Draft SER with Open Items Related to License Renewal of McGuire, Units 1 & 2 and Catawba, Units 1 & 2, Table of Contents
ML022270577
Person / Time
Site: Mcguire, Catawba, McGuire  Duke Energy icon.png
Issue date: 08/14/2002
From: Kuo P
Division of Regulatory Improvement Programs
To: Tuckman M
Duke Energy Corp
Franovich R, NRR/DRIP/RLEP, 415-1868
References
+adjud/rulemjr200506
Download: ML022270577 (25)


Text

Safety Evaluation Report with Open Items Related to the License Renewal of McGuire Nuclear Station, Units 1 and 2 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370, 50-413 and 50-414 Duke Energy Corporation U.S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation August 2002

-ii-ABSTRACT This safety evaluation report documents the Nuclear Regulatory Commissions (NRCs) review of Duke Energy Corporations (Dukes) application to renew the operating licenses for McGuire Nuclear Station, Units 1 and 2 (McGuire 1 and 2), and Catawba Nuclear Station, Units 1 and 2 (Catawba 1 and 2). The NRCs Office of Nuclear Reactor Regulation has reviewed the McGuire 1 and 2 and Catawba 1 and 2 license renewal application for compliance with the requirements of Title 10 of the Code of Federal Regulations, Part 54, Requirements for Renewal of Operating Licenses for Nuclear Power Plants, and prepared this report to document its findings.

On June 13, 2001, Duke submitted applications for renewal of McGuire 1 and 2 Operating License Nos. NPF-9 and NPF-17, which were issued pursuant to Section 103 of the Atomic Energy Act of 1954, as amended, for a period of up to 20 years beyond the current license expiration dates of June 12, 2021, and March 3, 2023, for McGuire 1 and 2, respectively. The McGuire nuclear facility is located 17 miles north-northwest of Charlotte, North Carolina, in Mecklenburg County. McGuire 1 and 2 are four-loop, Westinghouse pressurized-water reactors with nuclear steam supply systems designed to generate 3411 megawatts thermal, or 1129 megawatts electric.

In the same submittal of June 13, 2001, Duke requested renewal of the Catawba 1 and 2 Operating License Nos. NPF-35 and NPF-52, which were issued under Section 103 of the Atomic Energy Act of 1954, as amended, for a period of up to 19 years beyond the current license expiration dates of December 6, 2024, and February 24, 2026, respectively. The Catawba nuclear facility is located 18 miles southwest of Charlotte, North Carolina, in York County. Catawba 1 and 2 are four-loop, Westinghouse pressurized-water reactors with nuclear steam supply systems designed to generate 3411 megawatts thermal, or 1129 megawatts electric.

The NRC McGuire and Catawba license renewal project manager is Rani Franovich. Ms.

Franovich may be reached at 301-415-1868. Written correspondence should be addressed to the License Renewal and Environmental Impacts Program, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

-iii-THIS PAGE IS INTENTIONALLY LEFT BLANK

-iv-Table of Contents Abstract................................................................. -iii-Table of Contents.........................................................

-v-Abbreviations.......................................................... -xxiv-1 Introduction and General Discussion......................................... 1-1 1.1 Introduction........................................................ 1-1 1.2 License Renewal Background.......................................... 1-2 1.2.1 Safety Reviews................................................. 1-3 1.2.2 Environmental Reviews.......................................... 1-5 1.3 Summary of Principal Review Matters.................................... 1-6 1.3.1 Westinghouse Topical Reports..................................... 1-7 1.4 Summary of Open Items.............................................. 1-7 2 Scoping and Screening Methodology......................................... 2-1 2.1 Scoping and Screening Methodology.................................... 2-1 2.1.1 Introduction.................................................... 2-1 2.1.2 Summary of Technical Information in the Application.................... 2-1 2.1.2.1 Scoping Methodology

....................................... 2-2 2.1.2.1.1 Safety-related Systems, Structures and Components........... 2-2 2.1.2.1.2 Non-safety-related Systems, Structures and Components....... 2-2 2.1.2.1.3 Regulated Events...................................... 2-3 2.1.2.2 Screening Methodology...................................... 2-3 2.1.2.2.1 Screening Methodology for Mechanical Components........... 2-3 2.1.2.2.2 Screening Methodology for Structural Components............ 2-4 2.1.2.2.3 Screening Methodology for Electrical Components............. 2-4 2.1.3 Staff Evaluation................................................ 2-5 2.1.3.1 Evaluation of the Methodology for Identifying Systems, Structures and Components Within the Scope of License Renewal

...................... 2-6 2.1.3.1.1 Mechanical Scoping Methodology......................... 2-8 2.1.3.1.2 Structural Scoping Methodology........................... 2-9 2.1.3.1.3 Electrical Scoping Methodology

.......................... 2-10 2.1.3.2 Evaluation of the Methodology for Identifying Structures and Components Subject to an Aging Management Review............................. 2-11 2.1.3.2.1 Mechanical Component Screening Methodology.............. 2-11 2.1.3.2.2 Structural Screening Methodology

........................ 2-13 2.1.3.2.3 Electrical Screening Methodology......................... 2-13 2.1.4 Conclusions.................................................. 2-14 2.1.5 References for Section 2.1....................................... 2-14 2.2 Plant-Level Scoping Results.......................................... 2-15 2.2.1 Introduction................................................... 2-15 2.2.2 Summary of Technical Information in the Application................... 2-15 2.2.2.1 Systems, Structures and Components within the Scope of License Renewal....................................................... 2-15 2.2.2.2 Systems and Structures Not within the Scope of License Renewal.... 2-15

-v-2.2.3 Staff Evaluation............................................... 2-15 2.2.4 Conclusions.................................................. 2-18 2.3 System Scoping and Screening Results: Mechanical....................... 2-19 2.3.1 System Scoping and Screening Results: Reactor Coolant System......... 2-19 2.3.1.1 Reactor Coolant System Description........................... 2-19 2.3.1.1.1 Technical Information in the Application.................... 2-19 2.3.1.1.2 Staff Evaluation....................................... 2-20 2.3.1.1.3 Conclusions

......................................... 2-20 2.3.1.2 Class 1 Piping, Valves and Pumps

............................ 2-21 2.3.1.2.1 Technical Information in the Application.................... 2-21 2.3.1.2.2 Staff Evaluation....................................... 2-21 2.3.1.2.3 Conclusions

......................................... 2-21 2.3.1.3 Pressurizer............................................... 2-23 2.3.1.3.1 Technical Information in the Application.................... 2-23 2.3.1.3.2 Staff Evaluation....................................... 2-23 2.3.1.3.3 Conclusions

......................................... 2-24 2.3.1.4 Reactor Vessel and Control Rod Drive Mechanism Pressure Boundary 2-24 2.3.1.4.1 Technical Information in the Application.................... 2-24 2.3.1.4.2 Staff Evaluation....................................... 2-25 2.3.1.4.3 Conclusions

......................................... 2-26 2.3.1.5 Reactor Vessel Internals.................................... 2-26 2.3.1.5.1 Technical Information in the Application.................... 2-27 2.3.1.5.2 Staff Evaluation....................................... 2-27 2.3.1.5.3 Conclusions

......................................... 2-28 2.3.1.6 Steam Generator.......................................... 2-28 2.3.1.6.1 Technical Information in the Application.................... 2-29 2.3.1.6.2 Staff Evaluation....................................... 2-29 2.3.1.6.3 Conclusions

......................................... 2-31 2.3.2 System Scoping and Screening Results: Engineered Safety Features...... 2-32 2.3.2.1 Annulus Ventilation System.................................. 2-32 2.3.2.1.1 Technical Information in the Application.................... 2-32 2.3.2.1.2 Staff Evaluation....................................... 2-34 2.3.2.1.3 Conclusions

......................................... 2-36 2.3.2.2 Containment Isolation System................................ 2-37 2.3.2.2.1 Technical Information in the Application.................... 2-37 2.3.2.2.2 Staff Evaluation....................................... 2-37 2.3.2.2.3 Conclusions

......................................... 2-38 2.3.2.3 Containment Air Return Exchange & Hydrogen Skimmer System..... 2-38 2.3.2.3.1 Technical Information in the Application.................... 2-38 2.3.2.3.2 Staff Evaluation....................................... 2-39 2.3.2.3.3 Conclusions

......................................... 2-41 2.3.2.4 Containment Spray System.................................. 2-41 2.3.2.4.1 Technical Information in the Application.................... 2-41 2.3.2.4.2 Staff Evaluation....................................... 2-42 2.3.2.4.3 Conclusions

......................................... 2-42 2.3.2.5 Containment Valve Injection Water System...................... 2-42 2.3.2.5.1 Technical Information in the Application.................... 2-43 2.3.2.5.2 Staff Evaluation....................................... 2-43

-vi-2.3.2.5.3 Conclusions

......................................... 2-43 2.3.2.6 Refueling Water System.................................... 2-44 2.3.2.6.1 Technical Information in the Application.................... 2-44 2.3.2.6.2 Staff Evaluation....................................... 2-44 2.3.2.6.3 Conclusions

......................................... 2-46 2.3.2.7 Residual Heat Removal System............................... 2-46 2.3.2.7.1 Technical Information in the Application.................... 2-46 2.3.2.7.2 Staff Evaluation....................................... 2-47 2.3.2.7.3 Conclusions

......................................... 2-50 2.3.2.8 Safety Injection System..................................... 2-50 2.3.2.8.1 Technical Information in the Application.................... 2-50 2.3.2.8.2 Staff Evaluation....................................... 2-50 2.3.2.8.3 Conclusions

......................................... 2-51 2.3.2.9 Miscellaneous Instrumentation System......................... 2-51 2.3.2.9.1 Technical Information in the Application.................... 2-52 2.3.2.9.2 Staff Evaluation....................................... 2-52 2.3.2.9.3 Conclusions

......................................... 2-53 2.3.3 System Scoping and Screening Results: Auxiliary Systems.............. 2-54 2.3.3.1 Auxiliary Building Ventilation System........................... 2-54 2.3.3.1.1 Technical Information in the Application.................... 2-54 2.3.3.1.2 Staff Evaluation....................................... 2-56 2.3.3.1.3 Conclusions

......................................... 2-58 2.3.3.2 Boron Recycle System...................................... 2-59 2.3.3.2.1 Technical Information in the Application.................... 2-59 2.3.3.2.2 Staff Evaluation....................................... 2-59 2.3.3.2.3 Conclusions

......................................... 2-60 2.3.3.3 Building Heating Water System............................... 2-60 2.3.3.3.1 Technical Information in the Application.................... 2-60 2.3.3.3.2 Staff Evaluation....................................... 2-61 2.3.3.3.3 Conclusions

......................................... 2-62 2.3.3.4 Chemical & Volume Control System........................... 2-62 2.3.3.4.1 Technical Information in the Application.................... 2-62 2.3.3.4.2 Staff Evaluation....................................... 2-63 2.3.3.4.3 Conclusions

......................................... 2-64 2.3.3.5 Component Cooling System

................................. 2-64 2.3.3.5.1 Technical Information in the Application.................... 2-64 2.3.3.5.2 Staff Evaluation....................................... 2-65 2.3.3.5.3 Conclusions

......................................... 2-70 2.3.3.6 Condenser Circulating Water System.......................... 2-70 2.3.3.6.1 Technical Information in the Application.................... 2-70 2.3.3.6.2 Staff Evaluation....................................... 2-71 2.3.3.6.3 Conclusions

......................................... 2-75 2.3.3.7 Containment Ventilation Systems............................. 2-75 2.3.3.7.1 Technical Information in the Application.................... 2-75 2.3.3.7.2 Staff Evaluation....................................... 2-76 2.3.3.7.3 Conclusions

......................................... 2-76 2.3.3.8 Control Area Ventilation System and Chilled Water System......... 2-76 2.3.3.8.1 Control Area Ventilation System.......................... 2-76

-vii-2.3.3.8.1.1 Technical Information in the Application................ 2-76 2.3.3.8.1.2 Staff Evaluation.................................. 2-78 2.3.3.8.1.3 Conclusions..................................... 2-82 2.3.3.8.2 Control Area Chilled Water System........................ 2-82 2.3.3.8.2.1 Technical Information in the Application................ 2-82 2.3.3.8.2.2 Staff Evaluation.................................. 2-83 2.3.3.8.2.3 Conclusions..................................... 2-86 2.3.3.9 Conventional Waste Water Treatment System................... 2-87 2.3.3.9.1 Technical Information in the Application.................... 2-87 2.3.3.9.2 Staff Evaluation....................................... 2-87 2.3.3.9.3 Conclusions

......................................... 2-88 2.3.3.10 Diesel Building Ventilation System............................ 2-89 2.3.3.10.1 Technical Information in the Application................... 2-89 2.3.3.10.2 Staff Evaluation...................................... 2-90 2.3.3.10.3 Conclusions

........................................ 2-93 2.3.3.11 Diesel Generator Air Intake and Exhaust System................ 2-93 2.3.3.11.1 Technical Information in the Application................... 2-93 2.3.3.11.2 Staff Evaluation...................................... 2-94 2.3.3.11.3 Conclusions

........................................ 2-95 2.3.3.12 Diesel Generator Cooling Water System....................... 2-95 2.3.3.12.1 Technical Information in the Application................... 2-95 2.3.3.12.2 Staff Evaluation...................................... 2-96 2.3.3.12.3 Conclusions

........................................ 2-97 2.3.3.13 Diesel Generator Crankcase Vacuum System................... 2-97 2.3.3.13.1 Technical Information in the Application................... 2-97 2.3.3.13.2 Staff Evaluation...................................... 2-98 2.3.3.13.3 Conclusions

........................................ 2-99 2.3.3.14 Diesel Generator Fuel Oil System............................ 2-99 2.3.3.14.1 Technical Information in the Application.................. 2-100 2.3.3.14.2 Staff Evaluation..................................... 2-100 2.3.3.14.3 Conclusions

....................................... 2-102 2.3.3.15 Diesel Generator Lube Oil System........................... 2-103 2.3.3.15.1 Technical Information in the Application.................. 2-103 2.3.3.15.2 Staff Evaluation..................................... 2-104 2.3.3.15.3 Conclusions

....................................... 2-105 2.3.3.16 Diesel Generator Room Sump Pump System.................. 2-106 2.3.3.16.1 Technical Information in the Application.................. 2-106 2.3.3.16.2 Staff Evaluation..................................... 2-106 2.3.3.16.3 Conclusions

....................................... 2-107 2.3.3.17 Diesel Generator Starting Air System

........................ 2-107 2.3.3.17.1 Technical Information in the Application.................. 2-108 2.3.3.17.2 Staff Evaluation..................................... 2-108 2.3.3.17.3 Conclusions

....................................... 2-110 2.3.3.18 Drinking Water System................................... 2-111 2.3.3.18.1 Technical Information in the Application.................. 2-111 2.3.3.18.2 Staff Evaluation..................................... 2-111 2.3.3.18.3 Conclusions

....................................... 2-112 2.3.3.19 Fire Protection System.................................... 2-113

-viii-2.3.3.19.1 Technical Information in the Application.................. 2-113 2.3.3.19.2 Staff Evaluation..................................... 2-114 2.3.3.19.3 Conclusions

....................................... 2-121 2.3.3.20 Fuel Handling Building Ventilation System..................... 2-121 2.3.3.20.1 Technical Information in the Application.................. 2-121 2.3.3.20.2 Staff Evaluation..................................... 2-123 2.3.3.20.3 Conclusions

....................................... 2-125 2.3.3.21 Groundwater Drainage System............................. 2-125 2.3.3.21.1 Technical Information in the Application.................. 2-126 2.3.3.21.2 Staff Evaluation..................................... 2-126 2.3.3.21.3 Conclusions

....................................... 2-127 2.3.3.22 Hydrogen Bulk Storage System............................. 2-127 2.3.3.22.1 Technical Information in the Application.................. 2-127 2.3.3.22.2 Staff Evaluation..................................... 2-127 2.3.3.22.3 Conclusions

....................................... 2-128 2.3.3.23 Instrument Air System.................................... 2-128 2.3.3.23.1 Technical Information in the Application.................. 2-129 2.3.3.23.2 Staff Evaluation..................................... 2-129 2.3.3.23.3 Conclusions

....................................... 2-130 2.3.3.24 Liquid Waste System..................................... 2-130 2.3.3.24.1 Technical Information in the Application.................. 2-131 2.3.3.24.2 Staff Evaluation..................................... 2-131 2.3.3.24.3 Conclusions

....................................... 2-134 2.3.3.25 Miscellaneous Structures Ventilation System................... 2-134 2.3.3.25.1 Technical Information in the Application.................. 2-134 2.3.3.25.2 Staff Evaluation..................................... 2-135 2.3.3.25.3 Conclusions

....................................... 2-136 2.3.3.26 Nitrogen System........................................ 2-136 2.3.3.26.1 Technical Information in the Application.................. 2-136 2.3.3.26.2 Staff Evaluation..................................... 2-137 2.3.3.26.3 Conclusions

....................................... 2-140 2.3.3.27 Nuclear Sampling System................................. 2-140 2.3.3.27.1 Technical Information in the Application.................. 2-140 2.3.3.27.2 Staff Evaluation..................................... 2-140 2.3.3.27.3 Conclusions

....................................... 2-141 2.3.3.28 Nuclear Service Water System............................. 2-141 2.3.3.28.1 Technical Information in the Application.................. 2-142 2.3.3.28.2 Staff Evaluation..................................... 2-143 2.3.3.28.3 Conclusions

....................................... 2-144 2.3.3.29 Nuclear Service Water Pump Structure Ventilation System........ 2-144 2.3.3.29.1 Technical Information in the Application.................. 2-144 2.3.3.29.2 Staff Evaluation..................................... 2-145 2.3.3.29.3 Conclusions

....................................... 2-147 2.3.3.30 Nuclear Solid Waste Disposal System........................ 2-147 2.3.3.30.1 Technical Information in the Application.................. 2-147 2.3.3.30.2 Staff Evaluation..................................... 2-148 2.3.3.30.3 Conclusions

....................................... 2-149 2.3.3.31 Reactor Coolant Pump Motor Oil Collection Sub-System.......... 2-149

-ix-2.3.3.31.1 Technical Information in the Application.................. 2-149 2.3.3.31.2 Staff Evaluation..................................... 2-150 2.3.3.31.3 Conclusions

....................................... 2-151 2.3.3.32 Reactor Coolant System (Non-Class 1 Components)............ 2-152 2.3.3.32.1 Technical Information in the Application.................. 2-152 2.3.3.32.2 Staff Evaluation..................................... 2-152 2.3.3.32.3 Conclusions

....................................... 2-153 2.3.3.33 Recirculated Cooling Water System

......................... 2-153 2.3.3.33.1 Technical Information in the Application.................. 2-153 2.3.3.33.2 Staff Evaluation..................................... 2-153 2.3.3.33.3 Conclusions

....................................... 2-154 2.3.3.34 Spent Fuel Cooling System................................ 2-155 2.3.3.34.1 Technical Information in the Application.................. 2-155 2.3.3.34.2 Staff Evaluation..................................... 2-155 2.3.3.34.3 Conclusions

....................................... 2-156 2.3.3.35 Standby Shutdown Diesel................................. 2-157 2.3.3.35.1 Technical Information in the Application.................. 2-157 2.3.3.35.2 Staff Evaluation..................................... 2-157 2.3.3.35.3 Conclusions

....................................... 2-161 2.3.3.36 Turbine Building Sump Pump System........................ 2-161 2.3.3.36.1 Technical Information in the Application.................. 2-161 2.3.3.36.2 Staff Evaluation..................................... 2-161 2.3.3.36.3 Conclusions

....................................... 2-162 2.3.3.37 Turbine Building Ventilation System.......................... 2-162 2.3.3.37.1 Technical Information in the Application.................. 2-163 2.3.3.37.2 Staff Evaluation..................................... 2-164 2.3.3.37.3 Conclusions

....................................... 2-166 2.3.3.38 Waste Gas System...................................... 2-166 2.3.3.38.1 Technical Information in the Application.................. 2-166 2.3.3.38.2 Staff Evaluation..................................... 2-167 2.3.3.38.3 Conclusions

....................................... 2-169 2.3.4 System Scoping and Screening Results: Steam and Power Conversion Systems

........................................................ 2-170 2.3.4.1 Auxiliary Feedwater System................................. 2-170 2.3.4.1.1 Technical Information in the Application................... 2-170 2.3.4.1.2 Staff Evaluation...................................... 2-170 2.3.4.1.3 Conclusions

........................................ 2-171 2.3.4.2 Auxiliary Steam System.................................... 2-171 2.3.4.2.1 Technical Information in the Application................... 2-172 2.3.4.2.2 Staff Evaluation...................................... 2-172 2.3.4.2.3 Conclusions

........................................ 2-173 2.3.4.3 Condensate System....................................... 2-173 2.3.4.3.1 Technical Information in the Application................... 2-173 2.3.4.3.2 Staff Evaluation...................................... 2-173 2.3.4.3.3 Conclusions

........................................ 2-174 2.3.4.4 Condensate Storage System................................ 2-175 2.3.4.4.1 Technical Information in the Application................... 2-175 2.3.4.4.2 Staff Evaluation...................................... 2-175

-x-2.3.4.4.3 Conclusions

........................................ 2-176 2.3.4.5 Feedwater System........................................ 2-176 2.3.4.5.1 Technical Information in the Application................... 2-176 2.3.4.5.2 Staff Evaluation...................................... 2-177 2.3.4.5.3 Conclusions

........................................ 2-178 2.3.4.6 Feedwater Pump Turbine Exhaust System..................... 2-178 2.3.4.6.1 Technical Information in the Application................... 2-178 2.3.4.6.2 Staff Evaluation...................................... 2-178 2.3.4.6.3 Conclusions

........................................ 2-179 2.3.4.7 Feedwater Pump Turbine Hydraulic Oil System.................. 2-180 2.3.4.7.1 Technical Information in the Application................... 2-180 2.3.4.7.2 Staff Evaluation...................................... 2-180 2.3.4.7.3 Conclusions

........................................ 2-181 2.3.4.8 Main Steam System....................................... 2-181 2.3.4.8.1 Technical Information in the Application................... 2-181 2.3.4.8.2 Staff Evaluation...................................... 2-182 2.3.4.8.3 Conclusions

........................................ 2-182 2.3.4.9 Main Steam Supply to Auxiliary Equipment..................... 2-183 2.3.4.9.1 Technical Information in the Application................... 2-183 2.3.4.9.2 Staff Evaluation...................................... 2-183 2.3.4.9.3 Conclusions

........................................ 2-184 2.3.4.10 Main Steam Vent to Atmosphere System...................... 2-184 2.3.4.10.1 Technical Information in the Application.................. 2-184 2.3.4.10.2 Staff Evaluation..................................... 2-185 2.3.4.10.3 Conclusions

....................................... 2-186 2.3.4.11 Main Turbine Hydraulic Oil System.......................... 2-186 2.3.4.11.1 Technical Information in the Application.................. 2-186 2.3.4.11.2 Staff Evaluation..................................... 2-186 2.3.4.11.3 Conclusions

....................................... 2-187 2.3.4.12 Main Turbine Lube Oil and Purification System................. 2-187 2.3.4.12.1 Technical Information in the Application.................. 2-187 2.3.4.12.2 Staff Evaluation..................................... 2-187 2.3.4.12.3 Conclusions

....................................... 2-189 2.4 Scoping and Screening Results: Structures............................. 2-190 2.4.1 Reactor Buildings............................................. 2-190 2.4.1.1 Concrete Shield Building................................... 2-190 2.4.1.1.1 Technical Information in the Application................... 2-190 2.4.1.1.2 Staff Evaluation...................................... 2-191 2.4.1.1.3 Conclusions

........................................ 2-192 2.4.1.2 Steel Containment........................................ 2-193 2.4.1.2.1 Technical Information in the Application................... 2-193 2.4.1.2.2 Staff Evaluation...................................... 2-194 2.4.1.2.3 Conclusions

........................................ 2-194 2.4.1.3 Reactor Building Internal Structures

.......................... 2-195 2.4.1.3.1 Technical Information in the Application................... 2-195 2.4.1.3.2 Staff Evaluation...................................... 2-196 2.4.1.3.3 Conclusions

........................................ 2-197 2.4.2 Other Structures.............................................. 2-197

-xi-2.4.2.1 Auxiliary Buildings........................................ 2-197 2.4.2.1.1 Technical Information in the Application................... 2-197 2.4.2.1.2 Staff Evaluation...................................... 2-199 2.4.2.1.3 Conclusions

........................................ 2-201 2.4.2.2 Condenser Cooling Water Intake Structure..................... 2-201 2.4.2.2.1 Technical Information in the Application................... 2-201 2.4.2.2.2 Staff Evaluation...................................... 2-201 2.4.2.2.3 Conclusions

........................................ 2-203 2.4.2.3 Nuclear Service Water Structures............................ 2-203 2.4.2.3.1 Technical Information in the Application................... 2-203 2.4.2.3.2 Staff Evaluation...................................... 2-204 2.4.2.3.3 Conclusions

........................................ 2-205 2.4.2.4 Standby Nuclear Service Water Pond Dam..................... 2-205 2.4.2.4.1 Technical Information in the Application................... 2-205 2.4.2.4.2 Staff Evaluation...................................... 2-206 2.4.2.4.3 Conclusions

........................................ 2-206 2.4.2.5 Standby Shutdown Facility.................................. 2-206 2.4.2.5.1 Technical Information in the Application................... 2-207 2.4.2.5.2 Staff Evaluation...................................... 2-207 2.4.2.5.3 Conclusions

........................................ 2-208 2.4.2.6 Turbine Buildings (including Service Building)................... 2-208 2.4.2.6.1 Technical Information in the Application................... 2-208 2.4.2.6.2 Staff Evaluation...................................... 2-208 2.4.2.6.3 Conclusions

........................................ 2-209 2.4.2.7 Unit Vent Stack.......................................... 2-209 2.4.2.7.1 Technical Information in the Application................... 2-210 2.4.2.7.2 Staff Evaluation...................................... 2-210 2.4.2.7.3 Conclusions

........................................ 2-210 2.4.2.8 Yard Structures.......................................... 2-210 2.4.2.8.1 Technical Information in the Application................... 2-210 2.4.2.8.2 Staff Evaluation...................................... 2-211 2.4.2.8.3 Conclusions

........................................ 2-212 2.4.3 Component Supports.......................................... 2-212 2.4.3.1 Technical Information in the Application........................ 2-213 2.4.3.2 Staff Evaluation.......................................... 2-213 2.4.3.3 Conclusions............................................. 2-216 2.5 Scoping and Screening Results: Electrical and Instrumentation and Controls.... 2-217 2.5.1 Technical Information in the Application............................ 2-217 2.5.2 Staff Evaluation.............................................. 2-217 2.5.2.1 Identification of Passive Components......................... 2-218 2.5.2.2 Identification of Components Not Within the Scope of License Renewal 2-218 2.5.2.3 Identification of Components that are Passive but Not Long-lived.... 2-221 2.5.3 Conclusion.................................................. 2-221 3 Aging Management Review Results.......................................... 3-1 3.0 Common Aging Management Programs.................................. 3-1 3.0.1 Introduction.................................................... 3-1 3.0.2 Program and Activity Attributes..................................... 3-1 3.0.3 Aging Management Programs and Activities.......................... 3-2 3.0.3.1 Borated Water Systems Stainless Steel Inspection................. 3-2

-xii-3.0.3.1.1 Technical Information in the Application..................... 3-2 3.0.3.1.2 Staff Evaluation........................................ 3-2 3.0.3.1.3 FSAR Supplement

..................................... 3-5 3.0.3.1.4 Conclusion........................................... 3-5 3.0.3.2 Chemistry Control Program................................... 3-5 3.0.3.2.1 Technical Information in the Application..................... 3-5 3.0.3.2.2 Staff Evaluation........................................ 3-6 3.0.3.2.3 FSAR Supplement

..................................... 3-9 3.0.3.2.4 Conclusion.......................................... 3-10 3.0.3.3 Containment Inservice Inspection plan - IWE

.................... 3-10 3.0.3.3.1 Technical Information in the Application.................... 3-10 3.0.3.3.2 Staff Evaluation....................................... 3-11 3.0.3.3.3 FSAR Supplement

.................................... 3-17 3.0.3.3.4 Conclusion.......................................... 3-17 3.0.3.4 Containment Leak Rate Testing Program....................... 3-17 3.0.3.4.1 Technical Information in the Application.................... 3-18 3.0.3.4.2 Staff Evaluation....................................... 3-18 3.0.3.4.3 FSAR Supplement

.................................... 3-22 3.0.3.4.4 Conclusion.......................................... 3-22 3.0.3.5 Fire Barrier Inspections..................................... 3-22 3.0.3.5.1 Technical Information in the Application.................... 3-22 3.0.3.5.2 Staff Evaluation....................................... 3-23 3.0.3.5.3 FSAR Supplement

.................................... 3-25 3.0.3.5.4 Conclusion.......................................... 3-25 3.0.3.6 Flow-accelerated Corrosion Program........................... 3-25 3.0.3.6.1 Technical Information in the Application.................... 3-25 3.0.3.6.2 Staff Evaluation....................................... 3-26 3.0.3.6.3 FSAR Supplement

.................................... 3-28 3.0.3.6.4 Conclusion.......................................... 3-29 3.0.3.7 Fluid Leak Management Program............................. 3-29 3.0.3.7.1 Technical Information in the Application.................... 3-29 3.0.3.7.2 Staff Evaluation....................................... 3-29 3.0.3.7.3 FSAR Supplement

.................................... 3-33 3.0.3.7.4 Conclusion.......................................... 3-33 3.0.3.8 Galvanic Susceptibility Inspection............................. 3-33 3.0.3.8.1 Technical Information in the Application.................... 3-33 3.0.3.8.2 Staff Evaluation....................................... 3-34 3.0.3.8.3 FSAR Supplement

.................................... 3-36 3.0.3.8.4 Conclusion.......................................... 3-36 3.0.3.9 Common Heat Exchanger Activities............................ 3-36 3.0.3.9.1 Heat Exchanger Preventive Maintenance Activities - Pump Motor Air Handling Units............................................... 3-37 3.0.3.9.1.1 Technical Information in the Application................ 3-37 3.0.3.9.1.2 Staff Evaluation.................................. 3-37 3.0.3.9.1.3 FSAR Supplement................................ 3-40 3.0.3.9.1.4 Conclusion...................................... 3-40 3.0.3.9.2 Heat Exchanger Preventive Maintenance Activities - Pump Oil Coolers.................................................... 3-40 3.0.3.9.2.1 Technical Information in the Application................ 3-40 3.0.3.9.2.2 Staff Evaluation.................................. 3-41

-xiii-3.0.3.9.2.3 FSAR Supplement................................ 3-43 3.0.3.9.2.4 Conclusion...................................... 3-43 3.0.3.10 Inservice Inspection Plan................................... 3-43 3.0.3.10.1 Technical Information in the Application................... 3-44 3.0.3.10.2 Staff Evaluation...................................... 3-44 3.0.3.10.3 FSAR Supplement

................................... 3-47 3.0.3.10.4 Conclusion......................................... 3-48 3.0.3.11 Inspection Program for Civil Engineering Structures and Components 3-48 3.0.3.11.1 Technical Information in the Application................... 3-48 3.0.3.11.2 Staff Evaluation...................................... 3-49 3.0.3.11.3 FSAR Supplement

................................... 3-52 3.0.3.11.4 Conclusion......................................... 3-53 3.0.3.12 Liquid Waste System Inspection............................. 3-53 3.0.3.12.1 Technical Information in the Application................... 3-53 3.0.3.12.2 Staff Evaluation...................................... 3-54 3.0.3.12.3 FSAR Supplement

................................... 3-56 3.0.3.12.4 Conclusion......................................... 3-56 3.0.3.13 Preventive Maintenance Activities - Condenser Circulating Water System Internal Coating Program.......................................... 3-56 3.0.3.13.1 Technical Information in the Application................... 3-56 3.0.3.13.2 Staff Evaluation...................................... 3-57 3.0.3.13.3 FSAR Supplement

................................... 3-60 3.0.3.13.4 Conclusion......................................... 3-60 3.0.3.14 Selective Leaching Inspection............................... 3-60 3.0.3.14.1 Technical Information in the Application................... 3-61 3.0.3.14.2 Staff Evaluation...................................... 3-61 3.0.3.14.3 FSAR Supplement

................................... 3-64 3.0.3.14.4 Conclusion......................................... 3-64 3.0.3.15 Service Water Piping Corrosion Program...................... 3-64 3.0.3.15.1 Technical Information in the Application................... 3-64 3.0.3.15.2 Staff Evaluation...................................... 3-65 3.0.3.15.3 FSAR Supplement

................................... 3-69 3.0.3.15.4 Conclusion......................................... 3-69 3.0.3.16 Sump Pump Systems inspection............................. 3-69 3.0.3.16.1 Technical Information in the Application................... 3-70 3.0.3.16.2 Staff Evaluation...................................... 3-70 3.0.3.16.3 FSAR Supplement

................................... 3-72 3.0.3.16.4 Conclusion......................................... 3-72 3.0.3.17 Treated Water Systems Stainless Steel Inspection............... 3-72 3.0.3.17.1 Technical Information in the Application................... 3-72 3.0.3.17.2 Staff Evaluation...................................... 3-73 3.0.3.17.3 FSAR Supplement

................................... 3-75 3.0.3.17.4 Conclusion......................................... 3-75 3.0.3.18 Underwater Inspection of Nuclear Service Water Structures........ 3-76 3.0.3.18.1 Technical Information in the Application................... 3-76 3.0.3.18.2 Staff Evaluation...................................... 3-77 3.0.3.18.3 FSAR Supplement

................................... 3-79 3.0.3.18.4 Conclusion......................................... 3-79 3.0.4 Quality Assurance Program...................................... 3-80 3.1 Aging Management of Reactor Vessel, Internals, and Reactor Coolant System... 3-83

-xiv-3.1.1 Class 1 Piping, Valves, and Pump Casings.......................... 3-84 3.1.1.1 Technical Information in the Application......................... 3-84 3.1.1.2 Staff Evaluation........................................... 3-86 3.1.1.3 Conclusions.............................................. 3-92 3.1.2 Pressurizer................................................... 3-93 3.1.2.1 Technical Information in the Application......................... 3-93 3.1.2.2 Staff Evaluation........................................... 3-95 3.1.2.3 Conclusions............................................. 3-107 3.1.3 Reactor Vessel and Control Rod Drive Mechanism Pressure Boundary.... 3-107 3.1.3.1 Technical Information in the Application........................ 3-108 3.1.3.2 Staff Evaluation.......................................... 3-109 3.1.3.3 Conclusions............................................. 3-131 3.1.4 Reactor Vessel Internals........................................ 3-131 3.1.4.1 Technical Information in the Application........................ 3-132 3.1.4.2 Staff Evaluation.......................................... 3-133 3.1.4.3 Conclusions............................................. 3-148 3.1.5 Steam Generators............................................ 3-148 3.1.5.1 Technical Information in the Application........................ 3-149 3.1.5.2 Staff Evaluation.......................................... 3-150 3.1.5.3 Conclusions............................................. 3-159 3.1.6 Aging Management Review of Class-1Closure Bolting................. 3-159 3.1.6.1 Aging Effects............................................ 3-159 3.1.6.2 Aging Management Programs............................... 3-160 3.1.6.3 Conclusions............................................. 3-160 3.1.7 References for Section 3.1...................................... 3-160 3.2 Aging Management of Engineered Safety Features....................... 3-165 3.2.1 Annulus Ventilation System..................................... 3-166 3.2.1.1 Technical Information in the Application........................ 3-166 3.2.1.2 Staff Evaluation.......................................... 3-167 3.2.1.3 Conclusions............................................. 3-168 3.2.2 Containment Isolation System................................... 3-169 3.2.2.1 Technical Information in the Application........................ 3-169 3.2.2.2 Staff Evaluation.......................................... 3-171 3.2.2.3 Conclusions............................................. 3-174 3.2.3 Containment Air Return Exchange & Hydrogen Skimmer System........ 3-174 3.2.3.1 Technical Information in the Application........................ 3-174 3.2.3.2 Staff Evaluation.......................................... 3-175 3.2.3.3 Conclusions............................................. 3-176 3.2.4 Containment Spray System..................................... 3-177 3.2.4.1 Technical Information in the Application........................ 3-177 3.2.4.2 Staff Evaluation.......................................... 3-178 3.2.4.3 Conclusions............................................. 3-185 3.2.5 Containment Valve Injection Water System......................... 3-185 3.2.5.1 Technical Information in the Application........................ 3-185 3.2.5.2 Staff Evaluation.......................................... 3-185 3.2.5.3 Conclusions............................................. 3-187 3.2.6 Refueling Water System........................................ 3-187 3.2.6.1 Technical Information in the Application........................ 3-187 3.2.6.2 Staff Evaluation.......................................... 3-188 3.2.6.3 Conclusions............................................. 3-192

-xv-3.2.7 Residual Heat Removal System.................................. 3-192 3.2.7.1 Technical Information in the Application........................ 3-192 3.2.7.2 Staff Evaluation.......................................... 3-193 3.2.7.3 Conclusions............................................. 3-195 3.2.8 Safety Injection System........................................ 3-196 3.2.8.1 Technical Information in the Application........................ 3-196 3.2.8.2 Staff Evaluation.......................................... 3-197 3.2.8.3 Conclusions............................................. 3-199 3.2.9 Containment Air Return Exchange and Hydrogen Skimmer Systems -

Supplemental Evaluation............................................ 3-199 3.2.9.1 Technical Information in the Application........................ 3-199 3.2.9.2 Staff Evaluation.......................................... 3-200 3.2.9.3 Conclusions............................................. 3-200 3.2.10 AMR for Closure Bolting in ESFs................................ 3-201 3.2.10.1 Aging Effects........................................... 3-201 3.2.10.2 Aging Management Programs.............................. 3-202 3.2.10.3 Conclusions............................................ 3-202 3.3 Aging Management of Auxiliary Systems

............................... 3-203 3.3.1 Auxiliary Building Ventilation System.............................. 3-203 3.3.1.1 Technical Information in the Application........................ 3-203 3.3.1.2 Staff Evaluation.......................................... 3-204 3.3.1.3 Conclusions............................................. 3-205 3.3.2 Boron Recycle System......................................... 3-206 3.3.2.1 Technical Information in the Application........................ 3-206 3.3.2.2 Staff Evaluation.......................................... 3-206 3.3.2.3 Conclusions............................................. 3-208 3.3.3 Building Heating Water System.................................. 3-208 3.3.3.1 Technical Information in the Application........................ 3-208 3.3.3.2 Staff Evaluation.......................................... 3-209 3.3.3.3 Conclusions............................................. 3-210 3.3.4 Chemical & Volume Control System............................... 3-210 3.3.4.1 Technical Information in the Application........................ 3-210 3.3.4.2 Staff Evaluation.......................................... 3-211 3.3.4.3 Conclusions............................................. 3-212 3.3.5 Component Cooling System..................................... 3-212 3.3.5.1 Technical Information in the Application........................ 3-212 3.3.5.2 Staff Evaluation.......................................... 3-213 3.3.5.3 Conclusions............................................. 3-220 3.3.6 Condenser Circulating Water System.............................. 3-220 3.3.6.1 Technical Information in the Application........................ 3-220 3.3.6.2 Staff Evaluation.......................................... 3-221 3.3.6.3 Conclusions............................................. 3-223 3.3.7 Containment Ventilation System.................................. 3-223 3.3.7.1 Technical Information in the Application........................ 3-223 3.3.7.2 Staff Evaluation.......................................... 3-223 3.3.7.3 Conclusions............................................. 3-224 3.3.8 Control Area Ventilation System and Chilled Water System............. 3-224 3.3.8.1 Technical Information in the Application........................ 3-224 3.3.8.2 Staff Evaluation.......................................... 3-225 3.3.8.3 Conclusions............................................. 3-230

-xvi-3.3.9 Conventional Waste Water Treatment System....................... 3-230 3.3.9.1 Technical Information in the Application........................ 3-230 3.3.9.2 Staff Evaluation.......................................... 3-231 3.3.9.3 Conclusions............................................. 3-232 3.3.10 Diesel Building Ventilation System............................... 3-232 3.3.10.1 Technical Information in the Application....................... 3-232 3.3.10.2 Staff Evaluation......................................... 3-233 3.3.10.3 Conclusions............................................ 3-234 3.3.11 Diesel Generator Air Intake and Exhaust System.................... 3-234 3.3.11.1 Technical Information in the Application....................... 3-234 3.3.11.2 Staff Evaluation......................................... 3-235 3.3.11.3 Conclusions............................................ 3-238 3.3.12 Diesel Generator Cooling Water System.......................... 3-239 3.3.12.1 Technical Information in the Application....................... 3-239 3.3.12.2 Staff Evaluation......................................... 3-240 3.3.12.3 Conclusions............................................ 3-247 3.3.13 Diesel Generator Crankcase Vacuum System...................... 3-247 3.3.13.1 Technical Information in the Application....................... 3-247 3.3.13.2 Staff Evaluation......................................... 3-248 3.3.13.3 Conclusions............................................ 3-249 3.3.14 Diesel Generator Fuel Oil System

............................... 3-249 3.3.14.1 Technical Information in the Application....................... 3-249 3.3.14.2 Staff Evaluation......................................... 3-250 3.3.14.3 Conclusions............................................ 3-251 3.3.15 Diesel Generator Lube Oil System............................... 3-251 3.3.15.1 Technical Information in the Application....................... 3-251 3.3.15.2 Staff Evaluation......................................... 3-252 3.3.15.3 Conclusions............................................ 3-254 3.3.16 Diesel Generator Room Sump Pump System....................... 3-254 3.3.16.1 Technical Information in the Application....................... 3-254 3.3.16.2 Staff Evaluation......................................... 3-255 3.3.16.3 Conclusions............................................ 3-257 3.3.17 Diesel Generator Starting Air System............................. 3-257 3.3.17.1 Technical Information in the Application....................... 3-257 3.3.17.2 Staff Evaluation......................................... 3-258 3.3.17.3 Conclusions............................................ 3-265 3.3.18 Drinking Water System........................................ 3-265 3.3.18.1Technical Information in the Application....................... 3-265 3.3.18.2 Staff Evaluation......................................... 3-266 3.3.18.3 Conclusions............................................ 3-267 3.3.19 Fire Protection System........................................ 3-267 3.3.19.1 Technical Information in the Application....................... 3-267 3.3.19.2 Staff Evaluation......................................... 3-269 3.3.19.3 Conclusions............................................ 3-277 3.3.20 Fuel Handling Building/Area Ventilation System..................... 3-277 3.3.20.1 Technical Information in the Application....................... 3-277 3.3.20.2 Staff Evaluation......................................... 3-278 3.3.20.3 Conclusions............................................ 3-279 3.3.21 Groundwater Drainage System.................................. 3-279 3.3.21.1 Technical Information in the Application....................... 3-279

-xvii-3.3.21.2 Staff Evaluation......................................... 3-280 3.3.21.3 Conclusions............................................ 3-281 3.3.22 Hydrogen Bulk Storage System................................. 3-281 3.3.22.1 Technical Information in the Application....................... 3-281 3.3.22.2 Staff Evaluation......................................... 3-282 3.3.22.3 Conclusions............................................ 3-282 3.3.23 Instrument Air System........................................ 3-283 3.3.23.1 Technical Information in the Application....................... 3-283 3.3.23.2 Staff Evaluation......................................... 3-284 3.3.23.3 Conclusions............................................ 3-284 3.3.24 Liquid Waste System......................................... 3-285 3.3.24.1 Technical Information in the Application....................... 3-285 3.3.24.2 Staff Evaluation......................................... 3-286 3.3.24.3 Conclusions............................................ 3-288 3.3.25 Miscellaneous Structures Ventilation System....................... 3-288 3.3.25.1 Technical Information in the Application....................... 3-288 3.3.25.2 Staff Evaluation......................................... 3-288 3.3.25.3 Conclusions............................................ 3-289 3.3.26 Nitrogen System............................................. 3-289 3.3.26.1 Technical Information in the Application....................... 3-289 3.3.26.2 Staff Evaluation......................................... 3-289 3.3.26.3 Conclusions............................................ 3-290 3.3.27 Nuclear Sampling System

..................................... 3-290 3.3.27.1 Technical Information in the Application....................... 3-290 3.3.27.2 Staff Evaluation......................................... 3-291 3.3.27.3 Conclusions............................................ 3-292 3.3.28 Nuclear Service Water System.................................. 3-292 3.3.28.1 Technical Information in the Application....................... 3-292 3.3.28.2 Staff Evaluation......................................... 3-293 3.3.28.3 Conclusions............................................ 3-298 3.3.29 Nuclear Service Water Pump Structure Ventilation System............ 3-298 3.3.29.1 Technical Information in the Application....................... 3-298 3.3.29.2 Staff Evaluation......................................... 3-299 3.3.29.3 Conclusions............................................ 3-299 3.3.30 Nuclear Solid Waste Disposal System............................ 3-300 3.3.30.1 Technical Information in the Application....................... 3-300 3.3.30.2 Staff Evaluation......................................... 3-300 3.3.30.3 Conclusions............................................ 3-301 3.3.31 Reactor Coolant Pump Motor Oil Collection Sub-System.............. 3-302 3.3.31.1 Technical Information in the Application....................... 3-302 3.3.31.2 Staff Evaluation......................................... 3-302 3.3.31.3 Conclusions............................................ 3-304 3.3.32 Reactor Coolant System (Non-Class 1 Components)................. 3-304 3.3.32.1 Technical Information in the Application....................... 3-304 3.3.32.2 Staff Evaluation......................................... 3-305 3.3.32.3 Conclusions............................................ 3-306 3.3.33 Recirculated Cooling Water System - Catawba..................... 3-307 3.3.33.1 Technical Information in the Application....................... 3-307 3.3.33.2 Staff Evaluation......................................... 3-307 3.3.33.3 Conclusions............................................ 3-308

-xviii-3.3.34 Spent Fuel Cooling System.................................... 3-309 3.3.34.1 Technical Information in the Application....................... 3-309 3.3.34.2 Staff Evaluation......................................... 3-310 3.3.34.3 Conclusions............................................ 3-310 3.3.35 Standby Shutdown Diesel...................................... 3-311 3.3.35.1 Technical Information in the Application....................... 3-311 3.3.35.2 Staff Evaluation......................................... 3-312 3.3.35.3 Conclusions............................................ 3-317 3.3.36 Turbine Building Sump Pump System

............................ 3-317 3.3.36.1 Technical Information in the Application....................... 3-317 3.3.36.2 Staff Evaluation......................................... 3-318 3.3.36.3 Conclusions............................................ 3-319 3.3.37 Turbine Building Ventilation System.............................. 3-319 3.3.37.1 Technical Information in the Application....................... 3-319 3.3.37.2 Staff Evaluation......................................... 3-319 3.3.37.3 Conclusions............................................ 3-320 3.3.38 Waste Gas System........................................... 3-320 3.3.38.1 Technical Information in the Application....................... 3-320 3.3.38.2 Staff Evaluation......................................... 3-321 3.3.38.3 Conclusions............................................ 3-326 3.3.39 Auxiliary Systems - General.................................... 3-327 3.3.39.1 Thermal Fatigue......................................... 3-327 3.3.39.2 Scoping Issues Related to Aging Management Programs for Auxiliary Systems...................................................... 3-327 3.3.39.3 Ventilation Systems Flexible Connectors...................... 3-327 3.3.39.4 AMR for Closure Bolting in Auxiliary Systems.................. 3-328 3.3.39.4.1 Aging Effects....................................... 3-328 3.3.39.4.2 Aging Management Programs.......................... 3-329 3.3.39.4.3 Conclusions

....................................... 3-330 3.4 Aging Management of Steam and Power Conversion Systems............... 3-331 3.4.1 Auxiliary Feedwater System..................................... 3-331 3.4.1.1 Technical Information in the Application........................ 3-331 3.4.1.2 Staff Evaluation.......................................... 3-332 3.4.1.3 Conclusions............................................. 3-333 3.4.2 Auxiliary Steam System........................................ 3-333 3.4.2.1 Technical Information in the Application........................ 3-333 3.4.2.2 Staff Evaluation.......................................... 3-334 3.4.2.3 Conclusions............................................. 3-335 3.4.3 Condensate System........................................... 3-335 3.4.3.1 Technical Information in the Application........................ 3-335 3.4.3.2 Staff Evaluation.......................................... 3-336 3.4.3.3 Conclusions............................................. 3-337 3.4.4 Condensate Storage System.................................... 3-337 3.4.4.1 Technical Information in the Application........................ 3-337 3.4.4.2 Staff Evaluation.......................................... 3-338 3.4.4.3 Conclusions............................................. 3-339 3.4.5 Feedwater System............................................ 3-339 3.4.5.1 Technical Information in the Application........................ 3-339 3.4.5.2 Staff Evaluation.......................................... 3-341 3.4.5.3 Conclusions............................................. 3-342

-xix-3.4.6 Feedwater Pump Turbine Exhaust System.......................... 3-342 3.4.6.1 Technical Information in the Application........................ 3-342 3.4.6.2 Staff Evaluation.......................................... 3-343 3.4.6.3 Conclusions............................................. 3-344 3.4.7 Main Steam System........................................... 3-344 3.4.7.1 Technical Information in the Application........................ 3-344 3.4.7.2 Staff Evaluation.......................................... 3-346 3.4.7.3 Conclusions............................................. 3-346 3.4.8 Main Steam Supply to Auxiliary Equipment System................... 3-347 3.4.8.1 Technical Information in the Application........................ 3-347 3.4.8.2 Staff Evaluation.......................................... 3-348 3.4.8.3 Conclusions............................................. 3-349 3.4.9 Main Steam Vent to Atmosphere System........................... 3-349 3.4.9.1 Technical Information in the Application........................ 3-349 3.4.9.2 Staff Evaluation.......................................... 3-350 3.4.9.3 Conclusions............................................. 3-351 3.4.10 AMR for Closure Bolting in Steam and Power Conversion Systems...... 3-351 3.4.10.1 Aging Effects........................................... 3-352 3.4.10.2 Aging Management Programs.............................. 3-352 3.4.10.3 Conclusions............................................ 3-353 3.4.11 References for Section 3.4..................................... 3-353 3.5 Aging Management of Containments, Structures, and Component Supports.... 3-355 3.5.1 Reactor Building.............................................. 3-355 3.5.1.1 Technical Information in the Application........................ 3-355 3.5.1.1.1 Aging Effects........................................ 3-356 3.5.1.1.2 Aging Management Programs........................... 3-356 3.5.1.2 Staff Evaluation.......................................... 3-357 3.5.1.2.1 Aging Effects........................................ 3-357 3.5.1.2.2 Aging Management Programs........................... 3-364 3.5.1.3 Conclusions............................................. 3-373 3.5.2 Other Structures.............................................. 3-373 3.5.2.1 Technical Information in the Application........................ 3-373 3.5.2.1.1 Aging Effects........................................ 3-374 3.5.2.1.2 Aging Management Programs........................... 3-374 3.5.2.2 Staff Evaluation.......................................... 3-374 3.5.2.2.1 Aging Effects........................................ 3-375 3.5.2.2.2 Aging Management Programs........................... 3-377 3.5.2.3 Conclusions............................................. 3-385 3.5.3 Component Supports.......................................... 3-385 3.5.3.1 Technical Information in the Application........................ 3-385 3.5.3.1.1 Aging Effects........................................ 3-386 3.5.3.1.2 Aging Management Programs........................... 3-386 3.5.3.2 Staff Evaluation.......................................... 3-386 3.5.3.2.1 Aging Effects........................................ 3-387 3.5.3.2.2 Aging Management Programs........................... 3-388 3.5.3.3 Conclusions............................................. 3-394 3.5.4 AMR for High-strength Structural Bolts............................. 3-394 3.5.4.1 Aging Effects............................................ 3-394 3.5.4.2 Aging Management Programs............................... 3-394 3.5.4.3 Conclusions............................................. 3-395

-xx-3.6 Aging Management of Electrical and Instrumentation and Controls

........... 3-396 3.6.1 Aging Effects Caused by Heat and Radiation........................ 3-396 3.6.1.1 Technical Information in the Application........................ 3-396 3.6.1.1.1 Aging Effects..................................... 3-397 3.6.1.1.2 Aging Management Programs........................ 3-397 3.6.1.2 Staff Evaluation.......................................... 3-397 3.6.1.2.1 Aging Effects..................................... 3-398 3.6.1.2.2 Aging Management Programs........................ 3-398 3.6.1.3 Conclusions............................................. 3-403 3.6.2 Aging Effects Caused by Moisture and Voltage Stress for Inaccessible Medium-Voltage Cables................................................... 3-403 3.6.2.1 Technical Information in the Application........................ 3-403 3.6.2.1.1 Aging Effects..................................... 3-403 3.6.2.1.2 Aging Management Programs........................ 3-404 3.6.2.2 Staff Evaluation.......................................... 3-404 3.6.2.2.1 Aging Effects..................................... 3-404 3.6.2.2.2 Aging Management Programs........................ 3-405 3.6.2.3 Conclusions............................................. 3-411 3.6.3 Aging Effects Caused by Boric Acid Ingress into Connector Pins......... 3-411 3.6.3.1 Technical Information in the Application........................ 3-411 3.6.3.1.1 Aging Effects..................................... 3-411 3.6.3.1.2 Aging Management Programs........................ 3-411 3.6.3.2 Staff Evaluation.......................................... 3-411 3.6.3.2.1 Aging Effects..................................... 3-412 3.6.3.2.2 Aging Management Programs........................ 3-412 3.6.3.3 Conclusions............................................. 3-412 3.6.4 References for Section 3.6...................................... 3-412 4 Time-limited Aging Analyses............................................... 4-1 4.1 Identification of Time-Limited Aging Analyses.............................. 4-1 4.1.1 Technical Information in the Application.............................. 4-1 4.1.2 Staff Evaluation................................................ 4-2 4.1.3 Conclusions................................................... 4-2 4.2 Reactor Vessel Neutron Embrittlement................................... 4-2 4.2.1 Upper Shelf Energy............................................. 4-3 4.2.1.1 Technical Information in the Application.......................... 4-3 4.2.1.2 Staff Evaluation............................................ 4-3 4.2.2 Pressurized Thermal Shock....................................... 4-4 4.2.2.1 Technical Information in the Application.......................... 4-5 4.2.2.2 Staff Evaluation............................................ 4-5 4.2.3 Pressure-Temperature Limits...................................... 4-7 4.2.3.1 Technical Information in the Application.......................... 4-7 4.2.3.2 Staff Evaluation............................................ 4-7 4.2.4 FSAR Supplement.............................................. 4-8 4.2.5 Conclusions................................................... 4-8 4.3 Metal Fatigue

...................................................... 4-8 4.3.1 Technical Information in the Application.............................. 4-9 4.3.2 Staff Evaluation................................................ 4-9 4.3.3 FSAR Supplement............................................. 4-17 4.3.4 Conclusions.................................................. 4-17 4.4 Environmental Qualification (EQ) of Electric Equipment..................... 4-18

-xxi-4.4.1 Technical Information in the Application............................. 4-18 4.4.2 Staff Evaluation............................................... 4-22 4.4.3 FSAR Supplement............................................. 4-24 4.4.4 Conclusions.................................................. 4-24 4.5 Concrete Containment Tendon Prestress................................ 4-24 4.5.1 Technical Information in the Application............................. 4-24 4.5.2 Staff Evaluation............................................... 4-24 4.5.3 Conclusions.................................................. 4-24 4.6 Containment Liner Plate, Metal Containments, and Penetration Fatigue Analysis. 4-25 4.6.1 Technical Information in the Application............................. 4-25 4.6.2 Staff Evaluation............................................... 4-26 4.6.3 FSAR Supplement............................................. 4-27 4.6.4 Conclusions.................................................. 4-27 4.7 Other Plant Specific Time-Limited Aging Analyses......................... 4-27 4.7.1 Reactor Coolant Pump Flywheel Fatigue............................ 4-27 4.7.1.1 Technical Information in the Application......................... 4-27 4.7.1.2 Staff Evaluation........................................... 4-28 4.7.1.3 FSAR Supplement......................................... 4-28 4.7.1.4 Conclusions.............................................. 4-28 4.7.2 Leak-Before-Break Analyses..................................... 4-28 4.7.2.1 Technical Information in the Application......................... 4-28 4.7.2.2 Staff Evaluation........................................... 4-29 4.7.2.3 Conclusions.............................................. 4-30 4.7.3 Depletion of Nuclear Service Water Pond Volume due to Runoff.......... 4-31 4.7.3.1 Technical Information in the Application......................... 4-31 4.7.3.2 Staff Evaluation........................................... 4-32 4.7.3.3 FSAR Supplement......................................... 4-33 4.7.3.4 Conclusions.............................................. 4-33 4.8 References for Section 4............................................. 4-34 5 Review by the Advisory Committee for Reactor Safeguards....................... 5-1 6 Conclusions............................................................ 6-1 APPENDIX A, Chronology.................................................. A-1 APPENDIX B, Reference Documents.......................................... B-1 APPENDIX C, Principal contributors........................................... C-1

-xxii-ABBREVIATIONS Abbreviation Definition ACI American Concrete Institute ACRS Advisory Committee for Reactor Safeguards AFW auxiliary feedwater (system)

AMP aging management program AMR aging management review ANSI American National Standards Institute ASME American Society of Mechanical Engineers ASTM American Society for Testing and Materials BMI bottom mounted instrumentation BTP Branch Technical Position BWI Babcock and Wilcox International CASS cast austenitic stainless steel CCW condenser circulating water (system)

CFR Code of Federal Regulations CIV containment isolation valve CLB current licensing basis CRDM control rod drive mechanism CSS containment spray system CUF cumulative usage factor CVS chemical and volume control system DBA design basis accident DBD design basis documents ECCS emergency core cooling systems ECT eddy current test EFPY effective full power years EOC end of cycle EPL vital batteries system EPQ diesel generator batteries system EPRI Electric Power Research Institute EQ environmental qualification EQD standby shutdown facility diesel batteries system ETM standby shutdown facility batteries system FAC flow-accelerated corrosion FD (system) flow diagram FI filtration FP fire protection FSAR Final Safety Analysis Report GALL Generic Aging Lessons Learned (Report)

GDC General Design Criterion or General Design Criteria GEIS Generic Environmental Impact Statement gpm gallons per minute GSI generic safety issue HAZ heat-affected zone HELB high energy line break HVAC heating, ventilation, and air conditioning HT heat transfer

-xxiii-IASCC irradiation-assisted stress corrosion cracking ID inner diameter IR insulation resistance ISI inservice inspection ITS Improved Technical Specifications LBB leak-before-break (analysis)

LEFM linear elastic fracture mechanics LER Licensee Event Report LOCA loss of coolant accident LRA license renewal application LWR light water reactor MeV million electron volts MIC microbiologically induced corrosion Mpa mega pascals MW megawatts NC reactor coolant NDT nil ductility temperature NEI Nuclear Energy Institute NEPA National Environmental Protection Act NFPA National Fire Protection Association NRC Nuclear Regulatory Commission NSAC Nuclear Safety Analysis Center NSD Nuclear System Directive NSSS nuclear steam supply system NSW nuclear service water (system)

NW containment valve injection water (system)

OSHA Occupational Safety and Health Administration P&ID piping and instrumentation diagram PB pressure boundary PIP Problem Investigation Process PORV power-operated relief valve ppb parts per billion ppm parts per million psig pounds per square inch gauge PTS pressurized thermal shock PWHT post-weld heat treated PWSCC primary water stress corrosion cracking RAI request for additional information RCCA rod cluster control assembly RCP reactor coolant pump RCS reactor coolant system RG regulatory guide RHR residual heat removal (system)

RSG replacement steam generator RT reference temperature RV reactor vessel RVI reactor vessel internals RWST refueling water storage tank SBO station blackout (event)

SCs structures and components

-xxiv-scfm standard cubic feet per minute SG steam generator SER safety evaluation report SFP spent fuel pool SIS safety injection system SLC Selected Licensee Commitments SNSW standby nuclear service water (system or pond)

SR Surveillance Requirement SRP Standard Review Plan SCC stress corrosion cracking SCV steel containment vessel SE safety evaluation SER Safety Evaluation Report SSs systems and structures SSCs systems, structures and components SSE safe shutdown earthquake SSF standby shutdown facility SSS standby shutdown system TFMP Thermal Fatigue Management Program TH throttle TLAA time-limited aging analysis or analyses TR Testing Requirement TS Technical Specifications TSSR Technical Specification Surveillance Requirement UFSAR Updated Final Safety Analysis Report UHI Upper Head Injection UT ultrasonic testing VA auxiliary building ventilation (system)

VE annulus ventilation (system)

VF spent fuel pool building ventilation (system)

VC control area ventilation (system)

VCP Control Rod Drive Mechanism Nozzle and Other Vessel Closure Penetrations (Nozzle Inspection Program)

VD diesel building ventilation (system)

VHP vessel head penetration VK miscellaneous structures ventilation (system)

W Westinghouse WCAP Westinghouse Topical Report WOG Westinghouse Owners Group YC Control Area Chilled Water (System)