MONTHYEARML22027A3642022-01-26026 January 2022 KPS: CY2022 Inspection Plan, Docket No. 05000305, License No. DPR-43 ML17354A9382017-12-20020 December 2017 CY2018 Master Inspection Plan ML16356A6032016-12-21021 December 2016 Master Inspection Plan Calendar Year 2017 ML15357A1902015-12-21021 December 2015 Master Inspection Plan - Calendar Year 2016 ML14353A4082014-12-18018 December 2014 Master Inspection Plan - Calendar Year 2015 IR 05000305/20120012013-03-0404 March 2013 Annual Assessment Letter for Kewaunee Power Station (Report 05000305/2012001) ML12277A1642012-09-27027 September 2012 Response to Request for Additional Information on Reactor Vessel Internals Inspection Plan Review Request ML12249A4192012-09-0404 September 2012 Mid-Cycle Assessment Letter for Kewaunee Power Station IR 05000305/20110062011-09-0101 September 2011 Mid-Cycle Letter for Kewaunee Power Station; 05000305-11-006 IR 05000305/20110012011-03-0404 March 2011 Annual Assessment Letter for Kewaunee Power Station (05000305-11-001) ML1024400582010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan - Kewaunee Power Station IR 05000305/20100012010-03-0303 March 2010 Kewaunee Power Station EOC Annual Assessment Letter (Report 05000305-10-001) ML0924402722009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan IR 05000305/20090012009-03-0404 March 2009 Annual Assessment Letter, Kewaunee (IR 05000305-09-001) ML0824602762008-09-0202 September 2008 Kewaunee - Mid-Cycle Performance Review and Inspection Plan ML0735403332007-12-19019 December 2007 Change to the Inspection Plan 1/1/08 - 12/31/08 ML0724304312007-08-31031 August 2007 8/31/07 Kewaunee - Mid-Cycle Performance Review and Inspection Plan ML0707103942007-03-12012 March 2007 Document Request Letter for PI&R Inspection IR 05000305/20070012007-03-0202 March 2007 EOC Annual Assessment Letter (Report 05000305-07-001) ML0705701322007-01-18018 January 2007 Inspection Plan Kewaunee IR 05000305-07-006 (DRS) ML0703102502007-01-18018 January 2007 IR 05000305-07-006, Kewaunee Power, Inspection Plan ML0624303402006-08-31031 August 2006 Mid-Cycle Performance Review and Inspection Plan IR 05000305/20060012006-03-0202 March 2006 (EOC) Annual Assessment Letter (Report 05000305/2006001) ML0524202512005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Kewaunee Power Station ML0506204232005-03-0202 March 2005 Annual Assessment Letter - Kewaunee, 03/02/05 ML0424505152004-08-30030 August 2004 Mid-cycle Performance Review and Inspection Plan - Kewaunee Nuclear Power Plant ML0406411582004-03-0404 March 2004 End-of-Cycle Letter IR 05000305/20040012003-08-27027 August 2003 IR 05000305-04-001 - Mid-Cycle Assessment Letter IR 05000305/20030012003-03-0404 March 2003 Annual Assessment Letter - Kewaunee (Report 05000305-03-001) ML0224002262002-08-22022 August 2002 Mid-Cycle Performance Review and Inspection Plan - Kewaunee Nuclear Power Plant (August 22, 2002) IR 05000305/20020012002-03-0404 March 2002 Annual Assessment Letter - Kewaunee Nuclear Plant (Report 50-305/02-01) 2022-01-26
[Table view] Category:Letter
MONTHYEARIR 05000305/20240032024-11-0606 November 2024 NRC Inspection Report No. 05000305/2024003 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000305/20240022024-08-22022 August 2024 NRC Inspection Report 05000305/2024002 ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24136A1952024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report ML24130A0022024-05-0909 May 2024 Summary of Facility Changes, Tests and Experiments and Commitment Changes IR 05000305/20240012024-05-0202 May 2024 NRC Inspection Report No. 05000305/2024001 ML24121A2472024-04-29029 April 2024 And Three Mile Island, Unit 2 - 2023 Occupational Radiation Exposure Annual Report ML24101A0422024-04-22022 April 2024 Solutions Inc. – Exemption from Select Requirements of 10 CFR Part 73 ((Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24106A0492024-04-15015 April 2024 2023 Annual Radioactive Effluent Release Report ML24080A0702024-03-20020 March 2024 Decommissioning Trust Fund Annual Report ML24079A0162024-03-19019 March 2024 Annual Property Insurance Status Report ML24073A2312024-03-13013 March 2024 And Three Mile Island Nuclear Station, Unit 2 - Management Change ML24061A0202024-02-15015 February 2024 (Ksp) ISFSI, Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 6 ML23339A1332024-01-26026 January 2024 Exemption from the Req of 10 CFR Part 50.82(a)(8)(i)(A) to Use the Kewaunee Decommissioning Trust Fund for the Management of Site Restoration Activities IR 05000305/20230022023-12-27027 December 2023 NRC Inspection Report 05000305/2023002 (Drss); 07200064/2023001 (Drss) ML23332A1922023-11-28028 November 2023 Solutions, Inc., Request for Exemptions from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23278A1002023-10-0505 October 2023 Response to Request for Additional Information (RAI) Application for Kewaunee Solutions (Ks) Site Restoration Activities ML23222A1522023-08-29029 August 2023 Letter RAI KPS Exemption Site Restoration Final Repaired IR 05000305/20230012023-08-17017 August 2023 NRC Inspection Report No. 05000305/2023001-Kewaunee Power Station ML23171B0822023-07-0505 July 2023 Letter - Kewaunee Power Station - Issuance of Exemption from Certain Requirements from 10 CFR Part 20, Appendix G, Section Iii.E ML23132A0012023-05-11011 May 2023 2022 Annual Radiological Environmental Operating Report ML23116A2182023-04-26026 April 2023 2022 Annual Radioactive Effluent Release Report ML23089A3042023-03-30030 March 2023 Decommissioning Fund Status Report ML23093A0312023-03-29029 March 2023 Solutions, Inc., Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) for Site Restoration Activities ML23088A2752023-03-29029 March 2023 Solutions, Inc., Request for Exemption from 10 CFR 20, Appendix G, Section Iii.E ML23087A0292023-03-27027 March 2023 2022 Annual Report of Occupational Radiation Exposure ML23087A0402023-03-27027 March 2023 Annual Property Insurance Status Report ML23066A3232023-03-0707 March 2023 Energysolutions, LLC, Notification of Closing of Transaction ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring IR 05000305/20220022023-01-0303 January 2023 NRC Inspection Report Nos. 05000305/2022002(DRSS) – Kewaunee Power Station ML22292A2302022-11-25025 November 2022 U.S. Nuclear Regulatory Commission’S Analysis of Dominion Energy Kewaunee‘S Decommissioning Funding Status Report for Kewaunee Power Station, Docket No. 50-305 ML22290A0052022-10-13013 October 2022 Resubmittal of Kewaunee Power Station Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (Ioep) and IOEP- Emergency Action Level (EAL) Basis Document, Revision 0KS ML22241A0302022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Plan, Training and Qualification Plan and Safeguards Contingency Plan, Revision 5 ML24061A0182022-08-25025 August 2022 (Ksp) ISFSI Submittal of Security Pla11, Training and Qualification Plan and Safeguards Contingency Plan Revision 5 IR 05000305/20220012022-08-0101 August 2022 NRC Inspection Report Nos. 05000305/2022001(DNMS) - Kewaunee Power Station ML22215A1512022-07-27027 July 2022 Executed Financial Assurance Instruments for the Kewaunee License Transfer License No. DPR-43 (Docket Nos. 50-305, 72-64) ML22209A1252022-07-26026 July 2022 Amendment No. 11 to Indemnity Agreement No. B-53 for Kewaunee Power Station (KPS) - Signed by Kewaunee Solutions, Inc ML22175A1132022-06-30030 June 2022 Solutions, Inc. - Letter for Review and Acceptance of the Energysolutions, LLC Decommissioning Quality Assurance Program with Enclosure ML22160A5282022-06-28028 June 2022 Enclosure 2 - Amendment No. 11 to Indemnity Agreement B-53 ML22160A5262022-06-28028 June 2022 Letter - KPS - Issuance of Conforming License Amendment Regarding Indirect Transfer of License from DEK, Inc. to Kewaunee Solutions, Inc ML22160A5272022-06-28028 June 2022 Enclosure 1 - Amendment No. 221 to Renewed Facility Operating License No. DPR-43 ML22188A0812022-06-23023 June 2022 ISFSI, Virgil C. Summer Nuclear Station, Unit 1 & ISFSI, North Anna Power Station, Units 1 & 2 & ISFSI, Surry Power Station, Units 1 & 2 & ISFSI - Submission of Revision 32 of the Quality Assurance Topical Report ML22172A2452022-06-22022 June 2022 Notification of Planned Closing Date and Required Regulatory Approvals for the Kewaunee License Transfer Transaction ML22175A0662022-06-17017 June 2022 Designation of Additional Reviewing Official for ISFSI and 10 CFR Part 37 Program Security Background Investigations ML22166A3392022-06-13013 June 2022 Notification of Nuclear Insurance ML22158A2112022-05-10010 May 2022 Summary of Facility Changes, Tests and Experiments and Summary of Commitment Changes ML22138A2552022-05-10010 May 2022 Submittal of 2021 Annual Radiological Environmental Operating Report ML22108A0352022-04-0101 April 2022 License Transfer to Kewaunee Solutions, Inc 2024-09-18
[Table view] |
Text
rch 4, 2002
SUBJECT:
ANNUAL ASSESSMENT LETTER - KEWAUNEE NUCLEAR PLANT (Report 50-305/02-01)
Dear Mr. Warner:
On January 31, 2001, the NRC staff completed its end-of-cycle plant performance assessment of the Kewaunee Nuclear Plant. The end-of-cycle review for Kewaunee involved the participation of all technical divisions in evaluating performance indicators (PIs) for the most recent quarter and inspection results for the period from April 1 through December 31, 2001.
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility so that you will have an opportunity to prepare for these inspections and to inform us of any planned inspections which may conflict with your plant activities.
As discussed in our previous annual assessment letter dated May 31, 2001, this inspection and assessment cycle consisted of three quarters (i.e., the second, third, and fourth calendar quarters of calendar year 2001) instead of the usual four quarters. This change was implemented in order to align the inspection and assessment cycle with the calendar year beginning on January 1, 2002.
Overall, Kewaunee operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter, as well as for the first two quarters of the assessment cycle, was within the Licensee Response Column of the NRCs Action Matrix based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct only baseline inspections at your facility through March 31, 2003.
The enclosed inspection plan details the inspections scheduled through March 31, 2003. The inspection plan is provided to minimize the resource impact on your staff and to allow for scheduling conflicts and personnel availability to be resolved in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature.
The last 6 months of the inspection plan are tentative and may be revised at the Mid-Cycle Review meeting. In addition to the baseline inspection program, the NRC issued safeguards advisories recommending that nuclear power plant licensees go to the highest level of security immediately following the terrorist attacks on the World Trade Center and the Pentagon, and all promptly did so. With continued uncertainty about the possibility of additional terrorist activities, the Nation's nuclear power plants, including Kewaunee, remain at a high level of security. On February 25, 2002, the NRC issued an Order to all nuclear power plant licensees, requiring them to take certain additional interim compensatory measures to address the generalized high-level threat environment. These additional compensatory requirements will provide the NRC with reasonable assurance that public health and safety and the common defense and security continue to be adequately protected in the current generalized high-level threat environment. These requirements will remain in effect pending notification from the Commission that a significant change in the threat environment occurs, or until the Commission determines that other changes are needed following a more comprehensive re-evaluation of current safeguards and security programs. To date, we have monitored Kewaunees actions in response to the terrorist attacks through a series of audits. With the issuance of the Order, we will evaluate Kewaunees compliance with these interim requirements.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/NRC/ADAMS/index.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact me at (630) 829-9631 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Roger D. Lanksbury, Chief Projects Branch 5 Division of Reactor Projects, Region 3 Docket No. 50-305 License No. DPR-43 Enclosure: Kewaunee Inspection/Activity Plan See Attached Distribution DOCUMENT NAME: G:\EOC Ltrs\2002\Kew-eoc02.wpd To receive a copy of this document, indicate in the box:"C" = Copy without enclosure "E"= Copy with enclosure"N"= No copy OFFICE RIII RIII NAME MKunowski:co RLanksbury DATE 03/ /02 02/ /02 OFFICIAL RECORD COPY cc w/encl: T. Coutu, Manager, Kewaunee Plant D. Graham, Director, Bureau of Field Operations Chairman, Wisconsin Public Service Commission State Liaison Officer ADAMS Distribution:
AJM DFT H. Nieh, OEDO T. Boyce, NRR Project Director, NRR Project Mgr., NRR RidsNrrDipmlipb J. Caldwell, RIII G. Grant, RIII B. Clayton, RIII R. Lickus, RIII SRI Kewaunee DRPIII DRSIII PLB1 JRK1 BAH3
Page 1 of 2 Kewaunee 03/08/2002 06:50:47 Inspection / Activity Plan Report 22 03/04/2002 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type HTSINK B - BIENNIAL HEAT SINK 1 1 IP 7111107B Heat Sink Performance 03/04/2002 03/08/2002 Baseline Inspections IP 71121 - ALARA & RP ACCESS CONTROL INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 03/18/2002 03/22/2002 Baseline Inspections 1 IP 7112102 ALARA Planning and Controls 03/18/2002 03/22/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 03/18/2002 03/22/2002 Baseline Inspections IP 71121 - RAD INSTRUMENTATION INSP 1 1 IP 7112101 Access Control to Radiologically Significant Areas 07/08/2002 07/12/2002 Baseline Inspections 1 IP 7112103 Radiation Monitoring Instrumentation 07/08/2002 07/12/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 07/08/2002 07/12/2002 Baseline Inspections FY 2002 - KEWAUNEE INIT PREP 07/2002 3 1 W90056 OL - INITIAL EXAM - KEWAUNEE - JUL/AUG/SEP 2002 07/29/2002 08/02/2002 Not Applicable IP 71114 - EP BASELINE INSPECTION (NON-EXERCISE) 1 1 IP 7111402 Alert and Notification System Testing 08/12/2002 08/16/2002 Baseline Inspections 1 IP 7111403 Emergency Response Organization Augmentation Testing 08/12/2002 08/16/2002 Baseline Inspections 1 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 08/12/2002 08/16/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 08/12/2002 08/16/2002 Baseline Inspections 71111.11 - LIC OPERATOR REQUAL PROGRAM EVALUATION 2 1 IP 7111111B Licensed Operator Requalification 08/19/2002 08/23/2002 Baseline Inspections FY 2002 - KEWAUNEE INIT EXAM 08&09/2002 3 1 W90056 OL - INITIAL EXAM - KEWAUNEE - JUL/AUG/SEP 2002 08/26/2002 09/13/2002 Not Applicable IP 71122 - REMP & UNCONDITIONAL RELEASE INSP 1 1 IP 7112101 Access Control to Radiologically Significant Areas 09/16/2002 09/20/2002 Baseline Inspections 1 IP 7112203 Radiological Environmental Monitoring Program 09/16/2002 09/20/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/16/2002 09/20/2002 Baseline Inspections 71130 - SAFEGUARDS INSPECTION-AA/AC/PI/PC 1 1 IP 7113001 Access Authorization Program (Behavior Observation Only) 09/23/2002 09/27/2002 Baseline Inspections 1 IP 7113002 Access Control (Search of Personnel, Packages, and Vehicles: Identification and Authorization) 09/23/2002 09/27/2002 Baseline Inspections 1 IP 7113004 Security Plan Changes 09/23/2002 09/27/2002 Baseline Inspections 1 IP 71151 Performance Indicator Verification 09/23/2002 09/27/2002 Baseline Inspections SSDI - SAFETY SYSTEM DESIGN 5 1 IP 7111121 Safety System Design and Performance Capability 10/21/2002 11/08/2002 Baseline Inspections MAINT B - BIENNIAL MAINTENANCE RULE 1 1 IP 7111112B Maintenance Rule Implementation 12/02/2002 12/06/2002 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Kewaunee 03/08/2002 06:50:47 Inspection / Activity Plan Report 22 03/04/2002 - 03/31/2003 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type IP 71122 - RAD MATERIAL PROC/SHIPPING INSPECTION 1 1 IP 7112101 Access Control to Radiologically Significant Areas 02/10/2003 02/14/2003 Baseline Inspections 1 IP 7112202 Radioactive Material Processing and Transportation 02/10/2003 02/14/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.