O Duke WEnergy W. R. McCollum, Jr.
Vice President Duke Energy Oconee Nuclear Station 7800 Rochester Highway Seneca, SC 29672 (864) 885-3107 OFFICE (864) 885-3564 F/x February 12, 2001 U.
S. Nuclear Regulatory Commission Document Control Desk Washington, D.
C.
20555
Subject:
Oconee Nuclear Station Docket Nos.
50-269,
-270,
-287 Emergency Plan Implementing Procedures Manual Volume C Revision 2001-01 Please find attached for your use and review copies of the revision to the Oconee Nuclear Station Emergency Plan: Volume C Revision 2001-01, February 2001.
This revision is being submitted in accordance with 10 CFR 50-54(q) and does not decrease the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures.
Any questions or concerns pertaining to this revision please call Mike Thorne, Emergency Planning Manager at 864-885-3210.
By copy of this letter, two copies of this revision are
- NRC, Region II, Atlanta, Georgia.
Very truly yours, W. R.Mc~olumJr.
VP, Oconee Nurcle Site xc:
(w/2 copies of attachments)
Mr.
Luis Reyes, Regional Administrator, Region II U.
S. Nuclear Regulatory Commission 61 Forsyth St.,
SW, Suite 24T23 Atlanta, GA 30303 w/copy of attachments Mr.
Steven Baggett Rockville, Maryland (w/o Attachments, Oconee Nuclear Station)
NRC Resident Inspector M. D.
Thorne, Manager, Emergency Planning being provided to the
February 12, 2001 OCONEE NUCLEAR SITE INTRASITE LETTER
SUBJECT:
Emergency Plan Implementing Procedures Volume C, Revision 2001-01 Please make the following changes to the Emergency Plan Implementing Procedures Volume C by following the below instructions.
REMOVE Cover Sheet -
Rev. 2000-10 Table of Contents, Page 1 RP/0/B/1000/001 -
05/30/00 RP/0/B/1000/002 -
05/03/00 RP/0/B/1000/007 -
09/18/00 RP/0/B/1000/016 -
12/13/00 RP/0/B/1000/019 -
05/30/00 ADD Cover Sheet Rev.
2001-01 Table of Contents, Page 1 RP/0/B/1000/001 -
01/30/01 RP/0/B/1000/001 -
01/30/01 RP/0/B/1000/007 -
01/16/01 RP/0/B/1000/016 -
01/30/01 RP/0/B/1000/019 -
01/30/01
DUKE POWER EMERGENCY PLAN IMPLEMENTING PROCEDURES VOLUME C APPROVED:
. W. Foster, Manager Safety Assurance 02/12/2001 Date Approved 02/12/2001 Effective Date VOLUME C REVISION 2001-01 FEBRUARY, 2001
HP/0/B/1009/018 HP/0/B/1009/020 HP/0/B/1009/021 HP/0/B/1009/022 RP/0/B/1000/001 RP/0/B/1000/002 RP/O/B/1000/03A RP/0/B/1000/07 RP/0/B/1000/009 RP/0/B/1000/10 RP/0/B/1000/15A RP/0/B/1000/15B RP/0/B/1000/15C RP/0/B/1000/16 RP/0/B/1000/17 RP/0/B/1000/18 RP/0/B/1000/19 RP/0/B/1000/20 VOLUME C TABLE OF CONTENTS Offsite Dose Projections - (05/19/00)
Estimating Food Chain Doses Under Post Accident Conditions - (10/09/98)
Source Term Assessment of a Gaseous Release From Non-routine Release Points - (12/01/97)
On Shift Offsite Dose Projections (06/02/99)
Emergency Classification - (01/30/01)
Control Room Emergency Coordinator Procedure - (01/30/01)
ERDS Operation (12/03/98)
Security Event - (01/16/0 1)
Procedure for Site Assembly - (03/21/00)
Procedure for Emergency Evacuation/Relocation of Site Personnel -(03/21/00)
Offsite Communications From The Control Room - (12/10/98)
Offsite Communications From The Technical Support Center - (12/10/98)
Offsite Communications From The Emergency Operations Facility - (12/10/98)
Medical Response - (01/30/01)
Spill Response (11/30/00)
Core Damage Assessment (09/30/97)
Technical Support Center Emergency Coordinator Procedure (01/30/01)
Emergency Operations Facility Director Procedure - (05/31/00)
Revision 2001-01 February, 2001 1
I i
INFORMATION ONLY Duke Power Company PROCEDURE PROCESS RECORD (I) ID No.
RP/0/B/1000/001 Revision No 009 "EPARATION Station SProcedure Title Oconee Nuclear Station Emergency Classification (4)
Prepared By Donice Kelley (5)
Requires 10CFR50.59 evaluation?
N Yes (New procedure or revision with major changes)
El No (Revision with minor changes)
El No (To incorporate previously approved changes)
(6)
Reviewed By w9&M (QR)
Cross-Disciplinary Review By
.(QR)NAM Reactivity Mgmt. Review By
.(QR)NA (7)
Additional Reviews QA Review By Reviewed By Reviewed By (8)
Temporary Approval (if necessary)
Date 01/1812001 Date t 2-,'0 Date Date Date Date By By (SRO/QR)
(QR)
Date Date (9)
Approved By
"?
Date i PERFORMANCE (Compare with control copy every 14 calendar days while work is being performed.)
(10) Compared with Control Copy Date Compared with Control Copy Date Compared with Control Copy_
Date (11)
Date(s) Performed Work Order Number (WO#)
COMPLETION (12)
Procedure Completion Verification El Yes El NA Check lists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?
El Yes Dl NA Listed enclosures attached?
El Yes El NA Data sheets attached, completed, dated, and signed?
El Yes Dl NA Charts, graphs, etc. attached, dated, identified, and marked?
El Yes El NA Procedure requirements met?
Verified By Date (13)
Procedure Completion Approved Date
- 1) Remarks (Attach additional pages, if necessary)
(R(W97) 3 0-O1
Duke Power Company Oconee Nuclear Site Emergency Classification Reference Use Procedure No.
RP/O/B/1000/001 Revision No.
009 Electronic Reference No.
OX002WOS
RP/O/B/1000/001 Page 2 of 5 Emergency Classification NOTE:
This procedure is an implementing procedure to the Oconee Nuclear Site Emergency plan and must be forwarded to Emergency Planning within three (3) working days of approval.
- 1. Symptoms 1.1 This procedure describes the immediate actions to be taken to recognize and classify an emergency condition.
1.2 This procedure identifies the four emergency classifications and their corresponding Emergency Action Levels (EALs).
1.3 This procedure provides reporting requirements for non-emergency abnormal events.
1.4 The following guidance is to be used by the Emergency Coordinator/EOF Director in assessing emergency conditions:
1.4.1 The Emergency Coordinator/EOF Director shall review all applicable initiating events to ensure proper classification.
1.4.2 The BASIS Document (Volume A, Section D of the Emergency Plan) is available for review if any questions arise over proper classification.
1.4.3 IF THEN An event occurs on more than one unit concurrently, The event with the higher classification will be classified on the Emergency Notification Form.
A. Information relating to the problem(s) on the other unit(s) will be captured on the Emergency Notification Form as shown in RP/0/B/1000/015A, (Offsite Communications From The Control Room),
RP/O/B/ 1000/015B, (Offsite Communications From The Technical Support Center) or RP/0/B/1000/015C, (Offsite Communications From The Emergency Operations Facility).
1.4.4 IF AND THEN An event occurs, A lower or higher plant operating mode is reached before the Classification can be made, The classification shall be based on the mode that existed at the time the event occurred.
1.4.5 The Fission Product Barrier Matrix is applicable only to those events that occur at Hot Shutdown or higher.
1.5 IF THEN RP/0/B/ 1000/001 Page 3 of 5 A. An event that is recognized at Cold Shutdown or lower shall not be classified using the Fission Product Barrier Matrix.
- 1. Reference should be made to the additional enclosures that provide Emergency Action Levels for specific events (e.g., Severe Weather, Fire, Security).
A transient event should occur, Review the following guidance:
1.5.1 IF AND THEN 1.5.2 IF THEN An Emergency Action Level (EAL) identifies a specific duration The Emergency Coordinator/EOF Director assessment concludes that the specified duration is exceeded or will be exceeded, (i.e.;
condition cannot be reasonably corrected before the duration elapses),
Classify the event.
A plant condition exceeding EAL criteria is corrected before the specified duration time is exceeded, The event is NOT classified by that EAL.
A. Review lower severity EALs for possible applicability in these cases.
NOTE:
Reporting under 10CFR50.72 may be required for the following step. Such a condition could occur, for example, if a follow up evaluation of an abnormal condition uncovers evidence that the condition was more severe than earlier believed.
1.5.3 IF AND THEN 1.5.4 IF THEN A plant condition exceeding EAL criteria is not recognized at the time of occurrence, but is identified well after the condition has occurred (e.g.; as a result of routine log or record review)
The condition no longer exists, An emergency shall NOT be declared.
An emergency classification was warranted, but the plant condition has been corrected prior to declaration and notification, The Emergency Coordinator must consider the potential that the initiating condition (e.g.; Failure of Reactor Protection System) may have caused plant damage that warrants augmenting the on shift personnel through activation of the Emergency Response Organization.
RP/O/B/1000/001 Page 4 of 5 A. IF THEN An Unusual Event condition exists, Make the classification as required.
- 1. The event may be terminated in the same notification or as a separate termination notification.
B.
IF THEN AND An Alert, Site Area Emergency, or General Emergency condition exists, Make the classification as required, Activate the Emergency Response Organization.
1.6 Emergency conditions shall be classified as soon as the Emergency Coordinator/EOF Director assessment determines that the Emergency Action Levels for the Initiating Condition have been exceeded.
- 2. Immediate Actions 2.1 Determine the operating mode that existed at the time the event occurred prior to any protection system or operator action initiated in response to the event.
2.2 IF AND THEN The unit is at Hot Shutdown or higher The condition/event affects fission product barriers, GOTO Enclosure 4.1, (Fission Product Barrier Matrix).
2.2.1 Review the criteria listed in Enclosure 4.1, (Fission Product Barrier Matrix) and make the determination if the event should be classified.
2.3 Review the listing of enclosures to determine if the event is applicable to one of the categories shown.
2.3.1 IF THEN One or more categories are applicable to the event, Refer to the associated enclosures.
2.3.2 Review the EALs and determine if the event should be classified.
A. IF THEN An EAL is applicable to the event, Classify the event as required.
RP/0/B/1000/001 Page 5 of 5 2.4 IF The condition requires an emergency classification, THEN GOTO RP/O/B/1000/002, (Control Room Emergency Coordinator Procedure).
- 3. Subsequent Actions 3.1 Continue to review the emergency conditions to assure the current classification continues to be applicable.
- 4. Enclosures Enclosures Page Number 4.1 Fission Product Barrier Matrix 6
4.2 System Malfunctions 7
4.3 Abnormal Rad Levels/Radiological Effluents 9
4.4 Loss Of Shutdown Functions 11 4.5 Loss of Power 13 4.6 Fires/Explosions And Security Actions 14 4.7 Natural Disasters, Hazards, And Other Conditions Affecting Plant Safety 15 4.8 Radiation Monitor Readings For Emergency Classification 1 18 4.9 Unexpected/Unplanned Increase In Area Monitor Readings 19 4.10 Definitions 20 4.11 Operating Modes Defined In Improved Technical Specifications 23 4.12 Instructions For Using Enclosure 4.1 24
DETERMINE THE APPROPRIATE CLASSIFICATION USING THE TABLE BELOW:
EncL e4.1 Fission Product Barrier Matrix RCS BARRIERS (BD 5-7)
FUEL CLAD BARRIERS (BD 8-9)
CONTAINMENT BARRIERS (BD 10-12)
Potential Loss (4 Points)
Loss (5 Points)
Potential Loss (4 Points)
Loss (5 Points)
Potential Loss (1 Point)
Loss (3 Points)
RCS Leakrate > Makeup capacity RCS Leak rate > available makeup Average of the 5 highest Average of the 5 highest CETC CETC > 1200' F > 15 minutes Rapid unexplained containment of one HPI pump in normal capacity as indicated by a loss of CETC
> 1200' F OR pressure decrease after increase makeup mode (approx. 160 gpm) subcooling
>700' F CETC >700° F > 15 minutes with OR with Letdown isolated.
a valid RVLS reading 0" containment pressure or sump level not consistent with LOCA SGTR > Makeup capacity of one Valid RVLS reading of 0" Coolant activity > 300 jCi/ml DEI RB pressure > 59 psig Failure of secondary side of SG HPI pump in normal makeup OR results in a direct opening to the mode (approx. 160 gpm) with RB pressure > 10 psig and no environment with P/S leakage 2t 10 Letdown isolated.
RBCU or RBS gpm in the same SG Entry into the TSOR (Thermal I RIA 57/58 reading > 1.0 R/hr Hours Since SD RIA57/58 R/hr Hours Since SD RIA57/58 - R/hr Failure of secondary side of SG Shock) operating range results in a direct opening to the 2 RIA 57 reading > 1.6 R/hr 0 - < 0.5
>300/150 0 - < 0.5
_ 1800/860 environment with P/S leakage > 10 2 RIA 58 reading >1.0 R/hr gpm in the other SG 0.5 - < 2.0
> 80/40 0.5 - < 2.0
Ž 400/195 Feeding SQ with secondary side 3R1A 57/5 8 reading > 1.0 R/hr failure from the affected unit 2.0- 8.0
Ž 32/16 2.0- 8.0 2! 280/130 HPI Forced Cooling RCS pressure spike Ž_ 2750 psig Hydrogen concentration _> 9%
Containment isolation is incomplete and a release path to the environment exists Emergency Coordinator/EOF Emergency Coordinator/EOF Emergency Coordinator/EOF Emergency Coordinator/EOF Director Emergency Coordinator/EOF Emergency Coordinator/EOF Director judgment Director judgment Director judgment judgment Director judgment Director judgment UNUSUAL EVENT (1-3 Total Points)
ALERT (4-6 Total Points)
SITE AREA EMERGENCY (7-10 Total Points)
GENERAL EMERGENCY (11-13 Total Points)
OPERATING MODE: 1,2,3,4 OPERATING MODE: 1,2,3,4 OPERATING MODE:
1, 2,3,4 OPERATING MODE: 1,2,3,4 Loss of any two barriers
+
Any potential loss of Containment Any potential loss or loss of the Fuel Clad Loss of any two barriers and potential loss of the
+
Loss of one barrier and potential loss of either third barrier
+
Any loss of containment Any potential loss or loss of the RCS RCS or Fuel Clad Barriers Loss of all three barriers
+
Potential loss of both the RCS and Fuel Clad Barriers INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1,2,3,4 NOTIFY 1,2,3,4
.NOTIFY 1,2,3,4 NOTIFY 1,2,3,4 NOTE:
An event with multiple events could occur which would result in the conclusion that exceeding the loss or potential loss threshold is IMMINENT (i.e., within 1-3 hours). In this IMMINENT LOSS situation, use judgment and classify as if the thresholds are exceeded.
RP/OB/YuvJO/001 Page 1 of 1 CIRCLE EALS CHOSEN. ADD POINTS TO CLASSIFY. (SEE NOTE BELO WI
(
Enc(
Systemsý,
S4.2
.. unctions UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY I.
RCS LEAKAGE (BD 14)
OPERATING MODE: 1,2,3,4 A.
Unidentified leakage > 10 gpm B.
Pressure boundary leakage > 10 gpm C.
Identified leakage > 25 gpm
- 2.
UNPLANNED LOSS OF MOST OR ALL SAFETY SYSTEM ANNUNCIATION/
INDICATION IN CONTROL ROOM FOR > 15 MINUTES (BD 15)
OPERATING MODE: 1, 2, 3, 4 A. I Unplanned loss of > 50% of the following annunciators on one unit for > 15 minutes:
Units I & 3 1 SAI-9, 14-16, and 18 3 SAI-9, 14-16, and 18 Unit 2 2 SA1-9, 14-16 AND A.2 Loss of annunciators or indicators requires additional personnel (beyond normal shift complement) to safely operate the unit
- 3.
INABILITY TO REACH REQUIRED SHUTDOWN WITHIN LIMITS (BD 16)
OPERATING MODE:
1,2,3,4 A.
Required operating mode not reached within TS LCO action statement time (CONTINUED)
Ii.
UNPLANNED LOSS OF MOST OR ALL SAFETY SYSTEM ANNUNCIATION/
INDICATION IN CONTROL ROOM (BD 19)
OPERATING MODE:
1,2,3,4 A. I Unplanned loss of > 50% of the following annunciators on one unit for > 15 minutes:
Units 1 & 3 I SAI-9, 14-16, and 18 3 SA1-9, 14-16, and 18 Unit 2 2 SAI-9, 14-16 AND A.2 Loss of annunciators/indicators requires additional personnel (beyond normal shift complement) to safely operate the unit AND A.3.1 Significant plant transient in progress OR A.3.2 Loss of the OAC and ALL PAM indications (END)
- 1.
IINABSILIT 10 3
It. VlION11 OR A SIGNIFICANT TRANSIENT IN PROGRESS (BD 21)
OPERATING MODE: 1,2,3,4 A. I Unplanned loss of > 50% of the following annunciators on one unit for > 15 minutes:
Units 1 & 3 1 SA1-9, 14-16, and 18 3 SAI-9, 14-16, and 18 Unit 2 2 SAI-9, 14-16 AND A.2 A significant transient is in progress AND A.3 Loss of the OAC and ALL PAM indications AND A.4 Inability to directly monitor any one of the following functions:
I.
Subcriticality
- 2.
- 3.
- 4.
- 5.
6.
Core Cooling Heat Sink RCS Integrity Containment Integrity RCS Inventory (END)
RP/OfB/i Page 1 0i-.
'001 INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 NOTIFY 1, 2, 3, 4 NOTIFY 1, 2,3,4
Enc(
4.2 RP/0/B/K
.001 Systems vi'Uunctions Page 2 o UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY
- 4. UNPLANNED LOSS OF ALL ONSITE OR OFFSITE COMMUNICATIONS (BD 17)
OPERATING MODE: All A. Loss of all onsite communications capability (ROLM system, PA system, Pager system, Onsite Radio system) affecting ability to perform Routine operations B. Loss of all onsite communications capability (Selective Signaling, NRC FTS lines, Offsite Radio System, AT&T line) affecting ability to communicate with offsite authorities.
- 5. FUEL CLAD DEGRADATION (BD 18)
OPERATING MODE: All:
A.
DEI - >5l.Ci/ml (END)
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1.2.3.4
_I__
L 1
Encr
ý 4.3 Abnormal Rad LevL_. -.adiological Effluent UNUSUAL EVENT JALERT SITE AREA EMERGENCY GENERAL EMERGENCY 1
ANY UNPLANNED RELEASE OF GASEOUS OR LIQUID RADIOACTIVITY TO THE ENVIRONMENT THAT EXCEEDS TWO TIMES THE SLC LIMITS FOR 60 MINUTES OR LONGER (BD 23)
OPERATING MODE: All A.
Valid indication on radiation monitor RIA 33 of > 4.06E+06 cpm for > 60 minutes (See Note 1)
B.
Valid indication on radiation monitor RIA 45 of 2t 1.33E+06 cpm for > 60 minutes (See Note 1)
C.
Liquid effluent being released exceeds two times SLC 16.11.1 for > 60 minutes as determined by Chemistry Procedure D.
Gaseous effluent being released exceeds two times SLC 16.11.2 for> 60 minutes as determined by RP Procedure (CONTINUED)
- 1. ANY UNPLANNED RELEASE OF GASEOUS OR LIQUID RADIOACTIVITY TO THE ENVIRONMENT THAT EXCEEDS 200 TIMES RADIOLOGICAL TECHNICAL SPECIFICATIONS FOR 15 MINUTES OR LONGER (BD 28)
OPERATING MODE: All A.
Valid indication on RIA 46 of > 2.98E+04 cpm for > 15 minutes (See Note 1)
B. I RIA 33 HIGH Alarm AND B.2 Liquid effluent being released exceeds 200 times the level of SLC 16.11.1 for > 15 minutes as determined by Chemistry Procedure C.
Gaseous effluent being released exceeds 200 times the level of SLC 16.11.2 for >15 minutes as determined by RP Procedure
- 2.
RELEASE OF RADIOACTIVE MATERIAL OR INCREASES IN RADIATION LEVELS THAT IMPEDES OPERATION OF SYSTEMS REQUIRED TO MAINTAIN SAFE OPERATION OR TO ESTABLISH OR MAINTAIN COLD SHUTDOWN (BD 30)
OPERATING MODE: All A.
Valid radiation reading > 15 mRad/hr in CR, CAS, or, Radwaste CR B.
Unplanned/unexpected valid area monitor readings exceed limits stated in Enclosure 4.9 (CONTINUED)
- 1.
BOUNDARY DOSE RESULTING FROM ACTUAL/IMMINENT RELEASE OF GASEOUS ACTIVITY (BD 32)
OPERATING MODE: All A.
Valid reading on RIA 46 of > 2.98E+05 cpm for >15 minutes (See Note 2)
B.
Valid reading on RIA 57 or 58 as shown on.8 (See Note 2)
C.
Dose calculations result in a dose projection at the site boundary of:
_> 100 mRem TEDE or 500 mRem CDE adult thyroid D.
Field survey results indicate site boundary dose rates exceeding _100 mRad/hr expected to continue for more than one hour OR D. I Analyses of field survey samples indicate adult thyroid dose commitment of 2! 500 mRem CDE (3.84 E"7 gCi/ml) for one hour of inhalation NOTE 2: If actual Dose Assessment cannot be completed within 15 minutes, then the valid radiation monitor reading should be used for emergency classification.
(CONTINUED)
I.
BOUNDARY DOSE RESULTING FROM ACTUAL/ IMMINENT RELEASE OF GASEOUS ACTIVITY (BD 36)
OPERATING MODE: All A.
Valid reading on RIA 46 of > 2.98E+06 cpm for _1 5 minutes (See Note 3)
B.
Valid reading on RIA 57 or 58 as shown on.8 (See Note 3)
C.
Dose calculations result in a dose projection at the site boundary of:
> 5000 mRem CDE adult thyroid D.
Field survey results indicate site boundary dose rates exceeding >1000 mRad/hr expected to continue for more than one hour OR D. I Analyses of field survey samples indicate adult thyroid dose commitment of > 5000 mRem CDE for one hour of inhalation NOTE 3: If actual Dose Assessment cannot be completed within 15 minutes, then the valid radiation monitor reading should be used for emergency classification.
(END)
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2, 3, 4 NOTIFY 1, 2,3,4 NOTIFY 1,2,3,4 NOTIFY 1, 2, 3, 4 Assumptions used for calculation of vent monitors RIA 45 & 46:
Average annual meteirology (1.672 E-6.sec/m'), semi-elevated Vent flow rate 65,(XX) cfm (average daily fhlw rate)
Ni credit Ls taken for vent filtration One hour release duration for Unusual Ecent, 15 minute duration for Alert, Site Area Emergency, General Emergency General Emergency PAGs are I rem TEDE and 5 rem CDE; Site Area Emergency determination is based on II1Y, of the General Emergenci PAGs Calculations for monitor readings are based on whole body dose Standard ODCM guidance together with NUMARC guidance indicates that effluent releases are based on Technical Specification releases
(
RP/O/B4 Page 1 o0 1001 NOTE 1: If monitor reading is sustained for the time period indicated in the EAL AND the required assessments (procedure calculations) cannot be completed within this period, declaration must be made on the valid Radiation Monitor reading.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
901 Enc(
4.3 Abnormal Rad Leve.. -,oadiological Effluent Page 2 o*'z.
UNUSUAL EVENT I
ALERT I
SITE AREA EMERGENCY JGENERAL EM ERGENCY 2
UNEXPECTED INCREASE IN PLANT
- 3.
MAJOR DAMAGE TO IRRADIATED
- 2.
LOSS OF WATER LEVEL IN THE RADIATION OR AIRBORNE FUEL OR LOSS OF WATER LEVEL REACTOR VESSEL THAT HAS OR CONCENTRATION (BD 25)
THAT HAS OR WILL RESULT IN THE WILL UNCOVER FUEL IN THE UNCOVERING OF IRRADIATED FUEL REACTOR VESSEL (BD 35)
OPERATING MODE: All OUTSIDE THE REACTOR VESSEL (BD 31)
OPERATING MODE:
5,6 A.
LT 5 reading 14" and decreasing with makeup not keeping up with leakage WITH fuel in the OPERATING MODE: All A. I Failure of heat sink causes loss of Cold core Shutdown condition A.
Valid RIA 3,6,41, OR 49 HIGH Alarm B.
Uncontrolled water level decrease in the SFP AND and fuel transfer canal with all irradiated fuel B.
HIGH Alarm for portable area monitors on the assemblies remaining covered by water main bridge or SFP bridge A.2 LT 5 indicates 0 inches after initiation of RCS makeup C.
I R/hr radiation reading at one foot away from C
Report of visual observation of irradiated fuel a damaged storage cask located at the ISFSI uncovered B. 1 Failure of heat sink causes loss of Cold Shutdown condition D.
Valid area monitor readings exceeds limits D,
Operators determine water level drop in either stated in Enclosure 4.9.
the SFP or fuel transfer canal will exceed AND makeup capacity such that irradiated fuel will be uncovered B.2 Either train ultrasonic level indication less than 0 inches and decreasing after initiation of RCS (END) makeup (END)
NOTE: This Initiating Condition is also located in Enclosure 4.4., (Loss of Shutdown Functions). High radiation levels will also be seen with this condition.
(END)
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2, 3, 4 NOTIFY 1, 2, 3,4 NOTIFY 1, 2,3,4
(
EncL*_,e 4.4 Loss of Shutdown Functions RP/O/B/ý',,/001 Page 1 of 2 UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY
- 1.
FAILURE OF RPS TO COMPLETE OR INITIATE A Rx SCRAM (BD 39)
OPERATING MODE 1, 2, 3 A. 1 Valid reactor trip signal received or required WITHOUT automatic scram AND A. 1.1 DSS has inserted Control Rod Groups 5,6,7 OR A.I.2 Manual trip from the Control Room is successful and reactor power is less than 5% and decreasing
- 2.
INABILITY TO MAINTAIN PLANT IN COLD SHUTDOWN (BD 41)
OPERATING MODE: 5,6 A. I Loss of LPI and/or LPSW AND A.2 Inability to maintain RCS temperature below 2000 F as indicated by either of the following:
A.2.1 RCS temperature at the LPI Pump Suction OR A.2.2 Average of the 5 highest CETCs as indicated by ICCM display OR A.2.3 Visual observation (END)
- 1.
- 42)
INITIATE A Rx SCRAM (BD 42)
AUTOMATIC SCRAM AND MANUAL SCRAM NOT SUCCESSFUL WITH INDICATION OF CORE DAMAGE (BD 45)
OPERATING MODE: 1, 2 A. 1 Valid reactor trip signal received or required WITHOUT automatic scram AND A.2 DSS has NOT inserted Control Rod Groups 5, 6, 7 AND A.3 Manual trip from the Control Room was NOT successful in reducing reactor power to less than 5% and decreasing
- 2.
COMPLETE LOSS OF FUNCTION NEEDED TO ACHIEVE OR MAINTAIN HOT SHUTDOWN (BD 43)
OPERATING MODE: 1, 2,3,4 A.
Average of the 5 highest CETCs >1200* F shown on ICCM B.
Unable to maintain reactor subcritical C.
SSF feeding SG per EOP (CONTINUED)
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 OPERATING MODE: 1, 2 A. I Valid Rx trip signal received or required WITHOUT automatic scram AND A.2 Manual trip from the Control Room was NOT successful in reducing reactor power to < 5%
and decreasing AND A.3 Average of the 5 highest CETCs >1200' Fon ICCM (END)
(
(
EncC.e 4.4 Loss of Shutdown Functions RP/O/BIQ-,d/OO1 Page 2 of 2 UNUSUAL EVENT ALERT J
SITE AREA EMERGENCY GENERAL EMERGENCY
- 3.
LOSS OF WATER LEVEL IN THE REACTOR VESSEL THAT HAS OR WILL UNCOVER FUEL IN THE REACTOR VESSEL (BD 44)
OPERATING MODE: 5,6 A. I Failure of heat sink causes loss of Cold Shutdown conditions AND A.2 LT-5 indicates 0 inches after initiation of RCS Makeup B. I Failure of heat sink causes loss of Cold Shutdown conditions AND B.2 Either train ultrasonic level indication less than 0 inches and decreasing after initiation of RCS makeup (END)
+
t INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2,3,4
(
End*e 4.5 Loss of Power UNUSUAL EVENT
]ALERT SITE AREA EMERGENCY GENERAL EMERGENCY
.--- ~- -
. -. ~
~--~----
T n
nrnr~r r
- 1.
LOSS OF ALL OFFSITE POWER TO ESSENTIAL BUSSES FOR GREATER THAN 15 MINUTES (BD 47)
OPERATING MODE: All A.I Loss of all offsite AC power to both the Red and Yellow Busses for > 15 minutes AND A.2 Unit auxiliaries are being supplied from Keowee or CT5
- 2.
UNPLANNED LOSS OF REQUIRED DC POWER FOR GREATER THAN 15 MINUTES (BD 48)
OPERATING MODE: 5, 6 A.I Unplanned loss of vital DC power to required DC busses as indicated by bus voltage less than 110 VDC AND A.2 Failure to restore power to at least one required DC bus within 15 minutes from the time of loss (END) 1.
LOSS OF" ALL OF-SITEI1 AC POUWl AN LOSS OF ALL ONSITE AC POWER TO ESSENTIAL BUSSES (BD 51)
OPERATING MODE: 1,2,3,4 A.I MFB I and 2 de-energized AND A.2 Failure to restore power to at least one MFB within 15 minutes from the time of loss of both offsite and onsite AC power
- 1.
LOSS OF ALL OFFSITE AC POWER AND LOSS OF ALL ONSITE AC POWER TO ESSENTIAL BUSSES (BD 49)
OPERATING MODE: 5,6 Defueled A. I MFB I and 2 de-energized AND A.2 Failure to restore power to at least one MFB within 15 minutes from the time of loss of both offsite and onsite AC power
- 2.
AC POWER CAPABILITY TO ESSENTIAL BUSSES REDUCED TO A SINGLE SOURCE FOR GREATER THAN 15 MINUTES (BD 50)
OPERATING MODE:
1,2,3,4 A.
AC power capability has been degraded to a single power source for > 15 minutes due to the loss of all but one of:
Unit Normal Transformer Unit SU Transformer Another Unit SU Transformer CT4 CT5 (END)
LOSS OF ALL VITAL DC POWER (BD 52)
OPERATING MODE: 1, 2,3,4 A. I Unplanned loss of vital DC power to required DC busses as indicated by bus voltage less than 110 VDC AND A.2 Failure to restore power to at least one required DC bus within 15 minutes from the time of loss (END)
POWER AND ONSITE AC POWER (BD 54)
OPERATING MODE: 1,2, 3,4 A. 1 MFB I and 2 de-energized AND A.2 SSF fails to maintain Hot Shutdown AND A.3 At least one of the following conditions exist:
A.3.1 Restoration of power to at least one MFB within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is NOT likely OR A.3.2 Indications of continuing degradation of core cooling based on Fission Product Barrier monitoring (END)
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 2.
RP/O/B/KfiJo 01 Page 1 of 1
Enc(
Fires/ExplosionsKv
'e 4.6 Security Actions UNUSUAL EVENT ALERT
[
SITE AREA EMERGENCY GENERAL EMERGENCY
- 1.
FIRES/EXPLOSIONS WITHIN THE PLANT (BD 57)
OPERATING MODE: All NOTE: Within the plant means Turbine Building, Auxiliary Building, Reactor Building, Keowee Hydro.
A.
Fire within the plant not extinguished within 15 minutes of Control Room notification or verification of a Control Room alarm B.
Unanticipated explosion within the plant resulting in visible damage to permanent structures/equipment
- 2.
CONFIRMED SECURITY THREAT INDICATES POTENTIAL DEGRADATION IN THE LEVEL OF SAFETY OF PLANT (BD 58)
OPERATING MODE: All NOTE: RP/0/B/1000/007, (Security Event), shall be used in conjunction with all security related emergency classifications.
A.
Discovery of bomb within plant protected area and outside security vital areas B.
Hostage/Extortion situation C.
Violent civil disturbance within the owner controlled area (END)
FIRE/EXPLOSION AFFECTING OPERABILITY OF PLANT SAFETY SYSTEMS REQUIRED TO ESTABLISH/MAINTAIN SAFE SHUTDOWN (BD 59)
OPERATING MODE: All NOTE: Only one train of a system needs to be affected or damaged in order to satisfy this condition.
A. I Fire/explosions AND A. 1.1 Affected safety-related system parameter indications show degraded performance OR A. 1.2 Plant personnel report visible damage to permanent structures or equipment required for safe shutdown 2
SECURITY EVENT IN A PLANT PROTECTED AREA (BD 60)
OPERATING MODE: All NOTE: RP/0/B/1000/007, (Security Event),
shall be used in conjunction with all security related emergency classifications.
A.
Intrusion into plant protected area by a hostile force B.
Bomb discovered in an area containing safety related equipment (END)
- 1.
SECURITY EVENT IN A PLANT VITAL AREA (BD 61)
OPERATING MODE: All NOTE: RP/0/B/ 1000/007, (Security Event),
shall be used in conjunction with all security related emergency classifications A.
Intrusion into any of the following plant areas by a hostile force:
Reactor Building Auxiliary Building Keowee Hydro B.
Bomb detonated in any of the following areas:
"* Keowee Hydro
"* Keowee Dam
"* ISFSI
"* Reactor Building
"* Auxiliary Building
"* SSF (END)
SECURITY EAVE*NT RESIULTING~i IN L.OSS OF ABILITY TO REACH AND MAINTAIN COLD SHUTDOWN (BD 62)
OPERATING MODE: All NOTE: RP/0/B/l1000/007, (Security Event),
shall be used in conjunction with all security related emergency classifications A.
Loss of physical control of the control room due to security event B.
Loss of physical control of the Aux Shutdown panel and the SSF due to a Security Event (END)
(
1,001 Page I o3 INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY.
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2,3, 4 NOTIFY 1, 2, 3, 4 NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 1.
(
Enc(
7 4.7 Natural Disasters, Hazards and 0,..._ Conditions Affecting Plant Safety RP/0/B/(
Page 1 oi--.
'001 UNUSUAL EVENT J
ALERT I
SITE AREA EMERGENCY GENERAL EMERGENCY 1
NATURAL AND DESTRUCTIVE PHENOMENA AFFECTING THE PROTECTED AREA (BD 64)
OPERATING MODE: All A.
Tremor felt and valid alarm on the strong motion accelerograph B
Tornado striking within Protected Area Boundary C.
Vehicle crash into plant structures/systems within the Protected Area Boundary D.
Turbine failure resulting in casing penetration or damage to turbine or generator seals (CONTINUED)
- 1.
NATURAL AND DESTRUCTIVE PHENOMENA AFFECTING THE PLANT VITAL AREA (BD 69)
OPERATING MODE: All A.
Tremor felt and seismic trigger actuates (0.05g)
B.1 Tornado, high winds, missiles resulting from turbine failure, vehicle crashes, or other catastrophic event AND NOTE: Only one train of a safety-related system needs to be affected or damaged in order to satisfy these conditions.
B.I.1 OR Visible damage to permanent structures or equipment required for safe shutdown of the unit B. 1.2 Affected safety system parameter indications show degraded performance
- 2.
RELEASE OF TOXIC/FLAMMABLE GASES JEOPARDIZING SYSTEMS REQUIRED TO MAINTAIN SAFE OPERATION OR ESTABLISH MAINTAIN COLD SHUTDOWN (BD 71)
OPERATING MODE: All A.
Report/detection of toxic gases in concentrations that will be life-threatening to plant personnel B.
Report/detection of flammable gases in concentrations that will affect the safe operation of the plant:
"* Reactor Building
"* Auxiliary Building
"* Turbine Building
"* Control Room (CONTINUED)
- 1.
CONTROL ROOM EVACUATION AND PLANT CONTROL CANNOT BE ESTABLISHED (BD 75)
OPERATING MODE: All A. I Control Room evacuation has been initiated AND A.2 2.
Control of the plant cannot be established from the Aux Shutdown Panel or the SSF within 15 minutes KEOWEE HYDRO DAM FAILURE (BD 76)
OPERATING MODE: All A.
Imminent/actual dam failure includes any of the following:
"* Keowee Hydro Dam
"* Little River Dam
"* Dikes A,B,C, or D
"* Intake Canal Dike 3.
OTHER CONDITIONS WARRANT DECLARATION OF SITE AREA EMERGENCY (BD 77)
OPERATING MODE:
All A.
Emergency Coordinator/EOF Director judgment (END)
- 1.
OTHER CONDITIONS WARRANT DECLARATION OF GENERAL EMERGENCY (BD 78)
OPERATING MODE: All A.I Emergency Coordinator/EOF Director judgment indicates:
A.A.l Actual/imminent substantial core degradation with potential for loss of containment OR A.1.2 Potential for uncontrolled radionuclide releases that would result in a dose projection at the site boundary greater than 1000 mRem TEDE or 5000 mRem CDE Adult Thyroid (END)
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2,3,4 NOTIFY 1, 2, 3,4 NOTIFY 1, 2, 3, 4 NOTIFY 1, 2, 3, 4
Enc
,4.7 Natural Disasters, Hazards and O.
Conditions Affecting Plant Safety UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY
- 2.
NATURAL AND DESTRUCTIVE PHENOMENA AFFECTING KEOWEE HYDRO (BD 66)
OPERATING MODE: All A.
Reservoir elevation > 807 feet with all spillway gates open and the lake elevation continues to rise B.
Seepage readings increase or decrease greatly or seepage water is carrying a significant amount of soil particles C
New area of seepage or wetness, with large amounts of seepage water observed on dam, dam toe, or the abutments D.
Slide or other movement of the dam or abutments which could develop into a failure E.
Developing failure involving the powerhouse or appurtenant structures and the operator believes the safety of the structure is questionable
- 3.
RELEASE OF TOXIC OR FLAMMABLE GASES DEEMED DETRIMENTAL TO SAFE OPERATION OF THE PLANT (BD 67)
OPERATING MODE: All A.
Report/detection of toxic or flammable gases that could enter within the site area boundary in amounts that can affect normal operation of the plant B.
Report by local, county, state officials for potential evacuation of site personnel based on offsite event (CONTINUED)
- 3.
TURBINE BUILDING FLOOD (BD 72)
OPERATING MODE: All A.
Turbine Building flood requiring use of AP/l,2,3/A/1700/10, (Uncontrolled Flooding Of Turbine Building)
- 4.
CONTROL ROOM EVACUATION HAS BEEN INITIATED (BD 73)
OPERATING MODE: All A. 1 Evacuation of Control Room AND ONE OF THE FOLLOWING:
AND A. 1. 1 Plant control IS established from the Aux shutdown Panel or the SSF OR A. 1.2 Plant control IS BEING established from the Aux Shutdown Panel or SSF
- 5.
OTHER CONDITIONS WARRANT CLASSIFICATION OF AN ALERT (BD 74)
OPERATING MODE: All A.1 Emergency Coordinator judgment indicates that:
A. 1.1 Plant safety may be degraded AND A.1.2 Increased monitoring of plant functions is warranted (END)
(
001 Page 2 o INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 NOTIFY 1, 2,3,4 NOTIFY 1, 2, 3, 4
(
En e 4.7 Natural Disasters, Hazards and O.
Conditions Affecting Plant Safety RP/O/B(
Page 3 01 o001 UNUSUAL EVENT ALERT SITE AREA EMERGENCY GENERAL EMERGENCY 4
OTHER CONDITIONS EXIST WHICH WARRANT DECLARATION OF AN UNUSUAL EVENT (BD 68)
OPERATING MODE: All A.
Emergency Coordinator determines potential degradation of level of safety has occurred (END)
INITIAL NOTIFICATION REQUIREMENTS:
SEE EMERGENCY TELEPHONE DIRECTORY NOTIFY 1, 2,3, 4
Enc e 4.8 Radiation Monitor Readings for Emergency Classification Rp/0/B/K,,/00 1 Page 1 of 1 NOTE:
IF Actual Dose Assessment cannot be completed within 15 minutes.
THEN The valid monitor reading should be used for Emergency Classification.
All RIA values are considered GREATER THAN or EQUAL TO HOURS SINCE RIA 57 R/hr RIA 58 R/hr*
REACTOR TRIPPED Site Area Emergency General Emergency Site Area Emergency General Emergency 0.0 - < 0.5 5.9E+003 5.9E+004 2.6E+003 2.6E+004 0.5 - < 1.0 2.6E+003 2.6E+004 1.1E+003 1.1E+004 1.0 - < 1.5 1.9E+003 1.9E+004 8.6E+002 8.6E+003 1.5 - < 2.0 1.9E+003 1.9E+004 8.5E+002 8.5E+003 2.0 - < 2.5 1.4E+003 1.4E+004 6.3E+002 6.3E+003 2.5 - < 3.0 1.2E+003 1.2E+004 5.7E+002 5.7E+003 3.0 - < 3.5 1.1E+003 1.1E+004 5.2E+002 5.2E+003 3.5 - < 4.0 l.OE+003 L.OE+004 4.8E+002 4.8E+003 4.0 - < 8.0 1.OE+003 L.OE+004 4.4E+002 4.4E+003
- RIA 58 is partially shielded Assumptions used for calculation of high range in-containment monitors RIA 57 and 58:
- 1. Average annual meteorology (7.308 E6 sec/m 3)
- 2.
Design basis leakage (5.6 E6 ml/hr)
- 3.
One hour release duration
- 4.
General Emergency PAGs are 1 rem TEDE and 5 rem CDE; Site Area Emergency determination is based on 10% of the General Emergency PAGs
- 5.
Calculations for monitor readings are based on CDE because thyroid dose is limiting
- 6.
No credit is taken for filtration
- 7.
LOCA conditions are limiting and provide the more conservative reading
K Enc&..Lce 4.9 Unexpected/Unplanned Increase In Area Monitor Readings RP/0/B/ L,,/001 Page 1 of 1 NOTE:
This Initiating Condition is not intended to apply to anticipated temporary increases due to planned events (e.g.; incore detector movement, radwaste container movement, depleted resin transfers, etc.).
UNITS 1, 2,3 MONITOR NUMBER UNUSUAL EVENT 1000x ALERT I
NORMAL LEVELS mRAD/HR mRAD/HR RIA 7, Hot Machine Shop Elevation 796 150
_5000 RIA 8, Hot Chemistry Lab Elevation 796 4200
Ž5000 RIA 10, Primary Sample Hood Elevation 796 830
_5000 RIA 11, Change Room Elevation 796 210
>5000 RIA 12, Chem Mix Tank Elevation 783 800
Ž5000 RIA 13, Waste Disposal Sink Elevation 771 650
Ž> 5000 RIA 15, HPI Room Elevation 758 NOTE*
_ 5000 NOTE:
RIA 15 normal readings are approximately 9 mRad/hr on a daily basis. Applying 1000x normal readings would put this monitor greater than 5000 mRad/hr just for an Unusual Event. For this reason, an Unusual Event will NOT be declared for a reading less than 5000 mRad/hr.
.10 RP/O/B/1000/001 Definitions/Acronyms Page 1 of 3
- 1. List of Definitions and Acronyms NOTE:
Definitions are italicized throughout procedure for easy recognition.
1.1 ALERT - Events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.
1.2 BOMB - A fused explosive device 1.3 CONDITION A - Failure is Imminent or Has Occurred - A failure at the dam has occurred or is about to occur and minutes to days may be allowed to respond dependent upon the proximity to the dam.
1.4 CONDITION B - Potentially Hazardous Situation is Developing - A situation where failure may develop, but preplanned actions taken during certain events (such as major floods, earthquakes, evidence of piping) may prevent or mitigate failure.
1.5 CIVIL DISTURBANCE - A group of ten (10) or more people violently protesting station operations or activities at the site.
1.6 EXPLOSION - A rapid, violent, unconfined combustion, or a catastrophic failure of pressurized equipment that imparts energy of sufficient force to potentially damage permanent structures, systems, or components. A sudden failure of a pressurized pipe/line could fit this definition. This definition includes MS line rupture and FW line ruptures.
1.7 EXTORTION - An attempt to cause an action at the station by threat of force.
1.8 FIRE - Combustion characterized by heat and light. Sources of smoke, such as slipping drive belts or overheated electrical equipment, do NOT constitute fires. Observation of flames is preferred but is NOT required if large quantities of smoke and heat are observed.
1.9 GENERAL EMERGENCY - Events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity. Releases can be reasonably expected to exceed EPA Protective Action Guidelines exposure levels outside the Exclusion Area Boundary.
1.10 HOSTAGE - A person or object held as leverage against the station to ensure demands will be met by the station.
1.11 INTRUSION/INTRUDER - Suspected hostile individual present in a Protected Area without authorization.
1.12 INABILITY TO DIRECTLY MONITOR - Operational Aid Computer data points are unavailable or gauges/panel indications are NOT readily available to the operator.
.10 RP/O/B/1000/001 Definitions/Acronyms Page 2 of 3 1.13 LOSS OF POWER - Emergency Action Levels (EALs) apply to the ability of electrical energy to perform its intended function, reach its intended equipment. Ex. - If both MFBs, are energized but all 4160v switchgear is not available, the electrical energy can not reach the motors intended. The result to the plant is the same as if both MFBs were de-energized.
1.14 PROTECTED AREA - Encompasses all Owner Controlled Areas within the security perimeter fence.
1.15 REACTOR COOLANT SYSTEM (RCS) LEAKAGE - RCS Operational Leakage as defined in the Technical Specification Basis B 3.4.13.
1.16 RUPTURED (As relates to Steam Generator) - Existence of Primary to Secondary leakage of a magnitude sufficient to require or cause a reactor trip and safety injection.
1.17 SABOTAGE - Deliberate damage, mis-alignment, or mis-operation of plant equipment with the intent to render the equipment unavailable.
1.18 SAFETY-RELATED SYSTEMS AREA - Any area within the Protected area which contains equipment, systems, components, or material, the failure, destruction, or release of which could directly or indirectly endanger the public health and safety by exposure to radiation.
1.19 SIGNIFICANT TRANSIENT - An unplanned event involving one or more of the following:
(1) Automatic turbine runback > 25% thermal reactor power (2) Electrical load rejection > 25% full electrical load (3) Reactor Trip (4) Safety Injection System Activation 1.20 SITE AREA EMERGENCY - Events are in process or have occurred which involve actual or likely major failures of plant functions needed for the protection of the public. Any releases are NOT expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels outside the Exclusion Area Boundary.
1.21 SELECTED LICENSEE COMMITMENT (SLC) -Chapter 16 of the FSAR 1.22 SITE BOUNDARY - That area, including the Protected Area, in which DPC has the authority to control all activities including exclusion or removal of personnel and property (1 mile radius from the center of Unit 2).
1.23 TOXIC GAS - A gas that is dangerous to life or health by reason of inhalation or skin contact (e.g.; Chlorine).
1.24 UNCONTROLLED - Event is not the result of planned actions by the plant staff.
.10 RP/0/B/1000/001 Definitions/Acronyms Page 3 of 3 1.25 UNPLANNED -
An event or action is UNPLANNED if it is not the expected result of normal operations, testing, or maintenance. Events that result in corrective or mitigative actions being taken in accordance with abnormal or emergency procedures are UNPLANNED.
1.26 UNUSUAL EVENT - Events are in process or have occurred which indicate a potential degradation of the level of safety of the plant. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs.
1.27 VALID - An indication or report or condition is considered to be VALID when it is conclusively verified by: (1) an instrument channel check; or, (2) indications on related or redundant instrumentation; or, (3) by direct observation by plant personnel such that doubt related to the instrument's operability, the condition's existence, or the report's accuracy is removed. Implicit with this definition is the need for timely assessment.
1.28 VIOLENT - Force has been used in an attempt to injure site personnel or damage plant property.
1.29 VISIBLE DAMAGE - Damage to equipment or structure that is readily observable without measurements, testing, or analyses. Damage is sufficient to cause concern regarding the continued operability or reliability of affected safety structure, system, or component.
Example damage: deformation due to heat or impact, denting, penetration, rupture,
.11 Operating Modes Defined In Improved Technical Specifications RP/O/B/1000/001 Page 1 of 1 MODES REACTIVITY
% RATED AVERAGE CONDITION THERMAL REACTOR COOLANT MODE TITLE POWER (a)
TEMPERATURE (Keff)
(OF) 1 Power Operation
>0.99
>5 NA 2
Startup
>0.99
<5 NA 3
Hot Standby
<0.99 NA
>250 4
Hot Shutdown (b)
< 0.99 NA 250 > T > 200 5
Cold Shutdown (b)
< 0.99 NA
< 200 6
Refueling (c)
NA NA NA (a) Excluding decay heat.
(b) All reactor vessel head closure bolts fully tensioned.
(c) One or more reactor vessel head closure bolts less than fully tensioned.
.12 Instructions For Using Enclosure 4.1 RP/O/B/1000/001 Page 1 of 2
- 1. Instructions For Using Enclosure 4.1 - Fission Product Barrier Matrix 1.1 If the unit was at Hot S/D or above, (Modes 1, 2, 3, or 4) and one or more fission product barriers have been affected, refer to Enclosure 4.1, (Fission Product Barrier Matrix) and review the criteria listed to determine if the event should be classified.
1.1.1 For each Fission Product Barrier, review the associated EALs to determine if there is a Loss or Potential Loss of that barrier. Circle any that apply.
NOTE:
An event with multiple events could occur which would result in the conclusion that exceeding the loss or potential loss thresholds is imminent (i.e. within 1-3 hours). In this situation, use judgement and classify as if the thresholds are exceeded.
1.2 Three possible outcomes exist for each barrier. No challenge, potential loss, or loss.
Use the worst case for each barrier and the classification table at the bottom of the page to determine appropriate classification.
1.3 The numbers in parentheses out beside the label for each column can be used to assist in determining the classification. If no EAL is met for a given barrier, that barrier will have 0 points. The points for the columns are as follows:
Barrier Failure Points RCS Potential Loss 4
Loss 5
Fuel Clad Potential Loss 4
Loss 5
Containment Potential Loss 1
Loss 3
1.3.1 To determine the classification, add the highest point value for each barrier to determine a total for all barriers. Compare this total point value with the numbers in parentheses beside each classification to see which one applies.
1.3.2 Finally as a verification of your decision, look below the Emergency Classification you selected. The loss and/or potential loss EALs selected for each barrier should be described by one of the bullet statements.
.12 Instructions For Using Enclosure 4.1 RP/O/B/1000/001 Page 2 of 2 EXAMPLE: Failure to properly isolate a 'B' MS Line Rupture outside containment, results in extremely severe overcooling.
TSOR entry conditions were satisfied.
Stresses on the 'B' S/G resulted in failure of multiple S/G tubes.
RCS leakage through the S/G exceeds available makeup capacity as indicated by loss of subcooling margin.
Barrier EAL Failure Points RCS SGTR > Makeup capacity of one HPI pump in Potential Loss 4
normal makeup mode with letdown isolated Entry into TSOR operating range Potential Loss 4
RCS leak rate > available makeup capacity as Loss 5
indicated by a loss of subcooling Fuel Clad No EALs met and no justification for No 0
classification on judgment Challenge Containment Failure of secondary side of SG results in a Loss 3
direct opening to the environment RCS 5 + Fuel 0 + Containment 3 = Total 8 A. Even though two Potential Loss EALs and one Loss EAL are met for the RCS barrier, credit is only taken for the worst case (highest point value) EAL, so the points from this barrier equal 5.
B. No EAL is satisfied for the Fuel Clad Barrier so the points for this barrier equal 0.
C.
One Loss EAL is met for the Containment Barrier so the points for this barrier equal 3.
D. When the total points are calculated the result is 8, therefore the classification would be a Site Area Emergency.
E.
Look in the box below "Site Area Emergency". You have identified a loss of two barriers. This agrees with one of the bullet statements.
The classification is correct.
(R06-97)
INFORMATION ONLY Duke Power Company PROCEDURE PROCESS RECORD (1) ID No.
RP/O/B/1000/002 Revision No 006
'REPARATION
"*-*(2)
Station Oconee Nuclear Station (3)
Procedure Title Control Room Emergency Coordinator Procedure (4)
Prepared By Robert Taylor Date 01/24/2001 Requires 10CFR50.59 evaluation?
X Yes (New procedure or revision with major changes)
El No (Revision with minor changes) 11 No (To incorpo te previously approved changes)
Reviewed By
" 7'a-,/1* WU4"
(
Cross-Disciplinary R i w By
(
Reactivity Mgmt. Review By (7)
Additional Reviews QA Review By Reviewed By Reviewed By (8)
Temporary Approval (if necessary)
QR)
Date QR)NA ___ Date QR)NA Date Date Date Date
.(SRO/QR)
Date (QR)
Date (9)
Approved By
/1/
c1'11 Date PERFORMANCE (Compare with control copy every 14 calendar days while work is being performed.)
(10)
Compared with Control Copy Date Compared with Control Copy Compared with Control Copy Date Date (11)
Date(s) Performed Work Order Number (WO#)
COMPLETION (12)
Procedure Completion Verification El Yes Dl NA Check lists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?
El Yes El NA Listed enclosures attached?
"El Yes El NA Data sheets attached, completed, dated, and signed?
"El Yes El NA Charts, graphs, etc. attached, dated, identified, and marked?
El Yes El NA Procedure requirements met?
Verified By (13)
Procedure Completion Approved Date Date
.4) Remarks (Attach additional pages, if necessary)
(5)
(6) 16-5 By By 1-30-01
(
Duke Power Company Oconee Nuclear Site Control Room Emergency Coordinator Procedure Reference Use Procedure No.
RP/O/B/1000/002 Revision No.
005 Electronic Reference No.
OX002WOT I
RP/0/B/ 1000/002 Page 2 of 7 Control Room Emergency Coordinator Procedure NNOTE:
This procedure is an implementing procedure to the Oconee Nuclear Site Emergency Plan and must be forwarded to Emergency Planning within three (3) working days of approval.
- 1. Symptoms 1.1 Events are in process or have occurred which require activation of the Oconee Nuclear Site Emergency Plan.
- 2. Immediate Actions The Operations Shift Manager/Emergency Coordinator shall use this procedure until relieved by the Station Manager/Alternate in the Technical Support Center.
NOTE:
Place Keeping Aids: El at left of steps may be used for procedure place keeping. (I2) 0] 2.1 IF General Emergency conditions are met, THEN GO TO Enclosure 4.1 (General Emergency).
0I 2.2 IF Site Area Emergency conditions are met, THEN GO TO Enclosure 4.2 (Site Area Emergency).
LI 2.3 IF Alert conditions are met, THEN GO TO Enclosure 4.3 (Alert).
El 2.4 IF Unusual Event conditions are met, THEN GO TO Enclosure 4.4 (Unusual Event).
LI 2.5 IF An Emergency Classification does NOT exist and ERO Activation is desired, THEN GO TO Step 1.6 of Enclosure 4.4 (Unusual Event).
- 3. Subsequent Actions NOTE:
Actions are NOT required to be followed in any particular sequence.
EU 3.1 IF THEN A SBLOCA or Steam Generator Tube Leak exist, Implement OMP 1-18, (Emergency Worker Exposure Limits).
RP/I/B/1000/002 Page 3 of 7 0I3.2 IF THEN RIA 46 is on scale, Use Enclosure 4.3 of RP/O/B/1000/001, (Emergency Classification), to determine if the emergency classification should be upgraded to a Site Area Emergency or General Emergency based on radiation activity.
LI 3.2.1 Instruct RP to perform an Offsite Dose Calculation and determine any additional Protective Action Recommendations.
LI 3.3 IF 1, 3 RIA 57 reads > 1.0 R/hr; 2 RIA 57 reads > 1.6 R/hr; or 1, 2, 3 RIA 58 reads > 1.0 R/hr, THEN Use Enclosure 4.1 or 4.8 of RP/0/B/ 1000/001, (Emergency Classification), to determine if the emergency classification should be upgraded to a Site Area Emergency or General Emergency based on radiation activity.
0I3.4 IF THEN LI 3.4.1 RIA 16 or 17 are/were in Alert or High Alarm ( > 2.5 mR/hr),
Instruct RP to perform an Offsite Dose Calculation using the RIA values.
Use Enclosure 4.3 of RP/0/B/1000/001, (Emergency Classification), and the Offsite Dose Calculation results to determine if the emergency classification should be upgraded to a Site Area Emergency or General Emergency based on dose projection at the site boundary.
LI 3.4.2 Determine any additional Protective Action Recommendations.
E 3.5 IF THEN 0 3.6 IF THEN El 3.7 IF THEN A large scale fire or flood damage has occurred or is occurring, Use RP/0/B/1000/022, (Procedure For Site Fire Damage Assessment And Repair) and/or RP/0/B/1000/29, (Fire Brigade Response) to determine additional actions that may be required.
A Security Event is in progress, Use RP/O/B/1000/007, (Security Event), to determine additional actions that may be required.
A hazardous substance has been released, Use RP/O/B/1000/017, (Spill Response), to determine additional actions that may be required.
RP/O/B/1000/002 Page 4 of 7 NOTE:
Priority should be placed on providing treatment for the most life-threatening event (i.e.,
medical vs radiation exposure - OSC procedure RP/0/B/1000/011, (Planned Emergency Exposure). The Emergency Coordinator may authorize (either verbal or signature) exposures greater than 25 rem TEDE (Total Effective Dose Equivalent) for lifesaving missions.
0113.8 IF THEN A medical response is required, Use RP/0/1000/016, (Medical Response).
LI 3.8.1 Document verbal approval of Planned Emergency Exposures required for lifesaving missions in the Control Room Emergency Coordinator Log.
0113.9 IF THEN Changing plant conditions require an emergency classification upgrade, GO TO the applicable enclosure, designated in the Immediate Actions section of this procedure, required for the appropriate emergency classification.
0I 3.10 Announce over the Plant Public Address System the following information:
LI 3.10.1 The current emergency classification level and plant status UE/Alert/SAE/GE LI 3.10.2 If appropriate, the status of contamination and how people are to handle themselves:
Plant personnel should assume they are contaminated until surveyed by RP or until they have frisked themselves.
NO eating, drinking, or smoking until the area is cleared by RP Identify areas of contamination to plant personnel:
NOTE:
- The Outside Air Booster Fans (Control Room Ventilation System - CRVS) are used to provide positive pressure in the Control Room to prevent smoke, toxic gases, or radioactivity from entering the area as required by NuReg 0737.
0 Chlorine Monitor Alarm will either stop the Air Booster Fans or will not allow them to start.
RP/O/B/1000/002 Page 5 of 7 0i 3.11 IF There is an indication that smoke or toxic gases from the Turbine Building may enter the Control Room.
THEN Instruct Control Room personnel to turn on the Outside Air Booster Fans.
Fans On
[] 3.12 IF THEN Time:
RIA-39 is in ALARM, Follow AP/1/2/3/1700/018, (Abnormal Release Of Radioactivity).
Fans On Time:
LI Secure fans if back-up sample by RP shows RIA-39 is in error.
LI Isolate source of airborne contamination to the Control Room if sample from RP shows RIA alarm is valid.
El Secure fans if dose levels in CRITSC/OSC are increased by the addition of outside filtered air.
Fans Off Time:
NOTE:
10CFR50.54(x) allows for reasonable actions that depart from a License Condition or Technical Specification to be performed in an emergency when this action is immediately needed to protect the health and safety of the public and no action consistent with the License Condition or Technical Specification that can provide adequate or equivalent protection is immediately apparent.
10CFR50.54(y) requires approval of any 10CFR50.54(x) actions by a Licensed Senior Operator.
Implementation of Oconee Severe Accident Guidelines (OSAG) requires the use of 10CFR50.54 (x) and (y) provisions.
LI 3.13 IF Plant conditions require a decision to implement 10CFR50.54(x),
THEN Perform the following steps:
LI 3.13.1 Document decision and actions taken in the affected unit's log.
[1 3.13.2 Document decision and actions taken in the CR Emergency Coordinator Log.
NOTE:
NRC must be notified of any 10CFR50.54(x) decisions and actions within one (1) hour.
LI 3.13.3 Request CR NRC Communicator to report decision and actions taken to the NRC.
RP/O/B/1000/002 Page 6 of 7 NOTE:
10CFR50.72 requires NRC notification for specific plant conditions.
0I 3.14 IF Plant conditions require NRC notification under IOCFR50.72, THEN Request the CR NRC Communicator to provide this notification using the guidance in OMP 1-14, (Notifications).
LI 3.15 IF The Emergency Response Organization was activated, THEN Provide turnover to the Technical Support Center using Enclosure 4.5 of this procedure.
Technical Support Center Activated Time:
A. Turn over all emergency response procedures in use to the TSC.
0I 3.16 IF An Unusual Event classification is being terminated, THEN REFER TO Enclosure 4.6, (Emergency Classification Termination Criteria),
of this procedure for termination guidance.
LI 3.16.1 Verify that the Offsite Communicator has provided termination message to the offsite agencies.
NOTE:
The EP Section shall develop a written report, for signature by the Site Vice President, to the State Emergency Preparedness Agency, Oconee County EPD, and Pickens County EPD within 24 working hours of the event termination.
EL 3.16.2 Notify Emergency Planning Section (Emergency Planning Duty person after hours) that the Unusual Event has been terminated.
LI 3.16.3 Emergency Planning shall hold a critique following termination of any actual Unusual Event.
RP/O/B/1000/002 Page 7 of 7
- 4. Enclosures 4.1 General Emergency 4.2 Site Area Emergency 4.3 Alert 4.4 Unusual Event 4.5 Operations Shift Manager to TSC Emergency Coordinator Turnover Sheet 4.6 Emergency Classification Termination Criteria 4.7 Condition A/Condition B Response Actions 4.8 ERO Pager Activation By Security
.1 General Emergency RP/0/B/1000/002 Page 1 of 4
- 1. Immediate Actions NOTE:
State and County Agencies must be notified of event classification within 15 minutes of Emergency Declaration.
- Provide Offsite Communicator with declaration time.
0I 1.1 IF It has been determined that an Emergency Action Level for an Initiating Condition has been met, THEN Declare a General Emergency.
Time of Declaration:
LI 1.2 Appoint a person to maintain the Emergency Coordinator Log OR maintain the log yourself.
NOTE:
e Remind the Control Room Offsite Communicator that Follow Up notifications (updates) are required at least every 60 Minutes for this classification.
- Condition A, Dam Failure (Keowee or Jocassee), OR Condition B also requires notification of the Georgia Emergency Management Agency and National Weather Service. Remind the Control Room Offsite Communicator to notify these agencies in addition to and after SC State, Oconee County, and Pickens County.
LI 1.3 Appoint Control Room Offsite Communicator(s).
LI 1.4 Provide the following Protective Action Recommendations for use by the Offsite Communicator to complete the Emergency Notification Form.
PROTECTIVE ACTION PICKENS COUNTY OCONEE COUNTY SECTORS SECTORS AO Al BI C1 A2 B2 C2 A0 D1 El F1 D2 E2 F2 EVACUATE X
X X
X X
X X
X SHELTER X
X X
X x X
1.4.1 IF Condition A, Imminent or Actual Dam Failure (Keowee or Jocassee)
- exists, THEN REFER TO Enclosure 4.7, (Condition A/Condition B Response Actions), Step 1.0, for additional Protective Action Recommendations.
.1 General Emergency RP/O/B/1000/002 Page 2 of 4 NOTE:
Steps 1.6 - 1.13 may be started/completed while the Emergency Notification Form is being prepared by the Offsite Communicator.
LI 1.5 Review and approve completed Emergency Notification Form.
1.5.1 Sign Emergency Notification Form.
NOTE:
Activate the Alternate TSC and OSC in the Oconee Office Building, Rooms 316 and 316A, if a fire in the Turbine Building, flooding conditions, security events, or onsite/offsite hazardous materials spill have occurred or are occurring.
LI 1.6 Activate the Emergency Response Organization (ERO) by completing the following actions.
1.6.1 Activate ERO Pagers as follows:
NOTE:
Flooding/dam failure/earthquake conditions assume bridges may be impassable to reach emergency facilities. Provide the code below for these conditions.
0LA. IF THEN ERO activation for an Emergency (Blue Echo)is required, Press ERO Pager Activation Panel Button 1.
LI B. IF ERO activation for an Emergency affecting bridges (Blue Echo Bridges) is required, THEN Press ERO Pager Activation Panel Button 2.
I-IC. IF THEN ERO activation for a Drill (Blue Delta) is required, Press ERO Pager Activation Panel Button 3.
LI D. IF ERO activation for a Drill affecting bridges (Blue Delta Bridges) is required, THEN Press ERO Pager Activation Panel Button 4.
ELE.
IF THEN L F.
IF THEN Alternate TSC/OSC will be used, Press ERO Pager Activation Panel Button 5.
A Security Event is in progress, Press ERO Pager Activation Panel Button 6.
EL 1.6.2 Wait one minute and repeat step 1.6. 1.
EL 1.6.3 Monitor ERO Pager and verify that message has been provided to the ERO.
LI 1.6.4 Repeat steps 1.6.1 - 1.6.3 if message is not displayed on ERO Pager.
A. REFER TO Enclosure 4.8, (ERO Pager Activation By Security), if the ERO Pager is not activated by the completion of Steps 1.6.1 - 1.6.3.
.1 General Emergency RP/0/B/ 1000/002 Page 3 of 4 El 1.6.5 IF ERO activation is after normal working hours, THEN Contact Security at extension 3636 or 2309.
Security Officer Name A. Request Security Officer to activate the CAN call list.
SWARNING: Conducting Site Assembly during a Security Event may not be prudent.
LI 1.7 Contact the Security Shift Supervisor.
Inform the Security Shift Supervisor that the ERO has been activated.
1.7.2 Discuss the need to conduct Site Assembly.
0 1.8 IF OR THEN L 1.9 IF OR THEN "A Security Event does NOT exist, "A Security Event does exist and the Security Shift Supervisor agrees, Conduct Site Assembly per RP/0/B/1000/009, (Procedure For Site Assembly),.1 and 4.3.
Area Radiation Monitors are in ALARM, Steam Line Break has occurred, Contact shift RP and dispatch onsite monitoring teams.
NOTE:
Remind the NRC Communicator to complete the NRC Event Notification Worksheet and Plant Status Sheet from OMP 1-14 (Notifications) 0 An open line to the NRC may be required.
LI 1.10 Appoint an SRO to notify the NRC immediately after notification of the Offsite Agencies but not later than one (1) hour after declaration of the emergency.
1.10.1 NRC Communicator (SRO) Name NOTE:
The NRC Communicator should be used to activate ERDS.
El 1.10.2 Start the Emergency Response Data System (ERDS) for unit(s) involved within one (1) hour of the emergency classification.
A. REFER TO RP/0/B/1000/003A, (ERDS Operation).
1.7.1 I WARNING: Conducting Site Assembly during a Security Event may not be prudent.
I
.1 RP/O/B/1000/002 General Emergency Page 4 of 4 0 1.11 Evacuate all non-essential personnel from the site after personnel accountability has been reached.
0l 1.12 El 1.13 0 1.14 1.11.1 REFER TO RP/O/B/1000/010, (Procedure For Emergency Evacuation/
Relocation Of Site Personnel).
IF Condition A, Imminent or Actual Dam Failure (Keowee or Jocassee),
OR Condition B (Keowee) exists, THEN REFER TO Enclosure 4.7, (Condition A/Condition B Response Actions),
Step 2.0 or 3.0, for additional response actions.
Notify the Unit Operations Coordinator/Duty person of emergency status.
Return to Step 3.0, (Subsequent Actions), of this procedure.
.2 Site Area Emergency RP/0/3B/1000/002 Page 1 of 3
- 1. Immediate Actions NOTE:
- State and County Agencies must be notified of event classification within 15 minutes of Emergency Declaration.
- Provide Offsite Communicator with declaration time.
0I 1.1 IF It has been determined that an Emergency Action Level for an Initiating Condition has been met, THEN Declare a Site Area Emergency.
Time of Declaration:
LI 1.2 Appoint a person to maintain the Emergency Coordinator Log OR maintain the log yourself.
NOTE:
Remind the Control Room Offsite Communicator that Follow Up notifications (updates) are required at least every 60 Minutes for this classification.
- Condition A, Dam Failure (Keowee or Jocassee), OR Condition B also requires notification of the Georgia Emergency Management Agency and National Weather Service. Remind the Control Room Offsite Communicator to notify these agencies in addition to and after SC State, Oconee County, and Pickens County.
LI 1.3 Appoint Control Room Offsite Communicator(s).
0l 1.4 Provide the Protective Action Recommendations from Enclosure 4.7, (Condition A/
Condition B Response Actions), Step 1.0, for use by the Offsite Communicator if a Condition A, Imminent or Actual Dam Failure, exists.
NOTE:
Steps 1.6 - 1.12 may be started/completed while the Emergency Notification Form is being prepared by the Offsite Communicator.
1.5.1 Sign Emergency Notification Form.
LI 1.5 Review and approve completed Emergency Notification Form.
.2 RP/O/B/1000/002 Site Area Emergency Page 2 of 3 NOTE:
Activate the Alternate TSC and OSC in the Oconee Office Building, Rooms 316 and 316A, if a fire in the Turbine Building, flooding conditions, security events, or onsite/offsite hazardous materials spill have occurred or are occurring.
H 1.6 Activate the Emergency Response Organization (ERO) by completing the following actions.
1.6.1 Activate ERO Pagers as follows:
NOTE:
Flooding/dam failure/earthquake conditions assume bridges may be impassable to reach emergency facilities. Provide the code below for these conditions.
HA. IF THEN H B.
IF THEN H-C. IF THEN H-D. IF THEN HE. IF THEN H F.
IF ERO activation for an Emergency (Blue Echo)is required, Press ERO Pager Activation Panel Button 1.
ERO activation for an Emergency affecting bridges (Blue Echo Bridges) is required, Press ERO Pager Activation Panel Button 2.
ERO activation for a Drill (Blue Delta) is required, Press ERO Pager Activation Panel Button 3.
ERO activation for a Drill affecting bridges (Blue Delta Bridges) is required, Press ERO Pager Activation Panel Button 4.
Alternate TSC/OSC will be used, Press ERO Pager Activation Panel Button 5.
A Security Event is in progress, THEN Press ERO Pager Activation Panel Button 6.
H 1.6.2 Wait one minute and repeat step 1.6.1.
H 1.6.3 Monitor ERO Pager and verify that message has been provided to the ERO.
Hl 1.6.4 Repeat steps 1.6.1 - 1.6.3 if message is not displayed on ERO Pager.
A. REFER TO Enclosure 4.8, (ERO Pager Activation By Security), if the ERO Pager is not activated by the completion of Steps 1.6.1 - 1.6.3.
EH 1.6.5 IF ERO activation is after normal working hours, THEN Contact Security at extension 3636 or 2309.
Security Officer Name A. Request Security Officer to activate the CAN call list.
.2 RP/O/B/1000/002 Site Area Emergency Page 3 of 3 WARNING: Conducting Site Assembly during a Security Event may not be prudent.
I U 1.7 Contact the Security Shift Supervisor.
1.7.1 Inform the Security Shift Supervisor that the ERO has been activated.
1.7.2 Discuss the need to conduct Site Assembly.
F1 1.8 IF A Security Event does NOT exist, OR A Security Event does exist and the Security Shift Supervisor agrees, THEN Conduct Site Assembly per RP/O/B/1000/009, (Procedure For Site Assembly),.1 and 4.3.
U 1.9 IF Area Radiation Monitors are in ALARM, OR Steam Line Break has occurred, THEN Contact shift RP and dispatch onsite monitoring teams.
NOTE:
Remind the NRC Communicator to complete the NRC Event Notification Worksheet and Plant Status Sheet from OMP 1-14 (Notifications) 0 An open line to the NRC may be required.
U 1.10 Appoint an SRO to notify the NRC immediately after notification of the Offsite Agencies but not later than one (1) hour after declaration of the emergency.
1.10.1 NRC Communicator (SRO) Name NOTE:
The NRC Communicator should be used to activate ERDS.
Ul 1.10.2 Start the Emergency Response Data System (ERDS) for unit(s) involved within one (1) hour of the emergency classification.
A. REFER TO RP/O/B/1000/003A, (ERDS Operation).
U 1.11 IF Condition A, Imminent or Actual Dam Failure (Keowee or Jocassee),
OR Condition B (Keowee) exists, THEN REFER TO Enclosure 4.7, (Condition A/Condition B Response Actions),
Step 2.0 or 3.0, for additional response actions.
U 1.12 Notify the Unit Operations Coordinator/Duty person of emergency status.
U 1.13 Return to Step 3.0, (Subsequent Actions), of this procedure.
.3 Alert RP/0/B/ 1000/002 Page 1 of 3
- 1. Immediate Actions NOTE:
e State and County Agencies must be notified of event classification within 15 minutes of Emergency Declaration.
- Provide Offsite Communicator with declaration time.
0] 1.1 IF It has been determined that an Emergency Action Level for an Initiating Condition has been met, THEN Declare an Alert.
Time of Declaration:
El 1.2 Appoint a person to maintain the Emergency Coordinator Log OR maintain the log yourself.
NOTE:
Remind the Control Room Offsite Communicator that Follow Up notifications (updates) are required at least every 60 minutes for this classification.
- Condition B for Keowee Hydro Project Dams/Dikes also requires notification of the Georgia Emergency Management Agency and National Weather Service. Remind the Control Room Offsite Communicator to notify these agencies in addition to and after SC State, Oconee County, and Pickens County.
LI 1.3 Appoint Control Room Offsite Communicator(s).
NOTE:
Steps 1.5 - 1.11 may be started/completed while the Emergency Notification Form is being prepared by the Offsite Communicator.
1.4.1 Sign Emergency Notification Form.
0I 1.4 Review and approve completed Emergency Notification Form.
.3 Alert RP/O/B/1000/002 Page 2 of 3 NOTE:
Activate the Alternate TSC and OSC in the Oconee Office Building, Rooms 316 and 316A, if a fire in the Turbine Building, flooding conditions, security events, or onsite/offsite hazardous materials spill have occurred or are occurring.
LI 1.5 Activate the Emergency Response Organization (ERO) by completing the following actions.
1.5.1 Activate ERO Pagers as follows:
NOTE:
Flooding/dam failure/earthquake conditions assume bridges may be impassable to reach emergency facilities. Provide the code below for these conditions.
L A. IF THEN ERO activation for an Emergency (Blue Echo)is required, Press ERO Pager Activation Panel Button 1.
[] B.
IF ERO activation for an Emergency affecting bridges (Blue Echo Bridges) is required, THEN Press ERO Pager Activation Panel Button 2.
ERC. IF THEN ERO activation for a Drill (Blue Delta) is required, Press ERO Pager Activation Panel Button 3.
El D. IF ERO activation for a Drill affecting bridges (Blue Delta Bridges) is required, THEN Press ERO Pager Activation Panel Button 4.
LIE. IF THEN E F.
IF THEN Alternate TSC/OSC will be used, Press ERO Pager Activation Panel Button 5.
A Security Event is in progress, Press ERO Pager Activation Panel Button 6.
LI 1.5.2 Wait one minute and repeat step 1.5.1.
LI 1.5.3 Monitor ERO Pager and verify that message has been provided to the ERO.
El 1.5.4 Repeat steps 1.5.1 - 1.5.3 if message is not displayed on ERO Pager.
A. REFER TO Enclosure 4.8, (ERO Pager Activation By Security), if the ERO Pager is not activated by the completion of Steps 1.5.1 - 1.5.3.
El 1.5.5 IF ERO activation is after normal working hours, THEN Contact Security at extension 3636 or 2309.
Security Officer Name A. Request Security Officer to activate the CAN call list.
.3 Alert I WARNING: Conducting Site Assembly during a Security Event may not be prudent.
I
[i 1.6 Contact the Security Shift Supervisor.
Inform the Security Shift Supervisor that the ERO has been activated.
1.6.2 Discuss the need to conduct Site Assembly.
D 1.7 IF OR THEN
]
1.8 IF OR THEN "A Security Event does NOT exist, "A Security Event does exist and the Security Shift Supervisor agrees, Conduct Site Assembly per RP/0/B/1000/009, (Procedure For Site Assembly),.1 and 4.3.
Area Radiation Monitors are in ALARM, Steam Line Break has occurred, Contact shift RP and dispatch onsite monitoring teams NOTE:
Remind the NRC Communicator to complete the NRC Event Notification Worksheet and Plant Status Sheet from OMP 1-14 (Notifications).
0 An open line to the NRC may be required.
LI 1.9 Appoint an SRO to notify the NRC immediately after notification of the Offsite Agencies but not later than one (1) hour after declaration of the emergency.
1.9.1 NRC Communicator (SRO) Name NOTE:
The NRC Communicator should be used to activate ERDS.
LI 1.9.2 Start the Emergency Response Data System (ERDS) for unit(s) involved within one (1) hour of the emergency classification.
A. REFER TO RP/O/B/1000/003A, (ERDS Operation).
EL 1.10 IF THEN Condition B at Keowee exists, REFER TO Enclosure 4.7, (Condition A/Condition B Response Actions),
Step 3.0, for additional response actions.
0I 1.11 Notify the Unit Operations Coordinator/Duty person of emergency status.
LI 1.12 Return to Step 3.0, (Subsequent Actions), of this procedure.
RP/O/B/1000/002 Page 3 of 3 1.6.1
.4 Unusual Event RP/O/B/1000/002 Page 1 of 3
- 1. Immediate Actions NOTE:
State and County Agencies must be notified of event classification within 15 minutes of Emergency Declaration.
0 Provide Offsite Communicator with declaration time.
0I 1.1 IF It has been determined that an Emergency Action Level for an Initiating Condition has been met, THEN Declare an Unusual Event.
Time of Declaration:
LI 1.2 Appoint a person to maintain the Emergency Coordinator Log OR maintain the log yourself.
NOTE:
Remind the Control Room Offsite Communicator that an Initial Message and a Termination Message are required for this classification. No Follow Up Notifications (updates) are required unless requested by the Offsite Agencies.
Condition B for Keowee Hydro Project Dams/Dikes also requires notification of the Georgia Emergency Management Agency and National Weather Service. Remind the Control Room Offsite Communicator to notify these agencies in addition to and after SC State, Oconee County, and Pickens County.
LI 1.3 Appoint Control Room Offsite Communicator(s).
NOTE:
Steps 1.5 - 1.11 may be started/completed while the Emergency Notification Form is being prepared by the Offsite Communicator.
El 1.4 Review and approve completed Emergency Notification Form.
1.4.1 Sign Emergency Notification Form.
El 1.5 IF THEN Condition B at Keowee exists, REFER TO Enclosure 4.7, (Condition A/Condition B Response Actions),
Step 3.0, for additional response actions.
.4 Unusual Event RP/O/B/1000/002 Page 2 of 3 NOTE:
o Activation of the ERO is NOT required for an Unusual Event Classification.
9 Activate the Alternate TSC and OSC in the Oconee Office Building, Rooms 316 and 316A, if a fire in the Turbine Building, flooding conditions, security events, or onsite/
offsite hazardous materials spills have occurred or are occurring.
0] 1.6 IF Emergency Response Organization (ERO) activation is desired, THEN Complete the following actions.
1.6.1 Activate ERO Pagers as follows:
NOTE:
Flooding/dam failure/earthquake conditions assume bridges may be impassable to reach emergency facilities. Provide the code below for these conditions.
I-IA. IF THEN LIB.
IF THEN ELC. IF THEN E D. IF THEN 0 E. IF THEN E F.
IF ERO activation for an Emergency (Blue Echo)is required, Press ERO Pager Activation Panel Button 1.
ERO activation for an Emergency affecting bridges (Blue Echo Bridges) is required, Press ERO Pager Activation Panel Button 2.
ERO activation for a Drill (Blue Delta) is required, Press ERO Pager Activation Panel Button 3.
ERO activation for a Drill affecting bridges (Blue Delta Bridges) is required, Press ERO Pager Activation Panel Button 4.
Alternate TSC/OSC will be used, Press ERO Pager Activation Panel Button 5.
A Security Event is in progress, THEN Press ERO Pager Activation Panel Button 6.
Wait one minute and repeat step 1.6.1.
Monitor ERO Pager and verify that message has been provided to the ERO.
Repeat steps 1.6.1 - 1.6.3 if message is not displayed on ERO Pager.
A. REFER TO Enclosure 4.8, (ERO Pager Activation By Security), if the ERO Pager is not activated by the completion of Steps 1.6.1 - 1.6.3.
El 1.6.2
[1 1.6.3 El 1.6.4
.4 RP/O/B/1000/002 Unusual Event Page 3 of 3 LI 1.6.5 IF ERO activation is after normal working hours, THEN Contact Security at extension 3636 or 2309.
Security Officer Name A. Request Security Officer to activate the CAN call list.
WARNING: Conducting Site Assembly during a Security Event may not be prudent.
I
[1 1.7 Contact the Security Shift Supervisor.
1.7.1 Inform the Security Shift Supervisor that the ERO has been activated.
1.7.2 Discuss the need to conduct Site Assembly.
NOTE:
Consider conducting a Site Assembly if a Hazardous Materials spill affecting personnel safety is involved; or, if personnel safety is a concern.
El 1.8 IF The Emergency Response Organization is needed to assist with the Unusual Event emergency activities, AND A Security Event does NOT exist, OR A Security Event does exist and the Security Shift Supervisor agrees, THEN Conduct Site Assembly per RP/O/B/1000/009, (Procedure For Site Assembly),.1 and 4.3.
LI 1.8.1 Document the decision to conduct Site Assembly in the Control Room Emergency Coordinator Log.
El 1.9 IF Area Radiation Monitors are in ALARM, OR Steam Line Break has occurred, THEN Contact shift RP and dispatch onsite monitoring teams NOTE:
- Remind the NRC Communicator to complete the NRC Event Notification Worksheet and Plant Status Sheet from OMP 1-14 (Notifications).
- An open line to the NRC may be required.
El 1.10 Appoint an SRO to notify the NRC immediately after notification of the Offsite Agencies but not later than one (1) hour after declaration of the emergency.
1.10.1 NRC Communicator (SRO) Name
[1 1.11 Notify the Unit Operations Coordinator/Duty person of emergency status.
El 1.12 Return to Step 3.0, (Subsequent Actions), of this procedure.
.5 Operations Shift Manager To TSC Emergency Coordinator Turnover Sheet EMERGENCY CLASSIFICATION DESCRIPTION OF EVENT RP/O/B/1000/002 Page 1 of 2 TIME DECLARED Unit One Status:
Reactor Power RCS Pressure RCS Temperature Auxiliaries Being Supplied Power From ES Channels Actuated MAJOR EQUIPMENT OUT OF SERVICE JOBS IN PROGRESS Unit Two Status:
Reactor Power RCS Pressure RCS Temperature Auxiliaries Being Supplied Power From ES Channels Actuated MAJOR EQUIPMENT OUT OF SERVICE JOBS IN PROGRESS Unit Three Status:
Reactor Power RCS Pressure Auxiliaries Being Supplied Power From RCS Temperature ES Channels Actuated MAJOR EQUIPMENT OUT OF SERVICE JOBS IN PROGRESS
.5 RP/O/B/1000/002 Operations Shift Manager To TSC Emergency Page 2 of 2 Coordinator Turnover Sheet Classification Procedure in Use:
RP/O/B/1000/002 (Control Room Emergency Coordinator Procedure)
Is RP/O/B/1000/03A, (ERDS Operation) in use? Yes No If Yes, Unit No. __
Step No. __
Is RP/O/B/1000/007, (Security) in use?
Yes No If Yes, Step No. __
Is RP/O/B/1000/0 16, (Medical) in use?
Yes No __
If Yes, Step No. __
Is RP/O/B/1000/017, (Spill Response) in use?
Yes No __
If Yes, Step No. __
Is RP/O/B/1000/022, (Fire/Flood) in use?
Yes No __
If Yes, Step No. __
Is RP/O/B/1000/029, (Fire Brigade) in use?
Yes No __
If Yes, Step No. __
IF Condition A, Dam Failure, has been declared for Keowee Hydro Project, THEN Provide the following information to the TSC Emergency Coordinator:
Status of Offsite Agency Notifications Recommendations made to offsite agencies
+
Status of relocation of site personnel What is the status of Site Assembly? (This question is only applicable for those times that the Emergency Response Organization is activated after hours, holidays, or weekends.)
Next message due to Offsite Agencies at Time:
Operations Shift Manager/CR Time:
Emergency CoordinatorlTSC Time:
.6 RP/0/B/1000/002 Emergency Classification Termination Page 1 of 1 Criteria IF The following guidelines applicable to the present emergency condition have been met or addressed, THEN An emergency condition may be considered resolved when:
- 1. Existing conditions no longer meet the existing emergency classification criteria and it appears unlikely that conditions will deteriorate further.
- 2. Radiation levels in affected in-plant areas are stable or decreasing to below acceptable levels.
- 3. Releases of radioactive material to the environment greater than Technical Specifications are under control or have ceased.
- 4. The potential for an uncontrolled release of radioactive material is at an acceptably low level.
- 5. Containment pressure is within Technical Specification requirements.
- 6. Long-term core cooling is available.
- 7. The shutdown margin for the core has been verified.
- 8. A fire, flood, earthquake, or similar emergency condition is controlled or has ceased.
- 9. Offsite power is available per Technical Specification requirements.
- 10. All emergency action level notifications have been completed.
- 11. The Area Hydro Manager has been notified of termination of Condition B for Keowee Hydro Project.
REFER TO Section 6 of the Emergency Telephone Directory, (Keowee Hydro Project Dam/Dike Notification).
- 12. The Regulatory Compliance Section has evaluated plant status with respect to Technical Specifications and recommends Emergency classification termination.
- 13. Emergency terminated. Request the Control Room Offsite Communicator to complete DatelTime Initial an Emergency Notification Form for a Termination Message using guidance in RP/0/1000/015A, (Offsite Communications From The Control Room), and provide information to offsite agencies.
Return to Step 3.13.1.
.7 RP/0/B/1000/002 Condition A/Condition B Response Actions Page 1 of 3
- 1. Condition A Response - Immediate Actions 0I 1.1 IF Condition A, Imminent or Actual Dam Failure (Keowee or Jocassee) exists, THEN Perform the following actions:
11 1.1.1 Provide the following protective action recommendations to Oconee County and Pickens County for imminent/actual dam failure.
A. Provide the following recommendation for Emergency Notification Form Section 15 (B) Evacuate:
- 1.
Move residents living downstream of the Keowee Hydro Project dams to higher ground.
B.
Provide the following recommendation for Emergency Notification Form Section 15 (D) Other:
- 1. Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed.
El 1.2 Return to applicable Enclosure (4.1 or 4.2).
El 1.2.1 IF A General Emergency has been declared, THEN GO TO Step 1.5 of Enclosure 4.1, (General Emergency).
LI 1.2.2 IF A Site Area Emergency has been declared, THEN GO TO Step 1.5 of Enclosure 4.2, (Site Area Emergency).
- 2. Condition A Response - Subsequent Actions El 2.1 Notify the Duke Power System Coordinator (Systems Operation Center) on the Control Room Dispatcher phone and provide information related to the event.
0I 2.2 Relocate Keowee personnel to the Operational Support Center (OSC) if events occur where their safety could be affected.
El 2.2.1 IF Keowee personnel are relocated to the OSC, THEN Notify the Duke Power System Coordinator (Systems Operation Center) on the Control Room Dispatcher phone.
.7 RP/O/B/1000/002 Condition A/Condition B Response Actions Page 2 of 3 NOTE:
A loss of offsite communications capabilities (Selective Signaling and the Wide Area Network - WAN) could occur within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after Keowee Hydro Dam failure.
Rerouting of the Fiber Optic Network through Bad Creek should be started as soon as possible.
LI 2.3 Notify Telecommunications Group in Charlotte to begin rerouting the Oconee Fiber Optic Network.
2.3.1 REFER TO Selective Signaling Section of the Emergency Telephone Directory (page 9).
0I 2.4 Request Security to alert personnel at the Security Track/Firing Range and Building 8055 (Warehouse #5) to relocate to work areas inside the plant.
NOTE:
Plant access road to the Oconee Complex could be impassable within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> if the Keowee Hydro Dam fails. A loss of the Little River Dam (Newry Dam) or Dikes A-D will take longer to affect this road.
- PA Announcements can be made by the Control Room using the Office Page Override feature or Security.
0I 2.5 Make a PA Announcement to relocate personnel at the following locations to the World Of Energy/Operations Training Center.
Oconee Complex Oconee Garage Oconee Maintenance Training Facility EL 2.6 Dispatch operators to the SSF and establish communications.
EL 2.7 Return to applicable Enclosure (4.1 or 4.2).
EL 2.7.1 IF A General Emergency has been declared, THEN GO TO Step 1.13 of Enclosure 4.1, (General Emergency).
LI 2.7.2 IF A Site Area Emergency has been declared, THEN GO TO Step 1.12 of Enclosure 4.2, (Site Area Emergency).
Sm m
m
.7 RP/0/B/1000/002 Condition A/Condition B Response Actions Page 3 of 3
- 3. Condition B Response - Immediate Actions 0i 3.1 IF Condition B at Keowee exists, THEN Notify the Area Hydro Manager.
3.1.1 REFER TO Section 6 of the Emergency Telephone Directory, (Keowee Hydro Project Dam/Dike Notification).
LI 3.2 Return to applicable Enclosure (4.1, or 4.2, or 4.3, or 4.4).
El 3.2.1 IF A General Emergency has been declared, THEN GO TO Step 1.13 of Enclosure 4.1, (General Emergency).
El 3.2.2 IF A Site Area Emergency has been declared, THEN GO TO Step 1.12 of Enclosure 4.2, (Site Area Emergency).
[1 3.2.3 IF An Alert has been declared, THEN GO TO Step 1.11 of Enclosure 4.3, (Alert).
El 3.2.4 IF An Unusual Event has been declared, THEN GO TO Step 1.6 of Enclosure 4.4, (Unusual Event).
.8 RP/O/B/1000/002 ERO Pager Activation By Security Page 1 of 2
- 1. Symptoms 1.1 Activation of the ERO Pagers using the ERO Pager Activation Panel in the TSC was unsuccessful.
- 2. Immediate Actions 2.1 Activate the Emergency Response Organization (Technical Support Center, Operational Support Center, and Emergency Operations Facility) by completing the following actions.:
2.1.1 Contact Security.
A. Dial 3636 (Dial 2309 if no response is received).
Security Officer Name 2.1.2 Read the following information to the Security:
A. The Emergency Response Organization (Technical Support Center, Operational Support Center, and Emergency Response Facility) is being activated for an emergency relating to Unit # __
NOTE:
Activate the Alternate TSC and OSC in the Oconee Office Building, Rooms 316 and 316A, if a fire in the Turbine Building, flooding conditions, security events, or onsite/
offsite hazardous materials spills have occurred or are occurring.
B.
Primary TSC/OSC will be used OR Alternate TSC/OSC will be used C. This is a Blue Delta (Drill) activation OR This is a Blue Echo (Emergency) activation
.8 ERO Pager Activation By Security RP/O/B/1000/002 Page 2 of 2 NOTE:
Flooding/dam failure/earthquake conditions assume bridges may be impassable to reach emergency facilities. Provide the code below for these conditions.
D. This is a Blue Delta Bridges (Drill) activation OR This is a Blue Echo Bridges (Emergency) activation
(R0697)
INFORMATION Duke Power Company
(),IDNo RP/O/B/1000/007 ONLY PROCEDURE PROCESS RECORD Resion No 003
'PARATION (2*
Station OCONEE NUCLEAR STATION (3)
Procedure Title Security Event (4)
Prepared By Rodney Brown (Signature)
Date (5)
Requires 10CFR50.59 evaluation?
0] Yes (New procedure or revision with major changes)
El No (Revision with minor changes)
El No (To incor ratepreviously approved changes)
(6)
Reviewed By
.QR)
Date Cross-Disciplinar view By
_-(QR)NA Date IV Reactivity Mgmt.
eview By (QR)NA DateaJ0 (7)
Additional Reviews J*.
O Reviewed By Date a' 1 Reviewed By Date (Q) Temporary Approval (if necessary)
By (SRO/QR)
Date By (QR)
Date (9)
Approved By 1 14*
4 Date
_/w/__
PERFORMANCE (Compare with control copy every 14 calendar days while work is being performed.)
(10)
Compared with Control Copy Date Compared with Control Copy Date Compared with Control Copy_
Date (11)
Date(s) Performed Work Order Number (WO#)
COMPLETION (12)
Procedure Completion Verification:
"El Unit 0 El Unit 1 El Unit 2 El Unit 3 Procedure performed on what unit?
"El Yes El NA Check lists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?
"El Yes El NA Listed enclosures attached?
"El Yes El NA Data sheets attached, completed, dated, and signed?
"El Yes El NA Charts, graphs, etc. attached, dated, identified, and marked?
El Yes El NA Procedure requirements met?
Verified By Date
--,.-3)
Procedure Completion Approved Date (14) Remarks (Attach additional pages, if necessary)
Duke Power Company Oconee Nuclear Site Security Event Reference Use Procedure No.
RP/O/B/1000/007 Revision No.
003 Electronic Reference No.
OX002WOZ
RP/O/B/1000/07 Page 2 of 4 Security Event NOTE:
This procedure is an implementing procedure to the Oconee Nuclear Site Emergency Plan and should be reviewed by the Emergency Planning Group prior to approval by the responsible group. Upon revision, a Control Copy of this procedure must be forwarded to Emergency Planning within three (3) working days of approval.
- 1. Symptoms 1.1 Personnel/Civil Disturbance (Hostile) 1.2 Intrusion/attempted intrusion (Protected Area) 1.3 Hostage Situation/Extortion 1.4 Discovery of Bomb/explosive device
- 2. Immediate Actions NOTE:
- Following an intrusion into the protected area by an outsider, Security personnel at the CAS will notify the control room of the intrusion using the emergency telephone number.
0 Place keeping aids: El at left of steps may be used for procedure place keeping (10).
0i 2.1 IF Security notifies the control room of an intrusion into the protected area by an outsider.
THEN Perform the following steps:
El 2.1.1 Maintain an open line over the phone with Security.
El 2.1.2 Dispatch an RO or SRO to the communications area in the back of the control room and have them retrieve the portable Security radio.
LI 2.1.3 Establish/monitor radio communications on Security Channel 1 with the Security Officer in the CAS.
A. Continue to maintain open phone communications after radio communication with the CAS has been established.
El 2.1.4 Inform the Control Room SRO to dispatch operators to the SSF.
{ 1}
A. Coordinate this action with Security as needed.
RPOB/ O1000/07 Page 3 of 4 NOTE:
For drill purposes only, preface and close all PA announcements with the following statement, "This is a drill. This is a drill."
El 2.1.5 Warn site personnel by performing the following steps:
A. Pick up a ROLM phone located on Unit 1 &2 Control Room desk B. Switch the Office Page to "ON" C. Dial 70 D. Repeat the following announcement at least two (2) times; "Attention all personnel. An intrusion into the protected area has occurred. All personnel should take cover."
E. Switch the Office Page to "OFF" El 2.1.6 Notify the Operations Shift Manager (OSM) that a Security Event is in progress.
A. Provide this procedure and the portable Security Radio to the OSM.
El 2.2 The OSM/Emergency Coordinator shall perform the following steps after notification by Security or control room personnel.
El 2.2.1 Review RP/O/B/1000/001 (Emergency Classification), and determine if an emergency classification is warranted.
El 2.2.2 Establish/monitor communications with Security on Security Channel 1 of the portable Security Radio until the security event is terminated.
El 2.2.3 Evaluate the need to man the SSF based on Security recommendations related to discovery of an explosive device or civil disturbance.
{ 1 }
El 2.2.4 Authorize Security to notify Local Law Enforcement Agencies and/or Explosive Ordnance Disposal Center as applicable.
A. IF Offsite Agency support is requested and an emergency classification is not applicable.
THEN the NRC must be notified within four (4) hours.
(ref. 10CFR50.72 (b)(2)(vi)).
RP/O/B/1000/07 Page 4 of 4
- 3. Subsequent Actions NOTE:
Consideration should be given to tripping the unit(s) if it is determined that there is an imminent threat to the control room(s).
0i 3.1 Assess the operating status of each unit.
3.1.1 Determine the advisability of continuing power generation.
Li 3.2 Utilize emergency and operating procedures as applicable to mitigate the consequences of sabotage.
El 3.3 Assess the situation and take actions necessary within the scope of the Duke Power Nuclear Security and Contingency Plan as directed by the Senior Security Officer.
3.3.1 Determine the need for the following:
A. Lock the Control Room doors.
B. Lock perimeter doors to buildings inside the protected area to control access and egress.
- 4. Enclosures 4.1 References
.1 References RP/O/B/1000/007 Page 1 of 1 PIP 0-00-02158 1.
INFORMATION ONLY Duke Power Company PROCEDURE PROCESS RECORD (1) IDNo.
RP/0/B/1000/016 Revision No 004 tEPARATION
"-(-)
Station (3)
Procedure Title Oconee Nuclear Station Medical Resnonse (4)
Prepared By Donice Kelley (5)
Requires IOCFR50.59 evaluation?
0 Yes (New procedure or revision with major changes)
N No (Revision with minor changes)
El No (To incorrate previously approved changes)
(6)
Reviewed By Z,
(QR)
Cross-Disciplinar view By Reactivity Mgmt. Review By (QR)NA&Q (7)
Additional Reviews QA Review By Reviewed By Reviewed By (8)
Temporary Approval (if necessary)
By (SRO/QR)
By (QR)
Date 01/29/2001 Date 1" Date._
Date J Date Date Date Date Date (9)
Approved By
- ??/-.
,a Date PERFORMANCE (Compare with control copy every 14 calendar days while work is being performed.)
(10) Compared with Control Copy Date Compared with Control Copy Date Compared with Control Copy Date (11)
Date(s) Performed Work Order Number (WO#)
COMPLETION (12)
Procedure Completion Verification
"[] Yes ED NA Check lists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?
"El Yes Dl NA Listed enclosures attached?
"El Yes Dl NA Data sheets attached, completed, dated, and signed?
"El Yes El NA Charts, graphs, etc. attached, dated, identified, and marked?
El Yes El NA Procedure requirements met?
Verified By Date (13)
Procedure Completion Approved Date
- 4) Remarks (Attach additional pages, if necessary)
(R06-97)
Medical Resnonse
/-30-01
Duke Power Company Oconee Nuclear Site Medical Response Reference Use Procedure No.
RP/O/B/1000/016 Revision No.
004 Electronic Reference No.
OX002WPD
RP/OIB/ 1000/016 Page 2 of 2 Medical Response
- 1. Symptoms NOTE:
This procedure is an implementing procedure to the Oconee Nuclear Site Emergency Plan and must be forwarded to Emergency Planning within three (3) working days of approval.
1.1 Conditions exist where medical treatment, confined space rescue and/or transport of injured personnel is required.
1.2 This procedure shall provide guidance to Shift personnel and Emergency Coordinator for response, actions, coordination and transportation associated with a medical emergency either from the Control Room or the Operational Support Center.
- 2. Immediate Actions 2.1 Refer to Enclosure 4.1, (Medical Emergency Actions - Routine Operations), for response and action guidelines for emergency medical incidents that occur during routine operations.
2.2 Refer to Enclosure 4.2, (Medical Emergency Actions - OSC/TSC Activated), for response and action guidelines for emergency medical incidents that occur when OSC/TSC are operational.
2.3 Refer to Enclosure 4.3, (Oconee Nuclear Site - General Area Layout), for directions to provide the ambulance service for entry to the site.
- 3. Subsequent Actions 3.1 Complete Enclosure 4.1, (Medical Emergency Actions, - Routine Operations) or Enclosure 4.2, (Medical Emergency Actions - OSC/TSC Activated), and submit to the Emergency Planning Section.
- 4. Enclosures 4.1 Medical Emergency Actions - Routine Operations 4.2 Medical Emergency Actions - OSC/TSC Activated 4.3 Oconee Nuclear Site - General Area Layout 4.4 Medical Emergency Response Team - Patient Treatment Form
.1 Medical Emergency Actions Routine Operations RP/O/B/ 1000/016 Page 1 of 6
- 1. Medical Emergency Actions Routine Operations 1.1 Complete the procedure steps that apply to this medical emergency, N/A steps not performed.
1.2 Complete the following accident information:
Name of person reporting injury Call back number Name of person(s) injured:
Supervisor of injured person:
Location injury occurred Brief description of injury Time NOTE:
- Security Manager or designee in the Operational Support Center (OSC) will assume responsibility for running this procedure Enclosure 4.2, Medical Emergency Actions OSC/TSC Activated) after the TSC/OSC is established and turnover is accepted from Operations. The Security Manager or designee will also assume the responsibility of MERT Communicator after activation of the TSC/OSC.
- Actions may be followed in any sequence.
- Lines left of procedure steps are used to indicate place in procedure. Check marks are acceptable in these blanks.
.1 RP/O/B/1000/016 Medical Emergency Actions Page 2 of 6 Routine Operations NOTE:
Do NOT activate MERT when a security event is in progress until Security confirms that it is safe for MERT members to respond.
1.3 1.4 IF There is a Security Event in progress, THEN Continue with Step 1.3.1 or 1.3.2 as appropriate; if NOT, go to Step 1.4.
1.3.1 IF The patient is outside the Protected Area, THEN Dial 9-911 from the Operations Shift Manager's phone or Unit 1 Control Room SRO's phone or dial 911 from the Bell South line: Units 1/2 and 3 Control Rooms. Request EMS to respond along with local law enforcement.
1.3.2 IF The patient is inside the Protected Area, THEN Wait until Security gives assurance that it is safe for MERT to respond before proceeding to Step 1.4.
Activate MERT to respond to the medical emergency.
1.4.1 Use Plant Page to request all MERT members to respond to the incident.
1.4.2 Use the radio paging system to request MERT members to respond to the incident.
A. Use the following directions to activate radios and pagers encoded to the MERT alert tones:
Transmit "Standby for Emergency Message" Press the "Instant Call" button labeled "MERT"
"* Wait for the red "Transmit" light on the radio to turn off
"* Transmit message 1.4.3 Repeat Steps 1.4.1 and 1.4.2.
.1 RP/O/B/1000/016 Medical Emergency Actions Page 3 of 6 Routine Operations NOTE:
Do NOT call Security if there is a security event in progress.
1.4.4 Call Security at one of the following extensions and request they have Security MERT members respond to the emergency.
SAS (Secondary Alarm Station) -
2205 or 2767 CAS (Central Alarm Station) -
2222 or 2958 1.4.5 IF The incident location is away from the main plant (WOE, Complex, Keowee Hydro, etc.) and incident occurs during normal working hours, THEN Notify Shuttle Bus at 5353 to come to the main plant entrance to transport MERT members to those locations.
NOTE:
The primary location for Triage, should it be needed, is the Maintenance Support Building Cafeteria. An alternate location may need to be selected depending on the area of the plant involved in the incident.
1.5 IF A mass casualty event has occurred or is suspected, and a centralized treatment area is needed, and plant conditions allow, THEN Make a PA Announcement emphasizing the following:
"* Location of the Triage area
"* Warn that only trained medical personnel should move injured people unless there are life threatening conditions in the area NOTE:
Occupational Health Unit may call direct and request an ambulance without going through the emergency line (4911). Immediate notification will then be made to the Operations Shift Manager or his designee.
- Patients with less serious injuries or illnesses may be transported to offsite medical facilities by personal or company vehicle if site Medical or MERT Command gives approval.
1.6 IF Hospital evacuation is needed as determined by MERT Command or as indicated by Step 1.6.1, THEN Arrange transport of patient to the hospital by one of the following means:
.1 RP/O/B/1000/016 Medical Emergency Actions Page 4 of 6 Routine Operations
"" EMS (ambulance)
Dial 9-911 from the Operations Shift Manager's phone or Unit 1 Control Room SRO's phone or dial 911 from the Bell South line - Units 1/2 and 3 Control Rooms. Refer to Step 1.6.2, prior to requesting EMS.
" Company vehicle (less serious injury)
"" Personal vehicle (less serious injury) 1.6.1 IF Any of the following illnesses or injuries are reported on emergency line (4911),
THEN Immediately request EMS (ambulance) to respond to the site:
"* unconsciousness
"* cardiac arrest
"* fall greater than 10-12 feet (qualified as multi-trauma)
"* obvious fractures (with deformity or open)
"* amputations
"* allergic reaction WITH airway compromise (swollen lips, tongue)
"* poisonous snake bite
"* head injury with altered level of consciousness (confusion, disorientation)
"* altered mental status (confusion, disorientation)
"* seizure (grand mal)
"* respiratory distress
"* entrapped person
"* crushing injuries
.1 RP/O/B/1000/016 Medical Emergency Actions Page 5 of 6 Routine Operations NOTE:
EMS personnel will not prepare for a radiologically contaminated patient while enroute to the site unless the EMS dispatcher is requested to relay this information to them at the time of dispatch.
1.6.2 IF The patient is known or suspected to be radiologically contaminated, THEN Have the EMS dispatcher inform the EMS personnel to expect a contaminated person.
1.6.3 Notify Security at 2222 that the ambulance is enroute.
1.6.4 Notify MERT Command that the ambulance is enroute.
1.6.5 Notify World of Energy Duty Person (Ext. 4602 or Pager #777-9414).
1.7 Notify the Occupational Health Unit at ONS during normal working hours (4652).
NOTE:
IF Transportation of a radiologically contaminated person to an offsite medical facility is required.
THEN The NRC must be notified within four (4) hours (ref. 10CFR50.72 (b) (2) (v).
1.8 IF Radiological contamination is involved and the person is being sent to a hospital.
THEN: Complete the following 1.8.1 Request MERT Command to FAX the Patient Treatment Form to the appropriate hospital as soon as possible.
1.8.2 Determine if a Radiation Protection Technician accompanied the contaminated patient to the hospital. If a RP Technician did not go with the ambulance to the hospital, arrange for the first available one to go and assist the hospital with radiation monitoring and contamination control as needed.
1.8.3 Notify Operations Shift Manager to refer to NSD 202 for reportability requirements.
1.9 Remind MERT Command that a Patient Treatment Form needs to be completed for all patients and that the completed form is to be sent to the Medical Unit for inclusion in the patients medical file.
.1 RP/0/B/1000/016 Medical Emergency Actions Page 6 of 6 Routine Operations NOTE:
The Safety Duty Person should refer to the Processes and Interpretations Section of the Safety and Industrial Hygiene Compliance Manual for additional information.
1.10 After normal working hours the Operations Shift Manager or designee shall report the following incidents to ONS Safety Duty Person who will determine if additional people need to be notified
"* Fatality
"* Injuries requiring offsite medical treatment
"* Serious accidents (near miss) whereby personnel could have sustained a disabling injury although not resulting in an injury
"* Electric contact, shock or flash bums
"* Injuries or bums resulting from a fire
"* Vehicle accidents
"* Accident involving serious property damage
"* Accident involving potential DPC liability 1.11 Verify the following notifications in the event of a fatality or injuries to 3 or more people:
1.11.1 Notify Safety Duty person who will notify:
A. General Office Manager of Safety and Industrial Hygiene or designee for notification of OSHA (8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> reporting requirement).
1.11.2 Notify Site VP or his designee.
1.12 The Operations Shift Manager or designee shall ensure notification of next of kin, if applicable.
"* Fatality - Appropriate Division Manager performs notifications.
"* Injury requiring hospitalization - Employee's Supervisor or Manger perform notification.
1.13 Submit completed Enclosure 4.1, (Medical Emergency Actions-Routine Operations) to the Emergency Planning Section.
.2 Medical Emergency Actions OSC/TSC Activated RP/O/B/1000/016 Page 1 of 6
- 1. Medical Emergency Actions - OSC/TSC Activated 1.1 Contact the Control Room and determine if MERT was activated prior to OSC/TSC activation and if turnover for MERT Communicator is needed from the Control Room to the OSC.
1.2 Complete the procedure steps that apply to this medical emergency, N/A steps not performed.
1.3 Complete the following accident information:
Name of person reporting injury Call back number Name of person(s) injured:
Supervisor of injured person:
Location injury occurred Brief description of injury Time NOTE:
9 Security Manager or designee in the Operational Support Center (OSC) will assume responsibility for running this procedure (Enclosure 4.2) after the TSC/OSC is established and turnover is accepted from Operations. The Security Manager or designee will also assume the responsibility of MERT Communicator after activation of the TSC/OSC.
"* Community Alert Network will recall 3 MERT members to the site. One of these MERT members may assist the Security Manager in running this procedure.
"* Actions may be followed in any sequence.
"* Lines left of procedure steps are used to indicate place in procedure. Check marks are acceptable in these blanks.
.2 Medical Emergency Actions OSC/TSC Activated RP/I/B/1000/016 Page 2 of 6 NOTE:
Do NOT activate MERT when a security event is in progress until Security confirms that it is safe for MERT members to respond.
1.4 IF There is a Security Event in progress, THEN Continue with Step 1.4.1 or 1.4.2 as appropriate; if NOT, go to Step 1.5.
1.4.1 IF The patient is outside the Protected Area and radiological conditions will
- allow, THEN Dial 9-911 from the Security Managers phone (ext. 3176 - OSC and ext.
3421-Alt. OSC) and request a response from EMS and law enforcement.
1.4.2 IF The patient is inside the Protected Area, THEN Wait until it is safe for MERT to respond before activating MERT.
Do NOT use the plant paging system for activating MERT when the OSC/TSC are activated.
1.5 IF The patient is located inside the Protected Area, THEN Request MERT to respond in the following order.
1.6 IF The patient is located outside the Protected Area, THEN Select one of the following options for providing medical response:
"* Request Medical Unit to have nurse respond if available.
(extension 4652)
"* Send MERT if manpower is available.
Request a response from EMS and law enforcement if radiological conditions allow.
I NOTE:
.2 RP/O/B/1000/016 Medical Emergency Actions Page 3 of 6 OSC/TSC Activated NOTE:
The primary location for Triage, should it be needed, is the Maintenance Support Building Cafeteria. An alternate location may need to be selected depending on the area of the plant involved in the incident.
1.7 IF A mass casualty event has occurred or is suspected, and a centralized treatment area is needed, and plant conditions allow, THEN Make a PA Announcement emphasizing the following:
Location of the Triage area Warn that only trained medical personnel should move injured people unless there are life threatening conditions in the area NOTE:
9 Occupational Health Unit may call direct and request an ambulance without going through the emergency line (4911). Immediate notification will then be made to the Operations Shift Manager or his designee.
- Patients with less serious injuries or illnesses may be transported to offsite medical facilities by personal or company vehicle if site Medical or MERT Command gives approval.
1.8 IF Hospital evaluation is needed as determine by MERT Command or as indicated by step 1.8.1.
THEN Arrange transport of patient to the hospital by one of the following means:
EMS (ambulance)
Dial 9-911 from the Security Manager's phone (ext. 3176 - OSC and ext. 3421 Alternate OSC) and request EMS (Ambulance) to respond. Refer to Step 1.8.2, prior to requesting EMS..
Company vehicle (less serious injury)
Personal vehicle (less serious injury)
1.8.1.2 RP/0/B/1000/016 Medical Emergency Actions Page 4 of 6 OSC/TSC Activated IF Any of the following illnesses or injuries are reported on emergency line (4911),
THEN Immediately request EMS (ambulance) to respond to the site:
unconsciousness cardiac arrest fall greater than 10-12 feet (qualified as multi-trauma) obvious fractures (with deformity or open) amputations allergic reaction WITH airway compromise (swollen lips, tongue) poisonous snake bite head injury with altered level of consciousness (confusion, disorientation) altered mental status (confusion, disorientation) seizure (grand mal) respiratory distress entrapped person crushing injuries EMS personnel will not prepare for a radiologically contaminated patient while enroute to the site unless the EMS dispatcher is requested to relay this information to them at the time of dispatch.
1.8.2 IF The patient is known or suspected to be radiologically contaminated, THEN Have the EMS dispatcher inform EMS personnel to expect a contaminated patient.
1.8.3 Notify Security at 2222 that the ambulance is enroute.
1.8.4 Notify MERT Command that the ambulance is enroute.
1.8.5 Notify World of Energy Duty Person (Ext. 4602 or Pager #777-9414).
1.9 Notify the Occupational Health Unit at ONS during normal working hours (4652).
NOTE:
.2 RP/O/B/1000/016 Medical Emergency Actions Page 5 of 6 OSC/TSC Activated NOTE:
IF Transportation of a radiologically contaminated person to an offsite medical facility is required, THEN The NRC must be notified within four (4) hours (ref. 10CFR50.72 (b) (2) (v).
1.10 IF Radiological contamination is involved and the person is being sent to a hospital, THEN Complete the following:
A. Request MERT Command to FAX the Patient Treatment Form to the appropriate hospital as soon as possible.
B.
Determine if a Radiation Protection Technician accompanied the contaminated patient to the hospital. If a RP Technician did not go with the ambulance to the hospital, arrange for the first available one to go and assist the hospital with radiation monitoring and contamination control as needed.
C. Notify Operations Shift Manager to refer to NSD 202 for reportability.
1.11 Remind MERT Command that a Patient Treatment Form, needs to be completed for all patients and that the completed form is to be sent to the Medical Unit for inclusion in the patients medical file.
1.12 Notify Offsite Communicator (extension 3706) of MERT activation and/or injured personnel transported offsite.
NOTE:
The Safety Duty Person should refer to the Processes and Interpretations Section of the Safety and Industrial Hygiene Compliance Manual for additional information.
1.13 Report the following incidents to ONS Safety Duty Person who will determine if additional people need to be notified:
"* Fatality
"* Injuries requiring offsite medical treatment
"* Serious accidents (near miss) whereby personnel could have sustained a disabling injury although not resulting in an injury
"* Electric contact, shock or flash bums
"* Injuries or burns resulting from a fire
"* Vehicle accidents
"* Accident involving serious property damage
"* Accident involving potential DPC liability
.2 RP/O/B/1000/016 Medical Emergency Actions Page 6 of 6 OSC/TSC Activated 1.13.1 Verify the following notifications in the event of a fatality or injuries to 3 or more people:
A. Notify Safety Duty person who will notify:
- General Office Manager of Safety and Industrial Hygiene or designee for notification of OSHA (8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> reporting requirement).
B.
Notify Site VP or his designee 1.14 Ensure notification of next of kin, if applicable, for either of the following conditions.
"* Fatality - Appropriate Division Manager performs notifications.
Injury requiring hospitalization - Employee's Supervisor or Manager performs notification.
1.15 Submit the completed Enclosure 4.2, (Medical Emergency Actions-OSC/TSC Activated) to the Emergency Planning Section.
.3 Oconee Nuclear Site General Area Layout RP/0/B/ 1000/016 Page I of 1
- 1. General Area Layout 7 I'Hwy 13
.23 To Seneca I - Main Site Entrance 7 - PA Gate VAP 3 - IRW 13 - Operations Training Bldg.
19 - Soft Ball Field 2 - Main OCA Gate 8 - Microwave & Water Towers 14 - World of Energy 20- Recreation (Rec) Site 3 - Intake OCA Gate 9 - Oconee Office Bldg.
15 - Maint. Training Bldg.
21 - Skimmer Wall 4 - Complex OCA Gate 10 - Keowee Hydro Station 16 - Motor Pool & Garage 22 - Church and Grave Yard 5 - PA Gate VAP 2 - North East 11-Oconee Complex 17 - Switchyards 23 - Geo-Technical Center 6 - PA Gate, VAP 1 - Main 12 - Security Training Area 18 - Picnic Area/Boat House 24 - Keowee Intake/Spillway
.4 Example Oconee Nuclear Site RP/O/B/ 1000/016 Page 1 of 1
- 1. Medical Emergency Response Team - Patient Treatment Form Duke Power Company Oconee Nuclear Site Date:
Time of Incident:
Patient Name:
Age:
Sex: M F
Work Group:
Work Supervisor:
Incident Location:
Chief complaint:
Injury/Illness
Description:
Medications:
PMH:
Allergies:
Medical Unit-885-4652 OPS Shift Manager-885-3271 Vital signs:
BP:
/
Pulse:
Respirations: _
(-.Normal
-Shallow _Labored)
Time: __
BP:
/
Pulse:
Respirations: __(-Normal
-Shallow
-Labored)
Time:
BP:
/
Pulse:
Respirations: _
(__ Normal _Shallow _Labored)
Time:
Level of Consciousness: Alert __
Pain __ Verbal __
Unresponsive Treatment:
Is patient contaminated? -- yes no If yes, and transporting to hospital, is RP Technician enroute? --- Yes ___no Patient Disposition:
Medical _
Return to Work Home Personal Physician Hospital Patient Instructions:
MERT Command:
Primary Responder:
Additional Responders:
- Fax completed form to Oconee Hospital (885-7384), ASAP, when transporting to hospital**
INFORMATION ONLY Duke Power Company PROCEDURE PROCESS RECORD (I) ID No.
RP/0/B/1000/019 Revision No 008 REPARATION (2)
Station (3)
Procedure Title Oconee Nuclear Station Technical Support Center Emergency Coordinator Procedure (4)
Prepared By Donice Kelley Date:
(5)
Requires I OCFR50.59 evaluation?
0l Yes (New procedure or revision with major changes)
[q No (Revision with minor changes) 11 No (To incorporate previousi approved changes)
(6)
Reviewed By (QR)
Date Cross-Disciplina4r iew By (QR)NA AJ Date 1 Reactivity Mgmt. Review By (QR)NA_
Date (7)
Additional Reviews QA Review By Date Reviewed By Date Reviewed By Date (8)
Temporary Approval (if necessary)
By (SRO/QR)
Date By (QR)
Date (9)
Approved By Date I
PERFORMANCE (Compare with control copy every 14 calendar days while work is being performed.)
(10)
Compared with Control Copy Date Compared with Control Copy Date Compared with Control Copy Date (11)
Date(s) Performed Work Order Number (WO#)
COMPLETION (12)
Procedure Completion Verification El Yes El NA Check lists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?
El Yes El NA Listed enclosures attached?
El Yes El NA Data sheets attached, completed, dated, and signed?
El Yes El NA Charts, graphs, etc. attached, dated, identified, and marked?
El Yes El NA Procedure requirements met?
Verified By Date (13)
Procedure Completion Approved Date
- 4) Remarks (Attach additional pages, if necessary) 01/24/2001 0(
(R06-97)
Duke Power Company Oconee Nuclear Station Technical Support Center Emergency Coordinator Procedure Reference Use Procedure No.
RP/O/B/1000/019 Revision No.
008 Electronic Reference No.
OX002WPG
RP/O/B/1000/019 Page 2 of 20 Technical Support Center Emergency Coordinator Procedure NOTE:
This procedure is an implementing procedure to the Oconee Nuclear Site Emergency Plan and must be forwarded to Emergency Planning within three (3) working days of approval.
- 1. Symptoms 1.1 Conditions exist where events are in progress or have occurred which indicate a potential degradation in the level of safety of the plant and activation of the Emergency Response Organization has been initiated.
- 2. Immediate Actions NOTE:
- Enclosure 4.2 contains listing of abbreviations/acronyms.
"* Actions in Sections 2.0 and 3.0 are NOT required to be followed in any particular sequence.
"* Place keeping aids: LI at left of steps may be used for procedure place keeping (I0).
Major events are required to be documented in the TSC Emergency Coordinator Log.
EL 2.1 Establish the Technical Support Center as operational by doing the following:
LI 2.1.1 Use the attached Enclosure 4.3, (TSC Personnel Log Sheets) for sign-in by all personnel reporting to the TSC. Assign responsibility to the TSC Log Keeper.
LI 2.1.2 Ensure Names are also listed on the TSC Personnel Status Board in the TSC NOTE:
The TSC must assume turnover from the Control Room within 75 minutes of the initiating Emergency Classification time.
LI 2.1.3 Determine the following minimum staff requirements for TSC activation.
NAME Emergency Coordinator Dose Assessment Liaison Nuclear Engineering Offsite Communicator Tech Assistant to EC
RP/O/B/ 1000/019 Page 3 of 20 LI 2.1.4 Verify that the phone system is operational or make other provisions for communications.
LI 2.1.5 Verify that the OSC is Operational.
LI 2.1.6 Verify that a log of TSC actions and activities has been started.
LI 2.1.7 IF Activation of the Alternate TSC is required prior to completion of turnover with the OSM.
THEN REFER TO Step 1.0 of Enclosure 4.6, (Alternate TSC/OSC Activation).
L0 2.2 Receive turnover from the Operations Shift Manager using Enclosure 4.1, (Operations Shift Manager To TSC Emergency Coordinator Turnover Sheet)
TSC and OSC Activated Time 0I 2.3 Determine the status of Site Accountability from the TSC Offsite Communicator.
LI 2.3.1 Request the TSC/OSC Liaison to have a Search & Rescue Team dispatched from the OSC if personnel within the Protected Area have not been accounted for by their group.
0l 2.4 Verify that the electronic status board is set up and that someone is available to maintain it.
L0 2.5 Discuss any off-site radiological concerns with the TSC Dose Assessment Liaison.
L0 2.6 Announce the following over the TSC/OSC Public Address System:
LI 2.6.1 The current Emergency Classification level and plant status.
El 2.6.2 "Anyone who has consumed alcohol within the past five (5) hours notify either the Emergency Coordinator in the TSC or the OSC Manager in the OSC."
LI 2.6.3 "Personnel should assume that areas are contaminated until surveyed by RP."
"No eating, drinking, or smoking until the TSC and OSC are cleared by RP."
[] 2.6.4
RP/O/B/1000/019 Page 4 of 20 El 2.7 Turn office page over ride switch ON, and dial 70 on the Emergency Coordinator's phone.
2.7.1 Announce the following information over the Plant Public Address System:
Drill Message:
Attention all site personnel. This is (name)
I am the Emergency Coordinator.
This is a drill. This is a drill.
You have been assembled as a part of an emergency exercise. The simulated emergency conditions are If this was a real emergency, you would be asked to remain assembled waiting on further information, or given instructions to leave the site in accordance with our site evacuation plan. At this time, however, we will continue with the emergency exercise and you may now return to your normal work assignments. I repeat.... you may now return to your normal work assignments.
Thank you for your participation.
Emergency Message:
Attention all site personnel. This is (name)
. I am the Emergency Coordinator.
This is an emergency message.
At the present time we have a(n) emergency classification. The plant status is as follows Please remain at your site assembly location until you receive further instructions.
Information will be provided to you as conditions change.
El 2.8 Contact the State Director Emergency Planning at the SEOC.
NAME TELEPHONE NUMBERS SDEP 1(803) 737-8564 IF The SEOC has not been activated, THEN Contact the County Directors of Emergency Planning (CDEP) to discuss plant status.
Oconee CDEP E1 864) 638-4200 1(864) 898-5943 Pickens CDEP
RP/O/B/1000/019 Page 5 of 20 El 2.9 Perform the following concurrently.
"* Use Step 2.10 for emergency classification.
"* Use Step 2.11 for turnover to the EOF Director.
"* Use steps in 3.0 for tasks that must continue regardless of emergency classification.
(Step 2.10 on next page)
RP/O/B/ 1000/019 Page 6 of 20 0I 2.10 Review emergency classification and verify that it meets the criteria of RP/O/B/1000/001 (Emergency Classification). Discuss changing plant conditions with the Superintendent of Operations. Discuss emergency classification prior to making recommendations.
El 2.10.1 IF An Unusual Event Classification exists, THEN Initiate the following actions:
LI A. Notify counties/state within 15 minutes of event classification.
NOTE:
- Remind the TSC NRC Communicator to complete the NRC Event Notification Worksheet and Plant Status Sheet prior to contacting the NRC.
- NRC should be notified immediately after notification of Offsite Agencies but NOT later than one (1) hour after declaration of the emergency.
LI B.
Notify NRC of event classification NOTE:
Condition B for Keowee Hydro Project Dams/Dikes also requires notification of the Georgia Emergency Management Agency and National weather service. Remind the TSC Offsite Communicator to notify these agencies in addition to and after SC State, Oconee County, and Pickens County.
L C.
IF THEN Condition B at Keowee exists, Notify the Area Hydro Manager (refer to Section 6 of the Emergency Telephone Directory, Keowee Hydro Project Dam/Dike Notification).
LI D. Discuss classification with SDEP and CDEP NAME TELEPHONE NUMBERS SDEP Oconee CDEP Pickens CDEP 1(803) 737-8564 1(864) 638-4200 1(864) 898-5943 (Unusual Event Classification guidance continued on next page)
RP/O/B/1000/019 Page 7 of 20 EL E. IF THEN An Unusual Event classification is being terminated REFER TO Enclosure 4.5, (Emergency Classification Termination Criteria) of this procedure for termination guidance.
NOTE:
The EP Section shall develop a written report, for signature by Site Vice President, to the State Emergency Preparedness Agency, Oconee County EPD, and Pickens County EPD within 24 working hours of the event termination.
- 1. Notify Emergency Planning that the Unusual Event has been terminated.
El
- 2.
Emergency Planning shall hold a critique following termination of the Unusual Event.
(Step 2.10.2, Alert Classification on next page)
RP/O/B/1000/019 Page 8 of 20 El 2.10.2 IF An Alert Classification exists, THEN Initiate the following actions:
"Li A. Notify counties/state within 15 minutes of event classification "El B.
Follow Up Notifications (updates) are required a minimum of every 60 minutes Significant changes in plant status should be communicated to offsite agencies as they occur "Li C. Notify NRC of change in classification "LI D. Start ERDS (TSC NRC Communicator - RP/O/B/1000/003A, ERDS Operation)
"[] E. Discuss change in classification with the State Director of Emergency Preparedness (SDEP) and County Directors of Emergency Preparedness (CDEP)
NAME TELEPHONE NUMBERS SDEP 1(803) 737-8564
- 1. IF The SEOC has not been activated, THEN Contact the CDEP to discuss plant status.
Oconee CDEP 1(864) 638-4200 Pickens CDEP 1(864) 898-5943 NOTE:
Condition B for Keowee Hydro Project Dams/Dikes also requires notification of the Georgia Emergency Management Agency and National Weather Service. Remind the TSC Offsite Communicator to notify these agencies in addition to and after SC State, Oconee County, and Pickens County. {2}
LI F. IF Condition B at Keowee exists, THEN Notify the Area Hydro Manager (refer to Section 6 of the Emergency Telephone Directory, Keowee Hydro Project Dam/Dike Notification).
(Step 2.10.3, Site Area Emergency Classification on next page)
RP/O/B/1000/019 Page 9 of 20 El 2.10.3 IF A Site Area Emergency Classification exists, THEN Initiate the following actions:
El A. Notify counties/state within 15 minutes of event classification El B.
IF Condition A, Dam Failure (Keowee or Jocassee) exists, THEN Make the following protective action recommendations to Oconee County and Pickens County for imminent/actual dam failure and include on the Emergency Notification Form under Section 15 (B) and (D):
- 1.
Move residents living downstream of the Keowee Hydro Project dams to higher ground.
- 2.
Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed.
El C.
Follow Up Notifications (updates) are required a minimum of every 60 minutes
- 1. Significant changes in plant status should be communicated to offsite agencies as they occur El D. Notify NRC of change in classification El E.
Start ERDS (TSC NRC Communicator - RP/0/B/1000/003A, ERDS Operation)
El F. Discuss change in classification with SDEP and CDEP NAME TELEPHONE NUMBERS SDEP 1 (803) 737-8564
- 1. IF The SEOC has not been activated, THEN Contact the CDEP to discuss plant status.
Oconee CDEP 1 (864) 638-4200 Pickens CDEP 1(864) 898-5943 El G. IF Condition A, Dam Failure (Keowee or Jocassee) exists, THEN REFER TO Step 3.1.
RP/O/B/ 1000/019 Page 10 of 20 NOTE:
Condition B for Keowee Hydro Project Dams/Dikes also requires notification of the Georgia Emergency Management Agency and National Weather Service. Remind the TSC Offsite Communicator to notify these agencies in addition to and after SC State, Oconee County, and Pickens County. {2}
El H. IF Condition B at Keowee exists, THEN Notify the Area Hydro Manager (refer to Section 6 of the Emergency Telephone Directory, Keowee Hydro Project Dam/Dike Notification).
(Step 2.10.4, General Emergency Classification, on next page)
RP/O/B/ 1000/019 Page 11 of 20 2.10.4 IF A General Emergency Classification exists, THEN Initiate the following actions:
LI A. Evacuate 2 mile radius and 5 miles downwind unless conditions make evacuation dangerous. Shelter all sectors not evacuated. Request the TSC Dose Assessment Liaison to determine the actual sectors affected.
LI B. IF Condition A, Dam Failure (Keowee or Jocassee) exists, THEN Make the following protective action recommendations to Oconee County and Pickens County for imminent/actual dam failure and include on the Emergency Notification Form under Section 15B and D:
- 1.
Move residents living downstream of the Keowee Hydro Project dams to higher ground.
- 2.
Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed.
LI C. Notify counties/state within 15 minutes of event classification El D. Follow Up Notifications (updates) are required a minimum of every 60 minutes
- 1. Significant changes in plant status should be communicated to offsite agencies as they occur LI E.
Notify NRC of change in classification EL F.
Start ERDS (TSC NRC Communicator - RP/0/B/1000/003A, ERDS Operation)
LI G. Discuss change in classification and Protective Action Recommendations with SDEP and/or CDEP. Provide any known information concerning conditions that would make evacuation dangerous.
NAME TELEPHONE NUMBERS SDEP E1 803) 737-8564
- 1. IF The SEOC has not been activated, THEN Contact the CDEP to discuss plant status.
Oconee CDEP 1(864) 638-4200 Pickens CDEP 1 (864) 898-5943
RP/O/B/1000/019 Page 12 of 20 LI H. IF Condition A, Dam Failure (Keowee or Jocassee) exists, THEN REFER TO Step 3.1.
SI1. IF THEN Condition B at Keowee exists, Notify the Area Hydro Manager (refer to Section 6 of the Emergency Telephone Directory, Keowee Hydro Project Dam/Dike Notification).
(Step 2.11 on next page)
NOTE:
Condition B for Keowee Hydro Project Dams/Dikes also requires notification of the Georgia Emergency Management Agency and National Weather Service. Remind the TSC Offsite Communicator to notify these agencies in addition to and after SC State, Oconee County, and Pickens County. {2}
RP/O/B/ 1000/019 Page 13 of 20 0I 2.11 When notified by the EOF Director that the Emergency Operations Facility (EOF) is operational, notify the following TSC personnel to exchange information with their counterpart in the EOF.
TSC Dose Assessment Liaison TSC Offsite Communicator Control Room/EOF Liaison (Operations Network)
NOTE:
EOF Director will notify the Emergency Coordinator when the information has been received and establish a time for turnover. Turnover should be initiated as soon as possible. A goal of 30 minutes should be used to complete turnover after the EOF is declared Operational. { 1 }
EL 2.11.1 Obtain the current copy of the Emergency Notification Form and plant status.
The EOF Director shall provide to the Emergency Coordinator the information he has been provided with in the following areas:
Present Emergency Classification Initial Emergency Classification Time Time Initiating Condition/Unit affected Present status of affected unit(s), including significant equipment out of service Improving Stable Degrading _
Status of unaffected unit(s):
Unit 1 shutdown at or at
% power Unit 2 shutdown at or at
% power Unit 3 shutdown at or at
% power 0
Emergency Releases:
NO Airborne __
Liquid Is occurring __
Has occurred Normal Operating Limits:
Below __
Above Protective Action Recommendations Site Evacuation NO YES If yes, location Time of evacuation Time 0
Last Message Number Next Message due at
RP/O/B/1000/019 Page 14 of 20 2.11.2 Emergency Coordinator turnover to EOF Director complete.
EOF Activated Time EU 2.11.3 Request NRC Communicator to notify the NRC EOC that the EOF is activated.
- 3. Subsequent Actions 3.1 IF THEN Condition A, Dam Failure (Keowee or Jocassee) exists, Perform the following actions:
Li 3.1.1 Notify the Duke Power System Coordinator (System Operations Center) and provide information related to the event. Refer to Section 6 of the Emergency Telephone Directory.
El 3.1.2 Relocate Keowee personnel to the Operational Support Center if events occur where their safety could be affected.
El 3.1.3 Notify the Duke Power System Coordinator if Keowee personnel are relocated to the OSC.
NOTE:
A loss of offsite communications capabilities (Selective Signaling and the WAN) could occur within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after Keowee Hydro Dam failure. Rerouting of the Fiber Optic Network through Bad Creek should be started AS SOON AS POSSIBLE.
El 3.1.4 IF The EOF is NOT activated, THEN Notify Telecommunications Group in Charlotte to begin rerouting the Oconee Fiber Optic Network. Refer to Selective Signaling Section of the Emergency Telephone Directory (page 9).
El 3.1.5 Notify Security to alert personnel at the Security Track/Firing Range and Warehouse #5 to relocate to work areas inside the plant.
El 3.1.6 Relocate personnel at the following locations to the World of Energy/Operations Training Center:
NOTE:
Plant access road to the Oconee Complex could be impassable within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> if the Keowee Hydro Dam fails. A loss of the Little River Dam or Dikes A-D will take longer to affect this road.
Oconee Complex Oconee Garage Oconee Maintenance Training Facility
RP/O/B/1000/019 Page 15 of 20
[i 3.1.7 Ensure Operations has dispatched operators to the SSF and established communications.
0l 3.2 Periodically evaluate with TSC personnel the need to conduct evacuation. Log the status of this action on the TSC Status Board.
NOTE:
e Twenty-four (24) hour staffing must be accomplished prior to personnel being evacuated from the site. RP/OJB/ 1000/010, (Procedure for Emergency Evacuation/Relocation of Site Personnel).
0 Determine if personnel with special radiological exposure limits need to be evacuated (e.g.; declared pregnant women, personnel with radio-pharmaceutical limitations).
3.2.1 Consider the following for making Site Evacuation decisions:
"* Alert - determined by actual plant conditions Site Area Emergency - consider evacuation/relocation of non-essential site personnel. World of Energy personnel should be evacuated at the same time as non essential personnel.
General Emergency - evacuate all non-essential personnel. Notify the EOF Director to evacuate the World of Energy.
Notify the EOF anytime personnel are relocated on site or evacuated from the site.
RP/I/B/1000/019 Page 16 of 20 LI 3.3 Periodically evaluate the need to operate the outside air booster fans (Control Room Pressurization and Filter System - CRVS) with TSC personnel. Log status of this system on the TSC Status Board.
NOTE:
e Outside air booster fans are used to provide positive pressure in the Control Room/TSC/OSC to prevent smoke, toxic gas, or radioactivity from entering the area as required by NUREG 0737, Control Room Habitability.
- Chlorine Monitor Alarm will either stop the outside air booster fans OR will not allow them to start.
El 3.3.1 IF Smoke/toxic gas in the Turbine Building or Auxiliary Building is expected to reach the Control Room, THEN Instruct the Control Room to turn ON the outside air booster fans.
Fans On Time "LI A. Request OSC to verify operability of the Control Room Ventilation System per AP/1,3/A/1700/018, (Abnormal Release of Radioactivity).
3.3.2 IF RIA-39 is in Alarm THEN Verify that the Control Room has turned on the outside air booster fans.
"LI A. Request OSC to verify operability of the Control Room Ventilation System per AP/1,3/A/1700/018, (Abnormal Release of Radioactivity).
"LI B.
Request backup air sample from the OSC to verify RIA alarm "LI C. IF Air sample determines that RIA-39 alarm is not valid, THEN Secure outside air booster fans.
"LI D. IF Air sample determines that RIA-39 alarm is valid, THEN Isolate the source of airborne contamination to the Control Room/TSC/OSC "LI E. IF Dose levels in the Control Room/TSC/OSC are being increased by the addition of outside filtered air, THEN Secure outside air booster fans.
Fans Off Time
RP/O/B/ 1000/019 Page 17 of 20 El 3.4 Periodically evaluate the need to activate the Alternate TSC and/or OSC.
3.4.1 IF Activation of the Alternate TSC and/or OSC is required, THEN REFER TO Step 2.0 of Enclosure 4.6, (Alternate TSC/OSC Activation).
3.4.2 Notify the EOF Director once relocation to the Alternate TSC is completed.
NOTE:
The NRC will send a response team to the site at a Site Area or General Emergency Classification.
LI 3.5 IF An NRC team is enroute, THEN Perform the following steps:
LI 3.5.1 Notify Alternate Emergency Coordinator to report to the TSC for an update on plant conditions.
A. Record Alternate Emergency Coordinator's name on Enclosure 4.4 (NRC Site Team Response Form).
B.
Brief Alternate Emergency Coordinator on current plant conditions.
EL 3.5.2 Provide Enclosure 4.4 (NRC Site Team Response Form), to the TSC NRC Communicator.
A. Instruct TSC NRC Communicator to complete Steps 1.2 - 1.5 of.4 (NRC Site Team Response Form).
LI 3.5.3 Notify OSC Manager and request RP Manager and Security to implement actions required to process NRC Site Team.
0I 3.6 Provide periodic updates to the EOFD concerning plant status. Request the EOFD to provide dose assessment and field monitoring data to the TSC on a periodic basis.
3.6.1 IF Failed Fuel Condition Three (3) has been determined, THEN Immediately notify the EOFD.
A. Failed Fuel Condition Three (3) requires additional Protective Action Recommendations.
RP/O/B/1000/019 Page 18 of 20 0I 3.7 Authorize exposure greater than normal operating limits for planned equipment repair missions and/or emergency lifesaving missions.
3.7.1 Approval may be either verbal or written.
3.7.2 This authority may be delegated to the RP Manager in the OSC.
El 3.8 Update TSC and OSC personnel approximately every 30 minutes on the Emergency Classification and plant status via the TSC/OSC public address system. (Timer is available in the Emergency Procedures Cart) 0I 3.9 Establish twenty-four (24) hour staffing and have the Managers prepare as needed.
3.9.1 TSC Personnel Log Sheets (Enclosure 4.3) are to be used for this purpose.
NOTE:
Long term use of the SFP as a makeup source will deplete the SFP inventory.
Engineering has evaluated and approved the following method for refilling of the SFP with filtered lake water.
LI 3.10 IF THEN Offsite fire apparatus is needed to provide water to the Spent Fuel Pool, Request the EOFD to contact the Oconee CDEP to provide sufficient fire apparatus (at least 3 pumper trucks of 1000 gpm, or greater capacity) to Oconee Nuclear Site (If available, Keowee Ebenezer, Corinth Shiloh, or Keowee Key Rural Volunteer Fire Departments should be requested to provide support).
El 3.10.1 Provide the OSC Manager with the following information and request support from the OSC:
Fire apparatus is being dispatched from Oconee County to provide water to the Spent Fuel Pool Request Security Liaison to have Security Officers meet the fire apparatus at the determined site entrance Request Maintenance Manager to initiate MP/0/A/3009/012A (Emergency Plan For Refilling Spent Fuel Pool).
RP/O/B/1000/019 Page 19 of 20 NOTE:
e 10CFR50.54(x) allows for reasonable actions that depart from a License Condition or Technical Specification to be performed in an emergency when this action is immediately needed to protect the health and safety of the public and no action consistent with the License Condition or Technical Specification that can provide adequate or equivalent protection is immediately apparent.
10CFR50.54(y) requires approval of any 10CFR50.54(x) actions by a Licensed Senior Operator.
Implementation of Oconee Severe Accident Guidelines (OSAG) requires the use of 10CFR50.54 (x) and (y) provisions.
0 3.11 IF THEN Plant conditions require a decision to implement 10CFR50.54(x),
Perform the following steps:
U 3.11.1 Obtain approval of a Licensed Senior Reactor Operator prior to taking any action.
EU 3.11.2 Document decision and actions taken in the affected units log.
0 3.11.3 Document decision and actions taken in the Control Room Emergency Coordinator Log.
NOTE:
NRC must be notified of any 10CFR50.54(x) decisions and actions within one (1) hour.
Ul 3.11.4 Request Control RoomI/TSC NRC Communicator to report decision and actions taken to the NRC.
NOTE:
10CFR50.72 requires NRC notification for specific plant conditions.
U 3.12 IF THEN Plant conditions require NRC notification under 10CFR50.72, Request the Control Room/TSC NRC Communicator to provide this notification using the guidance in OMP 1-14, (Notifications).
RP/O/B/1000/019 Page 20 of 20 D] 3.13 IF A LOCA exists inside containment, THEN Initiate the following actions:
3.13.1 Request the Operations Superintendent to have Operations personnel refer to OP/1,2,3/A/ 1102/023, (Operation Of Containment Hydrogen Recombiner System).
3.13.2 Request the Operations Superintendent to have Operations personnel refer to OP/0/A/1 104/019 (Control Room Ventilation System).
0I 3.14 Establish a Recovery Organization (Section M of the ONS Emergency Plan, Volume A, located in the Operations Shift Manager's office) once the emergency has been terminated.
3.14.1 Request the OSC Manager to review Section M of the Emergency Plan (Volume 17A is located in Unit 3 Control Room) to begin preparation for recovery.
3.15 Emergency Planning Section shall be responsible for completing all Procedure Process Records of Emergency Plan Implementing procedures initiated by the TSC.
- 4. Enclosures 4.1 Operations Shift Manager to TSC Emergency Coordinator Turnover Sheet 4.2 Emergency Preparedness Acronyms 4.3 TSC Personnel Log 4.4 NRC Site Team Response Form 4.5 Emergency Classification Termination Criteria 4.6 Alternate TSC/OSC Activation 4.7 References
.1 RP/O/B/1000/019 Operations Shift Manager To TSC Emergency Coordinator Turnover Sheet EMERGENCY CLASSIFICATION Page 1 of 2 TIME DECLARED DESCRIPTION OF EVENT Unit One Status:
Reactor Power RCS Pressure RCS Temperature Auxiliaries Being Supplied Power From ES Channels Actuated MAJOR EQUIPMENT OUT OF SERVICE JOBS IN PROGRESS Unit Two Status:
Reactor Power RCS Pressure RCS Temperature Auxiliaries Being Supplied Power From ES Channels Actuated MAJOR EQUIPMENT OUT OF SERVICE JOBS IN PROGRESS Unit Three Status:
Reactor Power RCS Pressure RCS Temperature Auxiliaries Being Supplied Power From ES Channels Actuated MAJOR EQUIPMENT OUT OF SERVICE JOBS IN PROGRESS
.1 Operations Shift Manager To TSC Emergency Coordinator Turnover Sheet Classification Procedure in Use:
RP/O/B/1000/002 Control Room Emergency Coordinator Procedure Is RP/O/B/1000/003A, ERDS Operation, in use?
Yes No __
Is RP/0/B/1000/007, (Security), in use?
Is RP/0/B/1000/0 16, (Medical), in use?
Is RP/O/B/1000/017, (Spill Response), in use?
Is RP/0/B/1000/022, (Fire/Flood), in use?
Is RP/O/B/1000/29, (Fire Brigade) in use?
Yes__
Yes__
Yes__
Yes__
Yes No_
No No No No RP/O/B/1000/019 Page 2 of 2 If Yes, Unit No.__
Step No. __
If Yes, Step No. __
If Yes, Step No. __
If Yes, Step No. __
If Yes, Step No. __
If Yes, Step No. __
IF Condition A, Dam Failure, has been declared for Keowee Hydro Project, THEN provide the following information to the TSC Emergency Coordinator:
Status of Offsite Agency Notifications Recommendations made to offsite agencies Status of relocation of site personnel What is the status of Site Assembly? (This question is only applicable for those times that the Emergency Response Organization is activated after hours, holidays, or weekends.)
Next message due to Offsite Agencies at Time:
Operations Shift Manager/CR Emergency Coordinator/TSC Time:
Time:
.2 RP/O/B/1000/019 Emergency Preparedness Acronyms Page 1 of 1 CDEP County Director of Emergency Preparedness EC Emergency Coordinator EOF Emergency Operations Facility EOFD Emergency Operation, Facility Director ETS Emergency Telephone System LEC Law Enforcement Center NRC Nuclear Regulatory Commission EOC Emergency Operations Center OSC Operational Support Center PAR Protective Action Recommendation SCC State/County Communicator SDEP State Director of Emergency Preparedness SEOC State Emergency Operations Center SWP State Warning Point TSC Technical Support Center
Enclosu(
TSC Personnel Log DATE:
PRIMARY POSITION NAME SOCIAL SECURITY (Last, First, MI)
EMPLOYEE ID Emergency Coordinator**
Offsite Communicator**
Dose Assessment Liaison*
Nuclear Engineering**
Tech Assist to EC (Mech Engineer)**
Operations Superintendent TSC/OSC Liaison
- 45 Minute Responder
- 75 Minute Responder I
RELIEF SOCIAL SECURITY SHIFT SCHEDULE EMPLOYEE ID RP/0/1',
3/019 Page 1 of 2
(
Enclosu(
TSC Personnel Log PRIMARY IRELIEF POSITION NAME SOCIAL SECURITY TIME SHIFT NAME SOCIAL SECURITY SHIFT (Last, First, MI)
IN AT SCHEDULE (Last, First, MI)
SCHEDULE EMPLOYEE ID TSC EMPLOYEE ID TSC/OSC Liaison Support Engineering Manager NRC Communicator (ENS)
Dose Assessors Primary Systems Engineer Secondary Systems Engineer Emergency Planning Community Relations (WOE)
Local ITr RP/01(
YI019 Page 2 of 2
.4 NRC Site Team Response Form RP/O/B/1000/019 Page 1 of 1
- 1. NRC Site Team Response Form 1.1 Alternate Emergency Coordinator (name) 1.2 NRC Site Team Personnel Information:
NAME SOCIAL SECURITY NUMBER 1.3 Estimated Time of Arrival (ETA):
1.4 Mode of Transportation:
Access Gate (Circle One): Hwy 130 - Main Station/WOE Entrance (Gate 1)
Hwy 183 - Intake Owner Controlled Area (OCA) Gate (Gate 3)
Hwy 183 - Complex/Branch OCA Gate (Gate 4) 1.5 Telecopy this form to the OSC and Security using Speed Dial Code 031 or One-Touch Dial Code 31.
1.6 GET and BBA Requirements Waived:
RP Manager Date
.5 RP/O/B/1000/019 Emergency Classification Termination Page 1 of 1 Criteria IF The following guidelines applicable to the present emergency condition have been met or addressed, THEN An emergency condition may be considered resolved when:
0I 1.1 Existing conditions no longer meet the existing emergency classification criteria and it appears unlikely that conditions will deteriorate further.
LI 1.2 Radiation levels in affected in-plant areas are stable or decreasing to below acceptable levels.
LI 1.3 Releases of radioactive material to the environment greater than Technical Specifications are under control or have ceased.
L0 1.4 The potential for an uncontrolled release of radioactive material is at an acceptably low level.
LI 1.5 Containment pressure is within Technical Specification requirements.
Ii 1.6 Long-term core cooling is available.
0I 1.7 The shutdown margin for the core has been verified.
LI 1.8 A fire, flood, earthquake, or similar emergency condition is controlled or has ceased.
LI 1.9 Offsite power is available per Technical Specification requirements.
LI 1.10 All emergency action level notifications have been completed.
LI 1.11 The Area Hydro Manager has been notified of termination of Condition B for Keowee Hydro Project.
Li 1.12 The Regulatory Compliance Section has evaluated plant status with respect to Technical Specifications and recommends Emergency Classification termination.
Date/Initial/Time LI 1.13 Emergency terminated. Request the TSC Offsite Communicator to complete an Emergency Notification Form for a Termination Message using guidance in RP/0/B/1000/015B, (Offsite Communications From The Technical Support Center), and provide information to offsite agencies.
0 Return to Step 2.10.1.E. I
.6 RP/O/B/1000/019 Alternate TSC/OSC Activation Page 1 of 2
- 1. Activation of the Alternate TSC prior to completion of turnover with the OSM 0] 1.1 Request OSC Manager/SPOC Supervisor to initiate steps to setup the Alternate TSC located in RP/O/B/1000/25 (OSC Manager Procedure).
El 1.2 Request TSC Logkeeper (or designee) to announce over the plant PA that the Alternate TSC is being activated.
El 1.3 Relocate TSC personnel, except for the following, to the Alternate TSC, Room 316 of the Oconee Office Building:
El 1.3.1 TSC Offsite Communicator (1)
El 1.3.2 TSC Logkeeper El 1.3.3 Emergency Planning (if available)
El 1.4 Return to Step 2.2 of this procedure and complete turnover with the OSM.
El 1.4.1 Report to the Alternate TSC with remaining support personnel after completion of turnover.
.6 RP/O/B/1000/019 Alternate TSC/OSC Activation Page 2 of 2
- 2. Activation of the Alternate TSC/OSC 0] 2.1 Direct the TSC/OSC Liaison to inform the OSC Manager of the need to relocate the following emergency response facilities:
TSC OSC TSC and OSC 0l 2.2 Provide guidance on best available route to personnel being relocated to the Alternate TSC.
2.2.1 IF A radiological release is in progress, THEN Direct the TSC/OSC Liaison to request RP to determine the best available route to the Alternate TSC.
L0 2.3 Direct the following TSC personnel to report to the Alternate TSC to assist with setup of the facility and establish communications with the TSC:
(1) TSC Offsite Communicator (1) Dose Assessor Ops Superintendent Assistant TSC/OSC Liaison Technical Assistant 0I 2.4 Direct the TSC NRC Communicator to inform the NRC that the Alternate TSC is being activated.
0l 2.5 Direct the remaining TSC personnel to report to the Alternate TSC.
0I 2.6 Inform the EOF Director that the Alternate TSC is being activated and that TSC personnel, including the Emergency Coordinator, are enroute to that facility.
EL 2.7 Return to Step 3.4.2 of this procedure after reporting to the Alternate TSC.
.7 References RP/O/B/1000/019 Page 1 of I PIP 0-98-04996 PIP 0-99-00743
- 1.
2.