- TXU TXU Energy Comanche Peak Steam Electric Station P. O. Box 1002 (EO1)
Glen Rose, TX 76043 Tel: 254 897 8920 Fax: 254 897 6652 lance.terry@txu.com Ref:10CFR50.55a(g)
C. Lance Terry Senior Vice President & Principal Nuclear Officer CPSES-200200888 Log # TXX-02056 File#
10010.1 905.4 March 28, 2002 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)-UNIT 2 DOCKET NO. 50-446 TRANSMITTAL OF UNIT 2 INSERVICE INSPECTION PROGRAM PLAN, REVISION 5 (UNIT 2:1986 EDITION OF ASME CODE SECTION XI, NO ADDENDA, INTERVAL START DATE - AUGUST 3, 1993, FIRST INTERVAL)
Gentlemen:
Enclosed is one copy of Revision 5 to the Unit 2 Inservice Inspection (ISI) Program Plan for updating your manual. The enclosed Plan Revision 5 replaces the Plan Revision 4 in its entirety. This transmittal does not contain a request for relief from ASME Code requirements. ISI Program Plan Revisions include items such as rescheduled exams and updated drawings. The relief requests included in Appendix A are included in the ISI Program Plan for information only.
This communication contains no new licensing basis commitments regarding CPSES Units 1 and 2.
STXU TXX-02056 Page 2 of 2 Via this letter a copy of this report is also forwarded to Mr. G. Bynog, the Director and Chief Inspector of Texas Department of Licensing and Regulation. Should you need additional copies or require additional information, please contact Obaid Bhatty at (254) 897-5839 or Douglas Snow at (254) 897-8448.
Sincerely, TXU Generation Company LP By:
TXU Generation Management Company LLC Its General Partner C. L. Terry Senior Vice President and Principal Nuclear Officer By:
611ý1
- Lb RogeVD. Walker Regulatory Affairs Manager OAB/dws Enclosure cc:
E. W. Merschoff, Region IV W.D. Johnson, Region IV D. H. Jaffe, NRR Resident Inspectors, CPSES G. Bynog, TDLR W/O Enclosure W/O Enclosure W/O Enclosure W/O Enclosure
COMANCHE PEAK STEAM ELECTRIC STATION GLEN ROSE, TEXAS UNIT NO. 2 - FIRST INTERVAL ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN REVISION 5 - MARCH 20, 2002 COMMERCIAL OPERATION: AUGUST 3,1993 Prepared By:
ISI Engineer Reviewed By Engineering Overview Man6r Approved By: S. V, ua.
,-vA, Engineering Programs Manager I
sAP PJ /;->7
Comanche Peak Steam Electric Station Unit No. 2 - First Interval ASME Section XI Inservice Inspection Program Plan Table of Contents Section Content 1.0 Introduction 1.1 General Plant Description 1.2 Purpose 1.3 Responsibility 1.4 Scope 1.5 Acronyms 1.6 Exemptions 1.7 Reference System 1.8 Relief Requests 1.9 Records Retention 1.10 Authorized Inspection Agency 1.11 Interim Change Requests 2.0 Examination Boundaries 2.1 ASME Code Boundaries 2.2 ISI Isometric Drawings 2.3 ISI Examination Boundary Drawings 3.0 Non-Destructive Examination Methods 3.1 Visual Examination 3.2 Surface Examination 3.3 Volumetric Examination 4.0 Examination Tables 4.1 Class 1 NDE 4.2 Class 2 NDE 4.3 Component Supports 4.4 Eddy Current 5.0 Pressure Test Plan Appendix A Relief Requests Appendix B Interim Change Requests Appendix C Applicable Code Cases Appendix D Ultrasonic Calibration Blocks Appendix E TCX Isometric Drawings Table Appendix F Record of Revision I
1.0 INTRODUCTION
1.1 GENERAL PLANT DESCRIPTION The Comanche Peak Steam Electric Station (CPSES) is a two unit plant having Westinghouse pressurized water reactors each with an electrical output of 1150 Mwe. CPSES was constructed to the ASME Boiler and Pressure Vessel Code,Section III, 1974 Edition, including Summer 1974 Addenda for piping and Winter 1974 Addenda for component supports.
1.2 PURPOSE The purpose of this plan is to provide details pertaining to performance of the Inservice Inspection (ISI) at CPSES, Unit 2 (including common and Unit 1 systems required to support Unit 2 operations). This plan demonstrates compliance with the Code of Federal Regulations, 10CFR50.55a(g), and with Technical Specifications. This plan meets the requirements of the 1986 Edition of the ASME Boiler and Pressure Vessel Code,Section XI, no addenda including the Code Cases identified in Appendix C of this plan (hereafter referred to as the Code).
1.3 RESPONSIBILITY TXU Energy (Owner) is responsible for preparation and maintenance of the ten year ISI program plan, including any required reference drawings and boundary drawings. The owner shall prepare each outage plan which will define the scope of examinations, determine extent of any examinations, and define the method of each exam. After each outage, the examination plan shall be updated by the owner to reflect the completed examination, and a summary report shall be prepared and submitted to the Regulatory and Enforcement Authorities. The Owner shall be responsible for any associated craft labor required for the inspections including access provisions, insulation removal, weld preparation and other aspects. The Owner shall be responsible for the evaluation of all ISI examination records including indication evaluation and associated corrective actions.
A contractor working under the guidance of the Owner, will in most cases perform the examinations. The contractor will submit procedures for performance of examinations to the Owner for approval. An ISI coordinator and a suitable number of examination teams with the required NDE equipment will be provided to complete all scheduled examinations for the outage. The contractor shall conduct the examinations, review the data and make suitable recommendations to the Owner.
1.4 SCOPE ISI, as used in this plan, is the program of planned examinations of welds, components and their supports, which is implemented during the service life of a commercial nuclear power plant. This plan addresses those examinations to be performed on ASME Class 1, 2 and 3 systems and components as stipulated in the Code. ISI examinations will be performed in accordance with the schedule of IWB,C,D-2412, Inspection Program B of the Code.
1.0 Page 1 of 5
A risk-informed inspection (RI-ISI) program for selected, ASME Code Class 1 and 2 piping welds (category welds B-F, B-J, C-F-i, and C-F-2) has been developed, submitted, and authorized by the NRC as an acceptable alternative to the requirements of Section XI of the ASME Code for Inservice Inspections. This relief is authorized for the first 10-year interval of Unit 2 and is reflected in revision 5 of the Plan.
The examination of containments as stipulated in subsections IWE and IWL of the Code and the testing of pumps and valves as stipulated in subsections IWP and IWV of the Code are not within the scope of this plan.
1.5 ACRONYMS ANSI American National Standards Institute ASME American Society of Mechanical Engineers CPSES Comanche Peak Steam Electric Station FSAR Final Safety Analysis Report ISI Inservice Inspection PSI Pre-Service Inspection NDE Non-destructive Examination TDLR Texas Department of Licensing and Regulations 1.6 EXEMPTIONS 1.6.1 Code Class 1 The following Code Class 1 components (or parts of components) are exempted from the volumetric and surface examination requirements of Subarticle IWB-2500 of the Code by Subsubarticle IWB-1220.
(a) components that are connected to the reactor coolant system and part of the reactor coolant pressure boundary, and that are of such a size and shape so that upon postulated rupture the resulting flow of coolant from the reactor coolant system under normal plant operating conditions is within the capacity of makeup systems which are operable from on-site emergency power; (b)
(1) piping of NPS 1" and smaller and their supports, except for steam generator tubing;
- 2) components, their supports and their connections in piping of NPS 1" and smaller; (c) reactor vessel head connections and associated piping, and their supports, NPS 2" and smaller, made inaccessible by control rod drive penetrations.
1.6.2 Code Class 2 The following Code Class 2 components (or parts of components) are exempted from the volumetric and surface examination requirements of Subarticle IWC-2500 of the Code by Subsubarticle IWC-1220.
1.0 Page 2 of 5
1.6.2.1 Components within RHR, ECC, and CHR Systems (or Portions of Systems):
(a)
Vessels, piping, pumps, valves, and other components, and their supports, NPS 4" and smaller in all systems except high pressure safety injection systems.
(b)
Vessels, piping, pumps, valves, and other components, and their supports, NPS 1-1/2" and smaller in high pressure safety injection systems.
c)
Component connections NPS 4" and smaller (including nozzles, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size in all systems except high pressure safety injection systems.
(d)
Component connections NPS 1-1/2" and smaller (including nozzles, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size in high pressure safety injection systems.
(e)
Vessels, piping, pumps, valves, other components, and component connections of any size in statically pressurized, passive (i.e., no pumps) safety injection systems.
(f)
Piping, other components, and their supports of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during plant operating conditions.
1.6.2.2 Components Within Systems (or portions of systems) Other Than RHR, ECC, and CHR Systems:
(a)
Vessels, piping, pumps, valves, other components, and their supports NPS 4" and smaller.
(b)
Component connections NPS 4" and smaller (including nozzles, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size.
(c)
Vessels, piping, pumps, valves, other components, and component connections of any size in systems or portions of systems that operate (when the system function is required) at a pressure equal to or 1 less than 275 psig and at a temperature equal to or less than 200'F.
(d)
Piping, other components and their supports of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating condition.
1.6.2.3 Concrete Encased Components Piping support members and piping support components that are encased in concrete shall be exempted from the examination requirements of Subarticle IWC-2500.
1.0 Page 3 of 5
Note: RHR, ECC and CHR systems are the residual heat removal, emergency core cooling, and containment heat removal systems, respectively, and are described as such in section 6 of the FSAR.
1.6.3 The following Code Class 3 components (or parts of components) are exempted from the visual examination requirements of Subarticle IWD-2500 of the Code by Subsubarticle IWD 1220.
(a)
Integral attachments of supports and restraints to components that are NPS 4" and smaller within the system boundaries of Examination Categories D-A, D-B, and D-C of Table IWD-2500-1 shall be exempt from the visual examination VT-3, except for Auxiliary Feedwater Systems for which NPS 1" and smaller are exempt.
(b)
Integral attachments of supports and restraints to components exceeding NPS 4" may be exempted from the visual examination VT-3 of Table IWD-2500-1 provided:
(c) the components are located in systems (or portions of systems) whose function is not required in support of reactor residual heat removal, containment heat removal, and emergency core cooling; and (d) the components operate at a pressure of 275 psig or less and at a temperature of 2000 F or less.
1.7 REFERENCE SYSTEM Weld areas subject to surface or volumetric examination shall be identifiable through a reference system as specified by Subarticle IWA-2600 and Appendix III of the Code. This system shall consist of a combination of physical markings and written direction provided in this plan and in site implementing procedures. Welds within the boundaries, of the ISI program are uniquely identified on isometric drawings, which provide weld numbers and locations. In those cases where the physical configuration will not provide positive weld location, dimensional information can be obtained from construction isometric drawings or piping fabrication drawings to allow for such positive identification. These documents are maintained as permanent plant records. Welds which were inadvertently not marked or whose marks have been removed shall be marked at the time inservice inspection is performed. The method of marking these indications on the pipe will be delineated in the implementing procedures.
1.8 RELIEF REQUESTS Where a particular examination requirement of the Code is determined to be impractical, a request for relief from the requirement shall be submitted pursuant to the requirement of 10CFR50.55a (g)(6)(I). As these relief requests are identified, prepared and submitted to the Regulatory Authorities for approval they will be documented in Appendix A of this plan.
Each request for relief shall contain the following information, as a minimum:
(a)
Identification of the component(s) for which relief is requested; 1.0 Page 4 of 5
(b)
Code class of the component(s);
(c)
Code examination requirements for the component(s);
(d)
Basis for the request; (e)
Proposed alternative examinations, if any; and, (f)
Anticipated impact on the overall level of plant quality and safety.
1.9 RECORDS RETENTION Records and documentation of information and examination results, which provide the basis for evaluation and facilitate the comparison of examination results from previous and subsequent examinations, shall be maintained as permanent plant records at CPSES in accordance with Article IWA-6000 of the Code. As a minimum, this documentation shall include the applicable records described in Subsubarticle IWA-6340.
1.10 AUTHORIZED INSPECTION AGENCY In accordance with Subarticle IWA-1400, paragraph (f), of the Code, TXU Energy shall maintain a contract with an Authorized Inspection Agency for an Authorized Nuclear Inservice Inspector (ANII) to provide inspection services as described in Subarticle IWA 2110 of the Code. The ANII is afforded the opportunity to verify examinations and review the plan, examination procedures, examination records, certification records and other associated documents.
1.11 INTERIM CHANGE REQUESTS Changes to the plan may be made prior to the issuance of the next plan revision with the use of Interim Change Requests (ICR's). An ICR may be initiated when any user or holder of the plan identifies a need for a change or clarification to the contents of the plan. The process for initiation, review, approval and distribution of ICR's is described in detail in the implementing procedure. An index of ICR's is contained in Appendix B of this plan.
1.0 Page 5 of 5
2.0 EXAMINATION BOUNDARIES 2.1 ASME CODE BOUNDARIES ASME Code classification and system boundaries of the piping and other components subject to examination have been identified as required by Subarticle IWA-1400(a) of the Code.
Section 3.2 of the CPSES FSAR defines the various safety classes of piping and components in accordance with Regulatory Guide 1.26 and ANSI Standard NI 8.2. The plant piping schematic drawings (flow diagrams) show these class interfaces and the ISI examination boundary drawings were developed from these flow diagrams.
2.2 ISI ISOMETRIC DRAWINGS ISI isometric drawings have been developed to identify the ISI examination areas for examinations required by ASME Section XI tables IWB-2500, IWC-2500 and IWF-2500 (class 1 and 2 only). These drawings are maintained current by TXU Energy. Revisions to these ISI isometric drawings shall be prepared and approved in accordance with site implementing procedures.
2.3 ISI EXAMINATION BOUNDARY DRAWINGS The following ISI examination boundary drawings delineate the bounds within which the ISI examination requirements of the Code are applied. The plant systems included in the examination boundary are listed below:
AF -
Component Cooling Water CH -
Chilled Water System CS -
Chemical and Volume Control CT -
Demineralized & Reactor Make-up Water DO -
Diesel Oil FW -
Feedwater MS -
Main Steam PS -
Process Sampling RC -
Reactor Coolant RH -
Safety Injection SW -
Service Water 2.0 Page 1 of 1
3.0 NON-DESTRUCTIVE EXAMINATION (NDE) METHODS The method of examination for each weld, component or support is specified in the examination tables found in subsection 4.1, 4.2 and 4.3 of this plan. These methods, as described below, are in accordance with Article IWA-2000 of the Code.
3.1 VISUAL EXAMINATION (IWA-2210) 3.1.1 VT-i (IWA-2211)
This visual examination is conducted to determine the condition of the part, component, or surface examined, including such conditions as cracks, wear, corrosion, erosion, or physical damage on the surfaces of the part or component.
Enhanced Visual Examination (EVT) is conducted of the nozzle inner radius of the reactor Pressure Vessel for the detection of cracking. This examination is done remotely, in-vessel, with the resolution sensitivity established for a < 1 mil diameter wire. This alternate visual examination is done on the accessible surface, as shown in Figures IWB-2500-1 (a) through (d) in lieu of the volumetric examination requirement of Table IWB-2500-1, Examination Category B-D, Item No. B3.100.
This visual examination is conducted to locate evidence of leakage from pressure retaining components, or abnormal leakage from components with or without leakage collections systems as required during the conduct of system pressure or functional tests.
3.1.3 VT-3 (IWA-2213)
This visual examination is conducted to determine the general mechanical and structural condition of components and their supports, such as the verification of clearances, settings, physical displacements, loose or missing parts, debris, corrosion, wear, erosion, or the loss of integrity at bolted or welded connections.
This examination shall include examinations for conditions that could affect operability or functional adequacy of snubbers, and constant load and spring type supports. The visual examination may be performed remotely with or without optical aids to verify the structural integrity of component supports and component interiors.
3.2 SURFACE EXAMINATION (IWA-2220)
Surface examinations indicate the presence of surface discontinuities using either the magnetic particle or liquid penetrant method.
3.0 Page 1 of 2
3.2.1 Magnetic Particle Examination (IWA-2221)
This surface examination is conducted to detect cracks and other discontinuities on or near the surface of ferromagnetic materials by magnetizing an area to be examined and applying ferromagnetic particles to the surface. The particles will form patterns on the surface where cracks and other discontinuities cause distortions in the normal magnetic field. The magnetic particle examination shall be conducted in accordance with Article 7 of Section V of the ASME Boiler and Pressure Vessel Code, 1986 Edition.
3.2.2 Liquid Penetrant Examination (IWA-2222)
This surface examination is conducted to detect discontinuities which are open to the surface of non-porous metals by applying a liquid penetrant to the surface being examined and then applying a developer. The penetrant that has been trapped in discontinuities will "bleed out" visible for examination. The liquid penetrant examination shall be conducted in accordance with Article 6 of Section V of the ASME Boiler and Pressure Vessel Code, 1986 Edition.
3.3 VOLUMETRIC EXAMINATION (IWA-2230)
A volumetric examination indicates the presence of discontinuities throughout the volume of material.
3.3.1 Radiographic Examination (IWA-2231)
This volumetric examination is conducted to detect discontinuities using penetrating radiation with appropriate image-recording devices. This examination shall be conducted in accordance with Article 2 of Section V of the ASME Boiler and Pressure Vessel Code, 1986 Edition.
3.3.2 Ultrasonic Examination (IWA-2232)
This volumetric examination is conducted to detect discontinuities using appropriate ultrasonic instrumentation in accordance with Appendix III or VI of Section XI, or Article 4 or 5 of Section V of the ASME Boiler and Pressure Vessel Code, 1986 Edition.
3.3.3 Eddy Current Examination (IWA-2233)
This volumetric examination is conducted to detect discontinuities in heat exchanger tubing using electromagnetic principles in accordance with the provisions of Appendix IV of Section XI and Article 8 of Section V of the ASME Boiler and Pressure Vessel Code, 1986 Edition.
3.0 Page 2 of 2
DATE:
03/16/02 REVISION:
0 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION
SUMMARY
FOR THE FIRST INTERVAL SECTION XI
SUMMARY
NUMBER OF COMPONENTS SCHEDULED /
COMPLETED /
PERCENTAGE OF REQUIREMENT B-A B-B B-D B-F B-G-1 B-G-2 B-H B-J B-K-I B-L-2 B-M-2 B-N-i B-N-2 B-N-3 B-O C-A C-B C-C C-D C-F-i C-F-2 C-G D-A F-B 0
464 31%
FIRST PERIOD 0
524 66%
THIRD PERIOD 22 2
20 8
58 13 0
35 CATEGORY NUMBER OF COMPONENTS COMPONENTS REQUIRED 24 8
36 22 181 68 1
793 9
4 25 1
1 1
28 19 8
97 1
1685 617 27 141 95 1770 506 0
100%
4.0 - Page 1 of 3 PAGE:
SECOND PERIOD 0
3 24%
0 4
75%
0 6
54%
0 5
63%
0 55 65%
0 9
55%
0 1
100%
0 61 79%
0 4
66%
0 0
0%
0 1
75%
0 1
66%
0 0
0%
0 0
0%
0 0
0%
0 10 73%
0 2
50%
0 41 64%
0 0
100%
0 24 77%
0 12 100%
0 2
66%
0 51 65%
0 21 58%
0 211 64%
0 4
0 2
0 18 0
9 0
55 0
7 0
0 0
72 0
2 0
0 0
2 0
1 0
0 0
0 0
0 0
4 0
2 0
22 0
1 0
41 0
16 0
2 0
41 0
13 200 0
100%
F-C TOTAL 0
100%
0 100%
0 100%
0 100%
0 10 0%
0 100%
0 100%
0 10 0%*
0 loot 0
100%
0 100%
0 100%
0 100%
0 100%
0 100%
0 100%
0 100%6 0
loo%
0 100%
0 100%
0 loo%
0 100%
0 loo%
0 100%
0 150 26%
5662 3
1 1
1 1
1 4
5 29 8
44 22 168 29 1
168 9
1 4
3 1
1 4
19 8
97 1
84 28 6
140 58 561 1494 13%
25%
40%
40%
32%
24%
0%
42%
22%
0%
50%
33%
0%
0%
0%
21%
25%
22%
100%
48%
57%
33%
29%
22%
4 34 0
19 0
2 48 24
4.0 EXAMINATION TABLES CPSES ASME Section XI Inservice Inspection Plan tables 4.1 through 4.3 have been developed and contain the following information:
a)
System Name b)
Summary Number - A computer data base assigned sequencing number.
c)
Line Number of Component Number - Example: 6-SI-2-089-2501R-1 or TBX-RCPCRV-01.
d)
Weld Number or Pipe Support Number - Example: TCX-l-1 100-8 or CC-2-105-012-E33K.
e)
ASME Sec. XI Category and Item Number - Described in ASME Sec. XI Examination Tables (IWX-2500-1).
f)
NDE Method - Identifies the examination method(s) as described in section 3 of this plan.
g)
Plan Status - Identifies the inspection interval, period and outage (x = scheduled and c = complete) h)
Year - Example: 92. The year that PSI was performed.
I)
Instructions - Notes applicable to specific inspection requirements.
j)
Calibration Block - Example: TBX-18.
k)
Notes - Applicable to the results of specific outages preceded by the outage year. "92" refers to the baseline outage.
Arrangement of these items is shown on the next page.
4.0 - Page 2 of 3
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 COMPONENTS INSPECTION INTERVAL
_PLAN STATUS PRESERVICE YEAR I
FIRST SECOND THIRD I
(A)
ASME I
PERIOD PERIOD PERIOD I SEC. XI I --------------.-.-.-.-.-
I
SUMMARY
EXAMINATION AREA CATGY NDE I
TAG E I INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH I 1 2 1 2 3 1 2 I
- CALIBRATION BLOCK**
(D)
(K)
(G)
(E)
(F)
(H)
(I)
(J) 4.0 - Page 3 of 3 (B)
4.1 CLASS I NDE This subsection describes the examination areas and NDE methods for the Class 1 pressure retaining components and associated component integral welded attachments as specified in Article IWB of the Code. For pressure testing, see Section 5.
Class 1 valve bodies exceeding 4" NPS have been grouped according to size, constructional design, manufacturing method and function in accordance with Table IWB-2500-1, Category B-M-2, Note 3 of the Code. These groups are delineated below. One valve from each group has been selected for examination as denoted by the asterisk "'.
Group 1 -
6" Forged Pressurizer Relief Valves 2-8010A (reference TCX-1-4501 for location) 2-8010B 2-8010C Group 2 -
12" Forged Gate Valves Isolating the RC System from the RHR System 2-8701A (reference TCX-1-4101 for location) 2-8701B 2-8702A 2-8702B Group 3 -
10" Forged Check Valves Isolating the RC System from the SI System 2-8948A 2-8948B 2-8948C 2-8948D 2-8956A 2-8956B 2-8956C 2-8956D (reference TCX-1-4402 for location)
Group 4 -
6" Forged Check Valves Isolating the RC System from the SI System 2-8818A 2-8818B 2-8818C 2-8818D (reference TCX-1-4403 for location) 2-8949A 2-8949B 2-8949C 2-8949D 2-8841A 2-8841B 4.1 - Page 1 of 1
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS_
SECOND PERIOD PRESERVICE YEAR THIRD PERIOD I1 2-OUTAGE S11 1
23 1 2 INSTRUCTIONS
"**CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 000100 TCX-1-1100-1 RV FLANGE TO SHELL WELD R157 830RB B-A UT 1 -
C B1.30 X
83 50% PARTIAL IN 1ST PERIOD.
TDLR VERIFICATION BOUNDARY.
- PDI-01**
000200 TCX-1-1100-2 B-A RV UPPER TO INTERMEDIATE SHELL B1.11 WELD UT 1 -
-X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
000300 TCX-1-1100-3 B-A RV INTERMEDIATE TO LOWER SHELL B1.11 WELD UT I
X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
000400 TCX-1-1100-4 B-A RV LOWER SHELL TO BOTTOM HEAD 51.11 WELD UT I
-X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
000500 TCX-1-1100-5 B-A RV LOWER HEAD CIRCUMFERENTIAL B1.21 WELD UT 1 -
-X 82 TDLR VERIFICATION BOUNDARY.
- PDI-01**
000600 TCX-1-1100-6 B-A RV UPPER SHELL LONGITUDINAL B1.12 WELD UT 1-
-X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
000700 TCX-1-1100-7 B-A RV UPPER SHELL LONGITUDINAL B1.12 WELD UT 1 -
X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
DATE:
03/16/02 PAGE:
1 I ----------- -----------
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I----
I I-- -------
UT AG E---- --
1 12 1
2 3
1 2
PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 000800 TCX-1-1100-8 RV UPPER SHELL LONGITUDINAL WELD B-A B1. 12 UT 1
X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
000900 TCX-1-1100-9 RV INTERMEDIATE SHELL LONGITUDINAL WELD B-A Bl.12 UT 1 -
-X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
001000 TCX-1-1100-10 RV INTERMEDIATE SHELL LONGITUDINAL WELD B-A B1. 12 UT 1
-X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
001100 TCX-1-1100-11 RV INTERMEDIATE SHELL LONGITUDINAL WELD B-A B1.12 UT 1 -
83 TDLR VERIFICATION BOUNDARY.
- PDI-o1**
001200 TCX-1-1100-12 RV LOWER SHELL LONGITUDINAL WELD B-A B1.12 UT 1 -
83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
001300 TCX-1-1100-13 RV LOWER SHELL LONGITUDINAL WELD B-A 8l.12 UT I
83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
001400 TCX-1-1100-14 RV LOWER SHELL LONGITUDINAL WELD B-A UT I
B.12 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
PAGE:
2 DATE:
03/16/02
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ASME
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY ITEM NO NDE METH PLAN STATUS______
FIRST PERIOD 12 SECOND PERIOD OUTAGE 1
2 3
THIRD PERIOD 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 001500 TCX-1-1100-15 B-A RV BOTTOM HEAD MERIDIONAL WELD B1.22 UT 1 -
-X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
001600 TCX-1-1100-16 B-A RV BOTTOM HEAD MERIDIONAL WELD B1.22 UT 1 -
X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
001700 TCX-1-1100-17 B-A RV BOTTOM HEAD MERIDIONAL WELD B1.22 UT 1 -
-X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
001800 TCX-1-1100-18 B-A RV BOTTOM HEAD MERIDIONAL WELD B1.22 UT 1 -
-X 83 TDLR VERIFICATION BOUNDARY.
- PDI-01**
001850 TCX-1-1100-LUGS CORE SUPPORT LUGS (6) 001900 TCX-1-1100A-19 RV OUTLET NOZZLE TO VESSEL B-N-2 VT-3 1
B13.60 B-D UT 1 -
C R2 90 X
X 83 TDLR VERIFICATION BOUNDARY.
83 TDLR VERIFICATION BOUNDARY.
WELD R157 830RB
- RV-7, PDI-01**
001910 TCX-1-1100A-19IR B-D UT 1 -
C RV OUTLET NOZZLE INNER RADIUS B3.100 EVT R157 830RB X
83 TDLR VERIFICATION BOUNDARY.
PAGE:
3 DATE:
03/16/02 I ----------- -----------
DATE:
03/16/02 PAGE:
4 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS ASME SEC.
XI
SUMMARY
EXAMINATION AREA CATGY NDE NUMBER IDENTIFICATION ITEM NO METH FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD O----------
UTAGE 112 123 12 INSTRUCTIONS
"**CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 002000 TCX-1-1100A-20 B-D UT 1 -
83 TDLR VERIFICATION BOUNDARY.
RV INLET NOZZLE TO VESSEL WELD B3.90
- RV-7
,PDI-01**
002010 TCX-1-1100A-20IR B-D UT 1
RV INLET NOZZLE INNER RADIUS B3.100 EVT 83 TDLR VERIFICATION BOUNDARY.
002100 TCX-1-1100A-21 B-D RV INLET NOZZLE TO VESSEL WELD B3.90 UT 1
83 TDLR VERIFICATION BOUNDARY.
- RV-7
,PDI-01**
002110 TCX-1-1100A-21IR RV INLET NOZZLE INNER RADIUS 002200 TCX-1-1100A-22 RV OUTLET NOZZLE TO VESSEL WELD R157 830RB B-D UT I-B3.100 EVT B-D B3.90 UT 1 -
C K
K 83 TDLR VERIFICATION BOUNDARY.
83 TDLR VERIFICATION BOUNDARY.
- RV-7
,PDI-01**
002210 TCX-1-1100A-22IR B-D UT 1 -
C RV OUTLET NOZZLE INNER RADIUS B3.100 EVT R157 830RB 002300 TCX-1-1100A-23 RV OUTLET NOZZLE TO VESSEL WELD R157 830RB B-D B3.90 UT 1 -
C 83 TDLR VERIFICATION BOUNDARY.
83 TDLR VERIFICATION BOUNDARY.
- RV-7
,PDI-01**
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD 12
-OUTAGE THIRD PERIOD INSTRUCTIONS I
CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 002310 TCX-1-1100A-23IR B-D RV OUTLET NOZZLE INNER RADIUS B3.100 R157 830RB 002400 TCX-1-1100A-24 B-D RV INLET NOZZLE TO VESSEL WELD B3.90 UT EVT 1 -
C UT 1
X
-X 83 TDLR VERIFICATION BOUNDARY.
83 TDLR VERIFICATION BOUNDARY.
- RV-7
,PDI-01**
002410 TCX-1-1100A-24IR B-D UT 1
RV INLET NOZZLE INNER RADIUS B3.100 EVT
-X 83 TDLR VERIFICATION BOUNDARY.
- *RV-I*
X 83 TDLR VERIFICATION BOUNDARY.
- RV-7
,PDI-01**
002510 TCX--11100A-25IR RV INLET NOZZLE INNER RADIUS 002600 TCX-1-1100A-26 RV OUTLET NOZZLE TO VESSEL WELD R157 830R1B B-D UT 1-B3.100 EVT B-D B3.90 UT I
C X
X 83 TDLR VERIFICATION BOUNDARY.
83 TDLR VERIFICATION BOUNDARY.
- RV-7
,PDI-01**
002610 TCX-1-1100A-26IR B-D UT 1 -
C RV OUTLET NOZZLE INNER RADIUS B3.100 EVT R157 830RB X
83 TDLR VERIFICATION BOUNDARY.
PAGE:
5
----------- I
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I ----
I 1
2 OUTAGE 1
2 3
INSTRUCTIONS
- CALIBRATION BLOCK**
1 2 REACTOR COOLANT TCX-RCPCRV-01 002700 TCX-1-1100A-LIG RV FLANGE LIGAMENTS (1/54)
R157R830RB B-G-1 UT B6.40 1 -
C C
X 83 1/3 PER PERIOD.
TDLR VERIFICATION BOUNDARY.
- RV-3 002800 TCX-1-1200-INT RV INTERNALS (ACCESS DURING REFUELING)
R157 832RB 002805 TCX-1-1200-CSS RV CORE SUPPORT STUCT-NO ACCESS @ REFUEL B-N-1 VT-3 1 C B13.10 B-N-3 VT-3 1
B13.70 C
X X
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
003100 TCX-1-1300-1 B-A UT 1 C RV CLOSURE HEAD TO FLANGE WELD B1.40 MT R157R832RB C
X 83 1/3 PER PERIOD.
TDLR VERIFICATION BOUNDARY.
- TBX-29**
003200 TCX-1-1300-2 RV CLOSURE HEAD RING TO DISC WELD R157R832RB 003300 TCX-1-1300-3 RV CLOSURE HEAD MERIDIONAL WELD R157R832RB 003400 TCX-1-1300-4 RV CLOSURE HEAD MERIDIONAL WELD B-A Bl.21 UT i
C C
X 83 1/3 PER PERIOD.
TDLR VERIFICATION BOUNDARY.
- TBX-29**
B-A B1.22 UT 1 -
C 83 TDLR VERIFICATION BOUNDARY.
- TBX-29**
B-A B1.22 UT 1 -
-X 83 TDLR VERIFICATION BOUNDARY.
- TBX-29**
DATE:
03/16/02 PAGE:
6
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD I ----
I 0
-U TA GE------ -- ----
1 1 2
1 2
3 1
2 INSTRUCTIONS I
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 003500 TCX-1-1300-5 RV CLOSURE HEAD MERIDIONAL WELD B-A B1.22 UT 1 -
X 83 TDLR VERIFICATION BOUNDARY.
- TBX-29**
003600 TCX-1-1300-6 RV CLOSURE HEAD MERIDIONAL WELD B-A UT I C BI.22 83 TDLR VERIFICATION BOUNDARY.
- TBX-29**
003700 TCX-1-1300-CB75 CONOSEAL BOLTING R157 86ORB 003800 TCX-1-1300-CB76 CONOSEAL BOLTING R157 860RB 003900 TCX-1-1300-CB77 CONOSEAL BOLTING R157 860RB 004000 TCX-1-1300-CB78 CONOSEAL BOLTING R157 860RE 005150 TCX-1-1300A-CRD75 CONTROL ROD DRIVE R155 860RB B-G-2 VT-i 1
B7.80 B-G-2 VT-i 1 -
B7.80 B-G-2 VT-I 1 -
B7.80 B-G-2 VT-I I
B7.80 B-O B14.10 PT 1 -
X X
x K
X 84 TDLR VERIFICATION BOUNDARY.
84 TDLR VERIFICATION BOUNDARY.
84 TDLR VERIFICATION BOUNDARY.
84 TDLR VERIFICATION BOUNDARY.
83 TDLR VERIFICATION BOUNDARY.
PAGE:
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD 12 THIRD PERIOD OUTAGE--- ----------
1 2
3 1
2 INSTRUCTIONS
"**CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 005200 TCX-1-1300A-CRD76 CONTROL ROD DRIVE B-O B14. 10 PT 1
X 83 TDLR VERIFICATION BOUNDARY.
005250 TCX-1-1300A-CRD77 CONTROL ROD DRIVE B-0 B14. 10 005300 TCX-1-1300A-CRD78 CONTROL ROD DRIVE B-0 B14. 10 PT 1 -
PT 1 -
83 TDLR VERIFICATION BOUNDARY.
83 TDLR VERIFICATION BOUNDARY.
005400 TCX-1-1400-1 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005420 TCX-1-1400-2 RV STUD R160 905RB B-G-1 UT B6.30 MT i
C 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005440 TCX-1-1400-3 RV STUD R160 905RB B-G-1 UT B6.30 MT 1 C 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005460 TCX-1-1400-4 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
PAGE:
8
DATE:
03/16/02 PAGE:
9 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS_
FIRST SECOND THIRD PERIOD PERIOD PERIOD 112 0 U TOUTAGE-1 2
3 1
2
- - i PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 005480 TCX-1-1400-5 RV STUD RI60 905RB B-G-1 UT B6.30 MT 1 C 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005500 TCX-1-1400-6 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005520 TCX-1-1400-7 RV STUD RI60 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005540 TCX-1-1400-8 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005560 TCX-1-1400-9 RV STUD R160 905RB B-G-1 UT I C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005580 TCX-1-1400-10 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005600 TCX-1-1400-11 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD THIRD PERIOD I---------
OUTAGE-------------
1 2
2 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV- 01 005620 TCX-1-1400-12 RV STUD RI60 905R3B B-G-1 UT B6.30 MT i
C 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005640 TCX-1-1400-13 RV STUD R160 90SRB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005660 TCX-1-1400-14 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005680 TCX-1-1400-15 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005700 TCX-1-1400-16 RV STUD R160 905RB B-G-1 UT I C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
005720 TCX-1-1400-17 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005740 TCX-1-1400-18 RV STUD R160 905RB B-G-1 UT 1 C B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
PAGE:
10
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD 112 THIRD PERIOD OUTAGE--- ------------
I 1
2 3
12 I
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 005760 TCX-1-1400-19 RV STUD R160 905RB B-G-1 UT B6.30 MT 1
C 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005780 TCX-1-1400-20 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005800 TCX-1-1400-21 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005820 TCX-1-1400-22 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005840 TCX-1-1400-23 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005860 TCX-1-1400-24 RV STUD R160 905RB 005880 TCX-1-1400-25 RV STUD R160 905RB B-G-1 UT 1 -
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
C
-82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
PAGE:
11
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME PLAN STATUS
_PRESERVICE YEAR FIRST SECOND PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY ITEM NO DE---------
OUTAGE METH 12 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 005900 TCX-1-1400-26 RV STUD R160 905RB B-G-1 UT B6.30 MT 1 -
C 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005920 TCX-1-1400-27 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005940 TCX-i-1400-28 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005960 TCX-I-1400-29 RV STUD R160 905RB B-G-I UT 1-B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
005980 TCX-1-1400-30 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006000 TCX-i-1400-31 RV STUD R160 905RB B-G-1 UT 1
B6730 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006020 TCX-I-1400-32 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
THIRD PERIOD DATE:
03/16/02 I I I
PAGE:
12
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD I----
---------- I UT AG E---- -- -------
112 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 006040 TCX-1-1400-33 RV STUD R160 905RB B-G-1 UT B6.30 MT 1
C 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006060 TCX-1-1400-34 RV STUD RI60 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006080 TCX-1-1400-35 RV STUD R160 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006100 TCX-1-1400-36 RV STUD RI60 905RB B-G-1 UT 1
B6.30 MT C
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006120 TCX-1-1400-37 RV STUD B-G-1 UT 1
B6.30 MT
-X 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006140 TCX-1-1400-38 RV STUD B-G-1 UT 1
B6.30 MT
-X 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006160 TCX-1-1400-39 RV STUD B-G-1 UT 1
B6.30 MT
-x 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
PAGE:
13 I
DATE:
03/16/02 PAGE:
14 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND TI PERIOD PERIOD P1 I---------
OUTAGE-1 2
1 2
3 1
2 HIRD ERIOD
-l PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 006180 TCX-1-1400-40 RV STUD B-G-1 UT B6.30 MT 1 -
X 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006200 TCX-1-1400-41 RV STUD B-G-1 UT 1
B6.30 MT
-X 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006220 TCX-1-1400-42 RV STUD B-G-1 UT 1
B6.30 MT
-X 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006240 TCX-1-1400-43 RV STUD B-G-1 UT 1
B6.30 MT
-x 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006260 TCX-1-1400-44 RV STUD B-G-1 UT 1
B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006280 TCX-1-1400-45 RV STUD 006300 TCX-1-1400-46 RV STUD B-G-1 UT 1 -
B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
8 *TBX-52**
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
DATE:
03/16/02 PAGE:
15 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ASME SEC.
XI
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION PLAN STATUS______
FIRST SECOND PERIOD PERIOD THIRD PERIOD CATGY NDE -
0 U T A G E ITEM NO METH 1
2 1
2 3
1 2
PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 006320 TCX-1-1400-47 RV STUD B-G-1 UT B6.30 MT 1
X 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006340 TCX-1-1400-48 RV STUD B-G-1 UT 36.30 MT 1 -
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006360 TCX-1-1400-49 RV STUD B-G-1 UT B6.30 MT 1 -
-x 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006380 TCX-1-1400-50 RV STUD B-G-1 UT 1
B6.30 MT 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006400 TCX-1-1400-51 RV STUD B-G-1 UT B6.30 MT 1 -
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006420 TCX-1-1400-52 RV STUD B-G-1 UT P6.30 MT 1 -
X 82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
006440 TCX-1-1400-53 RV STUD B-G-1 UT 1
B6.30 MT X
82 TDLR VERIFICATION BOUNDARY.
- TBX-52**
I ----------- ----------- -----
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
A.SME
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH
_________LAN STATUS______
FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD I----------
OUTAGE--------------
112 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 006460 TCX-1-1400-54 RV STUD B-G-1 UT B6.30 MT I
-X 82 TDLR VERIFICATION BOUNDARY.
- TB3X-52**
006600 TCX-1-1400-1 RV NUT R160 905RB 006620 TCX-1-1400-2 RV NUT R160 905RB 006640 TCX-1-1400-3 RV NUT R160 905RB 006660 TCX-1-1400-4 RVNUT R160 905RB 006680 TCX-1-1400-5 RV NUT R160 905RB 006700 TCX-1-1400-6 RV NUT R160 905RD B-G-1 MT 1 C B6. 10 B-G-1 MT 1 C B6. 10 B-G-1 MT i
C B6. 10 B-G-1 MT 1 C B6. 10 B-G-1 MT 1 C B6. 10 B-G-1 MT 1 C B6.10 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
DATE:
03/16/02 PAGE:
16
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
-PLAN STATUS PRESERVICE YEAR FIRST ASME SEC.
XI SECOND PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION CATGY NDE I
ITEM NO METH I 1 2
OUTAGE 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 006720 TCX-1-1400-7 RV NUT R160 905RB B-G-1 B6. 10 MT 1 C 82 TDLR VERIFICATION BOUNDARY.
006740 TCX-1-1400-8 RV NUT R160 905RB 006760 TCX-1-1400-9 RV NUT R160 905RB 006780 TCX-1-1400-10 RV NUT R160 905RB 006800 TCX-1-1400-11 RV NUT R160 905RB 006820 TCX-1-1400-12 RV NUT R160 905RB 006840 TCX-1-1400-13 RV NUT R160 905RB B-G-1 MT 1 C B6. 10 B-G-1 MT 1 C B6. 10 B-G-1 MT 1 C B6.10 B-G-1 MT 1 C B6. 10 B-G-1 MT 1 C B6.10 B-G-1 MT 1 C B6.10 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
PAGE:
17 THIRD PERIOD
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS______
FIRST SECOND PERIOD PERIOD l-PRESERVICE YEAR THIRD PERIOD l
I- -----
-OUTAGE EI-----
112 123 1 2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 006860 TCX-1-1400-14 RV NUT R160 905RB B-G-1 B6.10 MT 1 C 82 TDLR VERIFICATION BOUNDARY.
006880 TCX-1-1400-15 RV NUT R160 905RB 006900 TCX-1-1400-16 RV NUT Ri60 905RB 006920 TCX-1-1400-17 RV NUT R160 905RB 006940 TCX-1-1400-18 RV NUT R160 905RB 006960 TCX-1-1400-19 RV NUT R160 905RB B-G-1 MT I C B6. 10 B-G-1 MT 1 C B6. 10 B-G-1 MT 1 C B6. 10 B-G-i MT 1 C B6.10 B-G-1 MT 1
B6. 10 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
006980 TCX-1-1400-20 RV NUT R160 905RB B-G-1 MT 1
B6. 10 C
82 TDLR VERIFICATION BOUNDARY.
PAGE:
18 DATE:
03/16/02
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH i1 2
PLAN STATUS_
FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD i
OUTAGE-- -----------
1 23 1
2 i
INSTRUCTIONS
- CALIBRATION BLOCK**
P1flTflP
("flflT.?.hrr
,rnv-nDnp'*T-n1 007000 TCX-1-1400-21 RV NUT RI60 905RB B-G-1 B6.10 MT 1 -
C 82 TDLR VERIFICATION BOUNDARY.
007020 TCX-1-1400-22 RV NUT R160 905RB B-G-1 MT I
B6. 10 C
82 TDLR VERIFICATION BOUNDARY.
007040 TCX-1-1400-23 RV NUT R160 905RB 007060 TCX-1-1400-24 RV NUT R160 905RB 007080 TCX-1-1400-25 RV NUT R160 905RB B-G-1 MT 1-B6. 10 B-G-1 MT 1
B6.10 B-G-1 MT I
B6.10 C
C C
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
007100 TCX-1-1400-26 RV NUT R160 905RB 007120 TCX-1-1400-27 RV NUT R160 905RB B-G-1 MT 1 -
B6. 10 B-G-1 MT 1 -
B6. 10 C
82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
PAGE:
19 REACTOR COOLANT TCX-RCPCRV-01 DATE:
03/16/02
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD 0----------OUTAE---------------
1 2
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 007140 TCX-1-1400-28 RV NUT R160 905RB B-G-1 B6.10 MT 1
82 TDLR VERIFICATION BOTTNDARY 007160 TCX-1-1400-29 RV NUT R160 905RB 007180 TCX-1-1400-30 RV NUT R160 905RB 007200 TCX-1-1400-31 RV NUT R160 905RB 007220 TCX-1-1400-32 RV NUT R160 905RB B-G-1 MT 1
B6.10 B-G-1 MT 1
B6.10 B-G-1 MT 1
B6.10 B-G-1 MT 1
B6.10 C
C-82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
007240 TCX-1-1400-33 RV NUT R160 905RB B-G-1 MT 1
26.10 C
82 TDLR VERIFICATION BOUNDARY.
007260 TCX-1-1400-34 RV NUT R160 905RB B-G-1 MT 1
B6.10 C
82 TDLR VERIFICATION BOUNDARY.
PAGE:
20 DATE:
03/16/02
DATE:
03/16/02 PAGE:
21 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL EXAMINATION AREA IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD PLAN STATUS_
SECOND THIRD PERIOD PERIOD I------- -OUTAGE-1 2
1 2
3 1
2 PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
mry-DrnD¶1*;-ni 007280 TCX-i-1400-35 RV NUT RI60 905RB B-G-1 MT B6. 10 C
82 TDLR VERIFICATION BOUNDARY.
007300 TCX-1-1400-36 RV NUT R160 905RE B-G-I MT 1
B6. 10 C
82 TDLR VERIFICATION BOUNDARY.
007320 TCX-i-1400-37 RV NUT 007340 TCX-I-1400-38 RV NUT 007360 TCX-i-1400-39 RV NUT 007380 TCX-1-1400-40 RV NUT B-G-1 MT 1
B6. 10 B-G-1 MT 1 -
B6. 10 B-G-1 MT 1
B6. 10 B-G-1 MT 1
B6. 10 X
X X
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
007400 TCX-I-1400-41 RV NUT 82 TDLR VERIFICATION BOUNDARY.
SUMMARY
NUMBER REACTOR COOLANT TCX-RCPCRV-01
- - I B-G-I MT 1
B6.10
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS_______
FIRST SECOND PERIOD PERIOD l-PRESERVICE YEAR THIRD PERIOD I
I- -----
-OUTAGE --- - - - --
112 123 12 INSTRUCTIONS
"**CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 007420 TCX-1-1400-42 RV NUT 007440 TCX-1-1400-43 RV NUT 007460 TCX-1-1400-44 RV NUT 007480 TCX-1-1400-45 RV NUT 007500 TCX-1-1400-46 RV NUT 007520 TCX-1-1400-47 RV NUT B-G-1 MT 1
B6.10 B-G-1 MT 1
B6.10 B-G-1 MT 1 -
B6.10 B-G-1 MT 1
B6. 10 B-G-1 MT 1
B6.10 B-G-1 MT I
B6. 10 X
X X
X 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
007540 TCX-1-1400-48 RV NUT 82 TDLR VERIFICATION BOUNDARY.
PAGE:
22 DATE:
03/16/02 B-G-1 MT 1
B6. 10
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD 112 PRESERVICE YEAR THIRD PERIOD OUTAGE1-1 23 1
2 INSTRUCTIONS
"**CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 007560 TCX-1-1400-49 RV NUT B-G-1 B6. 10 MT 1 -
-X 82 TDLR VERIFICATION BOUNDARY 007580 TCX-1-1400-50 RV NUT 007600 TCX-1-1400-51 RV NUT 007620 TCX-1-1400-52 RV NUT 007640 TCX-1-1400-53 RV NUT 007660 TCX-1-1400-54 RV NUT B-G-1 MT 1
B6.10 B-G-1 MT I
B6.10 B-G-1 MT 1
B6.10 B-G-1 MT 1
B6.10 B-G-1 MT 1
BEAO0 X
X X
X X
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
007800 TCX-1-1400-1 RV WASHER R160 905RB B-G-1 VT-I 1 C B6.50 82 TDLR VERIFICATION BOUNDARY.
PAGE:
23 DATE:
03/16/02 I ----------- ----------- -----------
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD I ----
I
-OUTAGE
I 12 1
2 3
12 I
INSTRUCTIONS
- CALIBRATION BLOCK**
007820 TCX-1-1400-2 RV WASHER R160 905RB B-G-1 B6.50 VT-i 1 C 82 TDLR VERIFICATION BOUNDARY.
007840 TCX-1-1400-3 RV WASHER R160 905RB 007860 TCX-1-1400-4 RV WASHER R160 905RB 007880 TCX-1-1400-5 RV WASHER RI60 905RB 007900 TCX-1-1400-6 RV WASHER R160 905RB 007920 TCX-1-1400-7 RV WASHER R160 905RB 007940 TCX-1-1400-8 RV WASHER R160 905RB B-G-1 VT-i 1 C B6.50 B-G-1 VT-I 1 C B6.50 B-G-1 VT-I 1 C B6.50 B-G-1 VT-i 1 C B6.50 B-G-1 VT1I C
B6.50 B-G-1 VT-i 1 C B6.50 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
PAGE:
24 lww-DATE:
03/16/02 I I
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_
PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD I---------- OUTA E--------------
112 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 007960 TCX-1-1400-9 RV WASHER R160 905RB B-G-1 B6.50 VT-I 1 C 82 TDLR VERIFICATION BOUNDARY.
007980 TCX-1-1400-10 RV WASHER R160 905RB 008000 TCX-1-1400-11 RV WASHER R160 905RB 008020 TCX-1-1400-12 RV WASHER R160 905RB 008040 TCX-1-1400-13 RV WASHER R160 905RB 008060 TCX-1-1400-14 RV WASHER R160 905RB 008080 TCX-1-1400-15 RV WASHER R160 905RB B-G-1 VT-I 1 C B6.50 B-G-1 VT-i 1 C B6.50 B-G-1 VT-i 1 C B6.50 B-G-1 VT-I 1 C B6.50 B-G-1 VT-I 1 C B6.50 B-G-1 VT-I 1 C B6.50 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
PAGE:
25 DATE:
03/16/02
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ASME
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY ITEM NO NDE METH PLAN STATUS______
FIRST PERIOD SECOND PERIOD I---------
OUTAGE 1
2 1
2 3
THIRD PERIOD 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 008100 TCX-1-1400-16 RV WASHER Ri60 905RB 008120 TCX-1-1400-17 RV WASHER R160 905RB 008140 TCX-1-1400-18 RV WASHER RI60 905RB 008160 TCX-1-1400-19 RV WASHER RI60 905RB 008180 TCX-i-1400-20 RV WASHER R160 905RB 008200 TCX-i-1400-21 RV WASHER 008220 TCX-1-1400-22 RV WASHER R160 905RB B-G-1 B6.50 VT-I 1 C B-G-1 VT-i 1
B6.50 B-G-1 VT-i 1 C B6.50 B-G-1 VT-i 1
B6.50 B-G-1 VT-i 1
B6.50 B-G-1 VT-i 1 C B6.50 B-G-1 VT-i 1
B6.50 82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
PAGE:
26 DATE:
03/16/02
DATE:
03/16/02 PAGE:
27 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS______
PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD I----
0 U TA 1
2 1
2 3
THIRD PERIOD GE --
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 008240 TCX-1-1400-23 RV WASHER R160 905RB B-G-1 B6.50 VT-I 1 -
C 82 TDLR VERIFICATION BOUNDARY.
008260 TCX-1-1400-24 RV WASHER R160 905RB B-G-1 VT-I 1
B6.50 C
82 TDLR VERIFICATION BOUNDARY.
008280 TCX-1-1400-25 RV WASHER R160 905RB 008300 TCX-1-1400-26 RV WASHER R160 905RB B-G-1 VT-i 1
B6.50 B-G-1 VT-i 1 -
B6.50 C
C 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
008320 TCX-1-1400-27 RV WASHER R160 905RB B-G-1 VT-i 1
B6.50 C
82 TDLR VERIFICATION BOUNDARY.
008340 TCX-1-1400-28 RV WASHER R160 905RB 008360 TCX-1-1400-29 RV WASHER R160 905RB B-G-1 VT-1 1 -
B6.50 B-G-1 VT-i 1 -
B6.50 C
82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
I --- - -- ----------- ----------- I
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I
2 112
-OUTAGE-1 23 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 008380 TCX-1-1400-30 RV WASHER R160 905RB 008400 TCX-1-1400-31 RV WASHER R160 905RB 008420 TCX-1-1400-32 RV WASHER R160 905RB B-G-1 B6.50 VT-I 1 -
B-G-1 VT-i 1 -
B6.50 B-G-1 VT-I 1 -
B6.50 C
82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
008440 TCX-1-1400-33 RV WASHER R160 905RB 008460 TCX-1-1400-34 RV WASHER R160 905RB B-G-1 VT-i 1 -
B6.50 B-G-1 VT-i 1 -
B6.50 C
C 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
008480 TCX-1-1400-35 RV WASHER R160 905RB 008500 TCX-1-1400-36 RV WASHER R160 905RB B-G-1 VT-I 1 -
B6.50 B-G-1 VT-i 1 -
BE.50 C
82 TDLR VERIFICATION BOUNDARY.
C 82 TDLR VERIFICATION BOUNDARY.
PAGE:
28 DATE:
03/16/02
DATE:
03/16/02 PAGE:
29 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METE SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD O----------
UTAGE --------------
112 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 008520 TCX-1-1400-37 RV WASHER B-G-1 VT-I B6.50 1
X 82 TDLR VERIFICATION BOUNDARY.
008540 TCX-1-1400-38 RV WASHER B-G-1 VT-I 1
B6.50 82 TDLR VERIFICATION BOUNDARY.
008560 TCX-1-1400-39 RV WASHER 008580 TCX-1-1400-40 RV WASHER B-G-1 VT-i 1
B6.50 B-G-1 VT-i 1
B6.50 X
82 TDLR VERIFICATION BOUNDARY.
X 82 TDLR VERIFICATION BOUNDARY.
008600 TCX-1-1400-41 RV WASHER 008620 TCX-1-1400-42 RV WASHER 008640 TCX-1-1400-43 RV WASHER B-G-1 VT-I 1 -
B6.50 B-G-1 VT-i 1
B6.50 B-G-1 VT-I 1
B6.50 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS______
FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I
OUTAGE-------------
J11i2 13 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 008660 TCX-1-1400-44 RV WASHER B-G-1 B6.50 VT-i 1 -
82 TDLR VERIFICATION BOUNDARY.
008680 TCX-1-1400-45 RV WASHER 008700 TCX-1-1400-46 RV WASHER B-G-1 VT-1 1
B6.50 B-G-1 VT-I 1 -
B6.50 X
X 82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
008720 TCX-1-1400-47 RV WASHER B-G-1 VT-i 1
B6.50 X
82 TDLR VERIFICATION BOUNDARY.
008740 TCX-1-1400-48 RV WASHER 008760 TCX-1-1400-49 RV WASHER 008780 TCX-1-1400-50 RV WASHER B-G-I VT-I 1
B6.50 B-G-1 VT-1 1 -
B6.50 B-G-1 VT-I 1
B6.50 X
X X
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
PAGE:
30 DATE:
03/16/02
DATE:
03/16/02 PAGE:
31 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD I----------
OUTAGE 1
2 123 1
PRESERVICE YEAR THIRD PERIOD INSTRUCTIONS 2
j
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCRV-01 008800 TCX-i-1400-51 RV WASHER B-G-1 VT-I B6.50 1
X 82 TDLR VERIFICATION BOUNDARY.
008820 TCX-1-1400-52 RV WASHER 008840 TCX-i-1400-53 RV WASHER 008860 TCX-1-1400-54 RV WASHER B-G-1 VT-I 1
B6.50 B-G-1 VT-I 1
B6.50 B-G-1 VT-i 1
B6.50 X
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
82 TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCPR-01 009000 TCX-1-2100-1 PRESSURIZER LOWER HEAD TO SHELL WELD R161A832RB 009100 TCX-1-2100-5 PRESSURIZER UPPER HEAD TO SHELL WELD R161A905RB C
79 TDLR VERIFICATION BOUNDARY.
B-B UT 1
B2.11
- TBX-1**
B-B B2. 11 UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
- TBX-1**
009200 TCX-1-2100-6 B-B PRESSURIZER LONG.
WELD 1)
RI61A832RB UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
- TBX-1**
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD I-112 OUTAGE 1
2 3
THIRD PERIOD INSTRUCTIONS 1
2
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCPR-01 009)00 TCX-
-2100 -9 B-B UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
PRESSURIZER LONG.
WELD 5)
R161A905RB
- TBX-)*-
009400 TCX-1-2100-10 B-H PRESSURIZER SUPPORT SKIRT WELD B8.20 RI61A832RB UT 1 -
C 82 TDLR VERIFICATION BOUNDARY.
- TBX-40**
009500 TCX-1-2100-11 B-D PRESSURIZER SURGE NOZZLE TO B3.110 VESSEL WELD R161A832RB UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
- TBX-I**
009550 TCX-1-2100-IIIR B-D UT 1 -
C NA TDLR VERIFICATION BOUNDARY.
PRESSURIZER SURGE NOZZLE INNER B3.120 RADIUS RI61A832RE 009600 TCX-1-2100-12 B-D UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
PRESSURIZER SPRAY NOZZLE TO B3.110 VESSEL WELD R161A905RB
- *TBX-1**
009650 TCX-1-2100-12IR B-D PRESSURIZER SPRAY NOZZLE INNER B3.120 RADIUS RI61A905RB 009700 TCX-1-2100-13 B-D PRESSURIZER SAFETY NOZZLE TO B3.110 VESSEL WELD R161A905RB UT 1 -
C NA TDLR VERIFICATION BOUNDARY.
- TBX-55**
UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
- TBX-1**
PAGE:
32 DATE:
03/16/02
- TBX-58**
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL-PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC. XI CATGY NDE ITEM NO METH I ----
I 112 OUTAGE--- -----------
1 23 1
2
'RESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCPR-01 009750 TCX-1-2100-13IR PRESSURIZER SAFETY NOZZLE INNER RADIUS RI61A905RB B-D B3.120 009800 TCX-1-2100-14 B-D PRESSURIZER RELIEF NOZZLE TO B3.110 VESSEL WELD RI61A905RB 009850 TCX-1-2100-14IR PRESSURIZER RELIEF NOZZLE INNER RADIUS R161A905RB B-D B3.120 UT 1 -
C NA TDLR VERIFICATION BOUNDARY.
UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
- TBX-1**
UT 1 -
C NA TDLR VERIFICATION BOUNDARY.
- TBX-59**
009900 TCX-1-2100-15 B-D PRESSURIZER SAFETY NOZZLE TO B3.110 VESSEL WELD R161A905RB 009950 TCX-1-2100-15IR PRESSURIZER SAFETY NOZZLE INNER RADIUS RI61A905RB B-D B3.120 UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
- TBX-I**
UT 1 -
C
-79 TDLR VERIFICATION BOUNDARY.
- TBX-59**
010000 TCX-1-2100-16 B-D PRESSURIZER SAFETY NOZZLE TO B3.110 VESSEL WELD RI61A905RB 010050 TCX-1-2100-16IR PRESSURIZER SAFETY NOZZLE INNER RADIUS RI61A905RB B-D B3.120 UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
- TBX-I**
UT 1 -
C 79 TDLR VERIFICATION BOUNDARY.
- TBX-59**
PAGE:
33 DATE:
03/16/02
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCPR-01 010100 TCX-1-2100-B1-16 PRESSURIZER MANWAY BOLTING (BI/B16)
Ri61A905RB ASME SEC.
XI CATGY NDE ITEM NO METH B-G-2 B7.20 FIRST SECOND PERIOD PERIOD THIRD PERIOD I ----
I I -------
OUTAGE---------
S12 VT-I 1 -
C 1
2 3
12 INSTRUCTIONS I
- CALIBRATION BLOCK**
84 TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCSG-01 010200 TCX-1-3100-1-1 B-B SG1 CHANNEL HEAD TO TUBESHEET B2.40 WELD A23 010300 TCX-1-3100-1A B-D SGI INLET NOZZLE INNER RADIUS B3.140 A23 UT 1 -
C 82 TDLR VERIFICATION BOUNDARY.
- TBX-28**
UT 1 -
C NA TDLR VERIFICATION BOUNDARY.
- TBX-28**
010400 TCX-1-3100-1B B-D SG1 OUTLET NOZZLE INNER RADIUS B3.140 A23 UT 1 -
C NA TDLR VERIFICATION BOUNDARY.
- TBX-28**
010500 TCX-1-3100-1BI-16 SG1 HOTLEG MANWAY BOLTING (1-B1/I-B16)
A23 010600 TCX-1-3100-1B17-32 SG1 COLDLEG MANWAY BOLTING (1-B17/1-B32)
A23 B-G-2 VT-i 1
B7.30 B-G-2 VT-i 1
B7_30 C
84 TDLR VERIFICATION BOUNDARY.
C 84 TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCSG-02 010700 TCX-1-3100-2-1 B-B SG2 CHANNEL HEAD TO TUBESHEET B2.40 WELD UT 1 -
C 82 TDLR VERIFICATION BOUNDARY.
PAGE:
34
R15SI812RB
- *TB3X28*
- COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL_
ASME SEC.
XI CATGY NDE ITEM NO METH
__PLAN STATUS-______
FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE--
1 23 1
2 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCSG- 02 010800 TCX-i-3100-2A B-D SG2 INLET NOZZLE INNER RADIUS B3.140 R1551812RB UT 1
C NA TDLR VERIFICATION BOUNDARY.
- SGIR**
010900 TCX-I-3100-2B B-D SG2 OUTLET NOZZLE INNER RADIUS B3.140 R1551812RB UT 1 -
C NA TDLR VERIFICATION BOUNDARY.
- SGIR**
011000 TCX-i-3100-2B1-16 SG2 HOTLEG MANWAY BOLTING (2-BI/2-B16)
R155I812RB 011100 TCX-1-3100-2B17-32 SG2 COLDLEG MANWAY BOLTING (2-B17/2-B32)
RI551812RB REACTOR COOLANT TCX-RCPCSG-03 B-G-2 VT-i 1
B7.30 B-G-2 VT-i 1-B7.30 C
C 84 TDLR VERIFICATION BOUNDARY.
84 TDLR VERIFICATION BOUNDARY.
011200 TCX-1-3100-3-1 B-B SG3 CHANNEL HEAD TO TUBESHEET B2.40 WELD R154K827RB 011300 TCX-I-3100-3A B-D SG3 INLET NOZZLE INNER RADIUS B3.140 R154K827RB UT 1 -
X 82 TDLR VERIFICATION BOUNDARY.
- TBX-28**
UT 1-NA TDLR VERIFICATION BOUNDARY.
- TBX-28**
011400 TCX-1-3100-3B B-D SG3 OUTLET NOZZLE INNER RADIUS B3.140 R154K827RB UT 1 -
NA TDLR VERIFICATION BOUNDARY.
- TBX-28**
PAGE:
35 DATE:
03/16/02
----------- ----------- I
DATE:
03/16/02 PAGE:
36 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION REACTOR COOLANT TCX-RCPCSG-03 011500 TCX-1-3100-3BI-16 SG3 HOTLEG MANWAY BOLTING (3-B1/3-B16)
R154K827RB 011600 TCX-1-3100-3B17-32 SG3 COLDLEG MANWAY BOLTING (3-B17/3-B32)
R154K827RB ASME SEC.
XI CATGY NDE ITEM NO METH B-G-2 B7.30 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I- ------
OUTAGE ---- - - - --
112 123 12 VT-i I -
B-G-2 VT-i 1
B7.30 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
X 84 TDLR VERIFICATION BOUNDARY.
84 TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCSG-04 011700 TCX-1-3100-4-1 B-B SG4 CHANNEL HEAD TO TUBESHEET B2.40 WELD A29 UT 1 -
82 TDLR VERIFICATION BOUNDARY.
- TBX-28**
011800 TCX-1-3100-4A B-D UT 1 -
NA TDLR VERIFICATION BOUNDARY.
SG4 INLET NOZZLE INNER RADIUS B3.140 A29
- TBX-28**
011900 TCX-1-3100-4B B-D SG4 OUTLET NOZZLE INNER RADIUS B3.140 A29 UT 1 -
NA TDLR VERIFICATION BOUNDARY.
- TBX-28**
012000 TCX-1-3100-4B1-16 SG4 HOTLEG MANWAY BOLTING (4-BI/4-B16)
A29 012100 TCX-1-3100-4B17-32 SG4 COLDLEG MANWAY BOLTING (4-BI7/4-B32)
A29 B-G-2 VT-I 1
B7.30 B-G-2 VT-I 1
B7.30 X
84 TDLR VERIFICATION BOUNDARY.
84 TDLR VERIFICATION BOUNDARY.
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD 12 THIRD PERIOD OUTAGE-- -----------
1 2
3 1
2 INSTRUCTIONS
"**CALIBRATION BLOCK**
REACTOR COOLANT 29-RC-2-001-WEST-1 012200 TCX-1-4100-1 RPV NOZZLE TO SAFE END R157 827RB B-F UT B5.10 PT 1 -
C X
92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
012300 TCX-1-4100-2 SAFE END TO PIPE R157 827RB B-J UT 1 -
C B9. 11 PT
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
012500 TCX-1-4100-4 B-F REDUCING ELBOW TO SG NOZZLE B5.70 R1541827RB UT 1
PT C
92 TDLR VERIFICATION BOUNDARY.
- TBX-57**
REACTOR COOLANT 31-RC--2-002-WEST-1 012600 TCX-1-4100-5 SG NOZZLE TO ELBOW R1541829RB B-F UT 1
B5.70 PT C
REACTOR COOLANT 27.5-RC-2-003-WEST-1 013400 TCX-1-4100-13 ELBOW TO SAFE END R157 827RB B-J UT 1
B9.11 PT
-X TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
013500 TCX-1-4100-14 SAFE END TO RV NOZZLE R1541827RB B-F UT 1
B5.10 PT
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
PAGE:
37 92 TDLR VERIFICATION BOUNDARY.
DATE:
03/16/02
DATE:
03/16/02 PAGE:
38 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS______
FIRST SECOND PERIOD PERIOD 112 OUTAGE 1
2 3
PRESERVICE YEAR THIRD PERIOD INSTRUCTIONS
- CALIBRATION BLOCK**
1 2
REACTOR COOLANT 12-RC-2-007-2501R-l 014400 TCX-1-4101-2 PIPE TO ELBOW R1541823RB 014500 TCX-1-4101-3 ELBOW TO PIPE R1541822RB B-J UT C
B9.11 PT 014600 TCX-1-4101-4 PIPE TO PIPE R1541817RB 014800 TCX-1-4101-6 ELBOW TO PIPE R1541817RB 014900 TCX-1-4101-7 PIPE TO VALVE R1541817RB B-J UT 1
B9. 11 PT B-J UT 1-B9. 11 PT B-J UT 1 C B9.11 PT X
X
- TBX-12**
92
- TBX-12**
RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-1 015000 TCX-1-4101-8 VALVE TO PIPE R1541817RB B-J UT C
B9. 11 PT 92 015500 TCX-1-4101-13 PIPE TO VALVE R154A817RB B-J UT 1 C B9.11 PT B-J UT B9.11 PT 1 C 92
- TBX-12**
92
- TBX-12**
- TBX-12**
92
- TBX-12**
----------- I
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS______
PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD I -----------------------------
I 12 OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 10-RC-2-021-2501R-1 015600 TCX-1-4102-1 BRANCH CONNECTION TO ELBOW R1541829RB B-J UT B9.11 PT 1 -
C 92 015700 TCX-1-4102-2 ELBOW TO PIPE R1541829RB B-J UT 1 -C B9.11 PT 015900 TCX-1-4102-4 ELBOW TO PIPE R1541831RB 016000 TCX-1-4102-5 PIPE TO PIPE R1541831RB 016100 TCX-1-4102-6 PIPE TO ELBOW R1541831RB 016300 TCX-1-4102-8 PIPE TO VALVE R1541831RB B-J UT 1 -
C B9.11 PT X
92 92 92 SAFETY INJECTION 10-SI-2-179-2501R-1 016400 TCX-1-4102-9 VALVE TO PIPE R1541831RB B-J UT 1 -
C B9. 11 PT 92 PAGE:
39
- TBX-9**
92
- TBX-9**
- TBX-9**
- TBX-9**
- TBX-9**
DATE:
03/16/02 PAGE:
40 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 1
2 PLAN STATUS_______
SECOND PERIOD PRESERVICE YEAR THIRD PERIOD
-OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 10-SI-2-179-2501R-1 017100 TCX-1-4102-16 ELBOW TO VALVE R1541819RB B-J UT B9. 11 PT 1 -
C 92
- TB3X-9**
SAFETY INJECTION 6-SI-2-089-2501R-1 017200 TCX-1-4103-1 VALVE TO PIPE R154A820ORB B-J UT I C B9. 11 PT 92 017500 TCX-1-4103-4 PIPE TO MOMENT RESTRAINT R154A820RB 017600 TCX-1-4103-5 MOMENT RESTRAINT TO PIPE R1541820RB 92 B-J UT 1 C B9. 11 PT B-J UT 1 C B9. 11 PT
- TBX-5**
92
- TBX-5**
SAFETY INJECTION 2-SI-2-063-2501R-1 018500 TCX-1-4103-14 SOCKOLET TO PIPE R154A82ORB 018600 TCX-1-4103-15 PIPE TO SOCKOLET R154A820RB B-J B9.32 B-J B9.40 PT 1 C 92 PT 1 C 92
- TBX-5B*
I ----------- -----------
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS-______
FIRST PERIOD 112 SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE G----- - - --
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 2-SI-2-063-2501R-1 018700 TCX-1-4103-16 PIPE TO VALVE R154A82ORB B-J B9.40 PT 1 C 92 REACTOR COOLANT 6-SI-2-008-2501R-1 018800 TCX-1-4104-1 PIPE TO WELDOLET R1541820RB 019400 TCX-1-4104-7 PIPE TO VALVE R1541826RB B-J UT 1 -
C B9.31 PT B-J UT 1 C B9.11 PT 92 92 REACTOR COOLANT 3-RC-2-019-2501R-1 020200 TCX-1-4105-6 PIPE TO VALVE R1541828RB B-J B9.21 PT i
C 92 CHEMICAL AND VOLUME CONTROL 3-CS-2-080-2501R-1 020300 TCX-1-4105-7 VALVE TO PIPE R1541828RB B-J B9.21 PT 1 C 020400 TCX-1-4105-8 PIPE TO VALVE R1541828RB B-J B9.21 PT 1 C 92 PAGE:
41
- SSCB-I**
- TBX-5**
92 DATE:
03/16/02 I ----------- -----------
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS_
FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH OUTAGE--- ----------
112 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 1.5-RC-2-020-2501R-1 020900 TCX-I-4107-4 PIPE TO ELBOW R1541828RB B-J PT I C B9.40 021000 TCX-1-4107-5 ELBOW TO PIPE R1541828RB 021100 TCX-1-4107-6 PIPE TO VALVE R1541828RB B-J B9.40 B-J B9.40 PT I C PT i
C 92 92 SAFETY INJECTION 1.5-SI-2-025-2501R-1 022350 TCX-1-4107-FE924 FLOW ELEMENT BOLTING R1541822RB B-G-2 B7.50 VT-i 1
C SAFETY INJECTION 2-SI-2-059-2501R-1 022400 TCX-1-4108-1 REDUCER TO PIPE R1541826RB 022700 TCX-1-4108-4 PIPE TO ELBOW R1541819RB B-J B9.21 B-J B9.21 PT I C PT 1 C 92 92 PAGE:
42 92 92
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_
PRESERVICE YEAR FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD 112 OUTAGE 12 3
THIRD PERIOD 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 2-SI-2-059-2501R-1 023000 TCX-1-4108-7 PIPE TO TEE R154A819RB 023100 TCX-1-4108-8 TEE TO PIPE R154A819RB B-J PT 1 C B9.21 92 REACTOR COOLANT 2-RC-2-015-2501R-1 024200 TCX-1-4109-4 PIPE TO ELBOW R1541813RB 024300 TCX-1-4109-5 ELBOW TO PIPE R1541813RB B-J PT 1
B9.40 C
024400 TCX-1-4109-6 PIPE TO ELBOW R1541813RE 024500 TCX-1-4109-7 ELBOW TO PIPE R1541813RB 024600 TCX-1-4109-8 PIPE TO TEE R1541813RB PAGE:
43 B-J B9.21 PT 1 C 92 B-J B9.40 PT 1 -
C 92 92 B-J B9.40 92 B-J B9.40 PT 1 -
C PT 1 -
C PT 1 -
C 92 B-J B9.40 92
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL_
F ASME j
P]
SEC.
XI CATGY NDE ITEM NO METH I1 2
PLAN STATUS-______
IRST SECOND ERIOD PERIOD PRESERVICE YEAR THIRD PERIOD
-OUTAGE---------------I 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 2-RC-2-015-2501R-1 024700 TCX-1-4109-9 TEE TO REDUCER R1541S13RB 024800 TCX-1-4109-10 TEE TO PIPE R1541813RB 024900 TCX-1-4109-11 PIPE TO VALVE R1541813RB CHEMICAL AND VOLUME CONTROL B-J B9.40 B-J B9.40 B-J B9.40 PT 1 -
C 92 PT 1 -
C PT 1 -
C 1.5-CS-2-242-2501R-1 025300 TCX-1-4110-2 FLANGE TO PIPE R154183ORB 025400 TCX-1-4110-3 PIPE TO ELBOW R1541828RB 025500 TCX-1-4110-4 ELBLOW TO PIPE R1541829RB 025600 TCX-1-4110-5 PIPE TO ELBOW R1541831RB B-J B9.21 PT 1 C 92 PAGE:
44 92 92 B-J B9.21 PT 1 C 92 PT I
C B-J B9.21 B-J B9.21 92 PT 1 C 92 DATE:
03/16/02
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS PRESERVICE YEAR I
FIRST SECOND
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME j
PERIOD SEC.
XI CATGY NDE ITEM NO METH I
2 PERIOD THIRD PERIOD
-OUTAGE 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
CHEMICAL AND VOLUME CONTROL 1.5-CS-2-248-2501R-1 025700 TCX-1-4110-6 ELBOW TO PIPE R1541831RB 025800 TCX-1-4110-7 PIPE TO ELBOW R1541831RB 025900 TCX-1-4110-8 ELBOW TO PIPE R1541831RB 026000 TCX-1-4110-9 PIPE TO ELBOW R1541828RB 026100 TCX-1-4110-10 ELBOW TO PIPE R1541828RB 026200 TCX-1-4110-11 PIPE TO ELBOW R1541828RB 026300 TCX-1-4110-12 ELBOW TO PIPE R1541828RB B-J B9.21 B-J B9.21 B-J B9.21 B-J B9.21 B-J B9.21 PT 1 C PT i C PT i
C PT I C PT 1 C 92 92 92 92 92 PAGE:
45 B-J B9.21 PT 1 C 92 B-J B9.21 PT i
C 92
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL P]
FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME PERIOD SEC. XI CATGY NDE E
0 ITEM NO METH i
2 1
LAN STATUS SECOND THIRD PERIOD PERIOD UTAGE-------------
2 3
1 2
PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
CHEMICAL AND VOLUME CONTROL 1.5-CS-2-248-2501R-1 027550 TCX-1-4110-FLG 1 FLANGE BOLTING R1541830RB REACTOR COOLANT 29-RC-2-023-WEST-1 027600 TCX-1-4200-1 RPV NOZZLE TO SAFE END R157 827RB B-F UT 1 -C B5.10 PT X
92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
027700 TCX-1-4200-2 SAFE END TO PIPE R157 827RB B-J UT 1 -
C B9.11 PT X
92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
027900 TCX-1-4200-4 REDUCING ELBOW TO SG NOZZLE R155J827RB B-F UT 1
B5.70 PT C
92 TDLR VERIFICATION BOUNDARY.
- TBX-57**
REACTOR COOLANT 31-RC-2-024-WEST-1 028000 TCX-1-4200-5 SG NOZZLE TO ELBOW R155J829RB B-F UT 1
B5.70 PT C
92 TDLR VERIFICATION BOUNDARY.
- TBX-57**
028300 TCX-1-4200-8 ELBOW TO PIPE R154J817RB B-J UT 1
B9.11 PT TDLR VERIFICATION BOUNDARY.
- TBX-57**
PAGE:
46 B-G-2 B7.50 VT-i 1 C 92 DATE:
03/16/02
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCMED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR EXAMINATION AREA IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 1
2 SECOND PERIOD THIRD PERIOD OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 27.5-RC-2-025-WEST-1 028800 TCX-1-4200-13 ELBOW TO SAFE END R157 827RB B-J UT 1-B9. 11 PT x
TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
028900 TCX-1-4200-14 SAFE END TO RV NOZZLE R154J827RB B-F UT 1
B5.10 PT
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
1 fl-PC-9-flV7-9A1P-1 029800 TCX-1-4201-4 ELBOW TO PIPE R154J831RB 029900 TCX-1-4201-5 PIPE TO ELBOW R154J831RB 030000 TCX-1-4201-6 ELBOW TO PIPE R154J831RB B-J UT 1
B9. 11 PT X
-x
- TBX-9**
x
- TBX-9**
030100 TCX-1-4201-7 PIPE TO VALVE R154J831RB B-J UT 1
B9.11 PT C
SAFETY INJECTION 10-SI-2-180-2501R-1 030200 TCX-1-4201-8 VALVE TO PIPE R154J831RB B-J UT 1
B9. 11 PT C
SUMMARY
NUMBER PAGE:
47 92
- TBX-9**
92 m--R COOLANT 10-RC-2-037-2501R-1
- T]3X-9**
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION INSPECTION INTERVAL_
ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD OUTAGE 123 12 THIRD PERIOD 12 PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
SAFETY INJECTION 10-SI-2-180-2501R-1 030900 TCX-1-4201-15 PIPE TO VALVE R154J823RB B-J UT B9.11 PT 1
C 92
- TBX-9**
SAFETY INJECTION 6-SI-2-328-2501R-1 031000 TCX-1-4202-1 VALVE TO PIPE R154B82ORB B-J UT 1
B9.11 PT C
92
- TBX-5**
SAFETY INJECTION 8-SI-2-090-2501R-1 031400 TCX-1-4202-5 ELBOW TO MOMENT RESTRAINT R154B82ORB 031500 TCX-1-4202-6 MOMENT RESTRAINT TO ELBOW R154J820RB B-J UT 1
B9.11 PT C
C 92 92
- TBX-18**
SAFETY INJECTION 2-SI-2-065-2501R-1 032200 TCX-1-4202-13 PIPE TO SOCKOLET R154B820RB B-J B9132 PT 1 -
C 032300 TCX-1-4202-14 SOCKOLET TO PIPE R154B820RB B-J PT 1
B9.40 C
PAGE:
48 92 92 DATE:
03/16/02
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD I-i-
OUTAGE-112 1
2 3
1 2
THIRD PERIOD i
INSTRUCTIONS "i
- CALIBRATION BLOCK**
SAFETY INJECTION 2-SI-2-065-2501R-1 032400 TCX-1-4202-15 PIPE TO ELBOW R154B819RB 032500 TCX-1-4202-16 ELBOW TO PIPE R154B819RB 032600 TCX-1-4202-17 PIPE TO ELBOW R154B819RB 032700 TCX-1-4202-18 ELBOW TO PIPE R154B819RB 032800 TCX-1-4202-19 PIPE TO TEE R154B817RB 032900 TCX-1-4202-20 TEE TO PIPE R154B817RB 033000 TCX-1-4202-21 PIPE TO TEE R154BB16RB B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 PT 1 -
PT 1 -
PT 1
PT 1
PT 1
PT 1 -
C
-92 C
C C
92 C
C
-92 PAGE:
49 B-J B9.40 PT 1
C 92 92 92 92
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS_______
FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD OTG--
1 1TAGE 1
- 1.
1 2 3 1 2l INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 2-SI-2-065-2501R-1 033100 TCX-1-4202-22 TEE TO PIPE R154BS16RB 033200 TCX-1-4202-23 PIPE TO VALVE R154B816RB B-J PT 1
B9.40 C
033210 TCX-1-4202-24 TEE TO REDUCER R154B8E16RB 033220 TCX-1-4202-25 TEE TO REDUCER R154B816RB B-J B9.40 B-J B9.40 PT 1-PT 1 -
C
-92 C
-92 SAFETY INJECTION 6-SI-2-101-2501R-1 033700 TCX-1-4203-5 PIPE TO ELBOW R154J823RB 033800 TCX-1-4203-6 ELBOW TO PIPE R154J823RB B-J UT 1
B9. 11 PT C
C 034000 TCX-1-4203-8 ELBOW TO PIPE R154JS31RB B-J UT 1
B9. 11 PT C
PAGE:
50 B-J B9.40 PT 1
C 92 92 92
- TBX-5**
92
- TBX-5**
92
- TBX-5**
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS_ ____
FIRST PERIOD 1
2 SECOND PERIOD THIRD PERIOD
-OUTAGE------------
1 23 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 6-RC-2-029-2501R-1 034200 TCX-1-4203-10 VALVE TO PIPE R154J831RB B-J UT B9.11 PT I
C 92 034300 TCX-1-4203-11 PIPE TO ELBOW R154J831RB 034400 TCX-1-4203-12 ELBOW TO PIPE R154J831RB 034500 TCX-1-4203-13 PIPE TO BRANCH CONNECTION R154J829RB B-J UT 1 -
B9.11 PT C
92 C
92 C
92 REACTOR COOLANT 1.5-RC-2-039-2501R-1 035600 TCX-1-4205-4 PIPE TO ELBOW R154J829RB B-J PT 1
B9.40 C
92 035700 TCX-1-4205-5 ELBOW TO PIPE R154J829RB 035800 TCX-1-4205-6 PIPE TO VALVE R154J829RB B-J B9.40 B-J B9.40 PT 1 -
PT 1 -
C 92 C
92 PAGE:
51
- TBX-5**
- TBX-5**
- TBX-5**
- TBX-5**
DATE:
03/16/02 I I
PAGE:
52 DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME PLAN STATUS FIRST SECOND THIRD I
PERIOD PERIOD PRESERVICE YEAR I
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION 019250 SEC.
XI CATGY NDE ITEM NO METH SAFETY INJECTION 1.5-SI-2-026-2501R-1 TCX-1-4205-FE925 B-G-2 FLOW ELEMENT BOLTING B7.50 R154BB17RB REACTOR COOLANT 2-RC-2-035-2501R-1 039400 TCX-1-4206-2 PIPE TO ELBOW R154J814RB B-J B9.40 1
2 VT-1 1 -
PT 1 -
OUTAGE 1
2 3
C INSTRUCTIONS
- CALIBRATION BLOCK**
1 2
92 C
-92 039500 TCX-1-4206-3 ELBOW TO PIPE R154JS14RB B-J PT 1
B9.40 C
-92 039600 TCX-1-4206-4 PIPE TO VALVE R154J813RB B-J B9.40 PT 1 -
C CHEMICAL AND VOLUME CONTROL 1.5-CS-2-249-2501R-1 040000 TCX-1-4207-2 FLANGE TO PIPE R154J83ORB 040100 TCX-1-4207-3 PIPE TO REDUCER R154J83ORB B-J B9.21 B-J B9.21 PT 1
PT 1-C
-92 C
92 92
----------- I I
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
_________PLAN STATUS_______
_PRESERVICE YEAR I
FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME PERIOD SEC. XI CATGY NDE ITEM NO METH 1
2 SECOND PERIOD
-OUTAGE 1
2 3
THIRD PERIOD
- I 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
CHEMICAL AND VOLUME CONTROL 2-CS-2-105-2501R-1 040200 TCX-1-4207-4 REDUCER TO ELBOW R154J83ORB 040300 TCX-1-4207-5 ELBOW TO PIPE R154J83ORB 040400 TCX-1-4207-6 PIPE TO TEE R154J826RB B-J B9.21 B-J B9.21 PT 1 -
PT 1 -
C 92 C
CHEMICAL AND VOLUME CONTROL 1.5-CS-2-249-2501R-1 040850 TCX-1-4207-PLGI FLANGE BOLTING R154B83ORB B-G-2 B7.50 VT-I 1 -
C
-92 REACTOR COOLANT
.- RC-2-040-WEST-1 040900 TCX-1-4300-1 RPV NOZZLE TO SAFE END R157 827RB B-F UT 1 -
C B5.10 PT
-X 92 TDLR VERIFICATION BOUNDARY.
- ThX-57,RV-6**
REACTOR COOLANT 29-RC-2-040-WEST-i 041000 TCX-1-4300-2 SAFE END TO PIPE R157 827RB B-J UT 1 -
C B9.11 PT
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
PAGE:
53 B-J B9.21 PT 1 -
C 92 92
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METE FIRST SECOND PERIOD PERIOD THIRD PERIOD I ----
I I -------
OUTAGE---------
1 1 2
1 2
3 1
2 INSTRUCTIONS I
- CALIBRATION BLOCK**
REACTOR COOLANT 31-RC-2-041-WEST-1 041600 TCX-1-4300-8 ELBOW TO PIPE R154K817RB B-J UT B9.11 PT X
92 TDLR VERIFICATION BOUNDARY.
- TBX-57**
REACTOR COOLANT 2.75-RC-2-042-WEST-1 041900 TCX-1-4300-11 RC PUMP DISCHARGE NOZZLE TO PIPE R154K827RB 042100 TCX-1-4300-13 ELBOW TO SAFE END R157 827RB B-J UT 1
B9. 11 PT
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-57**
B-J UT 1
B9.11 PT
-X TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
042200 TCX-1-4300-14 SAFE END TO RV NOZZLE R157 827RB B-F UT 1
B5. 10 PT 92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
SAFETY INJECTION 6-SI-2-330-2501R-1 044300 TCX-1-4302-1 VALVE TO PIPE R154C816RB B-J UT 1
B9.11 PT C
92 SAFETY INJECTION 8-SI-2-091-2501R-1 044700 TCX-1-4302-5 ELBOW TO MOMENT RESTRAINT R154C816RB B-J UT 1
B9. 11 PT C
92 PAGE:
54
- TBX-5**
- TBX-18**
DATE:
03/16/02
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
_-PLAN STATUS _PRESERVICE YEAR EXAMINATION AREA IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD I
Ii SECOND PERIOD THIRD PERIOD 2
1 23 1 2 INSTRUCTIONS I
- CALIBRATION BLOCK**
SAFETY INJECTION 8-SI-2-091-2501R-1 044800 TCX-1-4302-6 MOMENT RESTRAINT TO ELBOW R154K816RB 044900 TCX-1-4302-7 ELBOW TO PIPE R154K816RB B-J UT 1
B9. 11 PT C
SAFETY INJECTION 2-SI-2-067-2501R-1 045500 TCX-1-4302-13 PIPE TO SOCKOLET R154C816RB B-J B9.32 PT 1 -
C
-92 045600 TCX-1-4302-14 SOCKOLET TO PIPE R154C816RB 045700 TCX-1-4302-15 PIPE TO ELBOW R154C815RB B-J PT 1
B9.40 B-J PT 1-B9.40 C
92 C -
-92 045800 TCX-1-4302-16 ELBOW TO PIPE R154CSl5RB 045900 TCX-l-4302-17 PIPE TO TEE Rl54C815RB B-J B9.40 B-J B9.40 PT 1 -
PT 1 -
C 92 C
-92
SUMMARY
NUMBER PAGE:
C 92
- TBX-18**
92
- TBX-18**
E
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME PLAN STATUS- _PRESERVICE YEAR FIRST SECOND PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH O---------
UTAGE 112 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 2-SI-2-067-2501R-1 046000 TCX-1-4302-18 TEE TO REDUCING INSERT R154C815RB 046100 TCX-1-4302-19 TEE TO PIPE R154C815RB 046200 TCX-1-4302-20 PIPE TO TEE R154C815RB 046300 TCX-1-4302-21 TEE TO REDUCING INSERT R154C815RB 046400 TCX-1-4302-22 TEE TO PIPE R154C815RB 046500 TCX-1-4302-23 PIPE TO VALVE R154C815RB B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 B-J B9.40 PT 1 -
PT 1 -
PT 1
PT 1
PT 1 -
C C
92 92 C
92 C
92 C
92 SAFETY INJECTION 6-SI-2-102-2501R-1 047000 TCX-1-4303-5 PIPE TO ELBOW R154K823RB B-J UT 1
B9.11 PT C
-92 PAGE:
56 THIRD PERIOD B-J B9.40 PT 1
C 92
- TBX-5**
DATE:
03/16/02
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR FIRST ASME SEC.
XI SECOND PERIOD PERIOD THIRD PERIOD I ----
I
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION CATGY NDE
- ------------OUTAGE ITEM NO METH 12 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 6-SI-2-102-2501R-1 047100 TCX-1-4303-6 ELBOW TO PIPE R154K823RB 047300 TCX-1-4303-8 ELBOW TO PIPE R154K831RB B-J UT 1
B9. 11 PT C
REACTOR COOLANT 6-RC-2-046-2501R-1 047500 TCX-1-4303-10 VALVE TO PIPE R154K831RB 047600 TCX-1-4303-11 PIPE TO ELBOW R154K831RB B-J UT 1
B9. 11 PT C
-92
- TBX-S**
C 92 047700 TCX-1-4303-12 ELBOW TO PIPE R154K831RB 047800 TCX-1-4303-13 PIPE TO BRANCH CONNECTION R154K827RB B-J UT 1
B9.11 PT C
C REACTOR COOLANT 3-RC-2-052-2501R-1 048500 TCX-1-4304-1 BRANCH CONNECTION TO PIPE R154K814RB PAGE:
C 92
- TBX-5**
92
- TB3X-5**
92
- TBX-5**
92
- TBX-5**
B-J B9.21 PT 1 C 92
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
________PLAN STATUS-_____
FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD
I I -- -------
U TA GE--- -- ------
1 12 1
2 3
1 2
INSTRUCTIONS I
- CALIBRATION BLOCK**
REACTOR COOLANT 3-RC-2-052-2501R-1 048600 TCX-1-4304-2 PIPE TO ELBOW R154K814RB B-J PT 1 C B9.21 92 048700 TCX-1-4304-3 ELBOW TO PIPE R154K814RB 048800 TCX-1-4304-4 PIPE TO ELBOW R154K814RB 048900 TCX-1-4304-5 ELBOW TO PIPE R154K814RB 049000 TCX-1-4304-6 PIPE TO ELBOW R154K814RB B-J B9.21 B-J B9.21 B-J B9.21 B-J B9.21 PT 1 C PT I C PT I C PT I
C 92 92 92 92 049100 TCX-1-4304-7 ELBOW TO PIPE R154K814RB 049800 TCX-1-4304-14 PIPE TO VALVE R154K814RB PAGE:
58 B-J 39-21 PT 1 C 92 B-J 39.21 PT 1 C 92 DATE:
03/16/02 I -- -- -- -- -- -- -- -
DATE:
03/16/02 PAGE:
59 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS______
FIRST PERIOD SECOND PERIOD THIRD PERIOD I- ------
OUTAGE ---- - - - --
112 123 12 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 3-RC-2-052-2501R-1 049900 TCX-1-4304-15 VALVE TO PIPE R154K814RB SAFETY INJECTION 1.5-SI-2-027-2501R-1 056650 TCX-1-4306-FE926 FLOW ELEMENT BOLTING 817RB B-G-2 VT-I 1
B7.50 REACTOR COOLANT 2-RC-2-053-2501R-1 057000 TCX-1-4307-4 PIPE TO VALVE R154K813RB B-J B9.40 PT 1 C 92 CHEMICAL AND VOLUME CONTROL 1.5-CS-2-243-2501R-1 059150 TCX-1-4308-FLG1 FLANGE BOLTING R154K83ORB B-G-2 VT-1 1
B7.50 C
-92 REACTOR COOLANT 29-RC-2-058-WEST-1 059200 TCX-1-4400-1 RPV NOZZLE TO SAFE END R157 827RB 059300 TCX-1-4400-2 SAFE END TO PIPE R157 827RB B-F UT 1 -
C B9.11 PT K
92 TDLR VERIFICATION BOUNDARY.
92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
B-J B9.21 PT 1 C 92 92
. ---------- I
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS
SUMMARY
NUMBER INSPECTION INTERVAL_
ASME SEC.
XI EXAMINATION AREA CATGY NDE IDENTIFICATION ITEM NO METH REACTOR COOLANT 27.5-RC-2-060-WEST-1 060400 TCX-1-4400-13 ELBOW TO SAFE END R157 827RB B-J UT B9.11 PT PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD OUTAGE------------
1 2
2 3
1 2
1 -
PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
TDLR VERIFICATION MOEInDARY
- TBX-57,RV-6**
060500 TCX-1-4400-14 SAFE END TO RPV NOZZLE R157 827RB B-F UT 1
B5.10 PT 92 TDLR VERIFICATION BOUNDARY.
- TBX-57,RV-6**
REACTOR COOLANT 12-RC-2-069-2501R-1 061500 TCX-1-4401-2 PIPE TO ELBOW R154L823RB B-J UT 1
B9.11 PT 061800 TCX-1-4401-5 ELBOW TO PIPE R154L817RB B-J UT 1
B9. 11 PT
- TBX-12, SAFETY INJECTION 1.5-SI-2-028-2501R-1 071650 TCX-1-4407-FE927 FLOW ELEMENT BOLTING R154D822RB B-G-2 VT-I 1
B7.50 074950 TCX-1-4409-FLG1 FLANGE BOLTING 830RB X
B-G-2 VT-i 1
B7.50 X
- TBX-12, 92 92
%..IT Ll.
'i--
AND41 -',LmUMVE VWI(V
-°---6-2-244-2-1D/t-1 DATE:
03/16/02 PAGE:
60
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS-PRESERVICE YEAR EXAMINATION AREA IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD I- ------
OUTAGE-12 1
2 3
1 2
THIRD PERIOD INSTRUCTIONS I
- CALIBRATION BLOCK**
REACTOR COOLANT 14-RC-2-135-2501R-1 075100 TCX-1-4500-2 PIPE TO PIPE R154L832RB B-J UT B9.11 PT 1 -
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-19**
075200 TCX-1-4500-3 PIPE TO PIPE R154L832RB B-J UT 1
B9.11 PT
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-13**
075400 TCX-1-4500-5 PIPE TO SAFE END RI61B854RB B-J UT 1
B9.11 PT C
92 TDLR VERIFICATION BOUNDARY.
- TBX-19**
075500 TCX-1-4500-6 B-F SAFE END TO PRESSURIZER NOZZLE B5.40 RI61B854RB UT 1
PT C
92 TDLR VERIFICATION BOUNDARY.
- TBX-19,DMCB-1**
REACTOR COOLANT 6-RC-2-096-2501R-1 075600 TCX-1-4501-1 B-F PRESSURIZER NOZZLE TO SAFE END B5.40 RI61E905RB UT 1 -
C PT 92 075700 TCX-1-4501-2 SAFE END TO PIPE RI61E905RB B-J UT 1 -
C B9.11 PT 076400 TCX-1-4501-9 PIPE TO ELBOW RI61E905RB B-J UT 1
B9. 11 PT
- TBX-5
SUMMARY
NUMBER PAGE:
61
- DMCB-1**
92
- TBX-5**
I ------ ----------- ----------- I I
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ASME SEC.
XI
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION CATGY NDE ITEM NO METH
_________PLAN STATUS______
FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I ----
I I-----OUTAGE l
2 1
2 3
INSTRUCTIONS
"**CALIBRATION BLOCK**
1 2
REACTOR COOLANT 6-RC-2-096-2501R-1 076500 TCX-1-4501-10 ELBOW TO PIPE R661E905RB B-J UT B9.11 PT 1
X
- TBX-5,
076600 TCX-1-4501-11 PIPE TO VALVE (FLANGED)
R161E905RB 076650 TCX-1-4501-FLG 1 2-8010A FLANGE BOLTING 905RB B-J UT 1 -
C B9. 11 PT B-G-2 B7.50 VT-i 1 -
C 92 92 REACTOR COOLANT 6-RC-2-098-2501R-1 076700 TCX-1-4502-1 B-F PRESSURIZER NOZZLE TO SAFE END B5.40 R661E905RB 076800 TCX-1-4502-2 SAFE END TO PIPE R161E905RB B-J UT B9.11 PT UT 1 -
C PT 1 -
C 92 92 077700 TCX-1-4502-11 PIPE TO VALVE (FLANGED)
RI61E907RB B-J UT 1 -
C B9. 11 PT 077750 TCX-1-4502-FLG 1
2-80102 FLANGE BOLTING 907RB B-G-2 VT-i 1 -
C 27.50 92 PAGE:
62
- TBX-5**
- DMCB-I**
- TBX-5**
92
- TBX-5**
DATE:
03/16/02
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR ASME SEC.
XI CATGY ITEM NO
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST SECOND PERIOD PERIOD NDE METH 1
2 OUTAGE 1
2 3
1 THIRD PERIOD 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 6-RC-2-100-2501R-1 077800 TCX-1-4503-1 B-F UT PRESSURIZER NOZZLE TO SAFE END B5.40 R661E905RB 1 -
C
-92 PT 077900 TCX-1-4503-2 SAFE END TO PIPE R161E905RB B-J UT 1 -
C B9. 11 PT 078800 TCX-1-4503-11 PIPE TO VALVE (FLANGED)
RI61E907RB 078850 TCX-1-4503-FLG 1
2-8010C FLANGE BOLTING RI61A907RB B-J UT 1 -
C B9.11 PT B-G-2 VT-Ii C
B7.50 92 92 REACTOR COOLANT 6-RC-2-108-2501R-1 078900 TCX-1-4504-1 B-F PRESSURIZER NOZZLE TO SAFE END B5.40 R161E905RB 92 TDLR VERIFICATION BOUNDARY.
UT 1 -
C PT
- DMCB-1**
079000 TCX-1-4504-2 SAFE END TO PIPE RI61ES905RB B-J UT 1 -
C B9. 11 PT 92 TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT 4-RC-2-018-2501R-1 083700 TCX-1-4505-21 PIPE TO PIPE R161D883RB B-J UT 1
B9.11 PT
-X PAGE:
63
- DMCB-1**
92
- TBX-5**
- TBX-5**
-- TBX-4
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS-PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD I ----
I 112 OUTAGE 1
2 3
INSTRUCTIONS 1
2
- CALIBRATION BLOCK**
REACTOR COOLANT 6-RC-2-163-2501R-1 083900 TCX-1-4505-23 PIPE TO PIPE RI61D908RB B-J UT B9.11 PT REACTOR COOLANT 4-RC-2-075-2501R-1 084600 TCX-1-4506-7 PIPE TO REDUCER R161D905RB B-J UT 1
B9.11 PT X
REACTOR COOLANT 6-RC-2-161-2501R-1 084700 TCX-1-4506-8 REDUCER TO PIPE Ri61D906RB B-J UT 1
B9. 11 PT X
- TBX-5,
REACTOR COOLANT 6-RC-2-147-2501R-1 085400 TCX-1-4506-15 REDUCER TO PIPE R160B913RB B-J UT 1
B9. 11 PT X
- TBX-5 REACTOR COOLANT 4-RC-2-091-2501R-1 085800 TCX-1-4506-19 REDUCER TO PIPE R161E913RB 085900 TCX-1-4506-20 PIPE TO PIPE RIB1E913RB 3-J UT 1 -
C B9. 11 PT PAGE:
64
- TBX-4 92
- TBX-4**
92
- TB(X-4**
DATE:
03/16/02
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
PLAN STATUS PRESERVICE YEAR FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD I----------
OUTAGE 1
2 1
2 3
THIRD PERIOD 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 4-RC-2-091-2501R-1 086000 TCX-1-4506-21 PIPE TO SAFE END RI61E906RB B-J UT B9. 11 PT 1 -
C 92
- TBX-4**
086100 TCX-1-4506-22 B-F SAFE END TO PRESSURIZER NOZZLE B5.40 R161E906RB 92 UT 1 -
C PT
- DMCB-1**
SAFETY INJECTION 3-SI-2-303-2501R-1 090500 TCX-1-4600-4 PIPE TO PIPE R154A823RB 090600 TCX-1-4600-5 PIPE TO ELBOW R154A823RB 090700 TCX-1-4600-6 ELBOW TO PIPE R154A823RB B-J PT 1 -
B9.21 B-J PT 1-B9.21 SAFETY INJECTION 3-SI-2-033-2501R-1 090900 TCX-1-4600-8 REDUCER TO PIPE R154D818RB B-J PT 1
B9.21 X
PAGE:
65 B-J B9.21 PT 1 -
X X
X t
l I
t t*
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME SEC.
XI CATGY
SUMMARY
EXAMINATION AREA NUMMER IDENTIFICATION PLAN STATUS PRESERVICE YEAR FIRST SECOND PERIOD PERIOD THIRD PERIOD I ----
I NDE I ---------
O U T A G E-------
ITEM NO METH I1 2 1
2 3
1 2
INSTRUCTIONS I
- CALIBRATION BLOCK**
SAFETY INJECTION 3-SI-2-033-2501R-1 091400 TCX-1-4600-13 PIPE TO REDUCER R154D818RB B-J PT I
B9.21 X
SAFETY INJECTION 3-SI-2-339-2501R-1 091600 TCX-1-4600-15 PIPE TO ELBOW RI54D822RB 091700 TCX-1-4600-16 ELBOW TO PIPE R154D822RB B-J B9.21 B-J B9.21 PT 1 -
PT 1 -
X X
REACTOR COOLANT TCX-RCPCPC-02 092400 TCX-1-5100A-2SB1-12 RC PUMP 2 #1 SEAL BOLTING (2-B1/2-B12)
B-G-2 VT-I 1
B7.60
-X 92 TDLR VERIFICATION BOUNDARY.
092900 TCX-1-5100A-2FB1-24 RC PUMP 2 MAIN FLNG BLT (2-B1/2-B24)
B-G-1 B6.180 UT 1
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-54**
093000 TCX-1-5100A-2FLG B-G-1 VT-1 1
RC PUMP 2 MAIN FLANGE SURFACE B6.190 X
92 TDLR VERIFICATION BOUNDARY.
PAGE:
66 DATE:
03/16/02 f
f f
DATE:
03/16/02 PAGE:
67 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD I------
O -----------
O 1
2 123 12 PRESERVICE YEAR THIRD PERIOD INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCPC-02 093600 TCX-1-5100A-2FN1-24 RC PUMP 2 MAIN FLANGE NUTS (2-BI/2-B24) 094000 TCX-1-5100C-2CASING RC PUMP 2 CASING B-G-1 VT-i 1
B6.200 B-L-2 VT-3 1
B12.20 X
X 92 TDLR VERIFICATION BOUNDARY.
92 TDLR VERIFICATION BOUNDARY.
RESIDUAL HEAT REMOVAL 12-RH-2-001-2501R-1 094221 TCX-1-4101-8701A-BLT VALVE BODY BOLTING 2-8701A R154A808RB B-G-2 VT-1 1
B7.70 X
92 DWG.
8372D46 094244 TCX-1-4402-8956D-BLT VALVE BODY BOLTING 2-8956D 92 DWG.
8372D14 B-G-2 VT-I 1 C B7.70 SAFETY INJECTION 6-SI-2-092-2501R-1 094245 TCX-1-4403-8818D-BLT VALVE BODY BOLTING 2-8818D B-G-2 VT-I 1
B7 70 C
92 DWG.
8372D12 REACTOR COOLANT 6-RC-2-096-2501R-1 094249 TCX-1-4501-801OA-BLT VALVE BODY BOLTING 2-8010A R161A905RB B-G-2 VT-i 1
C B7.70 92 DWG.
DS-C-66075 I
SAFE 1....... -.
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_
FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH I---------
OUTAGE-------------
112 1
2 3
1 2
PRESERVICE YEAR INSTRUCTIONS i
- CALIBRATION BLOCK**
RESIDUAL HEAT REMOVAL 12-RN-2-001-2501R-1 094261 TCX-l-4101-8701A-INT VALVE INTERNAL SURFACES R154A808RB B-M-2 VT-3 1 -
B12.50 X
NA DWG.
8372D46 SAFETY INJECTION 10-SI-2-182-2501R-1 094279 TCX-1-4402-8956D-INT VALVE INTERNAL SURFACES B-M-2 VT-3 1 C B12.50 SAFETY INJECTION 6-SI-2-092-2501R-1 094280 TCX-1-4403-8818D-INT VALVE INTERNAL SURFACES B-M-2 VT-3 I
B12.50 C
NA DWG.
8372D12 REACTOR COOLANT 6-RC-2-096-2501R-a 094282 TCX-1 4501-8010A-INT VALVE INTERNAL SURFACES RI61A905RB NA DWG.
DS-C-66075 B-M-2 VT-3 1 -
C B12.50 DATE:
03/16/02 PAGE:
68 DWG.
8372D14
4.2 CLASS 2 NDE This subsection describes the examination areas and NDE methods for the Class 2 pressure retaining components and associated component integral welded attachments as specified in Article IWC of the Code. For pressure testing, see Section 5.
Class 2 valve body welds have been grouped according to design, size, function and service in a system in accordance with Table IWC-2500-1, Category C-G, Note 1 of the Code. These groups are delineated below. One valve from each group has been selected for examination as denoted by the asterisk "*"
Group 1 -
8" Forged Gate Valves, MS Safety Isolation 2MS-026 2MS-036 2MS-098 (reference TCX-2-2300 for location) 2MS-134 Group 2 -
18" Forged Gate Valves, Main Feedwater Isolation 2FW-071 2FW-077 (reference TCX-2-2202 for location) 2FW-083 2FW-089 Group 3 -
6" Forged Check Valves, Feedwater 2FW-191 2FW-192 2FW-193 (reference TCX-2-2204 for location) 2FW-194 2FW-195 2FW-196 2FW-197 2FW-198 2FW-199 2FW-200 2FW-201 2FW-202 Group 4 -
6" Forged Gate Valves, Auxiliary Feedwater Isolation 2FW-203 (reference TCX-2-2403 for location) 2FW-204 2FW-205 2FW-206 Group 5 -
12" Forged Gate Valves, Containment Spray Isolation 2CT-0026 2CT-0028 (reference TCX-2-2578 for location) 2CT-0078 2CT-0084 Group 6 -
12" Forged Gate Valve, Safety Injection 2SI-0048 (reference TCX-2-2582 for location) 4.2 - Page 1 of I
DATE:
03/16/02 PAGE:
69 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
I
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD I--------
PERIOD OU---------- GE
[112 12 3
PRESERVICE YEAR THIRD PERIOD INSTRUCTIONS
- CALIBRATION BLOCK**
1 2
MAIN STEAM TCX-RCPCSG-03 094300 TCX-2-1100-3-2 C-A UT 1 C SG 3 TUBESHEET TO SHELL WELD C1.30 RI55J832RB 92 TDLR VERIFICATION BOUNDARY.
- TBX-27**
094400 TCX-2-1100-3-3 C-A SG 3 LOWER SHELL CIRC.
C 92 TDLR VERIFICATION BOUNDARY.
- TBX-27**
094500 TCX-2-1100-3-5 C-A SG 3 TRANSITION CONE TO LOWER C1.10 SHELL WELD UT 1
X 92 TDLR VERIFICATION BOUNDARY.
094600 TCX-2-1100-3-6 C-A SG 3 UPPER SHELL TO TRANSITION C1.10 CONE WELD UT 1 -
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-27**
094700 TCX-2-1100-3-8 SG 3 HEAD TO SHELL WELD C-A UT 1
C1.20
-X 92 TDLR VERIFICATION BOUNDARY.
- TBX-27**
094800 TCX-2-1100-3-9 SG 3 FEEDWATER NOZZLE TO VESSEL WELD R155J832RB 094900 TCX-2-1100-3-9IR SG 3 FEEDWATER NOZZLE INNER RADIUS Rl55J832RB C-B UT C2.21 MT i
C 92 TDLR VERIFICATION BOUNDARY.
- TBX-27**
C-B C2.22 UT I C 92 TDLR VERIFICATION BOUNDARY.
- TBX-56**
DATE:
03/16/02 PAGE:
70 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD 112 PRESERVICE YEAR PERIOD OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
MAIN STEAM TCX-RCPCSG-03 095000 TCX-2-1100-3-10 C-B UT SG 3 AUX FEEDWATER NOZZLE TO C2.21 MT VESSEL WELD 1 -
X 92 TDLR VERIFICATION BOUNDARY.
- TBX-27**
095100 TCX-2-1100-3-11 SG 3 MAIN STEAM NOZZLE TO VESSEL WELD C-B UT 1
C2.21 MT
-X 92 TDLR VERIFICATION BOUNDARY.
CHEMICAL AND VOLUME CONTROL TCX-CSAHEL-01 095300 TCX-2-1110-1 EXCESS LETDOWN HX HEAD TO FLANGE WELD R154E80ORB C-A Cl. 20 UT 1 C 92 TDLR VERIFICATION BOUNDARY.
- TBX-8**
RESIDUAL HEAT REMOVAL TCX-RHAHRS-01 095600 TCX-2-1120-1-1 RHR HX1 HEAD TO SHELL WELD 095700 TCX-2-1120-1-2 C-A RHR HX1 SHELL TO FLANGE WELD C1.10 095800 TCX-2-1120-1-3 C-B RHR HXi INLET NOZZLE TO SHELL C2.21 WELD UT 1 -
UT 1 -
PT X
X C-A C1.20 UT 1 -
X 92
- TBX-30**
92
- TBX-30**
92
- TBX-51**
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
PLAN STATUS _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 1
2 SECOND PERIOD OUTAGE 1
2 3
1 THIRD PERIOD 2
INSTRUCTIONS
- CALIBRATION BLOCK**
RESIDUAL HEAT REMOVAL TCX-RHAHRS-01 096000 TCX-2-1120-1-4 C-B RHR HXl OUTLET NOZZLE TO SHELL C2.21 WELD 096200 TCX-2-1120-1-1WS RHR HX1 WELDED SUPPORT 790SB 096300 TCX-2-1120-1-2WS RHR HXl WELDED SUPPORT 790SB C-C C3. 10 C-C C3. 10 UT PT 1 -
PT 1 -
PT 1 -
X 92 X
X CHEMICAL AND VOLUME CONTROL TCX-CSAHLD-01 096400 TCX-2-1130-1 C-A UT HORIZONTAL LETDOWN HX HEAD TO C1.20 FLANGE WLD R81 811SB CHEMICAL AND VOLUME CONTROL TCX-TRAHLR-01 096500 TCX-2-1140-1 LETDOWN REHEAT HX HEAD TO SHELL WELD 833SB 096600 TCX-2-1140-2 LETDOWN REHEAT HX SHELL TO FLANGE WELD 833SB C-A Cl. 20 PT 1 -
C 92 PT IN LIEU OF UT PER CODE CASE N-435-1.
- TBX-7**
C-A Cl. 10 PT 1 -
C 92 PT IN LIEU OF UT PER CODE CASE N-435-1.
PAGE:
71
- TBX-51**
92 92 I C 92
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS_
FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD
I I- ------
OUTAGE G
- 3.
2 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
CHEMICAL AND VOLUME CONTROL TCX-CSAHRG-01 096700 TCX-2-1150-1 REGENERATIVE HX HEAD TO TEE WELD R155C833RB 096800 TCX-2-1150-2 REGENERATIVE HX HEAD TO TEE WELD R155C833RB 096900 TCX-2-1150-3 REGENERATIVE HX SHELL TO TEE WELD R155C833RB 097000 TCX-2-1150-4 REGENERATIVE HX SHELL TO TEE WELD R155C833RB 097100 TCX-2-1150-5 REGENERATIVE HX SHELL TO TUBESHEET WELD R155C833RB 097200 TCX-2-1150-6 REGENERATIVE HX SHELL TO TUBESHEET WELD R155C833RB C-A CI1 20 C-A C1.20 C-A Cl. 10 C-A Cl. 10 C-A C1.30 C-A C1.30 UT 1 -
UT 1 -
UT 1
UT 1 -
UT 1 -
UT 1 -
C 92 C
-92 C
92 C
92 C
92 C
-92 CONTAINMENT SPRAY CP2-CTAHCS-01 097410 TCX-2-1180-1-1 CT HXl HEAT TO SHELL WELD
- TBX-9**
- TBX-9**
- TBX-8**
- TBX-8**
- TBX-8**
- TB3X-8**
C-A C1.20 UT 1 -
C 92
- TBX-31**
DATE:
03/16/02 PAGE:-
72
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS_
I FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC. XI EXAMINATION AREA CATGY NDE -
0 U T A G E------
IDENTIFICATION ITEM NO METH 1
2 1
2 3
1 2
PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
CONTAINMENT SPRAY CP2-CTAHCS-01 097420 TCX-2-1180-1-2 C-A CT HX1 SHELL TO FLANGE WELD C1.10 097430 TCX-2-1180-1-3 C-B CT HX1 INLET NOZZLE TO SHELL C2.21 WELD UT 1
UT 1
PT C
C
- TBX-15,SSCB-1**
097444 TCX-2-1180-1-4 C-B CT HX1 OUTLET NOZZLE TO SHELL C2.21 WELD UT 1
PT C
92
- TBX-15,SSCB-I**
CONTAINMENT SPRAY TCX-CTAHCS-01 097450 TCX-2-1180-1-1WS CT HX1 WELD SUPPORT C-C C3. 10 097460 TCX-2-1180-1-2WS CT HXl WELDED SUPPORT C-C C3.10 MAIN STEAM 32-MS-2-001-1303-2 100300 TCX-2-2100-27 VALVE TO MOMENT RESTRAINT R108H877SB PT 1
PT 1 -
C 92 C
SUMMARY
NUMBER PAGE:
73 92 92 92
- TBX-33**
DATE:
03/16/02
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 1
2 PLAN STATUS SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE------------
1 23 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 18-FW-2-019-1303-2 102700 TCX-2-2101-11 PIPE TO PIPE (PENETRATION)
R1541856RB C-F-2 UT C5.51 MT 1 C 92 TDLR VERIFICATION BOUNDARY.
- TBX-21**
FEEDWATER 6-FW-2-095-1303-2 TCX-2-2103-24 PIPE TO VALVE RI0OBS62SB FEEDWATER 6-FW-2-091-2003-2 110900 TCX-2-2103-34 BRANCH CONNECTION TO PIPE RI00B857SB C-F-2 UT 1 C C5.51 MT C-F-2 UT I C C5.51 MT 92 TDLR VERIFICATION BOUNDARY.
- TBX-35**
92
- TBX-34**
MAIN STEAM 32-MS-2-002-1303-2 113500 TCX-2-2200-25 SWEEPOLET R10SC877SB 113900 TCX-2-2200-29 VALVE TO MOMENT RESTRAINT R108G877SB C-F-2 MT 1 -
C5.81 C-F-2 UT 1 -
C5.51 MT C
92 TDLR VERIFICATION BOUNDARY.
C 92
- TBX-33**
MAIN STEAM B-MS-2-240-1303-2 114300 TCX-2-2200-33 PIPE TO ELBOW R109C883SB C-F-2 UT 1
C5.51 MT C
92 TDLR VERIFICATION BOUNDARY.
- TBX-17**
DATE:
03/16/02 PAGE:
74 109900
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH
_________PLAN STATUS______
FIRST SECOND PERIOD PERIOD 12 THIRD PERIOD
-OUTAGE------------
1 23 1
2 PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
MAIN STEAM 6-2003-2 114600 TCX-2-2200-36 BRANCH CONNECTION TO FLANGE R109C878SB C-F-2 UT C5.51 MT 1 -
C 92 TDLR VERIFICATION BOUNDARY.
- ThBX-36**
FEEDWATER 16-FW-2-074-1303-2 115400 TCX-2-2201-1 NOZZLE TO REDUCING ELBOW R1551841RB C-F-2 UT 1
C5.51 MT C
NA TDLR VERIFICATION BOUNDARY.
- TBX-20**
FEEDWATER 18-FW-2-018-1303-2 115500 TCX-2-2201-2 REDUCING ELBOW TO PIPE R1551840RB C-F-2 UT 1
C5.51 MT C
NA TDLR VERIFICATION BOUNDARY.
- TBX-21**
FEEDWATER 6-FW-2-096-1303-2 121700 TCX-2-2203-27 PIPE TO ELBOW R154J872RB C-F-2 UT 1
C5.51 MT C
92 TDLR VERIFICATION BOUNDARY.
- TBX-35**
121800 TCX-2-2203-28 ELBOW TO NOZZLE R154J873RB C-F-2 UT 1
C5.51 MT C
92 TDLR VERIFICATION BOUNDARY.
- TBX-34**
FEEDWATER 6-FW-2-092-2003-2 122400 TCX-2-2204-6 ELBOW TO PIPE RI10D863SB C-F-2 UT 1 -
75
- TBX-34**
DATE:
03/16/02
DATE:
03/16/02 PAGE:
76 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I---------
OUTAGE-------------
1 2
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-092-2003-2 122800 TCX-2-2204-10 VALVE TO PIPE RI00D863SB C-F-2 UT C5.51 MT 1 -C 92 TDLR VERIFICATION BOUNDARY.
- TBX-34**
FEEDWATER 6-FW-2-096-1303-2 123400 TCX-2-2204-16 PIPE TO ELBOW Ri00D863SB C-F-2 UT 1 -
C C5.51 MT 92 TDLR VERIFICATION BOUNDARY.
- TBX-35**
124500 TCX-2-2204-27 PIPE TO PIPE (PENETRATION)
R155L864RB 124600 TCX-2-2204-28 PIPE TO ELBOW R155L864RB 124800 TCX-2-2204-30 PIPE TO ELBOW RI55L864RB C-F-2 UT 1 -
C Cs.51 MT 92 TDLR VERIFICATION BOUNDARY.
92 TDLR VERIFICATION BOUNDARY.
- TBX-35**
92 TDLR VERIFICATION BOUNDARY.
125300 TCX-2-2204-35 VALVE TO PIPE R155L864RB C-F-2 UT 1 -
C C5.51 MT 92 TDLR VERIFICATION BOUNDARY.
- TBX-35**
FEEDWATER 6-FW-2-100-1303-2 126100 TCX-2-2204-43 PIPE TO ELBOW R155L860RB C-F-2 UT 1 -
C C5.51 MT 92 TDLR VERIFICATION BOUNDARY.
- TBX-35-*
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD
I I -- -------
U TA GE--- -- ------
1 2
1 2
3 1
2 INSTRUCTIONS "i
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-100-1303-2 126700 TCX-2-2204-49 PIPE TO ELBOW R155L853RB C-F-2 UT 1 -
C C5.51 MT 92 TDLR VERIFICATION BOUNDARY.
- TBX-35**
127000 TCX-2-2204-52 ELBOW TO PIPE R155L863RB C-F-2 UT 1 -
C C5.51 MT 92 TDLR VERIFICATION BOUNDARY.
- TBX-35**
FEEDWATER 16-FW-2-073-1303-2 132200 TCX-2-2301-1 NOZZLE TO REDUCING ELBOW R154K841RB C-F-2 UT I C C5.51 MT NA TDLR VERIFICATION BOUNDARY.
- TBX-20**
FEEDWATER 18-FW-2-017-1303-2 132300 TCX-2-2301-2 REDUCING ELBOW TO PIPE R154K839RB C-F-2 UT 1 C C5.51 MT NA TDLR VERIFICATION BOUNDARY.
FEEDWATER 6-FW-2-093-2003-2 138600 TCX-2-2303-1 SWEEPOLET R100C856SB 139100 TCX-2-2303-6 ELBOW TO PIPE RI00C863SB C-F-2 MT 1 -
C5.81 C-F-2 UT 1
C5.51 MT C
92 C
-92 PAGE:
77
- TBX-34**
DATE:
03/16/02 PAGE:
78 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD 1
2 OUTAGE 1
2 3
1 PRESERVICE YEAR THIRD PERIOD INSTRUCTIONS 2
- CALIBRATIO] N BLOCK**
FEEDWATER 6-FW-2-097-1303-2 139700 TCX-2-2303-12 PIPE TO VALVE R100C863SB C-F-2 UT C5.51 MT 1 -
C 92 TDLR VERIFICATION BOUNDARY.
- TBX-35**
141000 TCX-2-2303-25 PIPE TO EBLOW RI00CS64SB C-F-2 UT 1
C5.51 MT C
92 TDLR VERIFICATION BOUNDARY.
- ThBX-35**
RESIDUAL HEAT REMOVAL 12-RH-2-003-601R-2 158100 TCX-2-2500-2 PIPE TO PIPE RI54A817RB 158500 TCX-2-2500-6 PIPE TO ELBOW R77B 817SB 158600 TCX-2-2500-7 ELBOW TO PIPE R77B 816SB C-F-1 UT 1 -
C5. 11 PT X
X RESIDUAL HEAT REMOVAL 16-RH-2-007-601R-2 160900 TCX-2-2500-30 PIPE TO REDUCING ELBOW R53 775SB C-F-I UT 1
C5.11 PT
-X
- TBX-II,**
- TBX-41,**
- TBX-11,**
- TBX-15,**
I ----------- ----------- --
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METE 112 OUTAGE1-1 23 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 16-SI-2-076-601R-2 162000 TCX-2-2500-41 PIPE TO ELBOW R65 803SB C-F-I UT C5. 11 PT 1 -
X
- TBX-15,**
RESIDUAL HEAT REMOVAL 12-RH-2-004-601R-2 162800 TCX-2-2501-6 PIPE TO ELBOW R77A 817SB 162900 TCX-2-2501-7 ELBOW TO PIPE R77A 816SB C-F-I UT 1 -
C5.11 PT X
K
- TBX-11,**
- TBX-II,**
RESIDUAL HEAT REMOVAL 16-RH-2-008-601R-2 165700 TCX-2-2501-35 PIPE TO REDUCING ELBOW R52 775SB C-F-i UT 1
C5.11 PT SAFETY INJECTION 16-SI-2-075-601R-2 166500 TCX-2-2501-43 ELBOW TO PIPE R62C 788SB C-F-I UT 1 C Cr_11 PT 92 166600 TCX-2-2501-44 PIPE TO ELBOW R62C 788SB C-F-I UT 1 C C5.11 PT PAGE:
79
- TBX-15,**
- TBX-15**
92
- TBX-15**
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL-PLAN STATUS_
PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD I----------- ------------------ I 112 OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 16-SI-2-075-601R-2 166700 TCX-2-2501-45 ELBOW TO PIPE R62C 788SB 166900 TCX-2-2501-47 PIPE TO PIPE R63 798SB 167000 TCX-2-2501-48 PIPE TO ELBOW R63 803SB C-F-I UT 1 -
C5.11 PT X
X RESIDUAL HEAT REMOVAL 8-RH-2-063-601R-2 172800 TCX-2-2520-56 PIPE TO ELBOW R54 780SB C-F-1 UT 1
C5.11 PT X
RESIDUAL HEAT REMOVAL 12-RH-2-034-601R-2 175000 TCX-2-2521-18 NOZZLE TO PIPE R68 797SB C-F-i UT 1
C5. 11 PT X
SAFETY INJECTION 10-SI-2-095-2501R-2 183800 TCX-2-2530-32 VALVE TO PIPE R77B 812SB C-F-I UT 1 C C5. 11 PT 92 PAGE:
- TBX-15**
- TBX-15,**
- TEX-42 NA
- TBX-11**
- TBX-9**
- TIBX-15,**
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND THIRD PERIOD PERIOD PERIOD OUTAGE I
1 2
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 10-SI-2-095-2501R-2 183900 TCX-2-2530-33 PIPE TO ELBOW R77B 812SB C-F-1 UT C5.11 PT 1 -
-X 184000 TCX-2-2530-34 ELBOW TO PIPE R77B 813SB 184500 TCX-2-2530-39 PIPE TO ELBOW R77B 823SB C-F-I UT 1 C C5. 11 PT C-F-I UT 1 C C5. 11 PT SAFETY INJECTION 10-SI-2-079-601R-2 186100 TCX-2-2531-14 ELBOW TO PIPE R77A 820SB C-F-I UT 1
C5.11 PT
-X SAFETY INJECTION 10-SI-2-083-2501R-2 186400 TCX-2-2531-17 VALVE TO PIPE R77A 820SE C-F-I UT i
C C5. 11 PT 186500 TCX-2-2531-18 PIPE TO PIPE R77A 820SB C-F-I UT 1 C C5. 11 PT 92 PAGE:
81
- TBX-9 92
- TBX-9**
92
- TBX-9**
- TBX-10 92
- TBX-9**
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 112 SECOND PERIOD THIRD PERIOD OUTAGE--- ----------
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 10-SI-2-078-601R-2 188300 TCX-2-2532-18 PIPE TO ELBOW R77B 820SB 188400 TCX-2-2532-19 ELBOW TO PIPE R77B 820SB C-F-I UT C5.11 PT C-F-i UT C5.11 PT 1-1-
X X
- TBX-10
- TBX10 SAFETY INJECTION 10-SI-2-082-2501R-2 190800 TCX-2-2533-3 PIPE TO TEE R154A82ORB C-F-I UT I C C5. 11 PT 92 191000 TCX-2-2533-5 PIPE TO REDUCER R154A82ORB C-F-i UT C5. 11 PT SAFETY INJECTION 8-SI-2-087-2501R-2 191300 TCX-2-2533-8 C-F-i REDUCING TEE TO PIPE C5.11 R154A820RB SAFETY INJECTION 10-SI-2-083-2501R-2 UT PT I C 92 1 C 92 192200 TCX-2-2534-1 PIPE TO PIPE (PENETRATION)
R154D821RB C-F-I UT 1 -
C C5.11 PT PAGE:
82
- TBX-9**
- TBX-9**
92
- TBX-9**
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
PLAN STATUS _
PRESERVICE YEAR FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD THIRD PERIOD I ----
I 1
2 OUTAGE 1
2 3
INSTRUCTIONS
- CALIBRATION BLOCK**
1 2
SAFETY INJECTION 10-SI-2-083-2501R-2 192300 TCX-2-2534-2 PIPE TO TEE R154D821RB C-F-I UT C5.11 PT 1 -
C 92
- TBX-9**
SAFETY INJECTION 8-SI-2-088-2501R-2 192700 TCX-2-2534-6 PIPE TO ELBOW R154D82ORB 192800 TCX-2-2534-7 ELBOW TO PIPE R154D82ORB C-F-i UT 1 -
C C5.11 PT 92 92 192900 TCX-2-2534-8 PIPE TO ELBOW RI54D817RB 193000 TCX-2-2534-9 ELBOW TO PIPE R154D817RB C-F-i UT 1 -
C C5. 11 PT 92
- TBX-18**
92
- TBX-18**
SAFETY INJECTION 6-SI-2-329-2501R-2 194100 TCX-2-2534-20 REDUCER TO PIPE RI54C817RB C-F-i UT 1 -
C C5.11 PT 92 PAGE:
83
- TBX-18**
- TBX-18**
- TBX-5**
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
PLAN STATUS _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 1
2 SECOND PERIOD 0 UTAG 1
2 3
THIRD PERIOD E---------------I E
1 2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 6-SI-2-329-2501R-2 194200 TCX-2-2534-21 PIPE TO VALVE R154C816RB C-F-i UT C5.11 PT 1 -
C 92
- TBX-5**
SAFETY INJECTION 6-SI-2-305-2501R-2 194500 TCX-2-2534-24 REDUCER TO PIPE R154D821RB 194600 TCX-2-2534-25 PIPE TO VALVE R154D821RB C-F-i UT 1 -
C C5. 11 PT 92 92 SAFETY INJECTION 6-SI-2-170-2501R-2 195900 TCX-2-2535-12 PIPE TO VALVE R154B823RB C-F-1 UT 1 -
C Cs.11 PT 92 SAFETY INJECTION 6-SI-2-171-2501R-2 196300 TCX-2-2535-16 REDUCER TO PIPE R154B823RB C-F-i UT 1 -
C C5.11 PT 92 196400 TCX-2-2535-17 PIPE TO ELBOW R154B823RE C-F-I UT 1 -
C C5.11 PT PAGE:
84
- TBX-5**
- TRBX-5**
- TBX-5**
- TBX-5**
92
- TBX-5**
I -----------.
DATE:
03/16/02 PAGE:
85 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH PRESERVICE YEAR I ----
I 1
2
-OUTAGE G
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 6-SI-2-171-2501R-2 196500 TCX-2-2535-18 ELBOW TO PIPE R154B823RB 196600 TCX-2-2535-19 PIPE TO VALVE R154B823RB C-F-i UT 1 -
C C5.11 PT 92
- TBX-5**
SAFETY INJECTION 4-SI-2-044-1501R-2 233400 TCX-2-2561-4 PIPE TO ELBOW R67 797SB C-F-i UT 1
C5.21 PT 233500 TCX-2-2561-5 ELBOW TO PIPE R67 797SB 233800 TCX-2-2561-8 PIPE TO TEE R67 797SB C-F-i UT 1
C5.21 PT C
92 C
-92 SAFETY INJECTION 4-SI-2-300-1501R-2 234200 TCX-2-2561-12 PIPE TO ELBOW R67 792SB C-F-1 UT 1
C5.21 PT C
C 92
- TBX-5**
C 92
- TBX-45**
- TBX-45**
- TB3X-45**
PAGE:
86 DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 112
-i - -- - -
SECOND PERIOD THIRD PERIOD
-OUTAGE-1 2
3 1
2
- - i INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 4-SI-2-300-1501R-2 234400 TCX-2-2561-14 PIPE TO ELBOW R67 792SB C-F-i UT C5.21 PT 1 -
C 234600 TCX-2-2561-16 PIPE TO TEE R67 796SB C-F-i UT 1
C5.21 PT C
SAFETY INJECTION 4-SI-2-044-1501R-2 234700 TCX-2-2561-17 TEE TO PIPE R67 798SB 234800 TCX-2-2561-18 PIPE TO ELBOW R67 804SB C-F-I UT 1 -
C5.21 PT C
-92
- TBX-45**
C 92
- TBCX-45**
SAFETY INJECTION 3-SI-2-296-150iR-2 237400 TCX-2-2562-1 FLANGE TO PIPE R62 775SB 237500 TCX-2-2562-2 PIPE TO REDUCING ELBOW R62 775SB C-F-1 UT 1 -
C5.21 PT C-F-1 UT 1-C5.21 PT C
92 C
92 92
- TBX-45**
92
- TBX-45**
- TBX-44**
- TBX-44**
I ----------- -----------
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD I----------------
OUTAGE--
1 21 2
3 1
2 PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
SAFETY INJECTION 4-SI-2-044-1501R-2 237600 TCX-2-2562-3 REDUCING ELBOW TO PIPE R62 775SB C-F-1 UT 1
C5.21 PT 92 237700 TCX-2-2562-4 PIPE TO ELBOW R62 788SB 238000 TCX-2-2562-7 ELBOW TO PIPE R62 788SB C-F-i UT 1
C5.21 PT C
92
- TBX-45**
C 92
- TBX-45**
SAFETY INJECTION 3-SI-2-335-1501R-2 239100 TCX-2-2562-18 PIPE TO ELBOW R62F 789SB 239200 TCX-2-2562-19 ELBOW TO PIPE R62F 789SB C-F-i UT 1 -
C5.21 PT C
-92
- TBX-44**
C 92
- TBX-44**
SAFETY INJECTION 4-SI-2-008-2501R-2 245500 TCX-2-2564-29 TEE TO PIPE R77B 812SB C-F-I UT I C C5.21 PT
- TBX-45**
92
- TBX-4**
DATE:
03/16/02 PAGE:
87
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS_______
FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD I---------
0TAGE--------------
112 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 4-SI-2-008-2501R-2 245600 TCX-2-2564-30 PIPE TO ELBOW R77B 812SB 245800 TCX-2-2564-32 PIPE TO VALVE R77B 812SB 246300 TCX-2-2564-37 TEE TO PIPE R77B 812SB C-F-i UT 1 C C5.21 PT C-F-i UT I C C5.21 PT C-F-i UT 1 C C5.21 PT 92 92 92 SAFETY INJECTION 2-SI-2-064-2501R-2 250900 TCX-2-2566-19 PIPE TO FLANGE R154B813RB 251000 TCX-2-2566-20 FLANGE TO PIPE R154B813RB C-F-i C5.30 PT i
C C-F-i PT I C C5.30 92 92 251100 TCX-2-2566-21 PIPE TO VALVE RI54B813RB 251400 TCX-2-2566-24 ELBOW TO PIPE RI54B813RB C-F-I PT 1 C C5.30 C-F-1 PT 1 C C5.30 PAGE:
88
- TBX-4**
- TBX-4**
- TBX-4**
92 92
DATE:
03/16/02 PAGE:
89 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL EXAMINATION AREA IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD I-1 2
OUTAGE 123 PERIOD 12 PRESERVICE YEAR INSTRUCTIONS
-C**CALIBRATION BLOCK**
SAFETY INJECTION 2-SI-2-064-2501R-2 251500 TCX-2-2566-25 PIPE TO VALVE R154B815RB C-F-I PT i C C5.30 SAFETY INJECTION 2-SI-2-068-250iR-2 255600 TCX-2-2566A-25 REDUCER TO PIPE R154D823RB C-F-1 UT 1 C C5.21 PT 92 CONTAINMENT SPRAY 12-CT-2-005-151R-2 289300 TCX-2-2576-16 PIPE TO ELBOW R54 777SB C-F-1 UT 1
C5.11 PT 289400 TCX-2-2576-17 ELBOW TO PIPE R54 776SB C-F-i UT 1
C5. 11 PT C
-92 CONTAINMENT SPRAY 16-CT-2-121-151R-2 292100 TCX-2-2577-11 ELBOW TO PIPE R66 793SB 292200 TCX-2-2577-12 PIPE TO VALVE R66 793SB C-F-I UT 1 -
C5.11 PT
-C 92
- TBX-48**
C 92
- TBX-48**
SUMMARY
NUMBER 92
- TBX-24**
C 92
- TBX-11**
- TBX-11**
I
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC.
XI PRESERVICE YEAR I ----
I
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION CATGY NDE 1
O U T A G E-ITEM NO METH 12 1
2 3
1 2
INSTRUCTIONS
"**CALIBRATION BLOCK**
CONTAINMENT SPRAY 16-CT-2-004-151R-2 292800 TCX-2-2577-18 PIPE TO ELBOW R75 802SB 293000 TCX-2-2577-20 PIPE TO VALVE R75 802SB C-F-i UT I
C5. i1 PT C
92
- TBX-48**
CONTAINMENT SPRAY 12-CT-2-007-151R-2 295600 TCX-2-2578-26 PIPE TO ELBOW R51 781SB 296300 TCX-2-2578-33 PIPE TO ELBOW R51 777SB C-F-i UT 1 -
C5.11 PT 92
-C 92
- TBX-II**
- TBX-II**
296400 TCX-2-2578-34 ELBOW TO PIPE R51 776SB 296500 TCX-2-2578-35 PIPE TO NOZZLE R51 776SB C-F-1 UT 1
C5. 11 PT C
92
- TBX-II**
C
-92
- TBX-II**
SAFETY INJECTION 24-SI-2-029-151R-2 300700 TCX-2-2580-6 PIPE TO ELBOW R85D 805YD C-F-I UT 1 -
C C5.11 PT 92 PAGE:
C 92 DATE:
03/16/02
- TBX-50**
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS _PRESERVICE YEAR FIRST PERIOD SECOND PERIOD THIRD PERIOD I ----
I 112 OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 24-SI-2-029-151R-2 300800 TCX-2-2580-7 ELBOW TO PIPE R85D 803YD 300900 TCX-2-2580-8 PIPE TO ELBOW R85D 803YD C-F-1 UT 1 -
C Cs.11 PT C-F-i UT 1 -C C5.11 PT 301600 TCX-2-2580-15 PIPE TO ELBOW R85D 803YD 301700 TCX-2-2580-16 ELBOW TO PIPE R85D 803YD C-F-i UT 1 -
C C5. 11 PT 92 92 SAFETY INJECTION 14-SI-2-071-601R-2 303900 TCX-2-2581-6 PIPE TO ELBOW R70 793SB C-F-i UT 1
C5.11 PT
-X SAFETY INJECTION 14-SI-2-072-601R-2 305800 TCX-2-2581-25 PIPE TO ELBOW R70 793SB C-F-I UT 1
C5.11 PT
-X DATE:
03/16/02 PAGE:
91 92
- TBX-50**
92
- TBX-50**
- TBX-50**
92
- TBX-47**
DATE:
03/16/02 PAGE:
92 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ASME SEC.
XI
SUMMARY
EXAMINATION AREA CATGY NDE NUMBER IDENTIFICATION ITEM NO METH
,PLAN STATUS________
FIRST PERIOD 12 SECOND PRESERVICE YEAR THIRD I
PERIOD PERIOD OUTAGE------------
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
RESIDUAL HEAT REMOVAL TCX-RHAPRH-01 313000 TCX-2-3100-1WS RHR PUMP 01 WELDED SUPPORT 313100 TCX-2-3100-2WS RHR PUMP 01 WELDED SUPPORT 313200 TCX-2-3100-3WS RHR PUMP 01 WELDED SUPPORT C-C C3.10 C-C C3. 10 PT 1 -
PT 1 -
X X
313300 TCX-2-3110-1WS CHG PUMP 01 WELDED SUPPORT 313400 TCX-2-3110-2WS CHG PUMP 01 WELDED SUPPORT 313500 TCX-2-3110-3WS CHG PUMP 01 WELDED SUPPORT 313600 TCX-2-3110-4WS CHG PUMP 01 WELDED SUPPORT C-C C3. 10 C-C C3.10 C-C C3. 10 C-C C3. 10 PT 1
PT 1 -
PT 1 -
PT 1 -
X X
X X
C-C C3. 10 PT 1 -
X 92 92 92 92 92 92 92 I I
DATE:
03/16/02 PAGE:
93 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME lP SEC.
XI CATGY NDE ITEM NO METH 1
2 PLAN STATUS SECOND PERIOD OUTAGE 1
2 3
THIRD PERIOD 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION TCX-SIAPSI-02 314000 TCX-2-3140-2B1-32 C-D Bi THRU B32 SI PUMP 02 STUDS C4.30 NT I -
C 92
- TBX-53**
FEEDWATER 18-FW-2-035-2003-2 500700 TCX-2-2202-FW077 C-G VALVE BODY WELD 2FW-0077 (ALT C6.20 2-HV-2135)
R100A856SB MT 1 C 92 TDLR VERIFICATION BOUNDARY.
DWG.
75830 FEEDWATER 6-FW-2-092-2003-2 501000 TCX-2-2204-FW193 VALVE BODY WELD 2FW-0193 R100CS63SB C-G C6.20 MT 1 -
C 92 DWG.
454KAB1-001 MAIN STEAM S-MS-2-223-1303-2 501200 TCX-2-2300-MS098 VALVE BODY WELD 2MS-0098 C-G C6.20 MT I
C 92 TDLR VERIFICATION BOUNDARY.
DWG.
75730-1 FEEDWATER 6-FW-2-094-2003-2 502300 TCX-2-2403-FW203 VALVE BODY WELD 2FW-0203 C-G C6.20 MT
-X 92 DWG.
435KAB2-002 CONTAINMENT SPRAY 12-CT-2-006-151R-2 502400 TCX-2-2578-CT028 VALVE BODY WELD 2CT-0028 C-G PT 1
C6.20 C
92 DWG.
75780
- ERIOD,
DATE:
03/16/02 COMANCHE PEAK UNIT 2 PAGE:
94 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS I
FIRST SECOND
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION THIRD ASME PERIOD PERIOD PERIOD SEC. XI -
I CATGY NDE
- ---------- O U T A G E I
ITEM NO METH 1
2 1
2 3
1 2
PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
CONTAINMENT SPRAY 12-SI-2-031-151R-2 502600 TCX-2-2582-SI048 VALVE BODY WELD 2SI-0048 C-G C6.20 PT 1 -
-X 92 DWG.
75780-1 I
4.3 COMPONENT SUPPORTS This subsection describes the examination areas and requirements for the Class 1, 2 and 3 component supports and Class 3 Integral Welded Attachments as specified in Article IWF and IWD of the Code, respectively. For pressure testing of Class 3 components, see Section 5.
In lieu of the requirements of Technical Specification 4.0.5 relating to snubbers, specifically those ISI requirements (e.g., plans, schedules, reports, inspector involvement and Code Data Reports) of ASME Section XI, snubbers shall be demonstrated operable by performance of the augmented inservice inspection program described in Section 3.1 of the CPSES Technical Requirements Manual.
Note 1 (As used in the item no. field of the following tables):
This support may have component standard items (F-C) and/or linear type items (F-B); the examination method is identical for all items in both categories.
4.3 - Page I of I
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS-PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD l---------
OTAGE--------------
112 123 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
CHEMICAL & VOLUME CONTROL 3-CS-2-080-2501R-1 600000 TCX-1-4105-H1 F-C VT-I C NA SPRING CS-2-080-401-C41S NOTE 1 R1541829RB CHEMICAL
& VOLUME CONTROL 3-CS-2-235-2501R-1 600300 TCX-1-4304-H23 CS-2-235-467-C41R 826RB F-C NOTE 1 VT-3 1
-X CHEMICAL & VOLUME CONTROL 2-CS-2-105-2501R-1 600400 TCX-1-4207-Hl CS-2-RB-002-704-1 R154B826RB F-C NOTE 1 VT-3 1 -
C NA STRUT CHEMICAL & VOLUME CONTROL 2-CS-2-112-2501R-1 600900 TCX-1-4507-H16 CS-2-RB-021-701-1 818RB F-C NOTE 1 VT-3 1 -
X 601200 TCX-1-4507-H13 CS-2-RB-021-704-1 818RB F-C VT-3 1
NOTE 1 X
CHEMICAL & VOLUME CONTROL 1.5-CS-2-248-2501R-1 603600 TCX-1-4110-H3 CS-2-RB-037A-701-1 R1541827RB F-C VT-3 1 C NOTE 1 PAGE:
95 NA STRUT NA SPRING NA STRUT NA SNUBBER
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH I---------
OUTAGE-------------
1 2
1 2
3 1
2 PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
CHEMICAL & VOLUME CONTROL 1.5-CS-2-248-2501R-1 603700 TCX-1-4110-H4 CS-2-RB-037A-702-1 R1541828RB 603800 TCX-1-4110-H5 CS-2-RB-037A-703-1 R1541828RB 603900 TCX-1-4110-H6 CS-2-RB-037A-704-1 R1541831RB F-C VT-3 I
C NOTE 1 F-C VT-3 1 C NOTE 1 NA SNUBBER NA SNUBBER CHEMICAL & VOLUME CONTROL 2-CS-2-103-2501R-1 604100 TCX-1-4110-HM CS-2-RB-037B-702-1 R1541826RB F-C NOTE 1 VT-3 1 C NA SNUBBER REACTOR COOLANT 12-RC-2-007-2501R-1 605400 TCX-1-4101-H2 RC-2-007-401-C41R R1541B19RB 605500 TCX-1-4101-HI RC-2-007-402-C41K R1541819RB F-C VT-3 I C NOTE 1 F-C VT-3 I
C NOTE 1 NA STRUT NA SNUBBER DATE:
03/16/02 PAGE:
96 F-C NOTE 1 VT-3 1 C NA SNUBBER
PAGE:
97 DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME SEC.
XI CATGY ITEM NO EXAMINATION AREA IDENTIFICATION NDE METH PLAN STATUS______
FIRST PERIOD 112 SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE--- ----------
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 3-RC-2-052-2501R-1 608800 TCX-1-4304-H6 RC-2-052-409-C41R R154K814RB F-C VT-3 1 C NOTE 1 NA STRUT 608900 TCX-1-4304-H7 RC-2-052-410-C41R R154K814RB F-C NOTE 1 VT-3 1 C NA STRUT REACTOR COOLANT 4-RC-2-075-2501R-1 610900 TCX-1-4506-H21 RC-2-075-417-C71R 902RB F-C VT-3 1
NOTE 1
-X 611000 TCX-1-4506-H20 RC-2-075-420-C71R 895RB F-C NOTE 1 VT-3 1 -
X REACTOR COOLANT 4-RC-2-087-2501R-1 612500 TCX-1-4505-H30 RC-2-087-403-C81K 908RB F-C NOTE 1 VT-3 1 -
X 612600 TCX-1-4505-H31 RC-2-087-407-C81K 91ORB F-C VT-3 1
NOTE 1
-X
SUMMARY
NUMBER NA STRUT NA STRUT NA SNUBBER NA SNUBBER
DATE:
03/16/02 PAGE:
98 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
_________PLAN STATUS_______
PRESERVICE YEAR I
FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME P1 SEC.
XI CATGY NDE ITEM NO METH I1 2
ERIOD SECOND PERIOD THIRD PERIOD OUTAGE E-- - - - --
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 4-RC-2-087-2501R-1 612700 TCX-1-4505-H32 RC-2-087-408-C81R 91IRB F-C VT-3 1
NOTE 1 X
REACTOR COOLANT 4-RC-2-088-2501R-1 612800 TCX-1-4506-H29 RC-2-088-401-C81R 909RB F-C VT-3 1
NOTE I
-X 612900 TCX-1-4506-H33 RC-2-088-403-C81S 913RB 613000 TCX-1-4506-H32 RC-2-088-404-C81K 913RB 613100 TCX-1-4506-H31 RC-2-088-408-C81K 911RB 613200 TCX-1-4506-H30 RC-2-088-409-C81R 911RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
X X
- X X
REACTOR COOLANT 3-RC-2-111-2501R-1 613500 TCX-1-4504-Hl RC-2-111-402-C81K 907RB F-C VT-3 1-NOTE 1
-X NA STRUT NA STRUT NA SPRING NA SNUBBER NA SNUBBER NA STRUT NA SNUBBER
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH 112 OUTAGE E--- - - --
1 2
3 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 3-RC-2-111-2501R-1 613600 TCX-1-4504-H2 RC-2-111-403-C81K 907RB F-C VT-3 1
NOTE 1 613700 TCX-1-4504-H3 F-C RC-2-111-404-C81S NOTE 1 907RB REACTOR COOLANT 14-RC-2-135-2501R-1 X
NA SNUBBER VT-3 1 -
X NA HANGER 613900 TCX-1-4500-HI RC-2-135-402-C41K 832RB F-C VT-3 1
NOTE 1
-X 614000 TCX-1-4500-H4 RC-2-135-407-C41S 832RB 614200 TCX-1-4500-H5 RC-2-135-409-C51R 843RB F-C NOTE I F-C NOTE 1 VT-3 1 -
VT-3 1 -
C NA SPRING C
NA STRUT REACTOR COOLANT 3-RC-2-146-2501R-1 614400 TCX-1-4504-HS RC-2-146-402-C81K 907RB F-C VT-3 1
NOTE 1 X
NA SNUBBER DATE:
03/16/02 PAGE:
99 NA SNUBBER I -----------.
DATE:
03/16/02 PAGE:
100 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS_______
FIRST PERIOD 112 SECOND PERIOD OUTAGE 1
2 3
THIRD PERIOD 1
2 PRESERVICE YEAR INSTRUCTIONS
CALIBRATION BLOCK**
REACTOR COOLANT 3-RC-2-146-2501R-1 614500 TCX-1-4504-H6 RC-2-146-403-C81K 907RB 614600 TCX-1-4504-H4 RC-2-146-406-C81K 908RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
X NA SNUBBER X
REACTOR COOLANT 6-RC-2-147-2501R-1 614800 TCX-1-4506-H34 RC-2-147-403-CS1K 913RB F-C NOTE 1 VT-3 1 -
-X 615000 TCX-1-4506-H2 RC-2-147-406-C81S R161A913RB F-C VT-3 1
NOTE 1 C
615050 TCX-1-4506-H2 RC-2-147-406-C81S R161A913RB B-K-i PT 1
Blo.10 C
92 WELDED ATTACHMENT 615100 TCX-1-4506-H35 F-C RC-2-147-408-C81R NOTE 913RB REACTOR COOLANT 6-RC-2-161-2501R-1 615200 TCX-1-4506-HI RC-2-161-402-C81A 909RB F-C VT-3 1
NOTE 1 NA SNUBBER NA SNUBBER NA SPRING VT-3 1 -
1 X
NA STRUT X
NA BOX I ----------- -----------
DATE:
03/16/02 PAGE:
101 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME SEC.
XI EXAMINATION AREA CATGY NDE IDENTIFICATION ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD
-~OUTAGE 1
21 2
3 THIRD PERIOD 12 PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
REACTOR COOLANT 6-RC-2-161-2501R-1 615250 TCX-1-4506-Hl RC-2-161-402-C81A 909RB B-K-I PT 1
BIO. 10 X
92 WELDED ATTACHMENT REACTOR COOLANT 4-RC-2-162-2501R-1 615600 TCX-1-4506-H28 RC-2-162-401-C81R 909RB 615700 TCX-1-4506-H27 RC-2-162-402-C81K 909RB 615800 TCX-1-4506-H26 RC-2-162-403-C81R 909RB 615900 TCX-1-4506-H25 RC-2-162-404-C8IR 909RB F-C NOTE 1 F-C NOTE I F-C NOTE I VT-3 1 -
VT-3 I
X X
VT-3 1
REACTOR COOLANT 6-RC-2-163-2501R-1 616000 TCX-1-4505-Hi RC-2-163-402-C81A 908RB F-C NOTE 1 VT-3 1 -
-x
SUMMARY
NUMBER F-C NOTE I VT-3 1 -
X NA STRUT NA SNUBBER NA STRUT NA STRUT X
NA BOX
DATE:
03/16/02 PAGE:
102 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD 1
2 PRESERVICE YEAR THIRD PERIOD OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT 6-RC-2-163-2501R-1 616050 TCX-1-4505-Hl RC-2-163-402-C81A 908RB B-K-I B10. 10 PT 1 -
X 92 WELDED ATTACHMENT REACTOR COOLANT 4-RC-2-164-2501R-1 616200 TCX-1-4505-H28 RC-2-164-402-C81R 908RB F-C VT-3 1
NOTE 1 REACTOR COOLANT 4-RC-2-162-2501R-1 616300 TCX-1-4505-H27 RC-2-164-403-CS1R 908RB F-C VT-3 I
NOTE 1 X
REACTOR COOLANT 2-RC-2-015-2501R-l 616500 TCX-1-4109-H2 RC-2-RB-027-702-1 R1541813RB 616600 TCX-1-4109-H3 RC-2-RB-027-703-1 R1541813RB 616700 TCX-1-4109-H4 RC-2-RB-027-704-1 R1541813RB F-C NOTE 1 F-C NOTE I F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
C NA SNUBBER C
NA SPRING C
NA SNUBBER NA STRUT NA STRUT
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS__
PRESERVICE YEAR FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD THIRD PERIOD I ----
I
-O 0U TA GE------
1 1 2
1 2
3 1
2 INSTRUCTIONS I
- CALIBRATION BLOCK**
REACTOR COOLANT 2-RC-2-015-2501R-1 616800 TCX-1-4109-H5 RC-2-RB-027-705-1 R1541813RB 617100 TCX-1-4109-H8 RC-2-RB-027-708-1 R1541813RB RESIDUAL HEAT REMOVAL 12-RH F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
C NA SNUBBER C
NA SNUBBER 001-2501R-1 618800 TCX-1-4101-H3 RH-2-001-404-C41S R1541817RB 618900 TCX-1-4101-H9 RH-2-001-405-C41R R154A817RB 619200 TCX-1-4101-HS RH-2-001-408-C41K R154A817RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 C VT-3 1 C VT-3 1 C NA SPRING NA STRUT NA SNUBBER RESIDUAL HEAT REMOVAL 12-RH-2-002-2501R-1 619400 TCX-1-4401-H9 RH-2-002-401-C41R 817RB F-C NOTE 1 VT-3 1 -
-X PAGE:
103 NA STRUT I
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS-PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD i-1 2
THIRD PERIOD OUTAGE1-1 23 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
RESIDUAL HEAT REMOVAL 12-RH-2-002-2501R-1 620000 TCX-I-4401-H4 RH-2-002-408-C41R 817RB F-C NOTE 1 VT-3 1 -
-X SAFETY INJECTION 3-SI-2-033-2501R-1 620100 TCX-1-4600-M3 SI-2-033-405-C41S 818RB 620125 TCX-I-4600-H4 SI-2-033-401-C41R 818RB 620150 TCX-1-4600-HS SI-2-033-403-C41K 818RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 I
X VT-3 1
VT-3 1 -
X
-X SAFETY INJECTION 6-SI-2-089-2501R-1 620300 TCX-1-4103-HI SI-2-089-402-C41S RI541827RB 620350 TCX-1-4103-H1 SI-2-089-402-C41S R1541828RB B-K-I PT 1 -
C B1O.10 92 SPRING PAGE:
104 NA STRUT NA SPRING NA STRUT NA SNUBBER F-C NOTE I VT-3 1 -
C NA
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS EXAMINATION AREA IDENTIFICATION INSPECTION INTERVAL PLAN STATUS FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD SEC.
XI CATGY NDE 0
U T A G E-------
ITEM NO METH 1 1 2
1 2
3 1
2 1
PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 6-SI-2-089-2501R-1 620400 TCX-1-4103-H3 SI-2-089-403-C41K R1541820RB 620500 TCX-1-4103-H6 SI-2-089-404-C41K R1541826RB 620600 TCX-1-4103-H5 SI-2-089-405-C41K R1541826RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
C NA SNUBBER VT-3 1 -
C SAFETY INJECTION 8-SI-2-090-2501R-1 620800 TCX-1-4202-HI SI-2-090-402-C41S R154J826RB F-C NOTE 1 VT-3 1 -
C NA SPRING 620850 TCX-1-4202-H1 SI-2-090-402-C41S R154J826RB 620900 TCX-1-4202-H3 SI-2-090-403-C41K R154J820RB 621000 TCX-1-4202-H4 SI-2-090-404-C41K R154J825RB B-K-i PT 1
BlO0.10 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
C 92 WELDED ATTACHMENT C
NA SNUBBER C
NA SNUBBER
SUMMARY
NUMBER PAGE:
105 F-C NOTE 1 VT-3 1
C NA qmTBBER NA SNUBBER
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
PLAN STATUS_
FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH 112 OUTAGE1-1 23 1
2 PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
SAFETY INJECTION 8-SI-2-091-2501R-1 621200 TCX-I-4302-H3 SI-2-091-401-C41R 816RB F-C VT-3 1
NOTE 1 SAFETY INJECTION 6-SI-2-101-2501R-1 622100 TCX-1-4203-HI SI-2-101-403-C41S R154J828RB F-C NOTE 1 VT-3 1 -
C NA SPRING 622150 TCX-1-4203-HI SI-2-101-403-C41S R154J828RB B-K-1 PT 1
Blo0.10 C
92 WELDED ATTACHMENT 622200 TCX-1-4203-H2 F-C SI-2-101-407-C41R NOTE 1 R154B823RB SAFETY INJECTION 6-SI-2-102-2501R-1 622400 TCX-1-4303-H1 SI-2-102-403-C41S 828RB 622450 TCX-1-4303-H1 SI-2-102-403-C41S 828RB F-C VT-3 1
NOTE 1 B-K-I PT 1 -
B10.10 C
NA SPRING C
92 WELDED ATTACHMENT DATE:
03/16/02 PAGE:
106 C
NA STRUT VT-3 1 -
C NA STRUT
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS______
SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD SOUTAGE---
1 2
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 10-SI-2-179-2502R-1 F-C NOTE 1 623200 TCX-1-4102-HI SI-2-179-401-C41S R1541827RB 623250 TCX-1-4102-HI SI-2-179-401-C41S R1541827RB 623400 TCX-I-4102-H3 SI-2-179-403-C41K R1541821RB 623500 TCX-i-4102-H4 SI-2-179-404-C41K R1541821RB VT-3 I
C B-K-I PT 1 -
C BI0. 10 F-C NOTE 1 F-C NOTE 1 VT-3 i
C VT-3 1 -
C NA SPRING 92 WELDED ATTACHMENT NA SNUBBER NA SNUBBER SAFETY INJECTION 10-SI-2-180-2502R-1 623700 TCX-I-4201-HI SI-2-180-402-C41S 828RB F-C VT-3 1
NOTE 1 X
NA SPRING 623750 TCX-1-4201-HI SI-2-180-402-C41S 828RB B-K-i PT 1
BIO.10
-X 92 WELDED ATTACHMENT SAFETY INJECTION 10-SI-2-182-2501R-1 624300 TCX-I-4402-Hl SI-2-182-405-C41R 819RB F-C VT-3 1
NOTE 1
-X PAGE:
107 NA STRUT
DATE:
03/16/02 PAGE:
108 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND I
PERIOD THIRD PERIOD I--
I- ---------
OUTAGE-------------
I112 1
23 1 2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 1.5-SI-2-027-2501R-1 624700 TCX-1-4306-HI2 SI-2-RB-007-702-1 815RB 625000 TCX-1-4306-H15 SI-2-RB-007-705-1 815RB 625100 TCX-1-4306-H16 SI-2-RB-007-706-1 815RB 625300 TCX-1-4306-H18 SI-2-RB-007-708-1 815RB 625600 TCX-1-4306-H21 SI-2-RB-007-711-1 817RB 626000 TCX-1-4306-H2 SI-2-RB-008-702-1 818RB 626300 TCX-1-4306-H5 SI-2-RB-008-707-1 818RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
X NA STRUT X
NA U-BOLT x
X X
x X
NA STRUT NA STRUT NA U-BOLT NA STRUT NA STRUT
DATE:
03/16/02 PAGE:
109 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME SEC.
XI EXAMINATION AREA CATGY NDE IDENTIFICATION ITEM NO METE SAFETY INJECTION 1.5-SI-2-027-2501R-1 PLAN STATUS FIRST SECOND THIRD PERIOD PERIOD PERIOD OUTAGE------------
1 2
1 2
3 1
2 PRESERVICE YEAR INSTRUCTIONS I
- CALIBRATION BLOCK**
626400 TCX-1-4306-H6 SI-2-RB-008-708-1 818RB 626600 TCX-1-4306-H8 SI-2-RB-008-710-1 817RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 I -
X NA STRUT SAFETY INJECTION 1.5-SI-2-201-2501R-1 627400 TCX-1-4306-H29 SI-2-RB-009-707-1 828RB 627600 TCX-1-4306-H32 SI-2-RB-009-709-1 829RB F-C NOTE I F-C NOTE 1 VT-3 1 -
VT-3 1 -
SAFETY INJECTION 2-SI-2-067-2501R-1 627800 TCX-1-4302-H1 SI-2-RB-01OA-705-1 815RB F-C NOTE I VT-3 1 -
C NA SNUBBER SAFETY INJECTION 1.5-SI-2-026-2501R-1 628100 TCX-1-4205-HI4 SI-2-RB-032-701-1 R154BS17RB F-C NOTE 1 VT-3 I
C NA U-BOLT
SUMMARY
NUMBER NA STRUT NA SNUBBER NA SNUBBER
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD I
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PERIOD PERIOD PERIOD I---------
OUTAGE--------------
1 1 2
1 2
3 1
2 1
INSTRUCTIONS
- CALIBRATION BLOCK**
SAFETY INJECTION 1.5-SI-2-026-2501R-1 628400 TCX-1-4205-H17 SI-2-RB-032-704-1 R154B817RB F-C VT-3 1
NOTE 1 C
NA SNUBBER 629100 TCX-1-4205-H4 SI-2-RB-033-703-1 R154B818RB 629200 TCX-1-4205-H3 SI-2-RB-033-704-1 R154B818RB F-C NOTE I F-C NOTE 1 VT-3 1 -
VT-3 1 -
C C
NA SNUBBER SAFETY INJECTION 2-SI-2-086-2501R-1 634600 TCX-1-4404-H6 SI-2-RB-052-705-1 819RB F-C VT-3 1
NOTE 1
-X REACTOR COOLANT TCX-RCPCPR-01 640000 TCX-1-1100-RVSI TCX-RCESRV-01-Ri R157 830RB F-B NOTE 1 VT-3 1 -
-X NA REACTOR VESSEL SUPPORTS.
1457F27.
TDLR VERIFICATION BOUNDARY.
640010 TCX-1-1100-RVS2 TCX-RCESRV-02-R2 R157 830RB F-B NOTE 1 VT-3 1 -
X NA REACTOR VESSEL SUPPORTS.
1457F27.
TDLR VERIFICATION BOUNDARY.
PAGE:
110 NA SNUBBER NA SPRING I I I
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL-PLAN STATUS PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD I1 2-
-OUTAGE S112 1
23 1 2 THIRD PERIOD INSTRUCTIONS I
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCPR-01 640020 TCX-1-1100-RVS3 TCX-RCESRV-03-R3 R157 830RB F-B NOTE 1 VT-3 1 -
X NA REACTOR VESSEL SUPPORTS.
1457F27.
TDLR VERIFICATION BOUNDARY.
640030 TCX-1-1100-RVS4 TCX-RCESRV-04-R4 R157 830RB F-B NOTE 1 VT-3 1 -
X NA REACTOR VESSEL SUPPORTS.
1457F27.
TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCSG-01 640040 TCX-1-3100-1CS1 TCX-RCESSG-01-Sl A23 812RB F-C NOTE 1 VT-3 1 -
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
640050 TCX-1-3100-1CS2 TCX-RCESSG-01-S2 A23 812RB 640060 TCX-1-3100-1CS3 TCX-RCESSG-01-S3 A23 812RB 640070 TCX-1-3100-1CS4 TCX-RCESSG-01-S4 A23 812RB 640080 TCX-1-3100-1LSI TCX-RCESSG-01-Li A23 835RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-B NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
PAGE:
ill I -- -- - - ----------- ----------- I I
DATE:
03/16/02 PAGE:
112 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD I---------
0 TAGE--------------
1 2
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCSG-01 640090 TCX-1-3100-1LS2 TCX-RCESSG-01-L2 A23 835RB 640100 TCX-1-3100-1LS3 TCX-RCESSG-01-L3 A23 835RB F-B NOTE 1 F-B NOTE 1 VT-3 1
VT-3 I
C C
NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
640110 TCX-1-3100-1US1 TCX-RCESSG-01-U1 A24 859RB 640120 TCX-1-3100-1US2 TCX-RCESSG-01-U2 A24 859RB 640130 TCX-1-3100-1US3 TCX-RCESSG-01-U3 A24 859RB 640140 TCX-1-3100-1SN1 TCX-RCESHS-01-SN1 A24 859RB F-B NOTE 1 F-B NOTE 1 F-B NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
C NA S.G.
UPPER LATERAL SUPPORT.
1457F34.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
UPPER LATERAL SUPPORT.
1457F34.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
UPPER LATERAL SUPPORT.
1457F35.
RING.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
HYD.
PD14856.
TDLR VERIFICATION BOUNDARY.
640150 TCX-1-3100-1SN2 TCX-RCESHS-01-SN2 A24 859RB F-C NOTE 1 VT-3 1 -
C NA S.G.
HYD.
PD14856.
TDLR VERIFICATION BOUNDARY.
DATE:
03/16/02 PAGE:
113 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ASME SEC.
XI CATGY ITEM NO
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION
_________PLAN STATUS FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD I-----
I NDE METH 1
OUTAGE G----
1 2
3 1
2 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCSG-02 640160 TCX-1-3100-2CS1 TCX-RCESSG-02-Sl R1551812RB 640170 TCX-1-3100-2CS2 TCX-RCESSG-02-S2 R1551812RB 640190 TCX-1-3100-2CS3 TCX-RCESSG-02-S3 R155IB12RB 640200 TCX-1-3100-2CS4 TCX-RCESSG-02-S4 R1551812RB 640210 TCX-1-3100-2LS1 TCX-RCESSG-02-LI R1551812RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-B NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
640220 TCX-1-3100-2LS2 TCX-RCESSG-02-L2 R1551835RB F-B NOTE 1 VT-3 I
C NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
640230 TCX-1-3100-2LS3 TCX-RCESSG-02-L3 R155I835RB F-B NOTE 1 VT-3 1 -
C NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH FIRST PERIOD 1
2 PLAN STATUS SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE------------
1 23 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCSG-02 640240 TCX-1-3100-2US1 TCX-RCESSG-02-Ul R1551859RB F-B NOTE 1 VT-3 1 -
C NA S.G. UPPER LATERAL SUPPORT.
1457F34.
TDLR VERIFICATION BOUNDARY.
640250 TCX-1-3100-2US2 TCX-RCESSG-02-U2 R1551859RB 640260 TCX-1-3100-2US3 TCX-RCESSG-02-U3 R1551859RB 640270 TCX-1-3100-2SNI TCX-RCESHS-02-SNI RI551859RB 640280 TCX-1-3100-2SN2 TCX-RCESHS-02-SN2 R1551859RB F-B NOTE 1 F-B NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
C C
NA S.G.
UPPER LATERAL SUPPORT.
1457F34.
TDLR VERIFICATION BOUNDARY.
NA S.G. UPPER LATERAL SUPPORT.
1457F35.
RING.
TDLR VERIFICATION BOUNDARY.
C NA S.G.
HYD.
SHOCK SUPRESSORS.
C NA S.G.
HYD.
PD14856.
TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCSG-03 640290 TCX-1-3100-3CSI TCX-RCESSG-03-Sl R154K812RB F-C NOTE I VT-3 1 -
-X NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
640300 TCX-1-3100-3CS2 TCX-RCESSG-03-S2 R154K812RB F-C VT-3 1
NOTE 1 X
NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
DATE:
03/16/02 PAGE:
114
DATE:
03/16/02 PAGE:
115 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME SEC.
XI CATGY ITEM NO
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD NDE 1
-OUTAGE METH I1 2
1 2
3 PRESERVICE YEAR THIRD PERIOD INSTRUCTIONS
- CALIBRATION BLOCK**
1 2
REACTOR COOLANT TCX-RCPCSG-03 640310 TCX-1-3100-3CS3 TCX-RCESSG-03-S3 R154K812RB 640320 TCX-1-3100-3CS4 TCX-RCESSG-03-S4 R154K812RB 640330 TCX-1-3100-3LS1 TCX-RCESSG-03-LI R154K827RB 640340 TCX-1-3100-3LS2 TCX-RCESSG-03-L2 R154K827RB 640350 TCX-1-3100-3LS3 TCX-RCESSG-03-L3 R154K827RB 640360 TCX-1-3100-3US1 TCX-RCESSG-03-U1 R154KS59RB 640370 TCX-1-3100-3US2 TCX-RCESSG-03-U2 R154K859RB F-C NOTE 1 F-C NOTE 1 F-B NOTE I F-B NOTE 1 F-B NOTE I F-B NOTE 1 F-B NOTE 1 VT-3 I
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
X NA X
X X
X X
X S.G. COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
NA S.G.
UPPER LATERAL SUPPORT.
1457F34.
TDLR VERIFICATION BOUNDARY.
NA S.G. UPPER LATERAL SUPPORT.
1457F34.
TDLR VERIFICATION BOUNDARY.
I -----------.
DATE:
03/16/02 PAGE:
116 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
FIRST ASME PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
xi CATGY NDE ITEM NO METH PLAN STATUS SECOND THIRD PERIOD PERIOD I- ------
OUTAGE G
1 2
1 2
3 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCSG-03 640380 TCX-1-3100-3US3 TCX-RCESSG-03-U3 R154K859RB 640390 TCX-1-3100-3SN1 TCX-RCESHS-03-SN1 R154KS59RB F-B NOTE 1 F-C NOTE 1 VT-3 1
VT-3 1 -
X X
NA S.G.
UPPER LATERAL SUPPORT.
1457F35. RING.
TDLR VERIFICATION BOUNDARY.
NA S.G.
HYD.
PD14856.
TDLR VERIFICATION BOUNDARY.
640400 TCX-1-3100-3SN2 TCX-RCESHS-03-SN2 R154K859RB F-C VT-3 1
NOTE 1 X
NA S.G.
NYD.
PD14856.
TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCSG-04 640410 TCX-1-3100-4CS1 TCX-RCESSG-04-Sl A29 812RB 640420 TCX-1-3100-4CS2 TCX-RCESSG-04-S2 A29 812RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
C VT-3 1 -
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
640430 TCX-1-3100-4CS3 TCX-RCESSG-04-S3 A29 812RB F-C VT-3 I
C NOTE 1 NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
640440 TCX-1-3100-4CS4 TCX-RCESSG-04-S4 A29 812RB F-C NOTE 1 VT-3 1 -
C NA S.G.
COLUMN SUPPORT.
1457F29.
TDLR VERIFICATION BOUNDARY.
I I ----------- -----------
DATE:
03/16/02 PAGE:
117 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS I SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS FIRST PERIOD 1
2 SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCSG-04 640450 TCX-1-3100-4LS1 TCX-RCESSG-04-Ll A29 835RB 640460 TCX-1-3100-4LS2 TCX-RCESSG-04-L2 A29 835RB 640470 TCX-1-3100-4LS3 TCX-RCESSG-04-L3 A29 835RB 640480 TCX-1-3100-4US1 TCX-RCESSG-04-Ul A30 859RB F-B NOTE 1 F-B NOTE 1 F-B NOTE 1 F-B NOTE 1 VT-3 1 -
C VT-3 1 -
C VT-3 1 -
C VT-3 1 -
NA S.G.
LOWER LATERAL SUPPORT.
1457F31. TDLR VERIFICATION BOUNDARY.
NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
NA S.G.
LOWER LATERAL SUPPORT.
1457F31.
TDLR VERIFICATION BOUNDARY.
X NA S.G.
UPPER LATERAL SUPPORT.
1457F34.
TDLR VERIFICATION BOUNDARY.
640490 TCX-1-3100-4US2 TCX-RCESSG-04-U2 A30 859RB F-B NOTE 1 VT-3 1
X NA S.G. UPPER LATERAL SUPPORT.
1457F34.
TDLR VERIFICATION BOUNDARY.
640500 TCX-1-3100-4US3 TCX-RCESSG-04-U3 A30 859RB 640510 TCX-1-3100-4SN1 TCX-RCESHS-04-SNI A30 859RB F-B NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 I
X X
NA S.G.
UPPER LATERAL SUPPORT.
1457F35. RING.
TDLR VERIFICATION BOUNDARY.
NA S.G.
HYD.
PD14856.
TDLR VERIFICATION BOUNDARY.
I ----------- ----------
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 1
2 PLAN STATUS SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE--
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCSG-04 640520 TCX-1-3100-4SN2 TCX-RCESHS-04-SN2 A30 859RB F-C VT-3 I
NOTE 1 X
NA S.G.
HYD.
PD14856.
TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCPC-01 640530 TCX-1-5100-1P1 TCX-RCESPC-01-Pl R154H812RB 640540 TCX-1-5100-1P2 TCX-RCESPC-01-P2 R154H812RB 640550 TCX-1-5100-1P3 TCX-RCESPC-01-P3 R154H812RB 640560 TCX-1-5100-1TI TCX-RCESPC-01-TI R154H83ORB 640570 TCX-1-5100-1T2 TCX-RCESPC-01-T2 R154H83ORB 640580 TCX-1-5100-1T3 TCX-RCESPC-01-T3 R154H83ORB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 C VT-3 1 C VT-3 1 C VT-3 1 C VT-3 1 C VT-3 1 C NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
DATE:
03/16/02 PAGE:
118
DATE:
03/16/02 PAGE:
119 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS______
FIRST PERIOD 1
2 SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCPC-02 640590 TCX-I-5100-2P1 TCX-RCESPC-02-PI A25 812RB 640600 TCX-1-5100-2P2 TCX-RCESPC-02-P2 A25 812RB 640610 TCX-1-5100-2P3 TCX-RCESPC-02-P3 A25 812RB 640620 TCX-1-5100-2T1 TCX-RCESPC-02-Tl A25 830RB 640630 TCX-1-5100-2T2 TCX-RCESPC-02-T2 A25 830RB 640640 TCX-1-5100-2T3 TCX-RCESPC-02-T3 A25 830RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE I VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
X X
X X
X X
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCPC-03 640650 TCX-1-5100-3PI TCX-RCESPC-03-Pl R15SJ812RB F-C VT-3 1-NOTE 1 C
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
I ---- -----. - ---- --.
DATE:
03/16/02 PAGE:
120 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME SEC.
XI CATGY ITEM NO
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION
_________PLAN STATUS FIRST PERIOD SECOND PERIOD NDE Ij......-OUTAGE METH 1 12 1
2 3
PRESERVICE YEAR THIRD PERIOD I
INSTRUCTIONS
- CALIBRATION BLOCK**
1 2
REACTOR COOLANT TCX-RCPCPC-03 640660 TCX-i-5100-3P2 TCX-RCESPC-03-P2 R155J812RB 640670 TCX-1-5100-3P3 TCX-RCESPC-03-P3 Ri55J812RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
C C
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
640680 TCX-1-5100-3TI TCX-RCESPC-03-Ti R155J830RB 640690 TCX-i-5100-3T2 TCX-RCESPC-03-T2 R155J830RB 640700 TCX-i-5100-3T3 TCX-RCESPC-03-T3 RI55JB30RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
C NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
C NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
C NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCPC-04 640710 TCX-1-5100-4PI TCX-RCESPC-04-PI R155K812RB 640720 TCX-I-5100-4P2 TCX-RCESPC-04-P2 R155K812RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
C VT-3 1 -
C NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
DATE:
03/16/02 PAGE:
121 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD SOUTAGE--- ----------
112 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCPC-04 640730 TCX-1-5100-4P3 TCX-RCESPC-04-P3 R155K812RB 640740 TCX-1-5100-4TI TCX-RCESPC-04-Tl R155K830RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 640750 TCX-1-5100-4T2 TCX-RCESPC-04-T2 R155K83ORB 640760 TCX-1-5100-4T3 TCX-RCESPC-04-T3 R155K83ORB VT-3 1 -
C VT-3 1 -
C VT-3 1 -
C F-C VT-3 1 -
C NOTE 1 NA RC PUMP COLUMN SUPPORTS.
1457F29.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
NA RC PUMP TIE RODS.
1457F33.
TDLR VERIFICATION BOUNDARY.
REACTOR COOLANT TCX-RCPCPR-01 640770 TCX-1-2100-USI TCX-RCESPR-01-WI R161A905RB 640780 TCX-1-2100-US2 TCX-RCESPR-01-W2 R161A905RB 640790 TCX-1-2100-US3 TCX-RCESPR-01-W3 R161A905RB F-B NOTE I F-B NOTE 1 F-B NOTE 1 VT-3 1 -
C VT-3 1 -
C VT-3 1 -
C NA PRESSURIZER UPPER LATERAL SUPPORTS.
1457F36.
TDLR VERIFICATION BOUNDARY.
NA PRESSURIZER UPPER LATERAL SUPPORTS.
1457F36.
TDLR VERIFICATION BOUNDARY.
NA PRESSURIZER UPPER LATERAL SUPPORTS.
1457F36.
TDLR VERIFICATION BOUNDARY.
DATE:
03/16/02 PAGE:
122 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 1 SCMED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
-PLAN STATUS FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I -----------------------------
I I1
-OUTAG 11i2 12 3
E 1
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
REACTOR COOLANT TCX-RCPCPR-01 640800 TCX-1-2100-US4 TCX-RCESPR-01-W4 RI61Ag05RB 640810 TCX-1-2100-LS1 TCX-RCESPR-01 R161A905RB F-B VT-3 1 -
C NOTE 1 F-B NOTE 1 VT-3 1 -
C NA PRESSURIZER UPPER LATERAL SUPPORTS.
1457F36.
TDLR VERIFICATION BOUNDARY.
NA PRESSURIZER LOWER SUPPORT.
TDLR VERIFICATION BOUNDARY.
SAFETY INJECTION 2-SI-2-059-2501R-1 640830 TCX-1-4108-MR2 CP2-SISSMR-02 R154A820RB F-B VT-3 1 C NOTE 1 NA MOMENT RESTRAINT.
SI-0538-11 SAFETY INJECTION 6-SI-2-101-2501R-1 640840 TCX-1-4203-MR3 CP2-SISSMR-03 R154B823RB F-B VT-3 1
NOTE 1 C
NA MOMENT RESTRAINT.
S1-0538-06 SAFETY INJECTION 8-SI-2-090-2501R-1 640870 TCX-1-4202-MR6 CP2-SISSMR-06 R154B82ORB F-B VT-3 1
NOTE 1 C
NA MOMENT RESTRAINT.
Sl-0538-03 SAFETY INJECTION 3-SI-2-303-2501R-1 640900 TCX-1-4600-MR9 CP2-SISSMR-09 R154A808RB F-B VT-3 1 -
C NOTE 1 NA MOMENT RESTRAINT. Sl-0538-13
DATE:
03/16/02 PAGE:
123 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_
FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME I
SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD 1
2 THIRD PERIOD S.
OUTAGE------------
1 23 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
CHEMICAL & VOLUME CONTROL 4-CS-2-076-2501R-2 652900 TCX-2-2569-H5 CS-2-076-402-A42R 818AB F-C NOTE 1 VT-3 1 -
653300 TCX-2-2569-Hl CS-2-076-407-A42K 818AB F-C VT-3 1
NOTE 1 CHEMICAL & VOLUME CONTROL 4-CS-2-085-2501R-2 653400 TCX-2-2570-HI CS-2-085-402-A42S R194 818AB F-C NOTE I VT-3 1 C NA SPRING CHEMICAL & VOLUME CONTROL 4-CS-2-346-2501R-2 655400 TCX-2-2570-Hil CS-2-346-401-A42R R202 816AB F-C NOTE 1 VT-3 1 C NA STRUT CHEMICAL & VOLUME CONTROL 3-CS-2-628-2501R-2 655600 TCX-2-2569-H7 CS-2-628-402-A42K 819AB F-C VT-3 1
NOTE 1 CHEMICAL & VOLUME CONTROL 3-CS-2-629-2501R-2 655700 TCX-2-2570-H7 CS-2-629-700-A42R R202 81BAB NA STRUT NA SNUBBER NA SNUBBER F-C NOTE 1 VT-3 1 C NA STRUT
DATE:
03/16/02 PAGE:
124 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS-ASME SEC.
XI
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST SECOND PERIOD PERIOD I-THIRD PERIOD CATGY NDE -
0 U T A G E-ITEM NO METH 1
21 2
3 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
CHEMICAL & VOLUME CONTROL 2-CS-2-086-2501R-2 655800 TCX-2-2570-H9 CS-2-AB-071-004-2 R202 818AB 655900 TCX-2-2570-H8 CS-2-AB-071-005-2 R202 818AB F-C NOTE 1 VT-3 1 C NA SPRING CONTAINMENT SPRAY 16-CT-2-002-15iR-2 656500 TCX-2-2536-Hi CT-2-002-402-S22K 788SB F-C NOTE 1 VT-3 1 -
C NA SNUBBER 656550 TCX-2-2536-Hl CT-2-002-402-S22K 788SE C-C C3.20 PT 1 -
C 92 WELDED ATTACHMENT CONTAINMENT SPRAY 16-CT-2-003-151R-2 656800 TCX-2-2575-HI CT-2-003-401-S32A 802SB F-C VT-3 NOTE 1 C
656850 TCX-2-2575-HI CT-2-003-401-S32A 802SB C-C C3.20 PT 1 -
C 92 WELDED ATTACHMENT F-C NOTE 1 VT-3 1 C NA SNUBBER NA BOX
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS FIRST SECOND ASME PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH 11 2 OUTAGE 1
2 3
PRESERVICE YEAR THIRD PERIOD INSTRUCTIONS
- CALIBRATION BLOCK**
1 2
CONTAINMENT SPRAY 16-CT-2-003-151R-2 656900 TCX-2-2575-H5 CT-2-003-402-S32R 802SB 657000 TCX-2-2575-H7 CT-2-003-403-S32R 802SB 657100 TCX-2-2575-H6 CT-2-003-404-S32R 802SB 657200 TCX-2-2575-H8 CT-2-003-405-$32S 802SB 657300 TCX-2-2575-H9 CT-2-003-406-S32R 800SB 657400 TCX-2-2575-HlO CT-2-003-407-S32R 793SB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1
VT-3 1 -
VT-3 1 -
C NA STRUT C
NA STRUT C
NA SPRING C
NA STRUT C
NA STRUT CONTAINMENT SPRAY 16-CT-2-004-151R-2 657500 TCX-2-2577-H5 CT-2-004-401-S32R 792SB F-C NOTE 1 VT-3 1 -
C NA STRUT DATE:
03/16/02 PAGE:
125 F-C NOTE 1 VT-3 1 -
r NA STRUT I -----------.
DATE:
03/16/02 PAGE:
126 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS______
FIRST PERIOD SECOND PERIOD I---------
OUTAGE 1
2 1
2 3
PRESERVICE YEAR THIRD PERIOD j
INSTRUCTIONS 1
2
- CALIBRATION BLOCK**
CONTAINMENT SPRAY 12-CT-2-005-151R-2 657900 TCX-2-2576-H5 CT-2-005-404-S22K 785SB 658300 TCX-2-2576-H1 CT-2-005-408-S22S 780SB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
r C
NA SNUBBER NA SPRING 658350 TCX-2-2576-HI CT-2-005-408-S22S 780SB C-C PT 1
C3.20 C
92 WELDED ATTACHMENT CONTAINMENT SPRAY 12-CT-2-006-151R-2 658800 TCX-2-2576-H2 CT-2-006-407-$22S 779SB 658850 TCX-2-2576-H2 CT-2-006-407-S22S 779SB F-C NOTE 1 C-C C3.20 VT-3 1 -
PT 1 -
C NA SPRING C
92 WELDED ATTACHMENT CONTAINMENT SPRAY 12-CT-2-007-151R-2 659400 TCX-2-2578-H12 CT-2-007-406-S22R 781SB F-C VT-3 1
NOTE 1 C
NA STRUT
DATE:
03/16/02 PAGE:
127 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS_
FIRST SECOND THIRD PERIOD 1
2 PERIOD PRESERVICE YEAR PERIOD I
OUTAGE1-1 23 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
CONTAINMENT SPRAY 12-CT-2-007-151R-2 659600 TCX-2-2578-H14 CT-2-007-408-S22R 781SB F-C VT-3 1
NOTE 1 C
CONTAINMENT SPRAY 12-CT-2-008-151R-2 659700 TCX-2-2578-HI CT-2-008-401-S22S 779SB F-C VT-3 1
NOTE 1 C
NA SPRING 659750 TCX-2-2578-Hi CT-2-008-401-S22S 779SB C-C C3.20 PT 1 -
C 92 WELDED ATTACHMENT CONTAINMENT SPRAY 16-CT-2-013-301R-2 662200 TCX-2-2571-Hl5 CT-2-013-408-S42K 818SB CONTAINMENT SPRAY 16-CT-2-025-301R-2 F-C NOTE 1 664640 TCX-2-2539-H2 CT-2-025-401-S22R R62E 785SB 664670 TCX-2-2539-M5 CT-2-025-402-S22S R62E 785SB VT-3 1 -
F-C VT-3 1
NOTE 1 C
NA HANGER C
NA HANGER NA STRUT F-C VT-3 1
NOTE 1 C
NA SNUBBER I
DATE:
03/16/02 PAGE:
128 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS______
FIRST PERIOD 112 SECOND THIRD PERIOD PERIOD I
OUTAGE--- ----------
1 2
3 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
CONTAINMENT SPRAY 16-CT-2-121-151R-2 665000 TCX-2-2577-Hl CT-2-121-403-S22S 790SB 665050 TCX-2-2577-Hl CT-2-121-403-$22S 790SB C-C C3.20 PT 1 -
C 92 WELDED ATTACHMENT FEEDWATER 18-FW-2-017-1303-2 665600 TCX-2-2301-H23 FW-2-017-433-C42S 827RB 665800 TCX-2-2301-H19 FW-2-017-441-C72R 888RB 665900 TCX-2-2301-H2 FW-2-017-444-C72K R15SN888RB 665910 TCX-2-2301-H16 FW-2-017-445-C72R 888RB F-C NOTE 1
F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1
VT-3 1 -
VT-3 1 -
VT-3 1 -
X X
C X
NA SPRING.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY 665950 TCX-2-2301-H2 FW-2-017-444-C72K R155N888RB C-C MT 1
C3.20 C
92 WELDED ATTACHMENT F-C NOTE 1 VT-3 1
C NA SPRING t
DATE:
03/16/02 PAGE:
129 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_PLAN STATUS_
FIRST SECOND THIRD PERIOD PERIOD PRESERVICE YEAR I
PERIOD I
-OUTAGE 1
21 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 18-FW-2-017-1303-2 666000 TCX-2-2301-H3 FW-2-017-446-C72R R155N888RB 666050 TCX-2-2301-H3 FW-2-017-446-C72R R155N888RB F-C NOTE I C-C C3.20 VT-3 1
MT 1
C NA STRUT.
TDLR VERIFICATION BOUNDARY C
92 WELDED ATTACHMENT 666100 TCX-2-2301-H13 FW-2-017-450-C72S 888RB 666200 TCX-2-2301-H12 FW-2-017-451-C72R 888RB 666300 TCX-2-2301-H11 FW-2-017-453-C62R 870RB 666400 TCX-2-2301-H5 FW-2-017-454-C52K R155N856RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1
VT-3 1 -
VT-3 1 -
VT-3 1 -
X X
X C
NA SPRING.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY 666450 TCX-2-2301-H5 FW-2-017-454-C52K R155N856RB C-C C3.20 MT 1 -
C 92 WELDED ATTACHMENT
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS- _PRESERVICE YEAR FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD 1
2 THIRD PERIOD OUTAGE------------
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 18-FW-2-017-1303-2 666500 TCX-2-2301-H1O FW-2-017-456-C52R 85ERB F-C NOTE 1 VT-3 1
X NA STRUT.
TDLR VERIFICATION BOUNDARY 666600 TCX-2-2301-H24 FW-2-017-700-C42K 827RE 666700 TCX-2-2301-Hl FW-2-017-701-C52R R155N849RB 666750 TCX-2-2301-Hl FW-2-017-701-C52R R155N849RB F-C NOTE 1 F-C NOTE 1 C-C C3.20 VT-3 1 -
VT-3 1
MT 1
K NA SNUBBER.
TDLR VERIFICATION BOUNDARY C
NA HANGER.
TDLR VERIFICATION BOUNDARY C
92 WELDED ATTACHMENT 666800 TCX-2-2301-H14 FW-2-017-702-C72R 888RB F-C NOTE 1 VT-3 1
X NA STRUT.
TDLR VERIFICATION BOUNDARY 666900 TCX-2-2301-H4 FW-2-017-703-C62R R155N873RB F-C NOTE 1 VT-3 I -
C NA STRUT.
TDLR VERIFICATION BOUNDARY 666950 TCX-2-2301-H4 FW-2-017-703-C62R R155N873RB C-C C3.20 MT 1 -
C 92 WELDED ATTACHMENT PAGE:
130
DATE:
03/16/02 PAGE:
131 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS______
FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I -------
OUTAGE--------
1 1 2
1 2
3 1
2 INSTRUCTIONS I
- CALIBRATION BLOCK**
FEEDWATER 18-FW-2-017-1303-2 667000 TCX-2-2301-H15 FW-2-017-704-C72R 888RE 667100 TCX-2-2301-H20 FW-2-017-705-C72R 888RB F-C NOTE 1 F-C NOTE I VT-3 1-VT-3 1 -
X NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY FEEDWATER 18-FW-2-018-1303-2 667400 TCX-2-2202-H6 FW-2-018-434-C52R R155L856RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY 667500 TCX-2-2201-H4 FW-2-018-441-C72R R155N888RB 667550 TCX-2-2201-H4 FW-2-018-441-C72R R155N888RB 667600 TCX-2-2201-H9 FW-2-018-443-C72R R15SN808RB 667800 TCX-2-2201-H1O FW-2-018-445-C72R R155N888RB F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
MT 1 -
VT-3 1
VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY C
92 WELDED ATTACHMENT C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 PAGE:
132 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND THIRD PERIOD 112 PERIOD PRESERVICE YEAR I
PERIOD I
OUTAGE------------
1 23 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 18-FW-2-018-1303-2 667900 TCX-2-2201-H3 FW-2-018-446-C72R R155N888RB F-C VT-3 1
NOTE 1 C
NA STRUT.
TDLR VERIFICATION BOUNDARY 667950 TCX-2-2201-H3 FW-2-018-446-C72R R155N888RB 668000 TCX-2-2201-Hll FW-2-018-447-C72R R155N888RB C-C C3.20 F-C NOTE 1 MT 1 -
VT-3 1 -
C 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
C NA STRUT.
TDLR VERIFICATION BOUNDARY 668100 TCX-2-2201-H2 FW-2-018-448-C72K Ri55N888RB 668150 TCX-2-2201-H2 FW-2-018-448-C72K R155N888RE F-C VT-3 1 -
NOTE 1 C-C MT 1
C3.20 C
NA SNUBBER.
TDLR VERIFICATION BOUNDARY C
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
668200 TCX-2-2201-H12 FW-2-018-449-C72R R155N888RB F-C NOTE 1 VT-3 I
C NA STRUT.
TDLR VERIFICATION BOUNDARY 668400 TCX-2-2201-H14 FW-2-018-452-C52R R154J859RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 PAGE:
133 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD I---------
OUTAGE--- ----------
1 2
2 3
12 INSTRUCTIONS
CALIBRATION BLOCK**
FEEDWATER 18-FW-2-018-1303-2 668500 TCX-2-2201-HI5 FW-2-018-453-C52R R154J856RB 668600 TCX-2-2201-HI7 FW-2-018-456-C52R R154J834RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
C C
NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY 668700 TCX-2-2201-H19 FW-2-018-457-C42S R154J827RB 668800 TCX-2-2201-HI FW-2-018-458-C42K R154J828RB 668850 TCX-2-2201-H1 FW-2-018-458-C42K R154J828RB 668900 TCX-2-2201-H16 FW-2-018-700-C52R R154J855RB F-C NOTE 1 F-C NOTE 1 C-C C3.20 F-C NOTE 1 VT-3 I
VT-3 I
MT 1
VT-3 1 -
C NA SPRING.
TDLR VERIFICATION BOUNDARY C
NA SNUBBER.
TDLR VERIFICATION BOUNDARY C
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
C NA STRUT.
TDLR VERIFICATION BOUNDARY 669000 TCX-2-2201-H7 FW-2-018-703-C72R R155N882RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST PERIOD 112 SECOND PERIOD OUTAGE 1
2 3
THIRD PERIOD INSTRUCTIONS 2
- CALIBRATION BLOCK**
FEEDWATER 18-FW-2-018-1303-2 669100 TCX-2-2201-HS FW-2-018-704-C62R R155N866RB 669150 TCX-2-2201-H5 FW-2-018-704-C62R R155N866RB F-C NOTE 1 C-C C3.20 VT-3 1 -
MT 1 -
C C
NA STRUT.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
FEEDWATER 18-FW-2-019-1303-2 669200 TCX-2-2101-H12 FW-2-019-401-C42S RI00A827RB 669300 TCX-2-2101-H8 FW-2-019-402-C52S R1541856RB 669400 TCX-2-2101-HI FW-2-019-404-C42K R1541827RB 669450 TCX-2-2101-HI FW-2-019-404-C42K R1541827RB 669500 TCX-2-2101-H7 FW-2-019-405-C52K R1541856RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 C-C C3.20 F-C NOTE 1 VT-3 1 C VT-3 1 C VT-3 1 C MT 1 C VT-3 1 C NA SPRING.
TDLR VERIFICATION BOUNDARY NA SPRING.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA SNUBBER.
TDLR VERIFICATION BOUNDARY PAGE:
134 I ----------- -----------
DATE:
03/16/02 PAGE:
135 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS _
PRESERVICE YEAR FIRST SECOND THIRD PERIOD PERIOD PERIOD I- ------
OUTAGE G
1 2
123 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 18-FW-2-019-1303-2 669600 TCX-2-2101-H2 FW-2-019-406-C52R R10OA85ORB 669650 TCX-2-2101-H2 FW-2-019-406-C52R R1541850RB 669700 TCX-2-2101-H6 FW-2-019-408-S62R R10OA856SB 669800 TCX-2-2101-HlN FW-2-019-411-C42K R1541827RB 669900 TCX-2-2101-Hll FW-2-019-412-C42K R1541828RB F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 C MT I
C VT-3 1 C VT-3 1 C VT-3 I C NA STRUT.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA STRUT.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY FEEDWATER 18-FW-2-020-1303-2 670000 TCX-2-2401-H1 FW-2-020-403-C42K 827RB 670010 TCX-2-2401-H7 FW-2-020-402-C52S 827RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
X X
NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA SPRING.
TDLR VERIFICATION BOUNDARY I - - - --
DATE:
03/16/02 PAGE:
136 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS_
FIRST PERIOD 112 SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE1-1 23 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 18-FW-2-020-1303-2 670050 TCX-2-2401-HI FW-2-020-403-C42K 827RB C-C C3.20 MT 1 -
X 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
670100 TCX-2-2401-Hll FW-2-020-410-C42S 827RB 670110 TCX-2-2401-H8 FW-2-020-407-C52K 827RB 670200 TCX-2-2401-H6 FW-2-020-413-S62R 856RB 670300 TCX-2-2401-H2 FW-2-020-700-C52R 842RB 670350 TCX-2-2401-H2 FW-2-020-700-C52R 842RB 670400 TCX-2-2401-HIO FW-2-020-701-C42K 830RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 C-C C3.20 F-C NOTE 1 VT-3 1 -
VT-3 1
VT-3 1 -
VT-3 1 -
MT 1 -
VT-3 1 -
X X
X X
X NA SPRING.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA SNUBBER.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 PAGE:
137 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD ASME PERIOD PERIOD PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY ITEM NO I----- ----------------------
I NDE I
METH 1 1 2
-OUTAGE 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-095-1303-2 671900 TCX-2-2103-H7 FW-2-095-401-C62R R155L64RB 672000 TCX-2-2103-H6 FW-2-095-401-S62R R100B870SB 672100 TCX-2-2102-H8 FW-2-095-402-C62R 867RB 672400 TCX-2-2103-H3 FW-2-095-404-S62R RI0OB863SB 672500 TCX-2-2102-H13 FW-2-095-405-C62S 871RB 672600 TCX-2-2102-H15 FW-2-095-408-C62S 871RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 C VT-3 1 C VT-3 1 -
VT-3 1 C VT-3 1 -
VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA SPRING.
TDLR VERIFICATION BOUNDARY C
NA STANCHION.
TDLR VERIFICATION BOUNDARY 672700 TCX-2-2102-117 FW-2-095-410-C62R 866RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
PLAN STATUS- _PRESERVICE YEAR FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD THIRD PERIOD I---------
OUTAGE--- ----------
12 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-095-1303-2 672800 TCX-2-2102-H20 FW-2-095-411-C62K 862RB F-C NOTE 1 VT-3 1
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY 672900 TCX-2-2102-H19 FW-2-095-412-C62K 863RB 673000 TCX-2-2102-Hi FW-2-095-413-C62S 869RB 673050 TCX-2-2102-Hl FW-2-095-413-C62S 869RB 673100 TCX-2-2102-H16 FW-2-095-414-C62K 867RB 673200 TCX-2-2102-HI8 FW-2-095-415-C62K 865RB F-C NOTE 1 F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 VT-3 1
C VT-3 1 -
MT 1
NA SNUBBER.
TDLR VERIFICATION BOUNDARY C
NA SPRING.
TDLR VERIFICATION BOUNDARY C
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
VT-3 1 -
VT-3 1
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY C
NA SNUBBER.
TDLR VERIFICATION BOUNDARY 673300 TCX-2-2102-H14 FW-2-095-702-C62K 871RB F-C NOTE 1 VT-3 1 -
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY PAGE:
138
DATE:
03/16/02 PAGE:
139 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS_______
FIRST PERIOD 12 SECOND PERIOD PRESERVICE YEAR THIRD PERIOD
-OUTAGE2 1
23 1
2 INSTRUCTIONS I
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-095-1303-2 673400 TCX-2-2102-Hll FW-2-095-703-C62R 869RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY 673500 TCX-2-2102-HI0 FW-2-095-704-C62K 867RB F-C NOTE 1 VT-3 1 -
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY 673600 TCX-2-2103-H8 FW-2-095-705-C62K R155L865RB F-C NOTE 1 VT-3 1 -
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY FEEDWATER 6-FW-2-096-1303-2 673700 TCX-2-2203-H25 FW-2-096-402-C62K 866RB 673800 TCX-2-2203-H23 FW-2-096-403-C62K 866RB 673900 TCX-2-2203-H21 FW-2-096-407-C62S 868RB 674000 TCX-2-2203-HI8 FW-2-096-409-C62K 869RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
X X
X X
NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA SPRING.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY I ----------- -----------
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS _PRESERVICE YEAR
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD THIRD PERIOD I ----
I
-O
-0UT AG E 1 12 1
2 3
1 2
INSTRUCTIONS I
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-096-1303-2 674100 TCX-2-2203-H19 FW-2-096-410-C62R 869RB F-C NOTE 1 VT-3 1 -
X NA STRUT.
TDLR VERIFICATION BOUNDARY 674200 TCX-2-2203-H14 FW-2-096-416-C62R 88ORB 674350 TCX-2-2203-H4 FW-2-096-422-C62R 880RB F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 C-C C3.20 F-C NOTE 1 674400 TCX-2-2203-H12 FW-2-096-423-C62R 880RB 674500 TCX-2-2203-HM1 FW-2-096-424-C62R 88ORB 674650 TCX-2-2203-M3 FW-2-096-428-C62R 874RB 674700 TCX-2-2203-H2 FW-2-096-432-C62R 867RB VT-3 1 -
MT 1 -
VT-3 1 -
VT-3 1 -
MT 1
VT-3 1 -
X X
X X
X X
NA STRUT.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA STRUT.
TDLR VERIFICATION BOUNDARY PAGE:
140
DATE:
03/16/02 PAGE:
141 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH
_________PLAN STATUS FIRST PERIOD 112 SECOND PERIOD PRESERVICE YEAR THIRD PERIOD OUTAGE--- ----------
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-096-1303-2 674750 TCX-2-2203-H2 FW-2-096-432-C62R 867RB 674800 TCX-2-2203-H8 FW-2-096-433-C62R 868RB 674900 TCX-2-2203-H9 FW-2-096-434-C62R 868RB 675000 TCX-2-2203-H6 FW-2-096-435-C62R 867RB 675100 TCX-2-2203-H7 FW-2-096-436-C62R 867RB 675200 TCX-2-2204-H11 FW-2-096-439-C62R 864RB C-C C3.20 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 MT 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
X X
K K
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY 675300 TCX-2-2204-H8 FW-2-096-442-S62R RI00CS63SB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC. XI CATGY NDE ITEM NO METH PLAN STATUS-
_PRESERVICE YEAR FIRST SECOND THIRD PERIOD PERIOD PERIOD
----------- ----------- I I------
0 U T A G E - ---------
INSTRUCTIONS i1 2
1 2
3 1
2
- CALIBRATIO]N BLOCK*
FEEDWATER 6-FW-2-096-1303-2 675600 TCX-2-2204-HI FW-2-096-702-C62K R155L864RB F-C NOTE 1 VT-3 1 -
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY 675650 TCX-2-2204-Hi FW-2-096-702-C62K R155L864RB C-C C3.20 MT 1 -
C 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
675700 TCX-2-2203-HI FW-2-096-705-C62K 867RB 675750 TCX-2-2203-Hi FW-2-096-705-C62K 867RB 675800 TCX-2-2203-H24 FW-2-096-707-C62S 865RB 675900 TCX-2-2203-H22 FW-2-096-708-C62K 868RB 676000 TCX-2-2203-Hi5 FW-2-096-709-C62R 88ORB F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
MT 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
X K
NA SNUBBER.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA SPRING.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY DATE:
03/16/02 PAGE:
142
DATE:
03/16/02 PAGE:
143 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS EXAMINATION AREA IDENTIFICATION INSPECTION INTERVAL-I F:
ASME P1 SEC.
XI CATGY NDE i
ITEM NO METH 1
2 PLAN STATUS PRESERVICE YEAR IRST SECOND ERIOD PERIOD THIRD PERIOD
I OUTAGE 1
2 3
1 2
INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-096-1303-2 676100 TCX-2-2203-H5 FW-2-096-710-C62K 88ORB 676150 TCX-2-2203-H5 FW-2-096-710-C62K 88ORB 676300 TCX-2-2203-H17 FW-2-096-712-C62R 86 9RB 676400 TCX-2-2203-H20 FW-2-096-713-C62K 869RB 676500 TCX-2-2204-H12 FW-2-096-716-C62K 864RB F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1
MT 1
VT-3 I
VT-3 1
VT-3 1-X X
X X
X NA SNUBBER.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA STRUT.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY FEEDWATER 6-FW-2-097-1303-2 676600 TCX-2-2303-H9 FW 097-401-S62R 863SB 676900 TCX-2-2302-H4 FW-2-097-405-C62R 867RB F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY
SUMMARY
NUMBER
DATE:
03/16/02 PAGE:
144 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
ASME SEC.
XI CATGY ITEM NO
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND PERIOD PERIOD NDE OUTAGE METH 1
2 1
2 3
THIRD PERIOD 1
2 PRESERVICE YEAR INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-097-1303-2 677000 TCX-2-2302-H6 FW-2-097-408-C62R 677050 TCX-2-2302-H7 FW-2-097-412-C62R F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY 677100 TCX-2-2302-H8 FW-2-097-413-C62R 877RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY 677200 TCX-2-2302-H9 FW-2-097-416-C62R 88ORB 677300 TCX-2-2302-H1O FW-2-097-417-C62R 808ORB 677400 TCX-2-2302-H12 FW-2-097-424-C62R 88ORB 677500 TCX-2-2302-H13 FW-2-097-425-C62R 88ORB F-C NOTE 1 F-C NOTE 1 F-C NOTE I F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 PAGE:
145 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH
_________PLAN STATUS_______
FIRST PERIOD SECOND PERIOD PRESERVICE YEAR THIRD PERIOD I -- -------
U TA GE--- -- ------
1 12 1
2 3
12 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-097-1303-2 677600 TCX-2-2302-H16 FW-2-097-428-C62R 876RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY 677700 TCX-2-2302-HI9 FW-2-097-430-C62R 868RB 677800 TCX-2-2302-H18 FW-2-097-431-C62R 868RB 677900 TCX-2-2302-H20 FW-2-097-433-C62R 868RB 678000 TCX-2-2302-H15 FW-2-097-434-C62R 868RB 678100 TCX-2-2302-H21 FW-2-097-435-C62S 868RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1
VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA SPRING.
TDLR VERIFICATION BOUNDARY 678200 TCX-2-2302-H22 FW-2-097-436-C62K 868RRB F-C NOTE 1 VT-3 1 -
-X NA SNUBBER.
TDLR VERIFICATION BOUNDARY I -- -- -- -- -- -- -- -
DATE:
03/16/02 PAGE:
146 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I ----
I OUTAGE G
1 21 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-097-1303-2 678300 TCX-2-2302-H24 FW-2-097-439-C62K 866RB 678400 TCX-2-2302-H27 FW-2-097-441-C62K 867RB F-C NOTE 1 F-C NOTE 1 VT-3 I
VT-3 1 -
X NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY 678500 TCX-2-2303-HI3 FW-2-097-448-C62K 865RB 678600 TCX-2-2303-H14 FW-2-097-449-C62R 865RB F-C NOTE I F-C NOTE 1 VT-3 1 -
VT-3 1 -
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY 678620 TCX-2-2302-H23 FW-2-097-451-C62K 865RB F-C NOTE I
VT-3 1 -
X NA SNUBBER.
TDLR VERIFICATION BOUNDARY 678700 TCX-2-2302-H5 FW-2-097-702-C62R 866RB F-C NOTE 1 VT-3 1
C NA STRUT.
TDLR VERIFICATION BOUNDARY 678800 TCX-2-2302-H1 FW-2-097-703-C62R 866RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY l I
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS SUNMARY EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH FIRST SECOND PERIOD PERIOD 112 PRESERVICE YEAR THIRD PERIOD OUTAGE G----
1 2
3 1
2 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-097-1303-2 678840 TCX-2-2302-H2 FW-2-097-418-C62R 880RB 678845 TCX-2-2302-H2 FW-2-097-418-C62R 88O0RB 678850 TCX-2-2302-H1 FW-2-097-703-C62R 866RB C-C C3.20 F-C NOTE 1 C-C C3.20 MT 1 -
VT-3 1 -
MT 1 -
C 92 BOX.
TDLR VERIFICATION BOUNDARY.
C NA WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
C 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
678900 TCX-2-2302-H3 FW-2-097-704-C62R 866RB 679000 TCX-2-2302-H17 FW-2-097-706-C62R 868RB 679100 TCX-2-2302-H25 FW-2-097-707-C62S 865RB 679200 TCX-2-2302-H26 FW-2-097-708-C62K 867RB F-C NOTE I F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
C C
X X
NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA SPRING.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY DATE:
03/16/02 PAGE:
147
DATE:
03/16/02 PAGE:
148 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL ASME SEC.
XI CATGY ITEM NO
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION PLAN STATUS FIRST SECOND TI PERIOD PERIOD P1 NDE-OUTAGE-METH 1
2 1
2 3
1 2
pPRESERVICE YEAR HIRD ERIOD INSTRUCTIONS I
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-098-1303-2 679300 TCX-2-2403-H8 FW-2-098-401-C62R 864RB 679400 TCX-2-2402-H5 FW-2-098-402-C62R 866RB 679500 TCX-2-2402-H9 FW-2-098-408-C62S 871RB 679600 TCX-2-2402-Hl1 FW-2-098-411-C62S 871RB 679700 TCX-2-2402-H13 FW-2-098-412-C62K 864RB 679900 TCX-2-2402-H14 FW-2-098-416-C62K 862RB 680000 TCX-2-2402-H4 FW-2-098-417-C62S 872RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1
X VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 I
VT-3 1 -
VT-3 1 -
X K
X K
X NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA SPRING.
TDLR VERIFICATION BOUNDARY NA HANGER.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA HANGER.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I---------
UTAE---------------
112 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-098-1303-2 680050 TCX-2-2402-H4 FW-2-098-417-C62S 872RB C-C C3.20 MT 1 -
X 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
680600 TCX-2-2402-H1O FW-2-098-423-C62R 871RB 680700 TCX-2-2402-H8 FW-2-098-424-C62R 871RB 680800 TCX-2-2402-H3 FW-2-098-704-C62K 680850 TCX-2-2402-H3 FW-2-098-704-C62K 872RB 680900 TCX-2-2402-H7 FW-2-098-706-C62R 868RB 681000 TCX-2-2402-H2 FW-2-098-708-C62R 871RB F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
MT 1 -
VT-3 1 -
VT-3 1 -
X X
X X
X NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA STRUT.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY PAGE:
149
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR ASME SEC.
XI CATGY ITEM NO
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION FIRST PERIOD SECOND PERIOD THIRD PERIOD I ----
I NDE METH I Ii OUTAGE G----
1 2
3 1
2 2
INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-098-1303-2 681050 TCX-2-2402-H2 FW-2-098-708-C62R 871RB C-C C3.20 MT 1 -
X 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
FEEDWATER 6-FW-2-099-1303-2 681100 TCX-2-2102-H7 FW-2-099-402-C62K 868RB 681200 TCX-2-2102-H6 FW-2-099-405-C62R 869RB 681300 TCX-2-2102-H3 FW-2-099-408-C62R 860RB 681400 TCX-2-2102-H4 FW-2-099-700-C62K 860RE F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
VT-3 1 -
VT-3 1 -
VT-3 1 -
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA SNUBBER.
TDLR VERIFICATION BOUNDARY 681500 TCX-2-2102-H5 FW-2-099-702-C62R 867RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY 681600 TCX-2-2102-H2 FW-2-099-703-C62K 860RB F-C NOTE 1 VT-3 1
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY PAGE:
150
DATE:
03/16/02 PAGE:
151 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL
__PLAN STATUS FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD PRESERVICE YEAR THIRD PERIOD I---------
O TAGE--------------
112 123 12 INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-100-1303-2 681700 TCX-2-2204-H13 FW-2-100-401-C62R 863RB F-C NOTE 1 VT-3 1 -
X NA STRUT.
TDLR VERIFICATION BOUNDARY 681850 TCX-2-2204-H4 FW-2-100-403-C62R R155L863RB 681900 TCX-2-2204-H3 FW-2-100-406-C52R R155L857RB C-C C3.20 F-C NOTE 1 MT 1 -
VT-3 1 -
C C
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA STRUT.
TDLR VERIFICATION BOUNDARY 681950 TCX-2-2204-H3 FW-2-100-406-C52R R155L857RB 682050 TCX-2-2204-H2 FW-2-100-701-C52R R155L855RB C-C C3.20 C-C C3.20 MT 1
MT 1
C C
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
FEEDWATER 6-FW-2-101-1303-2 682100 TCX-2-2303-H6 FW-2-101-401-C62R 863RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY 682200 TCX-2-2303-H3 FW-2-101-403-C62R 863RB F-C NOTE 1 VT-3 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 PAGE:
152 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS FIRST SECOND PERIOD PERIOD 112 PRESERVICE YEAR THIRD PERIOD OUTAGE G
I 1
2 3
12 I
INSTRUCTIONS
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-101-1303-2 682250 TCX-2-2303-H3 FW-2-101-403-C62R 863RB 682300 TCX-2-2303-H2 FW-2-101-404-C52R 856RB 682350 TCX-2-2303-H2 FW-2-101-404-C52R 856RB 682400 TCX-2-2303-HS FW-2-101-405-C52R 857RB 682500 TCX-2-2303-H4 FW-2-101-406-C52R 855RB 682650 TCX-2-2303-HI FW-2-101-700-C52R 855RB C-C C3.20 F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 C-C C3.20 MT 1
VT-3 1 -
MT 1
C 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
C NA STRUT.
TDLR VERIFICATION BOUNDARY C
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
VT-3 1 -
VT-3 1 -
MT 1 -
C NA STRUT.
TDLR VERIFICATION BOUNDARY C
NA STRUT.
TDLR VERIFICATION BOUNDARY C
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
FEEDWATER 6-FW-2-102-1303-2 682700 TCX-2-2402-H15 FW-2-102-403-C62R 868RB F-C NOTE 1 VT-3 1 -
X NA STRUT.
TDLR VERIFICATION BOUNDARY
DATE:
03/16/02 COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS_
PRESERVICE YEAR FIRST
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION ASME SEC.
XI CATGY NDE ITEM NO METH SECOND PERIOD PERIOD THIRD PERIOD I ----------------------------
I I -------
OUTAGE---------
1 1 2
1 2
3 1
2 INSTRUCTIONS I
- CALIBRATION BLOCK**
FEEDWATER 6-FW-2-102-1303-2 682800 TCX-2-2402-HI8 FW-2-102-404-C62R 868RB F-C NOTE I VT-3 1 -
X NA STRUT.
TDLR VERIFICATION BOUNDARY 682900 TCX-2-2402-HI FW-2-102-700-C62R 863RB 682950 TCX-2-2402-H1 FW-2-102-700-C62R 863RB 683000 TCX-2-2402-HI6 FW-2-102-702-C62K 868RB 683100 TCX-2-2402-H17 FW-2-102-703-C62R 868RB F-C NOTE 1 C-C C3.20 F-C NOTE 1 F-C NOTE 1 VT-3 1 -
MT 1 -
VT-3 1 -
VT-3 1 -
X X
NA STRUT.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
NA SNUBBER.
TDLR VERIFICATION BOUNDARY NA STRUT.
TDLR VERIFICATION BOUNDARY MAIN STEAM 32-MS-2-001-1303-2 683200 TCX-2-2100-H6 MS-2-001-402-C72S R1550890RB 683400 TCX-2-2100-HI MS-2-001-405-C72K R155089ORB F-C VT-3 1 C NOTE 1 F-C NOTE 1 VT-3 1 C NA SPRING.
TDLR VERIFICATION BOUNDARY NA SNUBBER.
TDLR VERIFICATION BOUNDARY PAGE:
153
COMANCHE PEAK UNIT 2 INSERVICE INSPECTION PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL_
FIRST ASME j
PERIOD
SUMMARY
EXAMINATION AREA NUMBER IDENTIFICATION SEC.
XI CATGY NDE ITEM NO METH PLAN STATUS SECOND THIRD PERIOD PERIOD SOUTAGE-------------
12 1
2 3
1 2
PRESERVICE YEAR INSTRUCTIONS "i
- CALIBRATION BLOCK**
MAIN STEAM 32-MS-2-001-1303-2 683450 TCX-2-2100-H1 MS-2-001-405-C72K R1550890RB C-C C3.20 MT I C 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
MAIN STEAM 32-MS-2-002-1303-2 684400 TCX-2-2200-H2 MS-2-002-408-C72K R155N900RB F-C NOTE 1 VT-3 1 -
C NA SNUBBER.
TDLR VERIFICATION BOUNDARY 684450 TCX-2-2200-H2 MS-2-002-408-C72K R155N900RB C-C MT 1-C3.20 C
92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
684500 TCX-2-2200-Hl MS-2-002-411-C72K R155N900RB 684550 TCX-2-2200-HI MS-2-002-411-C72K R155N900RB F-C NOTE 1 C-C C3.20 VT-3 1 -
MT 1 -
C C
NA SNUBBER.
TDLR VERIFICATION BOUNDARY 92 WELDED ATTACHMENT.
TDLR VERIFICATION BOUNDARY.
MAIN STEAM 32-MS-2-003-1303-2 685100 TCX-2-2300-H7 MS-2-003-402-C72S 894RB F-C VT-3 1
NOTE 1 C
NA U-BOLT.
TDLR VERIFICATION BOUNDARY PAGE:
154 DATE:
03/16/02