Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML24158A0072024-09-17017 September 2024 SLR License DPR-41 ML24158A0052024-09-17017 September 2024 Completion of Subsequent License Renewal Site Specific Environmental Review and Modification to Subsequent Renewed Facility Operating Licenses ML24158A0062024-09-17017 September 2024 SLR License DPR-31 ML24159A2652024-06-26026 June 2024 Correction of Safety Evaluation for Issuance of Amendment Nos. 298 & 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML24036A0732024-02-12012 February 2024 – Correction of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23320A3062024-01-22022 January 2024 Issuance of Amendment Nos. 298 and 291 Regarding Revising the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications ML23249A2412023-09-25025 September 2023 Regulatory Audit Summary for the Review of License Amendment Request to Revise the Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project ML23082A0402023-04-0505 April 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment Nos. 260 and 255 ML22028A0662022-05-24024 May 2022 Issuance of Amendment Nos. 296 and 289 Regarding Implementation of Full Spectrum Loss-of-Coolant Accident (Fsloca) Methodology (EPID L-2021-LLA-0070)- Non-Proprietary ML22098A0902022-04-13013 April 2022 Nextera/Fpl Non-Proprietary Presentation for April 13, 2022 Public Meeting Re Planned Turkey Point Digital Instrumentation and Controls License Amendment Request (EPID L-2021-LRM-0007) (Slides) ML22020A4032022-02-0707 February 2022 Summary of November 17, 2021, Meeting with Florida Power and Light/Nextera on Improved Technical Specification Conversion License Amendment Requests (EPIDs L-2021-LLI-0000 and L-2021-LLI-0002) ML21279A0432021-10-15015 October 2021 Summary of Pre-Application Meetings with Florida Power and Light Concerning a Proposed Digital Instrumentation and Control Upgrade for Turkey Point, Units 3 and 4 ML21119A3552021-05-26026 May 2021 Correction to Amendment Concerning Extension of Containment Leak Rate Testing Frequency Amendments ML21032A0202021-02-26026 February 2021 Issuance of Amendment Nos. 295 and 268 Concerning Extension of Containment Leak Rate Testing Frequency ML20198M4982021-01-27027 January 2021 Issuance of Amendment Nos. 294 and 267 Regarding Emergency Action Level Scheme Upgrade (EPID L-2019-LLA-0271) (L-2019-203) ML20237F3852020-10-20020 October 2020 Issuance of Amendment Nos. 293 and 286 Regarding Containment Atmospheric Radioactivity Ventilation Isolation and Leakage Detection System ML20104B5272020-04-16016 April 2020 Issuance of Exigent Amendment No. 291 Concerning the Deferral of Steam Generator Inspections ML19357A1952020-02-10010 February 2020 Unit No.1; & Turkey Point Nuclear Generating Unit Nos. 3 & 4 - Issuance of Amendments Nos. 265, 268, 164, 290, and 284 Revise Technical Specifications to Adopt TSTF-563 ML19266A5852019-12-17017 December 2019 Issuance of Amendment Nos. 289 and 283 Technical Specification Applicability to Equipment Shared Between Units and Exception to Technical Specification 4.0.4 ML19310D7782019-12-0404 December 2019 Florida Power & Light Company - Turkey Point Nuclear Generating Unit 4 Subsequent Renewed Facility Operating License ML19305C8792019-12-0404 December 2019 LTR - Issuance of Subsequent Renewed Facility Operating License Nos. DPR-31 and DPR-41 for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML19310D7772019-12-0404 December 2019 Florida Power & Light Company - Turkey Point Nuclear Generating Unit 3 Subsequent Renewed Facility Operating License ML19031C8912019-08-15015 August 2019 Issuance of Amendment Nos. 288 and 282 Regarding Revised Reactor Core Safety Limit to Reflect WCAP-17642-PA Revision 1 ML19148A7442019-07-31031 July 2019 Issuance of Amendment Nos. 161, 249, 200, 287, and 281 to Add Technical Specification Limiting Condition for Operation 3.0.6 L-2019-088, Subsequent License Renewal Application FPL Comments Regarding the NRC Biological Assessment2019-04-18018 April 2019 Subsequent License Renewal Application FPL Comments Regarding the NRC Biological Assessment ML19064A9032019-03-27027 March 2019 Issuance of Amendments Regarding Transition License Conditions for Reactor Coolant Pump Seals ML18354A6732019-03-18018 March 2019 Issuance of Amendments Regarding Technical Specifications Changes to Modify Emergency Diesel Generator Partial-Load Rejection Surveillance Requirement ML18270A4292018-12-0303 December 2018 Issuance of Amendments Nos. 284 and 278 Regarding Adoption of Risk-Informed Completion Times in Technical Specifications (CAC Nos. MF5455 and MF5456; EPID L-2014-LLA-0002) ML18255A3602018-11-14014 November 2018 Issuance of Amendments Regarding Technical Specifications Changes to Address Non-Conservative Actions for Containment and Control Room Ventilation Functions ML18019A0782018-03-19019 March 2018 Issuance of Amendments Regarding the Elimination of Certain Technical Specification Reporting Requirements (CAC Nos. MF9601 and MF9602; EPID L-2017-LLA-0213) ML18018A5592018-02-20020 February 2018 Issuance of Amendments Regarding the Technical Specification Requirements Pertaining to Mode Change Limitations (CAC Nos. MF9903 and MF9904; EPID L-2017-LLA-0254) ML17228A5632017-10-26026 October 2017 Issuance of Amendments Regarding Technical Specifications for High-Range Noble Gas Effluent Monitors ML17209A3192017-09-28028 September 2017 Issuance of Amendments Regarding Technical Specifications for Auxiliary Feedwater Actuation ML17172A1152017-08-0303 August 2017 Turkey Point Nuclear Plant Generating Unit Nos. 3 and 4 - Issuance of Amendments Regarding Technical Specifications for Control Room Emergency Ventilation System (CAC Nos. MF8221 and MF8222) ML17027A0782017-04-0707 April 2017 Issuance of Amendments Regarding Technical Specifications for Inservice Testing Programs (CAC Nos. MF8202 Through MF8209) ML17004A2922017-02-0909 February 2017 Issuance of Amendments Regarding Technical Specifications for Snubbers ML16120A4732016-06-20020 June 2016 Issuance of Amendments Regarding Technical Specifications for Moderator Temperature Coefficient Measurements ML16004A0192016-04-26026 April 2016 Issuance of Amendments Regarding Technical Specification Figure for the Boric Acid Tank Minimum Volume ML16040A3732016-03-29029 March 2016 Issuance of Amendments Regarding Technical Specifications for Communications and the Manipulator Crane ML16008B0722016-02-25025 February 2016 Issuance of Amendments Regarding Technical Specifications for Facility Staff Qualifications for Licensed Operators ML15294A4432015-11-0909 November 2015 Issuance of Amendments Regarding Emergency Core Cooling System Technical Specifications ML15233A3792015-09-28028 September 2015 Issuance of Amendments Regarding Cyber Security Milestone 8 Completion Date in the Renewed Facility Operating Licenses ML15205A1742015-08-14014 August 2015 Issuance of Amendments Regarding Removal of Reactor Coolant System Chemistry Requirements from the Technical Specifications and Relocation of Requirements in Licensee-Controlled Documents ML15181A1792015-07-27027 July 2015 Issuance of Amendments Regarding Adoption of Technical Specification Task Force Traveler 523 (TSTF-523), Revision 2 ML13329A0922014-06-13013 June 2014 Issuance of Amendments Regarding Operating License Conditions and Technical Specifications ML13329A1392014-02-21021 February 2014 Issuance of Amendments Regarding the Use of Optimized Zirlo Fuel Rod Cladding Material ML13207A0952013-09-10010 September 2013 Issuance of Amendment No. 258 Regarding a One-Time Extension of Unit 3 Technical Specification Surveillance Requirement 4.5.1.1.d ML13059A2242013-04-0202 April 2013 Issuance of Amendments Regarding the Recirculation Ph Control System and Sodium Tetraborate Basket Loading ML12339A1122012-12-17017 December 2012 Issuance of Amendments Regarding Revision of Cyber Security 2024-09-17
[Table view] Category:Technical Specifications
MONTHYEARML24269A1292024-09-24024 September 2024 Response to Requests for Additional Information Regarding Turkey Point License Amendment Request 277, Updated Spent Fuel Pool Criticality Analysis ML24135A0932024-05-0909 May 2024 Periodic Update to the Updated Final Safety Analysis Report, Chapter 15, Technical Specifications ML23234A1922023-09-27027 September 2023 Issuance of Amendment Nos. 297 and 290 Regarding Conversion to Improved Standard Technical Specifications L-2023-063, Enclosure 2, Volume 1: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Application of Selection Criteria to Technical Specifications, Revision 2, Volume 12023-05-24024 May 2023 Enclosure 2, Volume 1: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Application of Selection Criteria to Technical Specifications, Revision 2, Volume 1 ML23151A4472023-05-24024 May 2023 Enclosure 2, Volume 9: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.4, Reactor Coolant System, Revision 3 ML23151A4452023-05-24024 May 2023 Enclosure 2, Volume 7:Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.2, Power Distribution Limits, Revision 2 ML23151A4372023-05-24024 May 2023 Attachment 3: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion License Amendment Request NRC Request for Additional Information and FPL Responses Database ML23151A4382023-05-24024 May 2023 Enclosure 1: Contents of the Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Submittal ML23151A4402023-05-24024 May 2023 Enclosure 2, Volume 2: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Revision 2, Volume 2 ML23151A4362023-05-24024 May 2023 License Amendment Request Revision 3 for the Technical Specifications Conversion to NUREG - 1431 Revision 5 ML23151A4532023-05-24024 May 2023 Enclosure 2, Volume 15: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Chapter 4, Design Features, Revision 1 ML23151A4422023-05-24024 May 2023 Enclosure 2, Volume 4: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Chapter 2, Safety Limits, Revision 1 ML23151A4542023-05-24024 May 2023 Enclosure 2, Volume 16: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Chapter 5, Administrative Controls, Revision 2 ML23151A4412023-05-24024 May 2023 Enclosure 2, Volume 3, Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Revision 2, Chapter 1 - Use and Application, Revision 2 ML23151A4432023-05-24024 May 2023 Enclosure 2, Volume 5: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3, LCO and SR Applicability, Revision 2 ML23151A4462023-05-24024 May 2023 Enclosure 2, Volume 8: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.3, Instrumentation, Revision 3 ML23151A4442023-05-24024 May 2023 Enclosure 2, Volume 6: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.1, Reactivity Control Systems, Revision 2 ML23151A4512023-05-24024 May 2023 Enclosure 2, Volume 13: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.8, Electrical Power Systems, Revision 3 ML23151A4492023-05-24024 May 2023 Enclosure 2, Volume 11:Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.6, Containment Systems, Revision 3 ML23151A4502023-05-24024 May 2023 Enclosure 2, Volume 12: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.7, Plant Systems, Revision 2 ML23151A4482023-05-24024 May 2023 Enclosure 2, Volume 10: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.5, Emergency Core Cooling Systems, Revision 2 ML23151A4522023-05-24024 May 2023 Enclosure 2, Volume 14: Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion, Section 3.9, Refueling Operations, Revision 2 ML23095A0202023-04-0404 April 2023 Enclosure 2 - ITS Section 3.8 Electrical Power Systems, Revision 2, Volume 13 L-2023-043, Enclosure 2 - Application of Selection Criteria to the Turkey Point Nuclear Generating Station Units 3 and 4 Technical Specifications, Revision 2, Volume 12023-04-0404 April 2023 Enclosure 2 - Application of Selection Criteria to the Turkey Point Nuclear Generating Station Units 3 and 4 Technical Specifications, Revision 2, Volume 1 ML23095A0122023-04-0404 April 2023 Enclosure 2 - ITS Chapter 1.0 Use and Application, Revision 2, Volume 3 ML23095A0132023-04-0404 April 2023 Enclosure 2 - ITS Section 3.0 LCO and SR Applicability, Revision 2, Volume 5 ML23095A0092023-04-0404 April 2023 Enclosure 1 - Contents of the Turkey Point Nuclear Plant, Units 3 and 4 Improved Technical Specifications (ITS) Submittal ML23095A0142023-04-0404 April 2023 Enclosure 2 - ITS Section 3.1 Reactivity Control Systems, Revision 2, Volume 6 ML23095A0162023-04-0404 April 2023 Enclosure 2 - ITS Section 3.4 Reactor Coolant System (Rcs), Revision 2, Volume 9 ML23095A0192023-04-0404 April 2023 Enclosure 2 - ITS Section 3.7 Plant Systems, Revision 2, Volume 12 ML23095A0172023-04-0404 April 2023 Enclosure 2 - ITS Section 3.5 Emergency Core Cooling Systems (Eccs), Revision 2, Volume 10 ML23095A0152023-04-0404 April 2023 Enclosure 2 - ITS Section 3.2 Power Distribution Limits, Revision 2, Volume 7 ML23095A0182023-04-0404 April 2023 Enclosure 2 - ITS Section 3.6 Containment Systems, Revision 2, Volume 11 ML23095A0212023-04-0404 April 2023 Enclosure 2 - ITS Section 3.9 Refueling Operations, Revision 2, Volume 14 ML23095A0222023-04-0404 April 2023 Enclosure 2 - ITS Chapter 5.0 Administrative Controls, Revision 2, Volume 16 ML22089A2102022-03-30030 March 2022 Enclosure 2 - Volume 12, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.7, Plant Systems Revision 1 ML22089A2032022-03-30030 March 2022 Enclosure 2 - Volume 5, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.0 LCO and SR Applicability, Revision 1 ML22089A2072022-03-30030 March 2022 Enclosure 2 - Volume 9, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.4, Reactor Coolant System (Rcs), Revision 1 ML22089A2002022-03-30030 March 2022 Enclosure 2 - Volume 2, Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications Conversion Generic Determination of No Significant Hazards Consideration and Environmental Assessment, Revision 1 ML22089A2012022-03-30030 March 2022 Enclosure 2 - Volume 3, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Chapter 1.0 Use and Application, Revision 1 ML22089A2022022-03-30030 March 2022 Enclosure 2 - Volume 4, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion ITS Chapter 2.0 Safety Limits (Sls), Revision 1 ML22089A1972022-03-30030 March 2022 Attachment 1 - Contents of the Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Revision 1 Submittal ML22089A1982022-03-30030 March 2022 Enclosure 1 - Contents of the Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Submittal L-2022-040, Enclosure 2 - Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Revision 1 Submittal, Volumes 1 Through 162022-03-30030 March 2022 Enclosure 2 - Turkey Point Nuclear Plant, Units 3 and 4, Improved Technical Specifications (ITS) Revision 1 Submittal, Volumes 1 Through 16 ML22089A2042022-03-30030 March 2022 Enclosure 2 - Volume 6, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.1, Reactivity Control Systems, Revision 1 ML22089A2052022-03-30030 March 2022 Enclosure 2 - Volume 7, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.2, Power Distribution Limits, Revision 1 ML22089A2062022-03-30030 March 2022 Enclosure 2 - Volume 8, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.3, Instrumentation, Revision 1 ML22089A2082022-03-30030 March 2022 Enclosure 2 - Volume 10, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.5, Emergency Core Cooling Systems (Eccs), Revision 1 ML22089A2092022-03-30030 March 2022 Enclosure 2 - Volume 11, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.6 Containment Systems, Revision 1 ML22089A2112022-03-30030 March 2022 Enclosure 2 - Volume 13, Turkey Point Nuclear Generating Station, Units 3 and 4, Improved Technical Specifications Conversion, ITS Section 3.8, Electrical Power Systems, Revision 1 2024-09-24
[Table view] |