FINAL AS-ADMINISTERED WALKTHROUGH JPMS FOR THE LASALLE INITIAL EXAMINATION - APRIL 2002
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Secure RHR Service Water System Examination Level: RO /SRO /SRO(I)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date: March 14, 2002
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
B.1.a Task
Title:
Secure RHR Service Water System K/A
Reference:
400000A4.01 K/A Importance:
3.1/3.0 Examinee:
NRC Examiner:
Time Started:
Estimated Time to Completion:
8 min Date:
Time Finished:
Time Critical Task: NO Method of testingq:
Performance:
Simulated X"
Actual Location:
X Simulator Plant Task Standard:
Sequence stopping of multiple RHRSW pumps.
Required Materials:
LOP-RH-05, Operation of the RHR Service Water System General
References:
LOP-RH-05, Operation of the RHR Service Water System, Rev 22, 1/17/2001 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully completed the task.
Initial Conditions:
Plant Conditions are as shown. 'B' RHRSW has been running for a pump vibration and flow data test. B RHR SW Process Radiation Monitor is INOP. Chemistry has completed the required sample within the last hour. 1 El 2-F448 and 1 El 2-F441 have been cycled as part of the test. The test is complete. There are no Tech Spec time clocks in effect. An operator is standing by to assist you.
Initiating Cue:
The Unit Supervisor has directed you to secure 'B' RHRSW lAW LOP-RH-05. Inform the Unit Supervisor when the task is complete.
Page 2 of 8
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
This JPM can be run from any IC.
It is OK to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2.
Verify Div 1 and Div 2 Thermal O/L Bypass switches are in NORMAL.
- 3.
Start 'B' RHR Service Water system Start 'C RHR Service Water pump (1 El 2-C300C)
Open 'B' RHR Service Water Heat Exchanger Outlet Valve, 1E12-F068B Start 'D' RHR service Water pump (1 E12-C300D)
- 4.
This completes the setup for this JPM.
Page 3 of 8
JOB PERFORMANCE MEASURE Initial Conditions:
Plant Conditions are as shown.
'B' RHRSW has been running for a pump vibration and flow data test.
°
'B' RHRSW Process Radiation Monitor is INOP.
° Chemistry has completed the required sample within the last hour.
° 1 El 2-F448 and 1 El 2-F441 have been cycled as part of the test.
° The test is complete.
There are no Tech Spec time clocks in effect. An operator is standing by to assist you.
Initiating Cue:
The Unit Supervisor has directed you to secure 'B' RHRSW lAW LOP-RH-05. Inform the Unit Supervisor when the task is complete.
Page 4 of 8
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: All steps of this JPM are to be completed at CR Panel 1 H1 3-P601 Candidate should refer to LOP-RH-05, Section E.5, Shutdown of RHRSW System.
Element Expected Response 4t:
C:
E Cl)
E z
o Cl)
D 0
- 1.
Locally Backwash the operating strainer per LOP-RH-1 4.
CUE:
Candidate picks up phone and requests NLO backwash strainer.
As local operator, acknowledge direction. Wait a minute, then report that the B RHRSW strainer has been backflushed lAW LOP-RH-14.
- 2.
PLACE the O/L Bypass for 1El2-F003B, 4B, 4C, 6B, 47B, 68B, 73B, 74B, 93, 94 Thermal Overload bypass switch to test.
- 3.
Log positioning of O/L Bypass switch in Unit Log. Start 8 hr time clock.
- 4.
If required, START 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> clock O/L Bypass for 1 E12-FO03B, 4B, 4C, 6B, 47B, 68B, 73B, 74B, 93, 94 Thermal Overload bypass switch placed in TEST.
CUE: As NSO, you will log operation of O/L bypass switches.
Candidate determines that an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> timeclock must be started.
CUE:
If requested, as Unit Supervisor, state that the Unit NSO will perform the necessary actions for the Tech Spec Time clock.
- 5.
If only one RHRSW pump is in operation... (Step E.5.4).
- 6.
Place control switch for 1 Ei 2 F068B, 'B' RHR Hx water outlet vlv to CLOSE.
Candidate determines step is not applicable and continues with step E.5.5.
Control switch for 1 E 12-F068B, 'B' RHR Hx water outlet vlv placed in close position.
Page 5 of 8
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
H E
H-U)
E z
o WI D
0 Expected Response
- 7. When flow indicated on 1 El 2 R602B decreased below 4000 gpm, STOP one RHRSW pump 1E12 300C/D.
- 8.
When 1 E-F068B, 'B' RHR water outlet valve is closed, STOP the running RHRSW pump 1E12 300D/C.
C or D RHRSW pump control switch taken to STOP when flow decreases to <4000 gpm.
D or C RHRSW pump control switch taken to STOP when 1 E F068B, 'B' RHR water outlet valve is closed.
- 9.
VERIFY flow decreases to 0 gpm on Flow decrease to 0 gpm on flow flow indicator 1 El 2-R602B indicator 1 El 2-R602B.
- 10.
Place the O/L Bypass for 1 El 2 F003B, 4B, 4C, 6B, 47B, 68B, 73B, 74B, 93, 94 Thermal Overload bypass switch to NORMAL.
- 11.
Log position O/L Bypass switch in unit log.
O/L Bypass for 1 E1 2-FO03B, 4B, 4C, 6B, 47B, 68B, 73B, 74B, 93, 94 Thermal Overload bypass switch to NORMAL.
Position of O/L Bypass switch o
Logged in unit log o
Requested to be logged by Unit NSO.
Page 6 of 8 Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
E 3CO E z
o Element Expected Response
/)
D 0
CUE:
If requested, as Unit NSO, acknowledge request, report that the OIL Bypass for 1E12-F003B, 4B, 4C, 6B, 47B, 68B, 73B, 74B, 93, 94 Thermal Overload bypass switch to NORMAL has been logged.
- 12.
If required, STOP 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> clock Candidate determines that an 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> timeclock must be stopped.
CUE:
If requested, as Unit Supervisor, state that the Unit NSO will perform the necessary actions for the Tech Spec Time clock.
CUE: THIS JPM IS COMPLETE.
Enter JPM Stop Time:
Page 7 of 8
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 8 of 8
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Transfer a Turbine Driven Reactor Feed Pump from Manual Backup Station to 3-Element Control Examination Level: RO /SRO /SRO(I)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date: 3/14/2002
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
B.1.b Task
Title:
Transfer a TDRFP from Manual Backup Station to 3-Element Control K/A
Reference:
259002A4.02 K/A Importance:
3.9/3.7 Examinee:
NRC Examiner:
Date:
Time Started:
8 min Time Finished:
Time Critical Task: NO Method of testing:
Performance:
Simulated Location:
X Simulator X
Actual Plant Task Standard:
Transfer a TDRFP from Manual Backup station to Automatic controller.
Required Materials:
LOA-FW-1 01, Reactor Level/Feedwater Pump Control Trouble, Rev 7, 1/15/2002 LOP-RL-01, Operation of the Reactor Level Control System, Rev 14, 1/16/2002 General
References:
LOA-FW-1 01, Reactor Level/Feedwater Pump Control Trouble LOP-RL-1 01, Operation of the Reactor Level Control System JPM S-FW-04, Rev 4,1/19/1999 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
Unit 1 experienced slight oscillations in the AUTO control signal for the 'A' TDRFP.
The pump was transferred to the demand substitution mode on the manual backup station lAW LOP-FW-17.
The problem associated with the 'A' TDRFP M/A station has been repaired.
Initiating Cue:
The Unit Supervisor has directed you to transfer 'A' TDRFP from manual backup station to 3-element control lAW LOA-FW-1 01, Reactor Level/Feedwater Pump Control Trouble. Inform your supervisor when this task has been completed.
Page 2 of 7
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Reset the simulator to IC 22 (rst22).
It is OK to use a similar IC to the IC listed above, provided the IC actually used is verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2.
Conditions as follows:
Place the simulator in RUN Place the A TDRFP in Manual on its M/A station Shift it to the manual backup station in demand substitution mode Lower the M/A station signal to minimum
- 3.
Freeze the simulator until cued by examiner.
- 4.
Establish a delta flow between 'A' & 'B' FW loop flows of at least 1 E6 Lbm/hr.
- 5.
This completes the setup for this JPM.
Page 3 of 7
JOB PERFORMANCE MEASURE INITIAL CONDITIONS (To be read by examinee)
Initial Conditions:
Unit 1 experienced slight oscillations in the AUTO control signal for the 'B' TDRFP.
The pump was transferred to the demand substitution mode on the manual backup station lAW LOP-FW-17.
The problem associated with the 'A' TDRFP M/A station has been repaired.
Initiating Cue:
The Unit Supervisor has directed you to transfer 'A' TDRFP from manual backup station to 3 element control lAW LOA-FW-101, Reactor Level/Feedwater Pump Control Trouble. Inform your supervisor when this task has been completed.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
All steps of the JPM are to be completed at control room panel H13-P603 unless otherwise noted.
Element Expected Response E
H-Co E
z o
- 0)
D 0
- 1.
Check loss of speed demand alarm clear.
- 2.
Verify'A'TDRFP Manual Backup station Mode Selector Sw. is in Manual.
- 3. Place 'A' TDRFP Manual B/U Station Mode selector switch in AUTO.
- 4.
Check'A'TDRFP Manual backup Station Auto Enabled light illuminated.
- 5.
Candidate reviews LOP-RL-101 to place RWLC in AUTO.
- 6.
VERIFY:
"* No signal failures
"* No Lockout actuation which will affect operation of the component to be placed in auto.
"* 'A' Min Flow M/A Station in AUTO
"* No Level signal failure.
Candidate checks speed demand alarm clear on Operator work station, screen DS001.
'A' TDRFP Manual B/U station Mode select. Sw in Manual.
Candidate places places 'A' TDRFP Manual B/U Station Mode selector switch in AUTO.
Checks 'A' TDRFP Manual backup Station Auto Enabled light illuminated.
Candidate reviews LOP-RL-101.
Candidate checks for:
No signal failures, No Lockout actuations
'A' min flow M/A station in AUTO No level signal failure.
Page 5 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Expected
Response
E H C)
E z
0 Co D
0
- 7. DEPRESS AUTO Pushbutton on the 'A' TDRFP M/A station.
- 8. VERIFY Reactor Water Level is stable
- 9. Inform Unit Supervisor that B TDRFP is now in 3-element control.
(CUE) THIS COMPLETES THIS JPM Record Stop Time:
Depresses Auto PB at the 'A' TDRFP M/A station.
Candidate verifies Reactor Water Level is stable. May check A & B TDRFP speed demand outputs on DS001.
Candidate states that TDRFP is now in 3-element control.
Page 6 of 7 Element
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 7 of 7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Main Turbine Weekly Surveillance Test Examination Level: RO /SRO /SRO(I)
Date: March 5, 2002 Developed by: Raymond Keith Walton Date:
3/14/2002
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
B.1.c Task
Title:
Main Turbine Weekly Surveillance Test K/A
Reference:
241000A4.06 K/A Importance:
3.9/3.9 Examinee:
NRC Examiner:
Time Started:
Estimated Time to Completion:
10 min.
Date:
Time Finished:
Time Critical Task: NO Method of testing:
Performance:
Simulated X
Actual Location:
X Simulator Plant Task Standard:
Perform testing of Turbine bypass valves.
Required Materials:
LOS-TG-W1, Turbine Weekly Surveillances, Rev 34, 11/2/2001 General
References:
LOS-TG-W1, Turbine Weekly Surveillances READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
Unit 1 is at 85% of full power.
Initiating Cue:
Unit supervisor has directed you to perform Turbine Weekly Surveillance testing per LOS-TG-W1, A, Section A.2 (BPV). All Prerequisites and Precautions have been met. The Load Dispatcher has given permission to perform this surveillance.
Page 2 of 8
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Setup for 85% power operations and main turbine generator on line.
Page 3 of 8
JOB PERFORMANCE MEASURE Initial Conditions:
Unit 1 is at 85% of full power.
Initiating Cue:
Unit supervisor has directed you to perform Turbine Weekly Surveillance testing per LOS-TG-W1, Attachment 1A, Section A.2 (BPV). All Prerequisites and Precautions have been met. The Load Dispatcher has given permission to perform this surveillance.
Inform your supervisor when this task has been completed.
Page 4 of 8
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
E
-0 E
z o
c)
D 0
Expected Response
"*1.
TEST OPEN Turbine Bypass Valve 1B21-MSBPV-1:
- a. CHECK BPV Ready to Select light is energized.
- b. Place the BYPASS VALVE TEST selector SW in Postion 1
- c. DEPRESS the TEST BYPASS VALVE button.
- d. Release the TEST BYPASS VALVE button.
- 2.
TEST OPEN Turbine Bypass Valve 1 B21 -MSBPV-2:
- a. CHECK BPV Ready to Select light is energized.
- b. Place the BYPASS VALVE TEST selector SW in Position
- 2.
- c. DEPRESS the TEST BYPASS VALVE button.
- d. Release the TEST BYPASS VALVE button.
BPV Ready to Select light is energized Bypass Valve Test selector switch in Postion 1.
Depresses the TEST BYPASS VALVE button 1 B21 -MS-BPV-1 goes to Full open exhibiting fast open characteristics the final 10% of travel.
Test Bypass Valve button released 1 B21 MS-BPV-1 goes to Full closed.
BPV Ready to Select light is energized Bypass Valve Test selector switch in Position 2.
Depresses the TEST BYPASS VALVE button.
1 B21 -MSBPV-2 goes to Full open exhibiting fast open characteristics final 10% of travel.
Test Bypass Valve button released 1 B21 MSBPV-2 goes to Full closed.
Page 5 of 8 Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Expected Response I--
0 E
F-
- 0)
E Z
0
- 9)
-D 0
- 4.
TEST OPEN Turbine Bypass Valve 1B21-MSBPV-3:
- a. CHECK BPV Ready to Select light is energized.
- b. Place the BYPASS VALVE TEST selector SW in Position
- 3.
- c. DEPRESS the TEST BYPASS VALVE button.
- d. Release the TEST BYPASS VALVE button.
- 5.
TEST OPEN Turbine Bypass Valve 1B21-MSBPV-4:
- a. CHECK BPV Ready to Select light is energized.
- b. Place the BYPASS VALVE TEST selector SW in Position 4
- c. DEPRESS the TEST BYPASS VALVE button.
- d. Release the TEST BYPASS VALVE button.
BPV Ready to Select light is energized Bypass Valve Test selector switch in Position 3.
Depresses the TEST BYPASS VALVE button 1B21-MSBPV-3 goes to Full open exhibiting fast open the final 10% of travel.
Test Bypass Valve button released 1 B21 MSBPV-3 goes to Full closed.
BPV Ready to Select light is energized Bypass Valve Test selector switch in Position 4.
Depresses the TEST BYPASS VALVE button.
1 B21 -MSBPV-4 goes to Full open exhibiting fast open the final 10% of travel.
Test Bypass Valve button released 1 B21 MSBPV-4 goes to Full closed.
Page 6 of 8 Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Expected Response E
Cl)
E co D
0
- 6.
TEST OPEN Turbine Bypass Valve 1 B21 -MSBPV-5:
- a. CHECK BPV Ready to Select light is energized.
- b. Place the BYPASS VALVE TEST selector SW in Position
- 5.
- c. DEPRESS the TEST BYPASS VALVE button.
- d. Release the TEST BYPASS VALVE button.
- 7. CHECK that the Bypass Valve READY TO SELECT Light is energized.
- 8.
PLACE the BYPASS VALVE TEST selector Sw to OFF.
BPV Ready to Select light is energized Bypass Valve Test selector switch in Position 5.
Depresses the TEST BYPASS VALVE button 1 B21 -MSBPV-5 goes to Full open exhibiting fast open the final 10% of travel.
Test Bypass Valve button released 1 B21 MSBPV-5 goes to Full closed.
Ready To Select Light is energized Bypass Valve Test Selector Switch to OFF (CUE) THIS COMPLETES THIS JPM Record Stop Time:
Page 7 of 8 Element
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 8 of 8
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Stuck Control Rod Drive Examination Level: RO /SRO /SRO(l)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date: 3/14/2002
JOB PERFORMANCE MEASURE Facility:
LaSalle Nuclear Station Task No:
B.1.d Task
Title:
Stuck Control Rod Drive K/A
Reference:
201001A4.04 K/A Importance:
3.1/3.0 Examinee:
NRC Examiner:
Date:
Time Started:
Time Finished:
Estimated Time to Completion:
10 min Time Critical Task: NO Method of testinq:
Performance:
Simulated Location:
X Simulator X
Actual Plant Task Standard:
Ability to move stuck control rod by increasing rod drive pressure using abnormal procedures.
Required Materials:
Copy of LAP 100-13, Attachment C, for rod moves.
General
References:
LOA-RD-1 01, Control Rod Drive Abnormal, Rev 4, 3/27/2001 LAP 100-13, Control Rod Sequence Package Preparation, Review and Implementation.
READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
Unit 1 at 85% of full power operation.
Initiating Cue:
Unit Supervisor has instructed you to exercise rod 30-31 lAW LOS-AA-W1, Attachment 1 B.
Page 2 of 7
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Setup for power operations (-85%)
- 2.
Insert: mrdl 93 100% when drive >47 on dp RD1
- 3.
Delete mrd 193 Page 3 of 7
JOB PERFORMANCE MEASURE INITIAL CONDITIONS Initial Conditions:
Unit 1 at 85% power operation.
Initiating Cue:
Unit Supervisor has instructed you to adjust control rods lAW LAP 100-13, Attachment C and qualified nuclear engineer instructions.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Expected Response E
9CO E z
o I)
D 0
- 1.
Operator reviews LOS-AA-W1, B for Rod Group 10 B and LOP-RM-01, Reactor Manual Control Operation.
- 2.
Successfully withdraws rod 14 39 one notch.
- 3.
ATTEMPTS to INSERT CRD 22-15 by DEPRESSING Rod Insert Pushbutton.
Candidate reviews LOS-AA-W1, B for Rod Group 1OB and LOP-RM-01, Section E.3.
Withdraws rod 14-39 one notch.
CRD 22-15 selected. Candidate depresses CRD INSERT pushbutton.
CRD 22-15 does not move.
- 4.
NOTIFIES Unit Supervisor that CRD will not move.
CUE: Unit Supervisor acknowledges problems with CRD moving. Need to move rods!
- 5.
RAISE CRD Drive Pressure initially by no more than 100 psid.
- 6.
Applies INSERT signal.
- 7.
Raises CRD Drive Pressure but not to exceed 500 psid.
- 8.
Attempts to INSERT CRD 22 15.
Raises CRD Drive Pressure by <100 psid by adjusting CRD pressure control valve.
Control rod does not move.
Adjusts CRD Pressure Control Valve.
Attempts to insert control rod but control rod does not move.
NOTE TO EXAMINER:
INITIATE ALTERNATE PATH PORTION OF JPM.
Goal is to insert CRD by increasing CRD pressure by throttling on CRD PCV lAW Abnormal procedure LOA-RD-101.
Page 5 of 7 Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Element H c-,
E H'-
CO E
z o
Cl)
D) 0~
Expected Response
- 9.
Check control rod position indication normal.
- 10.
Insert stuck rod 22-15.
OBSERVE Directional Control Valve Sequencing.
- 11.
CHECK CRD 22-15 Failed to move with drive water pressure
<450 psid.
- 12.
RAISE Drive Water pressure to 500 psid.
"*13. Attempts to withdraw CRD 22 15 by depresses CRM INSERT pushbutton.
"*14 RETURN Drive Water pressure to NORMAL
"*15. Attempts to withdraw CRD 22 15 one notch.
(CUE) THIS COMPLETES THIS JPM Record Stop Time:
CUE: Control Rod position is in Normal position.
Directional Control Valve Sequencing normal.
CRD 22-15 Failed to move with drive water pressure <450 psid.
Candidate adjusts drive water pressure to 500 psid by throttling PCV lCl 1-F003.
Control Rod moves. Candidate moves CRD 22-15 in 1 notch.
Candidate adjusts drive water pressure to <450 psid by throttling PCV 1Cl 1 -F003 Candidate depresses CRM pushbutton. CRD 22-15 moves out one notch.
Page 6 of 7
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 7 of 7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Failure of SBGT System to Initiate Examination Level: RO /SRO /SRO(I)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date: 3/14/2002
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
B.1.e Task
Title:
Fuel Assembly Damage Results in Manual Actuation of ESF System K/A
Reference:
261 000A2.12 Examinee:
NRC Examiner:
K/A Importance:
3.2/3.4 Time Started:
Estimated Time to Completion:
5 min Time Finished:
Time Critical Task: NO Method of testing:
Performance:
Simulated X
Actual Location:
X Simulator Plant Task Standard:
Manually actuate SBGT and detect the failure of the fan output damper to automatically open.
Required Materials:
LOA-FH-001, Irradiated Fuel Assembly Damage, Rev 0, 7/31/1996 LOP-VG-01, Preparation for Standby Operation of the SBGT System, Rev. 9, 11/6/2000 General
References:
LOA-FH-001, Irradiated Fuel Assembly Damage, Rev 0, 7/31/1996 LOP-VG-01, Preparation for Standby Operation of the SBGT System, Rev. 9, 11/6/2000 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
Unit 1 is in Mode 5 with fuel shuffles in progress. Unit 2 is operating in Mode 1. The Fuel handling supervisor calls you in control room to inform you that they have just dropped a fuel bundle in the spent fuel pool. The dropped fuel is emitting gas bubbles. The radiation monitor on the fuel handling bridge is alarming. RP personnel have ordered an evacuation of the refuel floor. Unit 2 Standby Gas Treatment is out of service. Unit 1 Standby Gas Treatment has failed to automatically start.
Initiating Cue:
The Unit Supervisor has directed you to start SBGT in accordance with LOA-VG-1 01, Step E.1.c. Inform your supervisor when this task has been completed.
Page 2 of 7 Date:
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Reset Simulator to IC 26 (rst 26).
NOTE: It is OK to use a similar IC to the IC listed above, provided the IC actually used to verified to be compatible with this and other JPMs that are scheduled to be run concurrently.
- 2.
Set Simulator up for Mode 5 operations.
- 3.
Enter fault: Ul SBGT Dsch Vlv. 1(2)VG003 fails to automatically open. After candidate attempts to start Ul SBGT. THEN clear fault on SBGT VG003 damper!
- 4.
Insert the following annunciators:
H13-P601-E306, Fuel Pool Vent Rad Hi H13-P601-E204, Div 2 RB Vent Rad Hi-Hi H13-P601-E205, Div 2 Fuel Pool Rad Hi-Hi H13-P601-F204, Div 1 RB Vent Rad Hi-Hi H13-P601-F204, Div 1 Fuel Pool Rad Hi-Hi Page 3 of 7
JOB PERFORMANCE MEASURE INITIAL CONDITIONS Unit 1 is in Mode 5 with fuel shuffles in progress.
Unit 2 is operating in Mode 1.
Fuel handling supervisor calls you in the control room to inform you that they have just dropped a fuel bundle in the spent fuel pool.
The dropped fuel is emitting gas bubbles. The radiation monitor on the fuel handling bridge is alarming.
RP personnel have ordered an evacuation of the refuel floor.
Unit 2 Standby Gas Treatment is out of service.
Unit 2 Standby Gas Treatment is out of service. The Unit 1 Standby Gas Treatment has failed to automatically start.
Initiating Cue:
The Unit Supervisor has directed you to start SBGT lAW LOA-VG-101, Step E.1.c. Inform your supervisor when this task has been completed.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: All steps of the JPM are to be completed at Control Room Element Expected Response E
3CO E Z
o l)
D 0
- 1.
Locates and reviews copy of LGA-VG-1 01.
- 2. VERIFY for Unit 1 VG train:
OPENs 1VG001, Ul SBGT Inlet Isol VIv.
ENERGIZES Ul SBGT Primary Fan, 1VG01 C, by taking control switch to ON position.
Locates and reviews LGA-VG-1 01 to start SBGT System.
OPENs 1VG001, ENERGIZES Ul SBGT Primary Fan.
Discharge damper 1VG003 fails to open.
Annunciator PM07J-A401 alarms.
CUE: Need to have a train of SBGT running. (IF candidate is confused, have candidate respond to PM07J A401 alarm)
NOTE TO EXAMINER: INITIATE ALTERNATE PATH PORTION OF JPM.
Goal is to initiate SBGT by manually opening discharge damper.
- 4. Manually Opens 1VG003, Ul SBGT Dsch Vlv using control switch on PM07J.
1VG003 indicates open.
- 6. Verifies/deenergizes Ul SBGT Cooling fan, 1VG02C.
SBGT Cooling fan off.
Page 5 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: All steps of the JPM are to be completed at Control Room Element E
I-CO E
z o
)
D 0)
Expected Response
- 7. Verifies SBGT flow between 3600 to 4400 CFM:
0 U1 SBGT Outlet Flow Indicator, 1 FR-VG009 0
U1 SBGT Inlet Flow Indicator, 1 FI-VG003.
- 8. Informs Supervisor that U1 SBGT is operating.
CUE: THIS COMPLETES THIS JPM Record Stop Time:
SBGT system indicated flow between 3600 - 4400 CFM Page 6 of 7
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 7 of 7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Transfer Electrical Loads Bus 151 and 152 from SAT 142 to UAT 141 Examination Level: RO /SRO /SRO(Il Date: April 8, 2002 Developed by: Raymond Keith Walton Date:
JOB PERFORMANCE MEASURE Facility:
LaSalle Nuclear Station Task No:
B.1.f Task
Title:
Transfer Loads from SAT 142 to UAT 141 K/A
Reference:
262001 K5.01 K/A Importance:
3.1/3.4 Examinee:
NRC Examiner:
Time Started:
Date:
Time Finished:________
Estimated Time to Completion:
10min Time Critical Task: NO Method of testing:
Performance:
Simulated X
Actual Location:
X Simulator Plant Task Standard:
Transfer 6.9 Kv Electrical buses from SAT 142 to UAT 141 Required Materials:
LOP-AP-14, Transfer of 6.9KV or 4.16KV Bus Power Supply Between the System and Unit Auxiliary Transformers.
General
References:
LOP-AP-1 4,Transfer of 6.9KV or 4.16KV Bus Power Supply Between the System and Unit Auxiliary Transformers, Rev 5, 10/14/1998 LOP-AP-01, Unit Auxiliary Transformer Backfeeding Operations READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Inform me when you successfully completed the task.
Initial Conditions:
Unit 1 is shutdown (Mode 4). The Ul Main Generator Disconnect Links are open and UAT 141 Transformer Disconnect Links to Switchyard are closed. Backfeeding operations had previously been completed lAW LOP-AP-01, Unit Auxiliary Transformer Backfeeding Operations. UAT 141 is available for backfeeding. The 6.9Kv Buses 151 and 152 are being powered from SAT 142.
Initiating Cue:
The Unit Supervisor has directed you to Transfer Buses 151 and 152 from SAT 142 to UAT 141 in accordance with LOP-AP-14, Step E.4.
Page 2 of 7
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Reset Simulator
- 2.
Set up Simulator for Mode 4 with Unit 2 at full power.
- 3.
Backfeed operations for UAT141 have been completed, Generator Output disconnect links are open, UAT141 Transformer Output disconnect links are closed.
Page 3 of 7
JOB PERFORMANCE MEASURE INITIAL CONDITIONS (To be read by examinee)
Initial Conditions:
Unit 1 is shutdown (Mode 4). The Ul Main Generator Disconnect Links are open and UAT 141 Transformer Disconnect Links to Switchyard are closed. Backfeeding operations had previously been completed lAW LOP-AP-01, Unit Auxiliary Transformer Backfeeding Operations. UAT 141 is available for backfeeding. The 6.9Kv Buses 151 and 152 are being powered from SAT 142.
Initiating Cue:
The Unit Supervisor has directed you to Transfer Buses 151 and 152 from SAT 142 to UAT 141 in accordance with LOP-AP-14, Step E.4.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk) t E
H-0 E
z o
0o D
0 Expected Response
- 1.
PLACE circuit breaker synchroscope select switch for the on-coming transformer to the 6.9KV bus to ON.
ACB 1521, UAT 141 to Bus 152.
ACB 1511, UAT 141 to Bus 151.
- 2.
VERIFY the following:
Synchroscope steady at 12:00 o'clock position.
Synchronizing lights are NOT LIT.
Incoming and running voltages are approximately equal.
- 3. With synchroscope at 12:00 o'clock position, CLOSE feed breaker from UAT:
ACB 1521, UAT 141 to Bus 152.
ACB 1511, UAT 141 to Bus 151.
- 4.
CHECK 6.9 KV Paralleled Bus Alarm ANNUNCIATES.
- 5. OPEN feed breaker from SAT:
ACB 1522, SAT 142 to Bus 152.
ACB 1512, SAT 142 to Bus 151.
- 6.
CHECK all bus parameters normal.
Places circuit breaker synchroscope select switch for ACBs 1521 & 1511 to ON.
- 2. Verifies:
Synchroscope steady at 12:00 o'clock position.
Synchronizing lights are NOT LIT.
Incoming and running voltages are approximately equal.
With synchroscope at 12:00 o'clock position, closes feed breakers ACB 1521 and ACB 1511.
Checks 6.9 KV Paralleled Bus Alarm Annunciates.
Opens feed breaker:
ACB 1522 & ACB 1512.
Checks all bus parameters normal.
Page 5 of 7 Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: Allow candidate to locate and review copy of LOP-AP-08.
Element Expected Response
- 7.
CHECK UAT 141 picks up entire load.
- 8.
PLACE Synchroscope Select for the on-coming transformer to the 6.9KV bus to OFF.
ACB 1521, UAT 141 to Bus 152.
ACB 1511, UAT 141 to Bus 151.
- 9.
RESET Paralleled Bus Annunciator.
CUE: This completes this JPM Completion Time: __
CHECK UAT 141 picks up entire load.
Places Synchroscope Select for ACBs 1521 & 1511 to OFF.
Resets Paralleled Bus Annunciator.
Page 6 of 7
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 7 of 7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Reestablish Shutdown Cooling After Clearing Level 3 PCIS Signal Examination Level: RO /SRO /SRO(l)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date: 3/14/2002
JOB PERFORMANCE MEASURE Facility:
LaSalle Nuclear Station Task No:
B.1.q Task
Title:
Reestablish Shutdown Cooling After PCIS Level 3 Signal Cleared K/A
Reference:
20500A2.06 Examinee:
NRC Examiner:
K/A Importance: 3.4/3.5 Time Started:
Estimated Time to Completion:
10 min Time Finished:________
Time Critical Task: NO Method of testing:
Performance:
Simulated X
Actual Location:
X Simulator Plant Task Standard:
Identify that during reestablishing of shutdown cooling, a drain path between RPV and suppression pool occurs due to fault in RHR valve interlocks. Candidate must stop drain path prior to reaching RPV Level IV isolation signal.
Required Materials:
LOA-RH-101, RHR Abnormal, Rv. 4,12/5/2000 LOP-RH-07, Shutdown Cooling System Startup, Operation and Transfer, Rv. 46, 10/27/2000 General
References:
LOA-RH-101, RHR Abnormal, Rv. 4,12/5/2000 LOP-RH-07, Shutdown Cooling System Startup, Operation and Transfer, Rv. 46, 10/27/2000 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Tell me when you have successfully complete the task.
Initial Conditions:
Plant is in Mode 4. A spurious PCIS Level signal 3 had occurred which resulted in 'A' RHR pump tripping and a loss of shutdown cooling. The PClS level 3 signal has been reset and the 'A' RHR pump is ready to be started. The 'B' RHR pump is inoperable.
Initiating Cue:
The Shift Manager has requested you reestablish shutdown cooling on 'A' train of RHR lAW LOP-RH 07, "Shutdown Cooling System Startup Operation and Transfer," starting at step E.5.6. Inform your supervisor when this task has been completed.
Page 2 of 7 Date:
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Setup Simulator for Mode 4 operations:
Reactor temperature 120 degrees F, RPV pressure 100 psig,
° RPV water level at 42" Both recirculation pumps operating at 15 hz.
- 2.
Plant conditions as shown:
'B' RHR pump inoperable
'A' RHRSW system in operation
- 3.
Reset 92, Close 1 E12-F053A, Stop A RHR pump, Close 1 E12-FO03A, Insert Override to prevent operation of 1 El 2-F053A, RPV Water Level 42".
Page 3 of 7
JOB PERFORMANCE MEASURE INITIAL CONDITIONS Initial Conditions:
Plant is in Mode 4. A spurious PCIS Level signal 3 had occurred which resulted in 'A' RHR pump tripping and a loss of shutdown cooling. The PCIS level 3 signal has been reset and the
'A' RHR pump is ready to be started. The 'B' RHR pump is inoperable.
Initiating Cue:
The Shift Manager has requested you reestablish shutdown cooling on 'A' train of RHR lAW LOP-RH-07, "Shutdown Cooling System Startup Operation and Transfer," starting at step E.5.6.
Inform your supervisor when this task has been completed.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Expected Response
<2 E
H )
E z z 0
- 1. Refer to LOP-RH-07, Shutdown Cooling System Startup, Operation and Transfer.
- 2. VERIFY CLOSED VIvs:
1 El 2-F053A, 'A' Shutdown Cooling Return Isolation Vlv.
1 El 2-FO03A, 'A' RHR Hx Outlet VIv.
- 3. VERIFY Reactor Level >40"
- 4. Start'A' RHR pump.
- 5. Throttle Open E12-053A,'A' SDC Return Isolation VIv.
- 6. DETERMINES valve E12-053A does not open.
Locate and Open LOP-RH-07. Start at step E.5.6.
1 E12-F053A & 1 E12-FO03A indicate closed.
Verifies Reactor Level >40" Candidate starts 'A' RHR pump.
Verifies by looking at Pump amps, flow rate and pump breaker indication light that pump started.
Valve El 2-053A does not open Reports to Unit Supervisor that valve won't open.
CUE: Acknowledge that El 2-053A does not open.
NOTE TO EXAMINER: Initiate Alternate Path portion of JPM. Goal is to prevent draining RPV into the suppression pool via the 'A' train of RHR. Operator must close E12-FO06A or E12-F008 or E12-F009 valves prior to receiving a Group VI isolation at +12.5 inches.
Page 5 of 7 Standard
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Element
- 7. Identifies that opening of E12 F064A as vessel inventory loss:
Stops pump and closes valve in flow path.
- 8.
VERIFIES reactor water level is stable following isolation (manual or automatic)
- 9.
RESPONDS to H13-P601-C203 annunciator alarm, "RHR Vlvs E12-FO06A E12-F064A OPEN:"
Verifies E12-F064A, 'A' RHR Pump Minimum flow valve CLOSING.
Check 'A' RHR Pump is required to be running.
- 10. Shutdown RHR System lAW...
CUE: THIS COMPLETES THIS JPM.
Record Stop Time:
Expected Response Trips 'A' RHR pump. Closes E12 F006A or E12-F008 or E12-F009 prior to receiving a PCIS Group VI isolation.
Candidate verifies reactor water level is stable following RHR isolation.
Candidate responds to P601-C203.
Verifies E12-F064A, 'A' RHR Pump Minimum flow valve CLOSING.
Checks 'A' RHR pump NOT required to be running.
E cl)
E z
o cI) 0 Page 6 of 7
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 7 of 7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Startup 'B' RPS MG Set Examination Level: RO /SRO /SRO(I)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date: 3/14/2002
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task
Title:
Reference:
212000A2.02 Task No: B.2.a K/A Importance:
3.7/3.9 Examinee:
NRC Examiner:
Time Started:
Date:
Time Finished:
Estimated Time to Completion:
12 min Method of testing:
Performance:
X Simulated Actual Time Critical Task: NO Location:
Simulator X Plant Task Standard:
Required Materials:
LOP-RP-01, RPS MG-Set Startup and Operation General
References:
LOP-RP-01, RPS MGS Set Startup and Operation, Rev. 8, 9/14/2001 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Inform me when you have successfully completed the task.
Initial Conditions:
Unit 1 is operating in Mode 1. Bus 'B' RPS power is on Alternate supply. There are no surveillances being performed which produce half RPS or half PCIS actuations.
Initiating Cue:
You have been instructed by the Shift Manager to Startup the 'B' RPS MG set and place 'B' RPS MG set on the bus in accordance with LOP-RP-01, "RPS MG-Set Startup and Operation." Previously, an operator had completed prerequisite steps for the LOP-RP-01. Inform your supervisor when this task has been completed.
Page 2 of 7
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
NONE: In-plant Page 3 of 7
JOB PERFORMANCE MEASURE INITIAL CONDITIONS (To be read by examinee)
Initial Conditions:
Unit 1 is operating in Mode 1. Bus 'B' RPS power is on Alternate supply. There are no surveillances being performed which produce half RPS or half PCIS acuations.
Initiating Cue:
You have been instructed by the Shift Manager to:
Startup the 'B' RPS MG set and Place 'B' RPS MG-Set on the bus lAW LOP-RP-01, "RPS Bus 'B' Transfer."
Previously, an operator had:
completed prerequisite steps for LOP-RP-01, "RPS MG Set Startup Procedure" Inform your supervisor when this task has been completed.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
All plant operations are to be simulated.
CUE: Give candidate partially completed copies of LOP-RP-01 Expected Response w
E I-CO E
z 0
CD Zl Q
- 4. PRESS and HOLD the 'B' RPS MG set Motor On pushbutton (1 PB) at local 'B' RPS MG set control panel. Observe:
"* Motor ON light illuminates
"* Local volt meter indicates 120 VAC.
RELEASE Motor ON pushbutton.
- 6. Check Electrical Protection Assembly (EPA) breaker 1 C71 -S003B Red Motor Gen light ON.
Locate and Open LOP-RP-01 Procedures. Candidate to perform steps E.1 and E.3 of LOP-RP-01.
Candidate closes Feeder Breaker 136X-2, B-3.
CUE: 'B' RPS MG set output breaker handle down.
Candidate presses and holds 1 PB to
CUE: Motor ON light illuminates Local Voltmeter indicates 120 VAC.
CUE: Breaker handle pointing upwards.
CUE: EPA bkr 1C71-SO03B Red Motor Gen light ON.
Page 5 of 7 Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
Standard Expected Response
- 7. CLOSE EPA breaker 1 C71 -S003B
- 8. Check Electrical Protection Assembly (EPA) breaker 1C71-S003B Red RPS bus light ON.
- 9. Check Electrical Protection Assembly (EPA) breaker 1C71 S003D Red Motor Gen light ON.
"*10. CLOSE EPA breaker 1 C71 -S003D.
- 11.
Check Electrical Protection Assembly (EPA) breaker 1C71-S003D Red RPS bus light ON.
- 12.
Main Control Room panel 1H13 P610 white Generator 'B' feed light illuminated.
(CUE) THIS COMPLETES THIS JPM Record Stop Time:
I--
()
E c
E Z
o (I)
D CO CUE: EPA bkr 1C71-S003B breaker handle pointing up.
CUE: EPA bkr 1C71-S003B Red RPS Bus light ON.
CUE: EPA bkr 1C71-S003D Red Motor Gen light ON.
CUE: EPA bkr 1C71-S003D breaker indicates closed CUE: EPA bkr 1C71-S003D Red RPS Bus light ON.
CUE: NSO reports 1H13-P610 white Generator 'B' feed light illuminated in MCR.
Page 6 of 7
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 7 of 7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Startup and Operation of RCIC from the Remote Shutdown Panel Examination Level: RO /SRO /SRO(I)
Date: April 8, 2002 Developed by: Raymond Keith Walton Date: 3/14/2002
JOB PERFORMANCE MEASURE Facility:
LaSalle Nuclear Station Task No:
B.2.b Task
Title:
Startup and Operate RCIC from Remote Shutdown Panel K/A
Reference:
295016 AA2.02 K/A Importance:
4.2/4.3 Examinee:
NRC Examiner:
Time Started:
Date:
Time Finished:________
Estimated Time to Completion:
10 min Method of testing:
Performance:
X Simulated Actual Time Critical Task: NO Location:
X Simulator Plant Task Standard:
Startup and Inject to RPV using RCIC from remote shutdown panel.
Required Materials:
Copy of LOP-RX-04, Startup and Operation of RCIC from the Remote Shutdown Panel, Rev 13, 9/21/2001 General
References:
Licensee JPM S-RX-05, Rev 6, 8/31/1999 LOP-RX-04, Startup and Operation of RCIC from the Remote Shutdown Panel, Rev 13, 9/21/2001 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. Inform me when you have successfully complete the task.
Initial Conditions:
The Control Room has been evacuated. Control has been transferred to the Remote Shutdown Panel.
Suppression Pool Cooling has been established from the Remote Shutdown Panel. Ul CY tank level has been locally verified to be above 15 feet. Plant operators are available.
Initiating Cue:
The Unit Supervisor has directed you to start RCIC from the Remote Shutdown Panel and inject into the RPV per LOP-RX-04, "Startup and Operation of RCIC from the Remote Shutdown Panel." Prerequisites have been met. Inform the Unit Supervisor when RCIC is injecting. Inform your supervisor when this task has been completed.
Page 2 of 7
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1.
Reset Simulator
- a.
Insert malfunction to prevent RCIC automatic initiation, (imf mnb080-150)
- b.
Place MDRFP control switch in PTL
- c.
- d.
Place the mode switch to Shutdown
- e.
Trip both TDRFPs and close the FW01OA and FW01OB valves
- f.
Place all Remote Shutdown Panel transfer switches to Emergency lAW LOP-RX-03.
- g.
Start Suppression Pool Cooling lAW LOP-RX-06
- h.
Stabilize reactor water level between -30 inches to -10 inches.
L.
Verify the RCIC turbine trip light is NOT lit on RSP.
- 2.
Freeze simulator until examinee has acknowledged the initiating cue(to prevent reactor water level from going too high or too low for this JPM to be performed)
- 3.
Have a copy of LOP-RX-04 available to replace one used by examinee.
Page 3 of 7
JOB PERFORMANCE MEASURE Initial Conditions:
The Control Room has been evacuated.
Control has been transferred to the Remote Shutdown Panel.
Suppression Pool Cooling has been established lAW LOP-RX-06, "Startup of Suppression Pool Cooling from the Remote Shutdown Panel."
0 Ul CY tank level has been locally verified to be above 15 feet.
Plant operators are available.
Initiating Cue:
The Unit Supervisor has directed you to start RCIC from the Remote Shutdown Panel and inject into the RPV per LOP-RX-04, "Startup and Operation of RCIC from the Remote Shutdown Panel." Prerequisites have been met.
Inform the Unit Supervisor when RCIC is injecting. Inform your supervisor when this task has been completed.
Page 4 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: All steps of the JPM are to be completed at the Unit 1 Remote Shutdown Panel.
Simulator Operator: Place simulator in RUN.
Element E
I--
E I-0 E
Z o
Co) 0 Expected Response
- 1.
VERIFY RCIC flow controller is in AUTO & SET at 100%.
- 2.
VERIFY OPEN 1E51-F068, RCIC Turbine Exhaust Valve.
- 4. CONCURRENTLY
"° OPEN 1E51-F045, RCIC Turbine Steam Supply Stop Valve.
"* OPEN 1E51-F059, RCIC Full Flow Test to CST Stop Valve.
- 5.
START RCIC Barometric Condenser Vacuum Tank Vacuum Pump
- 6.
CHECK that RCIC Pump flow is increasing as indicated on RCIC flow controller.
Verifies RCIC flow controller in AUTO & SET to 100%.
Verifies E51-F068 valve open indicator illuminated.
Places and holds 1 E51-F022 control switch in OPEN until valve is fully open.
Examinee simultaneously turns both 1 E51 -F045 and 1 E51 -F059 control switches to OPEN.
Starts RCIC. Barometric Condenser Vacuum Tank Vacuum Pump Flow increasing on RCIC flow controller or flow indicator.
Opens 1E51-F046 RCIC Lube Oil Cooler Supply Stop Valve.
Page 5 of 7
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
E CJ)
E z
o U)
D 0
Standard Expected Response
Candidate opens 1 E51 -F01 3 valve Closes 1E51-F022, RCIC Full Flow Test Upstream Stop Valve
- 10. ADJUST the RCIC flow controller Adjusts RCIC flow controller to to maintain desired reactor level, maintain reactor level
- 11. VERIFY RCIC flow greater than 120 gpm.
Indicator reads greater than 120 gpm.
Closes 1E51-F059, RCIC Full Flow Test to CST Stop Valve
- 13. Have candidate locate remote Candidate locates remote shutdown panel in plant shutdown panel in plant.
CUE: THIS COMPLETES THIS JPM.
Record Stop Time:
Page 6 of 7
VERIFICATION OF COMPLETION Job Performance Measure No.
Examinee's Name:
Examiner's Name:
Date performed:
Number of attempts:
Time to complete:
Question Documentation:
Question:
Response
Result: SAT or UNSAT Examiner's signature and date:
Page 7 of 7
LASALLE COUNTY NUCLEAR STATION JOB PERFORMANCE MEASURE Local Emergency Start of the A/B VP Chiller lAW LOP-VP-02 Examination Level: RO /SRO /SRO(Il Date: April 8, 2002 Developed by: Raymond Keith Walton Date: 3/22/20002
JOB PERFORMANCE MEASURE Facility: LaSalle Nuclear Station Task No:
B.2.c Task
Title:
S/U and Orerate Primary Ctmt Chill Water Ventilation System lAW LO-VP-02 K/A
Reference:
295012A1.01 Examinee:
NRC Examiner:
Time Started:
Estimated Time to Completion:
35 min Method of testing:
Performance:
X Simulated Actual K/A Importance:
3.9/3.9 Date:
Time Finished:
Time Critical Task: NO Location:
Simulator X Plant Task Standard:
Startup and operate 'B' containment chill water system after the 'A' chill water system does not work.
Required Materials:
LOP-VP-02, Startup, Operation and Shutdown of Primary Containment Chilled Water and Ventilation System General
References:
LOP-VP-02, Startup, Operation and Shutdown of Primary Containment Chilled Water and Ventilation System, Rev. 22, dated 8/9/2002.
JPM P-VP-02, Rev 10, 9/10/1998 READ TO THE EXAMINEE:
I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this job performance measure will be satisfied.
Initial Conditions:
Unit 1 has scrammed. Procedure LGA-003 is in progress. Drywell temperature is 1450 F. The 'C' VP chiller is out of service.
Initiating Cue:
The Shift Manager wants you to start the 'A' VP Chiller Unit lAW LOP-VG-02, Startup, Operation and Shutdown of Primary Containment Chilled Water and Ventilation System using the Emergency Start Procedure. Prerequisites and Precautions have been met. Inform your supervisor when this task has been completed.
Page 2 of 10
JOB PERFORMANCE MEASURE Simulator Setup Instructions:
- 1. NONE-In plant Page 3 of 10
JOB PERFORMANCE MEASURE INITIAL CONDITIONS Initial Conditions:
Unit 1 has scrammed. Procedure LGA-003 is in progress. Drywell temperature is 1450F. The
'C' VP Chiller Unit is out of service.
Initiating Cue:
The Shift Manager wants you to restart the 'A' VP Chiller Unit lAW LOP-VG-02, Startup, Operation and Shutdown of Primary Containment Chilled Water and Ventilation System using the Emergency Start Procedure. Prerequisites and Precautions have been met. Inform your supervisor when this task has been completed.
Page 4 of 10
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: All tasks to be performed on Unit 1.
E (n
E I-C/2 E
z o
ci Z
0 Element Expected Response
- 1.
VERIFY A Chilled Water Pump is running.
Candidate inspects Ul A Chilled Water Pump (east of chillers) to verify pump in operation.
CUE: Pump noise/vibration heard, discharge pressure 70 psig at gauge board.
- 2.
DEPRESS RELAY RESET pushbutton and VERIFY no alarm exists.
Examinee simulates depressing the RELAY RESET PB and verifies no alarm exists.
CUE: RELAY RESET PB has been depressed and no alarms exist.
The cues for steps 3 through 5 reflect conditions that would exist for a chiller that has been shutdown for at least 14 minutes.
- 3.
VERIFY Program Timer ON indicating light is NOT lit.
Program Timer Light is NOT lit.
- 4.
VERIFY Control Power Switch is Candidate verifies CONTROL ON/ALARM.
POWER Switch is ON/ALARM
- 5.
NOTIFY NSO of pending chiller Simulate calling CR.
start.
CUE: NSO notified of chiller start.
- 6.
DEPRESS START pushbutton.
Candidate simulates depressing start push button.
CUE: START indicating light does NOT energize.
NOTE TO EXAMINER: INITIATING ALTERNATE PATH PORTION OF JPM.
Goal is for candidate to recognize that other chiller unit should be used.
Page 5 of 10
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: All tasks to be performed on Unit 1.
H a1 E
I-cl)
E z
o co D
O Expected Response
- 7.
Candidate calls control room (phone near stairwell) to inform CR that 'A' VP Chiller won't start.
- 8. Candidate decides to start other Chiller unit. Candidate reviews LOP-VP-02, Section E.5 to "Swap Loops with C VP Chiller Valved Out." Requires starting
'B' VP Loop per Section E.10, then starting 'B' VP Chiller per section E.1 (Emerg. Start)
- 9.
VERIFY VP055A/B PCCW Holdup Tank Train A/B Bypass Valves are closed.
- 10. Calls CR to Open VP053B, VP063B, VP1 13B, BP1 14B vlvs.
- 11. Step E.10.3 will be N/A'ed
"*12. START 'B' Primary Ctmt.
Chilled Water pump by holding control switch in start until following valves open:
"o VP084 PCCW Holdup tank train B outlet valve, "o VP086 PCCW Holdup tank train B intlet valve.
CUE: Control informed that 'A' VP Chiller won't start. Inform candidate that we need to get VP system running.
Reviews LOP-VP-02, Section E.5 and Section E.10. and Section E.1.
Candidate Checks valve in closed direction. CUE: Valves are closed.
CUE: Control Room has opened valves.
Step E.10.3 will be N/A'ed Holds control switch in START position until VP084 and VP086 valves open. Releases switch.
CUE: VP084 and VP085 indicate open. 'B' Primary Ctmt. Chilled Water pump starts.
Page 6 of 10 Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: All tasks to be performed on Unit 1.
E Co E
z o
c)
D 0
Expected Response
- 13. CHECK pump runs normal with discharge pressure >40 psig on PI-VP-014.
- 14. N/A step 10.3.4
"*15 Calls CR to have:
"* CR start 'B' Primary Ctmt Ventilation Supply fan per step 10.4.
"* Start (verify running) 5 area coolers running in fast speed.
- 16. N/As step 10.6, Starts section 1 of LOP-VP-02, VP Chiller Emergency Start.
- 17. VERIFY Chilled water pump running.
"*18. DEPRESS RELAY RESET pushbutton and VERIFY no alarm exists.
Cue: >40 psig on PI-VP-014.
N/A step 10.3.4 Has CR start 'B' Primary Ctmt Vent.
Supply fan, and perform step 10.4.
Has CR verify 5 area coolers running in fast speed. CUE: CR has performed step 10.4 and 5 area coolers are running in fast speed.
N/As section 10.6, Starts section 1 of LOP-VP-02. CUE: IF candidate starts Section E.1 1, cue him that this is an emergency condition.
Chilled water pump started in previous section.
Examinee simulates depressing the RELAY RESET PB and verifies no alarm exists.
CUE: Simulate RELAY RESET PB depressed and no alarms exist.
The cues for steps 3 through 5 reflect conditions that would exist for a chiller that has been shutdown for at least 14 minutes.
Page 7 of 10 Element
JOB PERFORMANCE MEASURE (Denote critical steps with an asterisk)
NOTE: All tasks to be performed on Unit 1.
Element Expected Response
- 19. VERIFY Program Timer ON indicating light is NOT lit.
- 20. VERIFY Control Power Switch is ON/ALARM.
- 21. NOTIFY NSO of pending chiller start.
- 22. DEPRESS START pushbutton.
C:
E Cl)
E Z
0 CW D
)
CUE: Program Timer Light is NOT lit.
Candidate verifies CONTROL POWER Switch is ON/ALARM.
Simulate calling CR.
CUE: NSO notified of chiller start.
Candidate simulates depressing start push button.
CUE: START indicating light energizes. Pump noiselvibration heard, discharge pressure 60 psig at gauge board.
- 23. VERIFY Start Sequence:
Red START light is lit.
PROGRAM TIMER ON light energizes. Red Oil Pump indicating light energizes.
Within 30 seconds, hear motor contactor close, and the compressor starts.
PROGRAM TIMER ON light deenergizes.
Candidate verifies that the B Chiller starts per the program sequence:
CUE: Red START light is lit.
PROGRAM TIMER ON light energizes. Red Oil Pump indicating light energizes. Within 30 seconds, hear motor contactor close, and the compressor starts.
PROGRAM TIMER ON light deenergizes.
Page 8 of 10