSE 1CV112B and /or (Note: Time and flowrate are ICVlI2C.

necessary to determine "* Verify Letdown flow is when 11,000 gallons have 120 gpm.

been added (per IBwGP 100 2A1 step 1.)

"* Maximize Charging flow while maintaining lFI 121A indication on scale.

5. Align CV pump discharge "* Mark time and flowrate flowpath. boration from RWST commenced.

Perform the following to align CV pump discharge El El flowpath:

"* Check OPEN 1CV8105 and ICV8106.

"* Check OPEN 1CV8324A or 1CV8324B.

"* Check OPEN 1CV8146 or 1CV8147.

"* THROTTLE 1CV121 to Establish maximum normal charging header

6. Turn on Pzr Backup Heaters. flow on IFI-121A.

Energize PZR Backup 11 El El heaters.

3 N-27B (5/25/01)

ZD73EXAM

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • ý7. Check if Boration flow can Determine if boration can be stopped:

0l El 0l be stopped.

(Note: At 150 gallons per Calculate flowrate and minute it will take time remaining to add almost 74 minutes to 11,000 gals, inform add 11,000 gals from US.

the RWST.)

(5500 gal per rod if (CUE: When examinee has borating from the RWST) determined how much time remains to borate from the RWST, use time compression to proceed.)

  • 8. Stop Emergency Boration Stop Emergency Boration El El El Flow. flow from the RWST without losing suction to the CV pump:

"* VERIFY/OPEN 1CV112B and lCVII2C.

"* VERIFY/CLOSE 1CV112D and/or lCVlI2E.

9. Notify Chemistry to sample Determine RCS and PZR El El El the RCS and the PZR to boron concentrations are determine Boron within 50 ppm of each Concentrations. other:

"* Request chemistry (CUE: sample RCS and PZR.

If asked as chemistry, "* Maintain PZR Level.

acknowledge the need to sample.)

(CUE: CRS will assign another operator to align RMCS to AUTO makeup)

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

4 N-27B (5/25/01)

ZD73EXAM

SIMULATOR SETUP INSTRUCTIONS

'PM NO: N-27B REQUIRED SIMULATOR MODE(S):

MALFUNCTION #'S: (Data A & B Failures on 2 control rods)

COMMENTS:

1. Set BA pot for 4.41 (1030 ppm)
2. On SDG CV8, throttle 1AB8460 to 100 to prevent > 30 gpm BA flow.
3. Provide cues/feedback from local operator at boric acid skid that lineup is correct.
4. Provide info when BA transfer pump running that filter dp is 25 psid.
5. Bypass filter if directed and report normal filter DP. (5 psid),

by opening 1AB8458 on SDG CV8.

6. Data A and Data B failure on two (2) control rods.

6 N-27B (5/25/01)

ZD73EXAM

TASK CONDITIONS:

1. You are the Unit NSO.
2. Unit 1 is in Mode 3 following a turbine trip / reactor trip.
3. Data A and Data B failures exist on two control rods.
4. Current RCS Boron Concentration is 1030 ppm.

INITIATING CUES:

2. Following a turbine trip / reactor trip, the crew is performing steps of lBwGP 100-5. DRPI for two (2) rods on the trip indicated Data A and Data B failures. After investigation it has been determined that these two rods my be partially withdrawn or stuck. You have been directed to emergency borate for this condition per 1BwGP 100-5 step F.11 CAUTION statement using lBwOA PRI-2.

5 N-27B(5/25/01)

ZD7 3 EXAM

JOB PERFORMANCE MEASURE TASK TITLE: Perform an Emergency Boration with a plugged AB filter, for 2 stuck rods following a normal reactor trip.

2M No.: N-27 REV: 0 TPO No.: IV.D.OA-8 K&A No.: (024AA1.17)

TASK No.: OA-099 K&A IMP: 3.9/3.9 TRAINEE:

EVALUATOR:_____________ DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 3,4,6,7 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME 16 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR

ýNERAL

REFERENCES:

1. lBwOA PRI-2, Emergency Boration.
2. 1BwGP 100-5, Plant Shutdown and Cooldown MATERIALS:

Copy of IBwOA PRI-2 and IBwGP 100-5 step F.11 CAUTION TASK STANDARDS:

1. Perform actions necessary to initiate emergency boration flow of 30 gpm of 7000 ppm Boric Acid or equivalent to raise RCS Boron concentration.

TASK CONDITIONS:

1. You are the Unit NSO.
2. Unit 1 is in Mode 3 following a turbine trip / reactor trip.
3. Data A and Data B failures exist on two control rods
4. Current RCS Boron Concentration is 1030 ppm.

INITIATING CUES:

1. Following a turbine trip / reactor trip,'the crew is performing steps of lBwGP 100-5. DRPI for two (2) rods on the trip indicated Data A and Data B failures. After investigation it has been determined that these two rods my be partially withdrawn or stuck. You have been directed to emergency borate for this condition per 1BwGP 100-5 step F.11 CAUTION statement using IBwOA PRI-2.

1 N-27B (5/25/01)

ZD73EXAM

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME

1. Refer to lBwGP 100-5 step Locate and Open IBwGP 01 0 11 F.11 and open and refer to 100-5 and 1BwOA PRI-2.

1BwOA PRI-2.

(CUE: After the correct procedure is located, provide a copy.)

2. Check at least 1 Charging Determine at least 1 13 01 01 pump is running. Charging pump is running:

RUN light lit, and amps or flow indicated.

  • 3. Establish Boration Flow Perform the following to 01 01 01 from the BAT. establish boration flow from the BAT:

"* OPEN 1CV8104

"* START boric Acid Transfer Pump.

"* CHECK emergency boration flow > 30 gpm.

  • 4. Align CV pump discharge Perform the following to 0 0 0 flowpath. align CV pump discharge flowpath:

E Check OPEN 1CV8105 and ICV8106.

"I Check OPEN ICV8324A or 1CV8324B.

"[] Check OPEN 1CV8146 or ICV8147.

  • THROTTLE ICV121 to Establish >30gpm normal charging header flow on 1FI-121A.
5. Turn on Pzr Backup Heaters. Energize PZR Backup heaters. 0l 0l 01 2

N-27B (5/25/01)

ZD73EXAM

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A 1* 6 . Check if Boration flow can Determine if boration can 0 0 0 be stopped. be stopped:

(CUE: When examinee has Calculate flowrate and determined how much time remaining to add time remains to 2,640 gals, inform US.

borate from the BAT, use time compression (1320 gal per rod if to proceed.) borating from the BAT)

  • 7. Stop Emergency Boration Stop Emergency Boration 0 0 0 Flow. flow.

"* Stop BA Transfer Pump

"* Close 1CV8104

8. Notify Chemistry to sample Determine RCS and PZR 01 01 01 the RCS and the PZR to boron concentrations are determine Boron within 50 ppm of each Concentrations. other:

"* Request chemistry sample RCS and PZR.

(CUE: If asked as chemistry, "* Maintain PZR Level.

acknowledge the need to sample.)

(CUE: CRS will assign another operator to align RMCS to AUTO makeup)

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 N-27B (5/25/01)

ZD73EXAM

TASK CONDITIONS:

1. You are the Unit NSO.
2. Unit 1 is in Mode 3 following a turbine trip / reactor trip.
3. Data A and Data B failures exist on two control rods.
4. Current RCS Boron Concentration is 1030 ppm.

INITIATING CUES:

2. Following a turbine trip / reactor trip, the crew is performing steps of IBwGP 100-5. DRPI for two (2) rods on the trip indicated Data A and Data B failures. After investigation it has been determined that these two rods my be partially withdrawn or stuck. You have been directed to emergency borate for this condition per 1BwGP 100-5 step F.11 CAUTION statement using IBwOA PRI-2.

4 N-27B (5/25/01)

ZD73EXAM

SIMULATOR SETUP INSTRUCTIONS JPM NO: N-27B REQUIRED SIMULATOR MODE(S):

MALFUNCTION #'S: (Data A & B Failures on 2 control rods)

COMMENTS:

1. Set BA pot for 4.41 (1030 ppm)
2. Provide cues/feedback from local operator at boric acid skid that lineup is correct (If asked)
3. Data A and Data B failure on two (2) control rods.

5 N-27B (5/25/01)

ZD73 EXAM

JOB PERFORMANCE MEASURE TASK TITLE: Establish Excess Letdown to the Volume Control Tank, CC cooling water failure 7PM No.: N-lla REV: 9 TPO No.: IV.C.CV-07 K&A No.: (APE022AK3.03)

TASK No.: CV-007 K&A IMP: 3.1 / 3.3 TRAINEE:

EVALUATOR:_____________ DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*)3,4,5,6 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME 9 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BWOP CV-15, Rev. 9, Excess Letdown Operations.

MATERIALS: None TASK STANDARDS:

1. Perform the actions required to place Excess Letdown in service.
2. Isolate Excess Letdown flow following loss of CC Cooling
3. Demonstrates the use of good Core Work Practices (CWP).

TASK CONDITIONS:

1. You are the Unit NSO.
2. The Unit is at steady state power.
3. Normal Letdown is in service at 120 gpm.

INITIATING CUES:

1. You have been directed by the US to establish Excess Letdown to the VCT using all loop drains and both excess letdown heat exchangers due to a suspected 0.5 gpm leak in the normal letdown line.
2. Estimated time for Excess Letdown operations will be approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
3. The SM does NOT desire flow directed to the VCT spray nozzle.

N-11 (06/25/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME

1. Determine correct Locate and Open 11 11 0l procedure BwOP CV-15.

(CUE: After examinee locates correct procedure, provide a copy.)

All prereqs, precautions and limits are met

2. Ensure thermal power VERIFY Rx Power is at least 0.1% below the 11 El El limits are not exceeded.

applicable power limit for plant operating (CUE: Calormetric power is conditions.

99.6% or indicated power if not at full power.)

  • 3. Establish Excess Letdown Perform the following: El El El to the VCT.

o VERIFY/OPEN 1CV8100 &

1CV8112, Seal Water Return Cnmt Isolation Valves

  • OPEN 1CC9437A, CC to Excess Letdown HX Isol Vlv at lPM06J
  • OPEN 1CC9437B, CC from Excess Letdown HX Isol Vlv at 1PMOGJ o VERIFY/CLOSE 1HCV CV123, Excess Letdown HX Flow Control Vlv at lPM05J (Note: Initiating cue was to align to the VCT.) o VERIFY/PLACE 1CV8143, excess Letdown to Seal Filter or RCDT Vlv, in the VCT position.

2 N-11 (06/25/01)

PERFORMANCE CHECKLIST S TANDARDS SAT UNSAT N/A

  • 4. Align Excess Letdown Perform the following: El 11 0l Lineup.

"* OPEN 1RC8037A-D, Loop Drain Valves, for the desired loop(s).

"* OPEN 1CV8153A&B, Excess Letdown HX lA/B Inlet Isol Vlv.

  • 5. Initiate Excess Letdown Perform the following: E0 11 01 flow.
  • SLOWLY OPEN IHCV CV123, Excess Letdown HX Flow Cont Vlv, as required to obtain desired flow.

o ENSURE Excess Letdown Outlet Temperature is

< 165 'F as indicated on lTI-122A, Excess Letdown HX Temperature.

Note: When excess letdown flow has been fully established, CC to letdown Hx valve, 1CC9437A, will close. This will result in increasing excess letdown temperatures.

Alternate path begins here.

k6. Respond to increasing Determine CC Cooling flow 0 E0 E0 Excess Letdown Hx Outlet is inadequate.

temperature.

o Determine 1CC9437A is closed and attempt to reopen.

Isolate Excess letdown before RCP Lower Bearing Temp Alarm comes in, (1-7-C2) at 184°F by either:

"o Closing all RC Loop Drain Valves 1RC8037A-D "oClosing flow control valve 1HCV123 "o Closing Hx isolation valves 1CV8153A&B (CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME MMENTS:

3 N-11 (06/25/01)

SIMULATOR SETUP INSTRUCTIONS T

PM NO: N-li REQUIRED SIMULATOR MODE(S): NOP-NOT or above MALFUNCTION #'S: N/A COMMENTS:

1) When excess letdown flow is fully established (monitor flow and lCV-123), then override CS for 1CC9437A to CLOSE (ZDIICC9437A) 5 N-il (06/25/01)

TASK CONDITIONS:

1. You are the Unit NSO.
2. The Unit is at steady state power.
3. Normal letdown is in service at 120 gpm.

INITIATING CUES:

1. You have been directed by the US to establish Excess Letdown to the VCT using all loop drains and both excess letdown heat exchangers due to a suspected 0.5 gpm leak in the normal letdown line.
2. Estimated time for Excess Letdown operations will be approximately 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
3. The SM does NOT desire flow directed to the VCT spray nozzle.

4 N-11 (06/25/01)

JOB PERFORMANCE MEASURE TASK TITLE: Respond to RCP Thermal Barrier Leak with CC Valve Failure JPM No.: N-118 REV: 2a TPO No.: IV.D.OA-51 K&A No.: (008K1.04)

TASK No.: OA-061 K&A IMP: 3.3/3.3 TRAINEE:

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 5, 6 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME 10 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. lBwOA PRI-6, Rev. 100, Component Cooling Malfunction
2. BwAR 1-7-E4, Rev. 51E2, RCP THERM BARR CC WTR FLOW HIGH LOW MATERIALS:

None TASK STANDARDS:

1. Determine RCS Thermal Barrier is leaking, and close 1CC685.
2. Isolate affected RCP thermal barrier, and restore CC cooling to unaffected thermal barriers
2. Demonstrates the use of good Core Work Practices (CWP).

TASK CONDITIONS:

1. You are the Assist NSO.
2. The Unit is at 100% power.

INITIATING CUES:

1. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed.

Using appropriate procedures, respond to the annunciator alarm.

N-118 (5/23/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME Note: Examinee may take the control switch for 1CC685 to CLOSE at any time (see step 6),

when it is noted that the valve did not automatically close on high flow.

ote: Examinee may refer to BwAR 1-7-E4 which directs responses per lBwOA Pri-6 (below) and lBwOA PRI-I. If examinee notes reference to IBWOA PRI-I, provide CUE: Another Operator will initiate actions of lBwOA-PRI-I, you are to perform actions of lBwOA PRI-6.

Note: Time compression will be used to enter containment and Cued as necessary.

1. Refer to IBwOA PRI-6, Locate and Open IBwOA El 01 01 Component Cooling PRI-6.

Malfunction.

(CUE:If asked, All Operator Action Summary elements have been reviewed and NONE currently require action.)

(CUE: Another operator will be assigned to review IBwOA PRI-I)

2. Check surge tank level > Checks Surge tank level:

"* ILIT-670/676 01 E0 01 13% and increasing.

"* Determines level > 13%

"* Determines level is increasing

"* Goes to Attachment B, per step l.b RNO.

"* Goes to Step 5 of Attachment B.

3. Checks for leakage from Checks for leakage from 01 E0 0l RCP Thermal Barrier. RCP Thermal Barrier:

"* Annunciator 1-7-E4 LIT.

"* Seal Injection Flows any abnormally high.

"* Determines 1A RCP has abnormally high flows.

4. Manually throttles 1CV121 Adjusts 1CV121 and 1CV182 to obtain between 8 and 01 0 El and 1CV182 to maintain seal injection flow. 13 gpm seal injection flow per RCP (as possible) 2 N-118 (5/23/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 5. Check lCC685 Closed. Determines corrective action to be taken:

0 0 0 (Note: Alternate path begins "o Checks position here) indication for 1CC685 "o Determines 1CC685 is OPEN.

"o Takes control switch for 1CC685 to CLOSED.

  • Manually Closes 1CC9438.
  • 6. Restore CC to unaffected Dispatch operator to enter cnmt and locally 01 01 0 RCPs by locally closing RCP Thermal Barrier CC close 1CC9496A.

outlet valve to isolate affected RCP.

(CUE: SM desires affected RCP to be isolated and CC restored to unaffected RCPs.) 0l 03 01 (CUE: Local operator After 1CC9496A closure, reports 1CC9496A reopen 1CC9438.

Closed)

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 N-118 (5/23/01)

SIMULATOR SETUP INSTRUCTIONS "PM NO: N-118 REQUIRED SIMULATOR MODE(S): 100%- steady state.

MALFUNCTION #'S: Malf CC09 231 gpm. (flow x-mitter failure)

Malf CC07A 25 gpm. (RCP therm barrier leak)

COMMENTS:

1) Override 1CC685, ZDIlCC685 OPEN (SDG CC7 or lPM06J(Al)CS override)
2) Note: adjust severity of malf CC07A to ensure actuation of HIGH FLOW alarm, 1-7-E4, but minimize RCS leak rate.
3) To locally operate/close 1CC9496A (SDG CC7)
4) Note: Time compression to perform containment entry to locally close 1CC9496A will be used. Cue as necessary.
5) If desired to simulate the alarm that comes in for operating the Cnmt hatch personnel door, override the annunciator at 1-1-B2, PN1148 ON/OFF as necessary.
6) Drain VCT / reset setup to 56%- via drn valves lCC202OA&B 5

N-118 (5/23/01)

ZD73EXAM

TASK CONDITIONS:

1. You are the Assist NSO.
2. The Unit is at 1001 power.

INITIATING CUES:

1. Annunciator 1-7-E4 RCP THERM BARR CC WTR FLOW HIGH LOW has just alarmed. Using appropriate procedures, respond to the annunciator alarm.

4 N-118 (5/23/01)

ZD73EXAM

JOB PERFORMANCE MEASURE TASK TITLE: Drain the Pressurizer Relief Tank (PRT)

JPM No.: N-119 REV: 2a TPO No.: IV.C.RY-03 K&A No.: (007A1.01)

TASK No.: RY-003 K&A IMP: 2.9/3.1 TRAINEE:

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 3,4,6,7 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 10 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP RY-4 Rev. 8, Draining the Pressurizer Relief Tank MATERIALS:

None TASK STANDARDS:

1. Decrease PRT level to < 80% , but > 75%.
2. Restores PRT Pressure to > 0 psig, if reduced to < 0 psig.
3. Demonstrates the use of good Core Work Practices.

TASK CONDITIONS:

1. You are the Assist NSO.
2. The Unit is at power.

INITIATING CUES:

1. PRT level has risen to 81% due to inadvertent opening of a PZR PORV. The US has directed you to lower PRT level to 78-79%.

1 N-119 (G/21/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME Note: Examinee may refer to BwAR 1-12-A7 "PRT LEVEL HIGH LOW." Actions here will direct

1) Checking PORVs and Safety Valves NOT open, 2) Drain the PRT per BwOP RY-4, 3) Check RCS leakage. It is not required for the examinee to perform these actions, but is acceptable f actions are completed.
1. Refer to BwOP RY-4, Locate and Open BwOP RY El 01 01 "Draining the PRT." 4.

(CUE: All Prerequisites, Precautions, Limitations and Actions have been met.)

2. Verify/ Open IAOV-RY8033, At lPM05J, VERIFY/OPEN:

0 1AOV-RY8033 01 01 0 Nitrogen Supply to PRT Isolation valve.

  • 3. Verify/ Open IRE1003, RCDT At IPMllJ, OPEN:

0 0 0 Pumps Discharge Cnmt

  • 1RE1003 Isolation Valve.
  • 4. Open lAOV-RY8031, PRT At lPMO5J, OPEN:

Drain Isolation Valve. IAOV-RY8031 1

0 o1 0

5. Verify/Start IRE01PA/B, At IPM05J:

RCDT Pump. & VERIFY/START IRE01PB.

01 ol 0

  • VERIFY PRT pressure remains > 0 psig on IPI-469.

NOTE: The following step will be CRITICAL, if during the lowering of PRT level, the PRT pressure drops to < 0 psig and the operator does NOT stop draining the PRT.

2 N-119(6/21/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 6. Verify PRT Pressure On lPM05J:

El El El remains > 0 psig. o Monitors PRT pressure indicator 1PI-469

  • Ensures PRT pressure remains > 0 psig while draining.

If PRT pressure falls to 0 psig, then immediately:

"* Stops draining PRT by stopping the running RCDT pump.

"* Allows PRT pressure to rise to -3 psig, before restarting RCDT pump.

  • 7.. Close lAOV-RY8031, PRT When PRT level is between Drain Isolation Valve, 75-80%, on lPM05J, takes El when desired level is control switch for lAOV reached. RY8031 to CLOSE.

El El0 El

8. Stop running RCDT pump. On lPM05J, VERIFY/STOP RCDT pump when lAOV RY El 8031 CLOSES:

0 1RE01PA

  • 1RE01PB (CUE:) THIS COMPLETES THIS JPM.

RECORDl STOP TIME __________

COMMENTS:

3 N-119(6/21/01)

SIMULATOR SETUP INSTRUCTIONS PM NO: N-119 REQUIRED SIMULATOR MODE(S): At power, steady state MALFUNCTION #'S: N/A COMMENTS:

1) Vent PRT, then start filling PRT.
2) Fill PRT to 81% level.
3) Ensure RCDT pump controls in AUTO on lPM05J.
4) Ensure 1RE1003 is closed and in AUTO on 1PMllJ.
5) Stop PRT Venting.

5 N-119 (6/21/01)

ZD73EXAM

TASK CONDITIONS:

1. You are the Assist NSO.
2. The Unit is at power.

INITIATING CUES:

1. PRT level has risen to 81* due to inadvertent opening of a PZR PORV. The US has directed you to lower PRT level to 78-79%.

4 N-119 (6/21/01)

ZD73EXAM

JOB PERFORMANCE MEASURE TASK TITLE: Drain the Pressurizer Relief Tank (PRT)

IM No.: N-119 REV: 2b TPO No.: IV.C.RY-03 K&A No.: (007A1.01)

TASK No.: RY-003 K&A IMP: 2.9/3.1 TRAINEE:

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 3,4,6,7 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 10 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. BwOP RY-4 Rev. 9, Draining the Pressurizer Relief Tank MATERIALS:

None TASK STANDARDS:

1. Decrease PRT level to < 80%, but > 75%.
2. Restores PRT Pressure to > 0 psig.
3. Demonstrates the use of good Core Work Practices.

TASK CONDITIONS:

1. You are the Assist NSO.
2. The Unit is at power.

INITIATING CUES:

1. PRT level has risen to due to inadvertent opening of a PZR PORV. The US has directed you to lower PRT level to 78-79%.

1 N-II9 (6/21/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME

"-ote: Examinee may refer to BwAR 1-12-A7 "PRT LEVEL HIGH LOW." Actions here will direct Checking PORVs and Safety Valves NOT open, 2) Drain the PRT per BWOP RY-4, 3) Check RCS

-eakage. It is not required for the examinee to perform these actions, but is acceptable if actions are completed.

1. Refer to BwOP RY-4, Locate and Open BwOP RY 11 El 0l "Draining the PRT." 4.

(CUE: All Prerequisites, Precautions, Limitations and Actions have been met.)

2. Verify/ Open lAOV-RY8033, At IPM05J, VERIFY/OPEN:

El

  • 3. Verify/ Open IRE1003, RCDT At lPMIIJ, OPEN:

E] 0l Pumps Discharge Cnmt

  • 1RE1003 Isolation Valve.

El

  • 4. Open IAOV-RY8031, PRT At lPM05J, OPEN:

Drain Isolation Valve. 0 1AOV-RY8031 El 11 El

5. Verify/Start IRE01PA/B, At lPM05J:

RCDT Pump. a VERIFY/START lRE01PB.

  • VERIFY PRT pressure remains > 0 psig on IPI-469.

NOTE: The following step will simulate draining of the PRT at a rate faster than N2 is supplied, reducing PRT pressure to zero (0). The alternate path begins here by stopping the drain and restoring pressure prior to reaching the desired level.

N-119(6/21/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 6. Verify PRT Pressure On IPM05J:

0l 0l 0l remains > 0 psig. O Monitors PRT pressure indicator 1PI-469

"* Determines PRT pressure is *0 psig.

"* Stops draining PRT by stopping the running RCDT pump.

"* Allows PRT pressure to rise to -3 psig, before restarting RCDT pump.

  • 7. Close IAOV-RY8031, PRT When PRT level is between o El El Drain Isolation Valve, 75-80%, on IPM05J, takes when desired level is control switch for IAOV reached. RY8031 to CLOSE.

On IPM05J, VERIFY/STOP 0l 0l

8. Stop running RCDT pump. El RCDT pump when IAOV RY 8031 CLOSES:

0 IRE01PA IlRE01PB (CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 N-119(6/21/01)

TASK CONDITIONS:

1. You are the Assist NSO.
2. The Unit is at power.

INITIATING CUES:

1. PRT level has risen to due to inadvertent opening of a PZR PORV. The US has directed you to lower PRT level to 78-79%.

4 N-119 (6/21/01)

ZD73EXAM

SIMULATOR SETUP INSTRUCTIONS JPM NO: N-119 REQUIRED SIMULATOR MODE(S): At power, steady state MALFUNCTION #'S: N/A COMMENTS:

1) Vent PRT, then start filling PRT.
2) Fill PRT to 81% level.
3) Ensure RCDT pump controls in AUTO on IPM05J.
4) Ensure IRE1003 is closed and in AUTO on IPMIIJ.
5) Stop PRT Venting.
6) When the PRT drain valve is opened, slowly decrease PRT pressure to 0 before reaching 80%. Restore pressure when the drain valve is closed or RCDT pump is secured.

5 N-119 (6/21/01)

ZD73 EXAM

JOB PERFORMANCE MEASURE TASK TITLE: Restore from Auxiliary Feedwater Check Valve Leakage JPM No.: N-57a REV: 0 TPO No.: K&_A No.: (035K1.01)

TASK No.: K&A IMP: 4.2/4.5 TRAINEE:

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*)3-6 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME 8 MINUTES EVALUATION METHOD: LOCATION:

X PERFORM IN PLANT SIMULATE X SIMULATOR GENERAL

REFERENCES:

1. lBwOA SEC-7, Rev. 4A, Auxiliary Feedwater Check Valve Leakage MATERIALS:

Copy of lBwOA SEC-7.

TASK STANDARDS:

1. Recover AFW line temperatures.
2. Demonstrates the use of good Core Work Practices (CWP).

TASK CONDITIONS:

1. You are the Assist NSO.
2. Unit 1 is at 99% power.

INITIATING CUES:

1. Auxiliary Feedwater line temperature failed to return to normal following a Train A AFW flow path operability non routine surveillance. lBwOA SEC-7, "Auxiliary Feedwater Check Valve Leakage" is in progress to address suspected check valve leakage on the Train A, loop 1B injection line. The crew has completed performing step 2. AFW piping has cooled to <130 0 F. You have been directed by the US to complete steps 3&4 of lBwOA SEC-7.

1 N-57 (2/28/2000)

ZD73EXAM

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME Note: When examinee locates correct procedure, provide a copy for placekeeping.

1. Refer to lBwOA SEC-7. Locate and Open lBwOA El EJ 11 SEC-7.

(CUE: US acknowledges entry into o Inform US of entry lBwOA SEC-7. SM has previously evaluated for GSEP.)

Affected temp is 98 0 F if asked)

2. Verify 1AF013B Closed Verify closed affected SG El El El isolation valve:
  • 1AF013B
  • 3. Start 1A AFW Pump Start 1A AFW Pump per El El El BwOP AF-5 (CUE: All Prereqs, precautions, o Review Prereqs, Limits and actions of BwOP precautions, limits AF-5 are met. An operator and actions is standing by locally and ready to start 1A AFW Pump. Through step 9 of AF-5 is complete. Step 10 is NA per SM.

(CUE: LOCAL/REMOTE switch at

  • Start the 1A AFW Pump 1PL04J is in REMOTE) from lPM06J (CUE: Recirc flow is 98 gpm) "o Verify recirc flow >84 gpm locally at FI AF095 "o Perform applicable (CUE: Local operator will steps of AF-5T1 complete AF-5T1 if asked)
  • 4. Establish 15-20 gpm AFW "o Throttle open 1AF013B El El El flow (NOTE: Alternate Path begins Identify failure of here. Operators will not 1AF013B to adequately be able to control AF013B control flow rate to 15 valve position well enough 20 gpm.

to limit AF Flow to 15-20 o Open 1AF013B gpm and will have to

  • throttle 1AF005B to throttle AF005B to establish 15-20 gpm maintain this flow rate.) flow rate.

o Maintain flow for a (CUE: Use time compression if minimum of 10 minutes.

flow is stabilized.

2 N-57 (2/28/2000)

ZD73EXAM

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A

  • 5. Shutdown the 1A AFW Pump Locate and open BwOP AF-6 El 11 El and shutdown the 1A AFW Pump.

"* Direct local start of (CUE: lube oil pump is started.

lube oil pump

"* Place control switch at lPM06J to NORM/AFTER TRIP (CUE: AF004A is OPEN and in AUTO o Verify open AF004A at local control panel)

  • 6. Restore AF Alignment AT lPM06J:

13 11 El

"* Verify lAF013A-D OPEN

"* Set 1AF05B Potentiometer at 6.8 (CUE: Crew will wait 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to o Inform US of need to check AF piping <130°F. The wait 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to JPM should be ended here. recheck AF Temps.

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

3 N-57 (2/28/2000)

ZD73EXAM

SIMULATOR SETUP INSTRUCTIONS

-PM NO: N-57 REQUIRED SIMULATOR MODE(S): N/A MALFUNCTION #'S: N/A COMMENTS:

Close IAF013B (Train A, Loop lB AF Isolation Valve)

Start 1A AFW Pump Aux Oil Pump. Ensure run light lit on lPM06J When AF013B begins to open, override CS to OPEN (lPM06J(Al) or (ZDI1AF013B) to force AF flow > 20 gpm. DELETE override when this is accomplished.

REPEAT if further attempts at 1AF013B control is made. The object is to NOT allow control at 15-20 gpm and force throttling of lAF005B.

5 N-57(2/28/2000)

ZD73EXAM

TASK CONDITIONS:

1. You are the Assist NSO.
2. Unit 1 is at 99% power.

INITIATING CUES:

1. Auxiliary Feedwater line temperature failed to return to normal following a Train A AFW flow path operability non routine surveillance. lBwOA SEC-7, "Auxiliary Feedwater Check Valve Leakage" is in progress to address suspected check valve leakage on the Train A, loop lB injection line. The crew has completed performing step 2. AFW piping has cooled to 98°F. You have been directed by the US to complete steps 3&4 of lBwOA SEC-7.

4 N-57 (2/28/2000)

ZD73EXAM

JOB PERFORMANCE MEASURE TASK TITLE: Align Fire Protection Cooling to the 2A Centrifugal Charging Pump 1PM No.: N-138 REV: 0 TPO No.: IV.D.OA-69 K&A No.: .02A4K3.03 TASK No.: K&_A IMP: 4.0/4.2 TRAINEE:

EVALUATOR: DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 2 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 13 MINUTES EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. 2BwOA PRI-8, Essential Service Water Malfunction MATERIALS:

None TASK STANDARDS:

1. Perform the actions necessary to align FP cooling to the 2A CV Pump
2. Demonstrates the use of good Core Work Practices.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 2 is experiencing a loss of Essential Service Water and cannot be cross-tied.

INITIATING CUES:

1. The Unit Supervisor has directed you to perform the actions necessary to align Fire Protection Cooling to ONLY the 2A Centrifugal Charging Pump per 2BwOA PRI-8, Attachment C 1

N-138(7/23/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A RECORD START TIME

1. Refer to 2BwOA PRI-8, Locate and open 2BwOA 0l 0l 0l Essential Service Water PRI-8, Attachment C Malfunction.

NOTE: This step may be performed at any time

  • 2. Locally align FP to CHG PUMP Lube Oil Cooler (CUE: FP Supply Hose Connected. CONNECT fire hose El 0 0 (located in 2A CV Pump room) to CV Pump 2A Simulate hose hookup - do lube oil cooler ANDFP NOT remove it from the connection outside 2A locker)

CV Pump room ('364' V18)

(CUE: OFP840 is OPEN) "* OPEN FP hose supply El El 0l isolation valve 0FP840 (364' V18)

(CUE: Hose is not pinched by room door. No kinks in hose) "* VERIFY fire hose CHARGED El El El (CUE: 2SX259A is OPEN)

"* OPEN CENT CHG Pump oil cooler FP Supply valve 0l 2SX259A (CUE: 2SX258A is CLOSED) "* CLOSE CENT CHG Pump 01 0l Dl oil cooler SX Supply valve 2SX258A

3. CHECK CENT CHG Pump 2A Operation. INFORM NSO 2A CV Pump is 0l El El ready to start (CUE: 2A CV Pump is ready to start)

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

2 N-138 (7/23/01)

TASK CONDITIONS:

1. You are an extra NSO.
2. The Unit 2 is experiencing a loss of Essential Service Water and cannot be cross-tied.

INITIATING CUES:

1. The Unit Supervisor has directed you to perform the actions.

necessary to align Fire Protection Cooling to ONLY the 2A.

Centrifugal Charging Pump per 2BwOA PRI-8, Attachment C 3

IN-138 (7/23/01)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A JOB PERFORMANCE MEASURE TASK TITLE: Align the Fire Hazards Panel

-PM No.: N-34 REV: 9 TPO No.: IV.D.OA-27 K&A No.: (APE068AA1.03)

TASK No.: OA-112 K&A IMP: 4.1/4.3 TRAINEE:

EVALUATOR:_______________________ DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 2 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 13 MINUTES EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. 2BwOA PRI-5, Rev. 100, Control Room Inaccessibility MATERIALS:

Copy of 2BwOA PRI-5 TASK STANDARDS:

1. Activate the Fire Hazards Panel
2. Demonstrates the use of good Core Work Practices.

TASK CONDITIONS:

1. You are an extra NSO.
2. A fire is ongoing in the Main Control Room and the Unit 2 AEER.
3. The Remote Shutdown Panels have been manned.
4. lBwOA PRI-5 and 2BwOA PRI-5 are in progress.

INITIATING CUES:

1. You have been directed to align the Fire Hazards Panel in order to establish the capability to monitor Unit 2 S/G Levels, S/G Pressures, PZR Level, and PZR Pressure per step 7.c. RNO of 2BwOA PRI-5.

1 N-34 (7/12/2001)

PERFORMANCE CHECKLIST STANDARDS SAT UNSAT N/A CWP RECORD START TIME

1. Refer to procedure and Locate and obtain 2BwOA 0 0] 0 proceed to 2PLIOJ, Fire PRI-5, step 7.c RNO and hazards Panel. proceed to Fire Hazards Panel.

(CUE: When examinee locates correct procedure, provide a copy..)

(Note: 426' CWA U-12 Unit 1, S-24 on Unit 2.)

  • 2. Activate the Fire Hazards Place the following panel 01 01 01 Panel. switches to the FIRE position:

(CUE: 2HS-FW309 is in FIRE "* 2HS-FW309 - SG 2A WR position. If asked Level for indication 60%.)

(CUE: 2HS-FW310 is in FIRE "* 2HS-FW310 - SG 2B WR position. If asked Level for indication 60%.)

(CUE: 2HS-MS193 is in FIRE "* 2HSLMSI93 - SG 2A position. If asked Pressure for indication 1080 psig.)

(CUE: 2HS-MS194 is in FIRE "* 2HS-MS194 - SG 2B position. If asked Pressure for indication 1080 psig.)

(CUE: 2HS-RY034 is in FIRE "* 2HS-RY034 - PZR Level position. If asked for indication 30%.)

(CUE: 2HS-RY033 is in FIRE "* 2HS-RY033 - PZR position. If asked Pressure for indication 2200 psig.)

(CUE:) THIS COMPLETES THIS JPM.

RECORD STOP TIME COMMENTS:

2 N-34(7/12/2001)

SIMULATOR SETUP INSTRUCTIONS TPM NO: N-34 REQUIRED SIMULATOR MODE(S): N/A, IN PLANT MALFUNCTION #'S: N/A COMMENTS:

4 N-34(7/12/2001)

TASK CONDITIONS:

1. You are an extra NSO.
2. A fire is ongoing in the Main Control Room and the Unit 2 AEER.
3. The Remote Shutdown Panels have been manned.
4. lBwOA PRI-5 and 2BwOA PRI-5 are in progress.

INITIATING CUES:

1. You have been directed to align the Fire Hazards Panel in order to establish the capability to monitor Unit 2 S/G Levels, S/G Pressures, PZR Level, and PZR Pressure per step 7.c.RNO of 2BwOA PRI-5.

3 N-34 (7/12/2001)

JOB PERFORMANCE MEASURE TASK TITLE: Perform Local Reset of Feedwater Isolation Signal JPM No.: N-91 REV: 6 TPO No.: IV.D.EF-03 K&A No.: (013A4.02)

TASK-No.: EF-003 K&A IMP: 4.3/4.4 TRAINEE:

EVALUATOR:_ DATE:

The Trainee: PASSED this JPM. TIME STARTED:

FAILED TIME FINISHED:

CRITICAL ELEMENTS: (*) 3, 4 JPM TIME: MINUTES CRITICAL TIME: NA APPROX COMPLETION TIME: 7 MINUTES EVALUATION METHOD: LOCATION:

PERFORM X IN PLANT X SIMULATE SIMULATOR GENERAL

REFERENCES:

1. 2BWFR-H.I, Rev. 100, WOG IC, Response to Loss of Secondary Heat Sink MATERIALS:

Keys for 2PA27J and 2PA28J, Laser pointer.

Copy of 2BwFR-H.l, step 7.

TASK STANDARDS:

1. Correctly RESET Feedwater Isolation Signal as required by 2BwFR-H.I, step 7.
2. Demonstrates the use of good Core Work Practices.

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 2 NSOs are responding to a steamline break inside containment after a safety injection.
3. Conditions have deteriorated to the point that an entry into 2BwFR-H.I, Loss of Secondary Heat Sink has been made.

INITIATING CUES:

1. The Unit Supervisor has directed you to locally reset FW Isolation by performing the actions of 2BwFR-H.I step 7.f.

_,&CORD START TIME 1

N-91(7/14/01)

Note: Prompt the use of a laser pointer to identify components located inside electrical cabinets.

1. Refer to 2BwFR H.1 step Locate and open 2BwFR 11 0 11 7.f. H.1, step 7.f.

(CUE: After examinee locates procedure, provide a copy.)

2. Obtain keys for and locate Obtains keys for and 11 11 El Safeguards Cabinets 2PA27J proceed to.Safeguards and 2PA28J. Cabinets 2PA27J and 2PA28J:

"* Obtain keys for Cabinets 2PA27J and 2PA28J from the Shift Office.

"* Proceed to 2PA27J/

2PA28J (U2 AEER).

Note: JPM steps 3 and 4 may be performed in any order. Prompt use of laser pointer vice breaking plane of cabinet.

  • 3. De-energize Feedwater At 2PA27J, De-energize El El El Isolation Aux Relays by Feedwater Isolation Aux removing fuses at Aux. Relays by removing:

Safeguard Relay Cabinet 2PA27J.

"* Fuse FU-24 (CUE: Fuse FU-24 is removed. "* Fuse FU-27 Fuse FU-27 is removed.)

  • 4. De-energize Feedwater At 2PA28J, De-energize Feedwater Isolation Aux 11 El El Isolation Aux Relays by removing fuses at Aux. Relays by removing:

Safeguard Relay Cabinet 2PA28J.

S Fuse FU-24 (CUE: Fuse FU-24 is removed. S Fuse FU-27 Fuse FU-27 is removed.)

,(CUE: THIS COMPLETES THIS JPM.)

7ECORD STOP TIME___________

2 N -91(7/14/01)

SIMULATOR SETUP INSTRUCTIONS TPM NO: N-91 REQUIRED SIMULATOR MODE(S): N/A Inplant.

MALFUNCTION #'S: N/A COMMENTS:

4 N-91(7/14/01)

TASK CONDITIONS:

1. You are an extra NSO.
2. Unit 2 NSOs are responding to a steamline break inside containment after a safety injection.
3. Conditions have deteriorated to the point that an entry into 2BwFR-H.1, Loss of Secondary Heat Sink has been made.

INITIATING CUES:

1. The Unit Supervisor has directed you to locally reset FW Isolation by performing the actions of 2BwFR-H.l step 7.f.

3 N-91 (7/14/01)