Letter Sequence Approval |
---|
|
|
MONTHYEARML0211503862002-04-22022 April 2002 Technical Specifications, Issuance of Amendments Project stage: Approval ML0207803112002-04-22022 April 2002 License Amendment, Revise TS Surveillance Requirement 3.4.14-1 to Clarify the Frequency of Performance with Regard to Reactor Coolant System Pressure Isolation Valves in the Heat Removal System Flow Path Project stage: Other 2002-04-22
[Table View] |
|
---|
Category:Technical Specifications
MONTHYEARML23235A2962023-08-24024 August 2023 Issuance of Amendment Nos. 247 and 244, Regarding License Amendment Request to Revise Technical Specification 3.6.5, Containment Air Temperature, (EPID L-2023-LLA-0116) (Emergency Circumstances) NL-23-0704, Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit2023-08-22022 August 2023 Emergency License Amendment Request: Technical Specification 3.6.5, Containment Air Temperature, One-Time Temporary Change to Limit NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-22-0223, License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value2022-06-30030 June 2022 License Amendment to Revise Technical Specification 3.4.10, Pressurizer Safety Valves to Decrease Low Side Setpoint Tolerance Limiting Condition for Operation (LCO) Value ML22069A0042022-04-27027 April 2022 Issuance of Amendments Revision to TSs to Adopt TSTF-269-A, Rev. 2, Allow Administrative Means of Position Verification for Locked or Sealed Valves NL-22-0091, Correction of Technical Specification Typographical Omission2022-02-24024 February 2022 Correction of Technical Specification Typographical Omission ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21316A0552022-01-0505 January 2022 1 & 2, and Vogtle Electric Generating Plant, 1 & 2 - Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (EPID L-2021-LLA-0163 ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls NL-21-0385, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2021-09-29029 September 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML20303A1192020-12-11011 December 2020 Issuance of Amendment Nos. 232 and 229 Regarding Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19071A1382019-07-16016 July 2019 Issuance of Amendments 223 and 220 Revise Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations TSTF-51 and TSTF-471 ML18151A1742018-06-27027 June 2018 Issuance of Amendment Nos. 219 and 216, Adopt Technical Specification Task Force Traveler TSTF-412, Revision 3, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable ML17333A0792017-12-0606 December 2017 Reissue of Corrected Technical Specification Page 3.6.6-3 NL-17-1974, Supplemental Submittal of Corrected Technical Specification Pages for the AST, TSTF-448 and TSTF-312 Amendment Package2017-11-21021 November 2017 Supplemental Submittal of Corrected Technical Specification Pages for the AST, TSTF-448 and TSTF-312 Amendment Package NL-17-1067, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request2017-06-0808 June 2017 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request ML17034A1932017-02-16016 February 2017 Issuance of Amendments to Adopt TSTF-427 Allowance for Non Technical Specification Barrier Degradation on Supported System Operability ML16232A0002016-10-17017 October 2016 Issuance of Amendments Related to NFPA-805 Supplement ML16272A1892016-10-0303 October 2016 Correction to Amendment Nos. 203 (Unit 1) and 199 (Unit 2) ML15289A2272016-06-10010 June 2016 Issuance of Amendments Related to TSTF-432-A, Revision 1 ML16083A2652016-05-17017 May 2016 Issuance of Amendments to Revise Technical Specification 3.4.14 NL-16-0034, License Amendment Request and 10 CFR 50.12 Exemption Request, Optimized Zirlo Fuel Rod Cladding2016-03-16016 March 2016 License Amendment Request and 10 CFR 50.12 Exemption Request, Optimized Zirlo Fuel Rod Cladding NL-15-1956, Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions2016-03-14014 March 2016 Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions NL-15-2062, Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-52, Revision 22015-11-25025 November 2015 Response to Second Request for Additional Information Regarding SNC License Amendment Request for TSTF-52, Revision 2 NL-15-0722, Technical Specification 3.3.5 Loss of Power Diesel Generator Start Instrumentation License Amendment Request2015-11-20020 November 2015 Technical Specification 3.3.5 Loss of Power Diesel Generator Start Instrumentation License Amendment Request ML15180A3342015-08-0303 August 2015 Issuance of Amendments ML15083A0982015-06-0202 June 2015 Issuance of Amendments (TAC Nos. MF4828, MF4829, MF4889, and MF4890) ML14308A0482015-03-10010 March 2015 Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) NL-15-0188, Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.52015-02-13013 February 2015 Response to Request for Additional Information Regarding the License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.5 NL-14-0115, Units 1 & 2 & Vogtle Electric Generating Plant - Units 1 and 2 - License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.52014-09-17017 September 2014 Units 1 & 2 & Vogtle Electric Generating Plant - Units 1 and 2 - License Amendment Request to Revise Technical Specification Surveillance Requirement 3.1.3.2 and Specification 5.6.5 ML14155A3022014-08-15015 August 2014 Issuance of Amendment Regarding Minimum Condensate Storage Tank Level Technical Specifications ML14069A3442014-05-13013 May 2014 Issuance of Amendments to Incorporate the Schedule for Degraded Grid Voltage Modification NL-12-0867, License Amendment Request to Technical Specification 3.7.6, Condensate Storage Tank2012-08-20020 August 2012 License Amendment Request to Technical Specification 3.7.6, Condensate Storage Tank NL-12-0868, Request to Revise Technical Specifications Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits Report2012-08-15015 August 2012 Request to Revise Technical Specifications Associated with the Low Temperature Overpressure Protection System and the Pressure and Temperature Limits Report NL-12-1226, License Amendment Request to Allow Nexus Nuclear Data Methodology in the Preparation of the Core Operating Limits Report2012-08-14014 August 2012 License Amendment Request to Allow Nexus Nuclear Data Methodology in the Preparation of the Core Operating Limits Report NL-12-1552, Emergency Technical Specification Revision Request for 3.8.1 AC Sources - Operating2012-07-23023 July 2012 Emergency Technical Specification Revision Request for 3.8.1 AC Sources - Operating NL-12-0403, Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST)2012-02-28028 February 2012 Exigent Technical Specification Revision Request for TS 3.5.4 Refueling Water Storage Tank (RWST) NL-11-0299, Application to Amend Surveillance Requirement 3.4.11.1 and 3.4.11.42012-01-18018 January 2012 Application to Amend Surveillance Requirement 3.4.11.1 and 3.4.11.4 NL-10-0272, License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated..2010-10-29029 October 2010 License Amendment Request for Adoption of TSTF-425-A, Revision 3, Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Using the Consolidated.. NL-09-1676, Request to Revise Technical Specification 3.7.8, Service Water System (Sws).2009-10-21021 October 2009 Request to Revise Technical Specification 3.7.8, Service Water System (Sws). NL-09-1622, Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (Sws).2009-10-0808 October 2009 Emergency Technical Specification (TS) Revision Request Regarding TS 3.7.8, Service Water System (Sws). NL-09-1861, License Amendment Request to Technical Specification 3.3.2 ESFAS Instrumentation and 5.6.8 Post Accident Monitoring Report2009-09-15015 September 2009 License Amendment Request to Technical Specification 3.3.2 ESFAS Instrumentation and 5.6.8 Post Accident Monitoring Report ML0917706642009-09-0404 September 2009 Southern Nuclear Operating Company Plants, License Amendments, Regarding Elimination of Working Hour Restrictions from Technical Specifications ML0827300082008-09-29029 September 2008 Tech Spec Pages for Amendment Nos. 178 and 171 Revised TS for Limiting Condition for Operation 3.9.3, Containment Penetrations. NL-08-0832, Southern Nuclear Operating Company, Inc., Revision to License Amendment Request to Technical Specification 5.2, Organization, and License Amendment Request to TS 5.3. Unit Staff Qualifications.2008-06-12012 June 2008 Southern Nuclear Operating Company, Inc., Revision to License Amendment Request to Technical Specification 5.2, Organization, and License Amendment Request to TS 5.3. Unit Staff Qualifications. ML0818202472008-05-23023 May 2008 Updated Final Safety Analysis Report, Revision 21, Technical Specifications Bases NL-06-2801, Technical Specification Amendment Request, Containment Leakage Rate Testing Program2007-11-0505 November 2007 Technical Specification Amendment Request, Containment Leakage Rate Testing Program NL-07-1079, Edwin I. Hatch Nuclear Plant, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization2007-07-17017 July 2007 Edwin I. Hatch Nuclear Plant, Vogtle Electric Generating Plant, License Amendment Request to Technical Specification 5.2, Organization ML0719804822007-07-16016 July 2007 Tech Spec Pages for Amendments 175 and 168 Regarding Technical Specification Changes to Reflect Change in Organizational Structure 2023-08-24
[Table view] |
Text
RCS PIV Leakage 3.4.14 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.4.14.1 NOTES S
- 1. Not required to be performed in MODES 3 and 4.
- 2. Not required to be performed on the RCS PIVs located in the RHR flow path when in the shutdown cooling mode of operation.
- 4. RCS PIVs actuated during the performance of this Surveillance are not required to be tested more than once if a repetitive testing loop cannot be avoided.
Verify leakage from each RCS PIV is equivalent to 18 months, prior
"<0.5 gpm per nominal inch of valve size up to a to entering MODE 2 maximum of 5 gpm at an RCS pressure Ž 2215 psig and < 2255 psig. AND Following valve actuation due to automatic or manual action or flow through the valve (except for RCS PIVs located in the RHR flow path)
SR 3.4.14.2 - NOTE -..
Not required to be met when the RHR System valves are required open in accordance with SR 3.4.12.3.
Verify RHR System autoclosure interlock 18 months causes the valves to close automatically with a simulated or actual RCS pressure signal > 700 psig and < 750 psig.
'I Farley Units I and 2 3.4.14-3 Amendment No. 155 (Unit 1)
Amendment No. 147 (Unit 2)
RCS PIV Leakage B 3.4.14 BASES LCO The LCO PIV leakage limit is 0.5 gpm per nominal inch of valve size (continued) with a maximum limit of 3 or 5 gpm depending on the valve. The previous NRC Standard cnterion of I gpm for all valve sizes imposed an unjustified penalty on the larger valves without providing information on potential valve degradation and resulted in higher personnel radiation exposures. A study concluded a leakage rate limit based on valve size was superior to a single allowable value.
Reference 7 permits leakage testing at a lower pressure differential than between the specified maximum RCS pressure and the normal pressure of the connected system during RCS operation (the maximum pressure differential) in those types of valves in which the higher service pressure will tend to diminish the overall leakage channel opening. In such cases, the observed rate may be adjusted to the maximum pressure differential by assuming leakage is directly proportional to the pressure differential to the one half power.
APPLICABILITY In MODES 1, 2, 3, and 4, this LCO applies because the PIV leakage potential is greatest when the RCS is pressurized. In MODE 4, valves in the RHR flow path are not required to meet the requirements of this LCO when in, or during the transition to or from, the RHR mode of operation.
In MODES 5 and 6, leakage limits are not provided because the lower reactor coolant pressure results in a reduced potential for leakage and for a LOCA outside the containment.
ACTIONS The Actions are modified by two Notes. Note 1 provides clarification that each flow path allows separate entry into a Condition. This is allowed based upon the functional independence of the flow path.
Note 2 requires an evaluation of affected systems if a PIV is inoperable. The leakage may have affected system operability, or isolation of a leaking flow path with an alternate valve may have degraded the ability of the interconnected system to perform its safety function.
(continued)
Fadey Units 1 and 2 B 3.4.14-3 Revision 14
RCS PIV Leakage B 3.4.14 BASES SURVEILLANCE SR 3.4.14.1 (continued)
REQUIREMENTS For the two PIVs in series, the leakage requirement applies to each valve individually and not to the combined leakage across both valves. If the PIVs are not individually leakage tested, one valve may have failed completely and not be detected if the other valve in series meets the leakage requirement. In this situation, the protection provided by redundant valves would be lost.
Testing is to be performed every 18 months, a typical refueling cycle, on all PIVs listed in the TRM. The 18 month Frequency is consistent with 10 CFR 50.55a(g) (Ref. 8) as contained in the Inservice Testing Program, is within frequency allowed by the American Society of Mechanical Engineers (ASME) Code, Section Xl (Ref. 7), and is based on the need to perform such surveillances under the conditions that apply during an outage and the potential for an unplanned transient if the Surveillance were performed with the reactor at power.
In order to satisfy ALARA requirements, leakage may be measured indirectly (as from performance of pressure indicators) if accomplished in accordance with approved procedures and supported by computations showing that the method is capable of demonstrating valve compliance with leakage criteria.
In addition, testing must be performed once after the valve has been opened by flow or exercised to ensure tight reseating except for RCS PIVs located in the RHR flow path (Q1/2E1 IV001A and B, Q1/2E11V016A and B, QI/2E11V021A, B, C and QI/2E11V042A and B). PIVs disturbed in the performance of this Surveillance should also be tested unless documentation shows that an infinite testing loop cannot practically be avoided. Testing must be performed after the valve has been reseated.
The leakage limit is to be met at the RCS pressure associated with MODES 1 and 2. This permits leakage testing at high differential pressures with stable conditions not possible in the MODES with lower pressures.
Entry into MODES 3 and 4 is allowed to establish the necessary differential pressures and stable conditions to allow for performance of this Surveillance. The Note that allows this provision is complementary to the Frequency of prior to entry into MODE 2. In addition, this Surveillance is not required to be performed on the RHR System when the RHR System is aligned to the RCS in the (continued)
Farley Units 1 and 2 B 3.4.14-6 Revision 14
RCS PIV Leakage B 3.4.14 BASES SURVEILLANCE SR 3.4.14.1 (continued)
REQUIREMENTS shutdown cooling mode of operation. PIVs contained in the RHR shutdown cooling flow path must be leakage rate tested when RHR is secured and stable unit conditions and the necessary differential pressures are established. Leak rate testing is performed manually, with test personnel in the vicinity of the system connections in containment during setup and testing. Should the check valve that was being tested rupture or pressure in the system cause a rupture of the test equipment, there would be a concern for the safety of the personnel in the area. In addition, testing with RCS temperature above 212 OF would result in any leakage past the RHR valves flashing into steam making accurate measurement of the leakage rate impossible. Therefore, testing of the RHR System PIVs should normally be performed in Mode 5, as the test results are meaningful and plant conditions in Mode 5 minimize the potential impact on personnel safety.
SR 3.4.14.2 Verifying that the RHR autoclosure interlock is OPERABLE ensures that RCS pressure will not pressurize the RHR system beyond 125%
of its design pressure of 600 psig. The autoclosure interlock isolates the RHR System from the RCS when the interlock setpoint is reached. The setpoint ensures the RHR design pressure will not be exceeded. The 18 month Frequency is based on the need to perform the Surveillance under conditions that apply during a plant outage. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment.
The SR is modified by a Note that provides an exception to the requirement to perform this surveillance when using the RHR System suction relief valves for cold overpressure protection in accordance with SR 3.4.12.3.
(continued)
Farley Units 1 and 2 B 3.4.14-7 Revision 14
RCS PIV Leakage B 3.4.14 BASES SURVEILLANCE SR 3.4.14.3 REQUIREMENTS (continued) Verifying that the RHR open permissive interlock is OPERABLE ensures that the RCS will not pressurize the RHR system beyond design of 600 psig. The open permissive interlock prevents opening the RHR System suction valves from the RCS when the RCS pressure is above the setpoint. The setpoint upper value ensures the RHR System design pressure will not be exceeded at the RHR pump discharge and was chosen taking into account instrument uncertainty and calibration tolerances. This value also provides assurance that the RHR System suction relief valves setpoint will not be exceeded.
The minimum value of the setpoint range is chosen based upon operational considerations (differential pressure) for the RCP seals and thus does not have a safety-related function. The 18 month Frequency is based on the need to perform the Surveillance under conditions that apply during a plant outage. The 18 month Frequency is also acceptable based on consideration of the design reliability (and confirming operating experience) of the equipment.
The SR is modified by a Note that provides an exception to the requirement to perform this surveillance when using the RHR System suction relief valves for cold overpressure protection in accordance with SR 3.4.12.3.
REFERENCES 1. 10 CFR 50.2.
- 2. 10 CFR 50.55a(c).
- 3. 10 CFR 50, Appendix A, Section V, GDC 55.
- 4. WASH-1400 (NUREG-75/014), Appendix V, October 1975.
- 5. NUREG-0677, May 1980.
- 6. Technical Requirement Manual (TRM).
- 7. ASME, Boiler and Pressure Vessel Code,Section XI.
- 8. 10 CFR 50.55a(g).
Revision 14 I Farley Units 1 and 2 B 3.4.14-8