Category:License-Operator Examination Report
MONTHYEARML22234A0282022-08-19019 August 2022 NA-2022-6 Examination Report and Cover Letter IR 05000338/20203012020-09-16016 September 2020 NRC Operator License Examination Report 05000338/2020301, 05000339/2020301 IR 05000338/20123022013-01-15015 January 2013 Er 05000338-12-302, 05000339-12-302; 12/18-19/2012; North Anna Power Station; Operator License Examinations IR 05000338/20123012012-10-17017 October 2012 Er 05000338-12-301, 05000339-12-301; 09/10-14/2012 and 09/19/2012; North Anna Power Station; Operator License Examinations IR 05000338/20103012010-08-0404 August 2010 Er 05000338-10-301, 05000339-10-301, on 06/07-23/2010 and 06/16/2010, North Anna Power Station, Operator License Examinations ML0821800072008-08-0505 August 2008 Er 05000338-08-301, 05000339-08-301, on 06/02-20/2008 and 06/24/2008; North Anna Power Station; Licensed Operator Examinations ML0818405022008-07-0202 July 2008 Retake Exam 05000338-06-302 Draft Job Performance Measures (Part 2 of 2) ML0635203872006-12-18018 December 2006 Initial Retake Examination Report - 05000338-06302 and 0500339-06302 IR 05000338/20063012006-08-0202 August 2006 Er 05000338-06-301, 05000339-06-301; 5/22-26/2006, 6/5-9/2006, 6/14/2006; North Anna Power Station; Licensed Operator Examinations ML0220703442002-07-25025 July 2002 Examination Reports 050-338/2002-301 & 50-339/2002-301on June 10-4, 24-25 & June 6, 2002. Eleven of Thirteen Applicants Passed Both Written & Operating Examinations. One RO & One SRO Failed Written Examination ML0220000992002-07-10010 July 2002 Stations, Units 1 & 2 -- Requested Information on Proposed Site-Specific Operator Licensing Examination Schedules & Estimated Number of Applicants, Regulatory Issue Summary 2002-09 ML0037616232000-10-19019 October 2000 Sept/2000 Exam 50-338/2000-301 North Anna Exam Report - Reactor & Senior Reactor Operator Initial Examinations 2022-08-19
[Table view] Category:License-Operator
MONTHYEARML22241A0262022-08-29029 August 2022 Exam Administrative Items (1) ML22241A0232022-08-29029 August 2022 Adams 2B Na Exam Administrative Items ML22214A0252022-08-0202 August 2022 NA-2022-6 RO as Given Written ML22214A0272022-08-0202 August 2022 NA-2022-6 SRO as Given Written ML22147A0162022-05-26026 May 2022 2022-301 Exam Approval Letter ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21313A2632021-11-0808 November 2021 301 Corporate Notification Letter (210-day Ltr) ML21111A3412021-04-16016 April 2021 March 2021 GFE ML21011A0082021-01-11011 January 2021 301-2B Normal Release - Exam Administrative Items ML21011A0552021-01-11011 January 2021 301 2A-3, Exam Administrative Items ML21011A0312021-01-11011 January 2021 301 2A-2 Exam Final Items ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML19100A2012019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for North Anna Power Station ML19045A3712019-02-12012 February 2019 March 2019 GFE Cover Letter Rii ML19018A0882019-01-17017 January 2019 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019 IR 05000338/20183012018-08-29029 August 2018 05000338/2018301 and 05000339/2018301 Post Exam Comments ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML17331A7042017-11-21021 November 2017 Notification of Licensed Operator Initial Examination 05000338/2018301 and 05000339/2018301 ML17172A6922017-06-22022 June 2017 Section 1 - Draft Administrative Documents ML17172A7032017-06-21021 June 2017 Section 3 - North Anna 2016301 SRO Written Draft - Delay Release 2 Yrs ML17172A7012017-06-21021 June 2017 Section 2 - North Anna 2016301 RO Written Draft - Delay Release 2 Years ML17172A7112017-06-21021 June 2017 Section 5 - Draft Sim and in Plant JPMs ML17172A7272017-06-21021 June 2017 Section 14 - General Correspondence ML17172A7082017-06-21021 June 2017 Section 4 - North Anna 2016301 - Draft Simulator Scenarios ML17172A7262017-06-21021 June 2017 Section 12 - Final Administrative JPMs - North Anna Power Station ML17172A7202017-06-21021 June 2017 Section 10 - Final Simulator Scenarios - North Anna Power Station ML17172A7142017-06-21021 June 2017 Section 6 - Draft Administrative JPMs ML17172A7252017-06-21021 June 2017 Section 11 - Final Sim in Plant JPMs ML17172A7182017-06-21021 June 2017 Section 7 - Final Admin Docs - North Anna ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17116A6362017-04-24024 April 2017 March 2017 - North Anna NRC Generic Fundamentals Examination Results ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16214A3022016-08-0101 August 2016 05000338/2016301 and 05000339/2016301 Final RO Written Exam - Delay Release ML16214A3042016-08-0101 August 2016 0500033i8/2016301 and 05000339/20163001 Final SRO Written Exam - Delay Release ML16214A3012016-07-14014 July 2016 05000338/2016301 and 05000339/2016301 Post Exam Comments ML16173A1522016-06-16016 June 2016 Operator Licensing Written Examination Approval 050000338/2016301 and 050000339/2016301 ML15356A7592015-12-21021 December 2015 Notification of Licensed Operational Examination 05000338/2016301 and 05000339/2016301 IR 05000338/20163012015-12-21021 December 2015 Notification of Licensed Operational Examination 05000338/2016301 and 05000339/2016301 ML14233A5452014-08-21021 August 2014 Initial Exam 2014-301 Draft Simulator Scenarios ML14233A4602014-08-21021 August 2014 Inital Exam 2014-301 Draft RO Written Exam ML14233A4972014-08-21021 August 2014 Initial Exam 2014-301 Draft SRO Written Exam ML14234A0082014-08-21021 August 2014 Initial Exam 2014-301 Draft Simulator and in Plant JPMs ML14234A0102014-08-21021 August 2014 Initial Exam 2014-301 Draft Administrative JPMs ML14234A0132014-08-21021 August 2014 Initial Exam 2014-301 Final Administrative Documents ML14234A0152014-08-21021 August 2014 Initial Exam 2014-301 Final Simulator Scenarios ML14234A0182014-08-21021 August 2014 Initial Exam 2014-301 Final Simulator and in Plant JPMs ML14234A0192014-08-21021 August 2014 Initial Exam 2014-301 Final Administrative JPMs ML14234A0202014-08-21021 August 2014 Initial Exam 2014-301 Post Exam Comments ML14234A0222014-08-21021 August 2014 Initial Exam 2014-301 General Correspondence 2022-08-29
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML22241A0232022-08-29029 August 2022 Adams 2B Na Exam Administrative Items ML22241A0262022-08-29029 August 2022 Exam Administrative Items (1) ML22214A0252022-08-0202 August 2022 NA-2022-6 RO as Given Written ML22214A0272022-08-0202 August 2022 NA-2022-6 SRO as Given Written ML22147A0162022-05-26026 May 2022 2022-301 Exam Approval Letter ML22125A1762022-05-0505 May 2022 Preparation and Scheduling of Operator Licensing. ML21313A2632021-11-0808 November 2021 301 Corporate Notification Letter (210-day Ltr) ML21011A0312021-01-11011 January 2021 301 2A-2 Exam Final Items ML21011A0552021-01-11011 January 2021 301 2A-3, Exam Administrative Items ML21011A0082021-01-11011 January 2021 301-2B Normal Release - Exam Administrative Items ML21019A3932021-01-11011 January 2021 1 GFE Annual Letter for Fy 2021 ML20156A3122020-06-0404 June 2020 Preparation and Scheduling of Operator Licensing Examinations ML19100A2012019-04-10010 April 2019 March 6, 2019, NRC Generic Fundamentals Examination Results for North Anna Power Station IR 05000338/20183012018-08-29029 August 2018 05000338/2018301 and 05000339/2018301 Post Exam Comments ML18135A0842018-04-25025 April 2018 NRC Regulatory Issue Summary 2018-02 Preparation and Scheduling of Operator Licensing Examinations ML17331A7042017-11-21021 November 2017 Notification of Licensed Operator Initial Examination 05000338/2018301 and 05000339/2018301 ML17172A6922017-06-22022 June 2017 Section 1 - Draft Administrative Documents ML17172A7202017-06-21021 June 2017 Section 10 - Final Simulator Scenarios - North Anna Power Station ML17172A7182017-06-21021 June 2017 Section 7 - Final Admin Docs - North Anna ML17172A7252017-06-21021 June 2017 Section 11 - Final Sim in Plant JPMs ML17172A7142017-06-21021 June 2017 Section 6 - Draft Administrative JPMs ML17172A7262017-06-21021 June 2017 Section 12 - Final Administrative JPMs - North Anna Power Station ML17172A7012017-06-21021 June 2017 Section 2 - North Anna 2016301 RO Written Draft - Delay Release 2 Years ML17172A7272017-06-21021 June 2017 Section 14 - General Correspondence ML17172A7082017-06-21021 June 2017 Section 4 - North Anna 2016301 - Draft Simulator Scenarios ML17172A7032017-06-21021 June 2017 Section 3 - North Anna 2016301 SRO Written Draft - Delay Release 2 Yrs ML17172A7112017-06-21021 June 2017 Section 5 - Draft Sim and in Plant JPMs ML17142A2962017-05-17017 May 2017 Preparation and Scheduling of Operator Licensing Examinations ML17032A2792017-01-27027 January 2017 Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2017 ML16214A3022016-08-0101 August 2016 05000338/2016301 and 05000339/2016301 Final RO Written Exam - Delay Release ML16214A3042016-08-0101 August 2016 0500033i8/2016301 and 05000339/20163001 Final SRO Written Exam - Delay Release ML16214A3012016-07-14014 July 2016 05000338/2016301 and 05000339/2016301 Post Exam Comments ML16173A1522016-06-16016 June 2016 Operator Licensing Written Examination Approval 050000338/2016301 and 050000339/2016301 IR 05000338/20163012015-12-21021 December 2015 Notification of Licensed Operational Examination 05000338/2016301 and 05000339/2016301 ML15356A7592015-12-21021 December 2015 Notification of Licensed Operational Examination 05000338/2016301 and 05000339/2016301 ML14234A0202014-08-21021 August 2014 Initial Exam 2014-301 Post Exam Comments ML14234A0232014-08-21021 August 2014 Initial Exam 2014-301 Other Documents for Retention ML14233A4602014-08-21021 August 2014 Inital Exam 2014-301 Draft RO Written Exam ML14233A4972014-08-21021 August 2014 Initial Exam 2014-301 Draft SRO Written Exam ML14234A0082014-08-21021 August 2014 Initial Exam 2014-301 Draft Simulator and in Plant JPMs ML14234A0222014-08-21021 August 2014 Initial Exam 2014-301 General Correspondence ML14234A0102014-08-21021 August 2014 Initial Exam 2014-301 Draft Administrative JPMs ML14234A0132014-08-21021 August 2014 Initial Exam 2014-301 Final Administrative Documents ML14234A0192014-08-21021 August 2014 Initial Exam 2014-301 Final Administrative JPMs ML14234A0182014-08-21021 August 2014 Initial Exam 2014-301 Final Simulator and in Plant JPMs ML14234A0152014-08-21021 August 2014 Initial Exam 2014-301 Final Simulator Scenarios ML14188C2322014-07-0707 July 2014 301 SRO Answer Key ML14188C2772014-07-0707 July 2014 301 SRO Written Exam References ML14188C2462014-07-0707 July 2014 301 SRO As-Given Written Exam ML14188B9952014-07-0707 July 2014 301 RO Answer Key 2022-08-29
[Table view] |
See also: IR 05000338/2000301
Text
October 19, 2000
Virginia Electric and Power Company
ATTN: Mr. David A. Christian
Senior Vice President and
Chief Nuclear Officer
Innsbrook Technical Center - 2SW
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT: REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS
NORTH ANNA POWER STATION - 50-338/00-301 AND 50-339/00-301
Dear Mr. Christian:
During the period September 18 - 21, 2000, the Nuclear Regulatory Commission (NRC)
administered operating examinations to employees of your company who had applied for
licenses to operate the North Anna Power Station Units 1 and 2. At the conclusion of the
examination, the examiners discussed the examination questions and preliminary findings with
those members of your staff identified in the enclosed report. The written examination was
administered by your staff on September 14, 2000.
All six of the Reactor Operator and all four of the Senior Reactor Operator applicants passed
both the written and operating examinations. A Simulation Facility Report is included in this
report as Enclosure 2.
In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/ADAMS/index.html (the Public
Electronic Reading Room).
Sincerely,
/RA/
Michael E. Ernstes, Chief
Operator Licensing and
Human Performance Branch
Division of Reactor Safety
Docket Nos.: 50-338, 50-339
License Nos.: NPF-4, NPF-7
Enclosures: (See page 2)
VEPCO 2
Enclosures: 1. Report Details
2. Simulation Facility Report
cc w/encls:
W. Rentz, Acting Manager Donald P. Irwin, Esq.
Nuclear Licensing and Hunton and Williams
Operations Support Electronic Mail Distribution
Virginia Electric and Power Company
Electronic Mail Distribution H. Ashley Royal, Superintendent
Nuclear Training
D. A. Heacock North Anna Power Station
Site Vice President P. O. Box 402
North Anna Power Station Mineral, VA 23117
Electronic Mail Distribution
Attorney General
R. Blount Supreme Court Building
Site Vice President 900 East Main Street
Surry Power Station Richmond, VA 23219
Virginia Electric and Power Company
Electronic Mail Distribution Distribution w/encls:
N. Kalyanam, NRR
Executive Vice President PUBLIC
Old Dominion Electric Cooperative
Electronic Mail Distribution
County Administrator
Louisa County
P. O. Box 160
Louisa, VA 23093
OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP
SIGNATURE /RA/ /RA/ /RA by M. Ernstes /RA/ /RA by L. Garner for/
NAME RAIELLO:pmd MSYKES LMILLER MERNSTES BHAAG
DATE 10/18/2000 10/19/2000 10/19/2000 10/19/2000 10/19/2000
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME: C:\MyFiles\Copies\NA2000-301 (rfa) Examination Report.wpd
NUCLEAR REGULATORY COMMISSION
REGION II
Docket Nos.: 50-338 and 50-339
License Nos.: NPF-4, NPF-7
Report Nos.: 50-338/00-301 and 50-339/00-301
Licensee: Virginia Electric and Power Company
Facility: North Anna Power Station
Location: Mineral, VA
Dates: Operating Tests - September 18 - 21, 2000
Written Examination - September 14, 2000
Examiners: Ron Aiello, Chief License Examiner
Mike Ernstes, Chief, Operator Licensing and Human
Performance Branch
Marvin Sykes, License Examiner
Mike Morris, License Examiner trainee
Lee Miller, License Examiner trainee
Approved by: Michael E. Ernstes, Chief
Operator Licensing and Human Performance Branch
Division of Reactor Safety
Enclosure 1
SUMMARY OF FINDINGS
North Anna Power Station
NRC Inspection Report 50-338/00-301 and 50-339/00-301
During the period September 18 - 21, 2000, NRC examiners conducted an announced operator
licensing initial examination in accordance with the guidance of Examiner Standards, NUREG-
1021, Revision 8. This examination implemented the operator licensing requirements of
10 CFR §55.41, §55.43, and §55.45. No significant issues were identified.
Six Reactor Operator applicants and four Senior Reactor Operator applicants received written
examinations and operating tests. The NRC administered the operating tests during the period
September 18 - 21, 2000. The licensee administered the written examination on September 14,
2000. All of the applicants passed the examination.
Report Details
Summary of Plant Status: Units 1 and 2 were at 100% throughout the examination period.
4. OTHER ACTIVITIES
4OA5 Inspection Scope
a. Scope
The NRC conducted a regular, announced operator licensing initial examination during
the period September 18 - 21, 2000. Six RO applicants and four SRO applicants
received written and operating examinations. The examiners reviewed the facilitys
training departments security procedure, FIG 28, NRC Initial License Exam Security,
and actual practices to ensure examination security and integrity.
b. Observations and Findings
The facility training staff developed the written examination in accordance with NUREG
1021, Revision 8. The NRC developed the operating test. The examiners reviewed the
proposed written examination making modifications as needed. The NRC administered
the operating tests during the period September 18 - 21, 2000. The facility training staff
administered the approved written examination on September 14, 2000. There were no
findings regarding examination security.
All six RO and four SRO applicants passed both examinations. Details of each
applicants deficiencies are described in the individuals examination report, Form ES-
303-1, Operator Licensing Examination Report. Copies of the evaluations have been
forwarded under separate cover to the Training Manager in order to enable the licensee
to evaluate these deficiencies, and provide appropriate remedial training for those
operators as necessary.
The licensee submitted the as-given written examinations (ADAMS Accession Number
ML003759128). There were no post-examination comments submitted by the licensee.
However, upon review of question number 99 of the RO examination following the
examination, the NRC determined that choice b instead of a was the correct answer.
The subsequent change to the grading did not effect the overall pass/fail results.
4OA6 Management Meetings
Exit Meeting Summary
The Chief Examiner presented the preliminary examination results to J. Hayes, Station
Manager, Safety and Licensing and to members of licensee management on
September 22, 2000. The licensee acknowledged the examination results presented.
The examiners asked the licensee whether any materials examined during the
examination should be considered proprietary. No proprietary information was identified.
2
PARTIAL LIST OF PERSONS CONTACTED
Licensee
J. Hayes, Station Manager, Safety and Licensing
P. Kemp, Director, Nuclear Oversight
L. Lane, Superintendent of Operations
J. Scott, Supervisor, Operations Training
G. Winks, III, Supervisor, Technical Training
SIMULATION FACILITY REPORT
Facility Licensee: North Anna Power Station Units 1 and 2
Facility Docket Nos.: 50-338/2000-301 and 50-339/2000-301
Operating Tests Administered on: September 18 - 21, 2000
This form is to be used only to report observations. These observations do not constitute audit
or inspection findings and are not, without further verification and review, indicative of
noncompliance with 10 CFR 55.45(b). These observations do not affect NRC certification or
approval of the simulation facility other than to provide information that may be used in future
evaluations. While conducting the simulator portion of the operating tests, no significant fidelity
or configuration items were observed.
Enclosure 2