MONTHYEARML24032A1112024-02-0101 February 2024 Owner'S Activity Report for North Anna, Unit 2, Refueling Outage N2R29 - First Period of the Fifth ISI Interval ML24032A4662024-01-16016 January 2024 Response to Comments on Draft Vpdes Permit No. VA0052451 ML24017A0802024-01-11011 January 2024 Notification of Licensed Operator Initial Examination 05000338/2024301 and 05000339/2024301 ML24003A8372024-01-0909 January 2024 Letter to Elizabeth Toombs, Thpo, Cherokee Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8412024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8502024-01-0909 January 2024 Letter to Wenonah Haire, Thpo, Catawba Indian Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A7272024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8382024-01-0909 January 2024 Letter to G. Anne Richardson, Chief, Rappahannock Tribe, Inc., Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8482024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8392024-01-0909 January 2024 Letter to Gerald Stewart, Chief, Chickahominy Indian Tribe, Eastern Division Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8472024-01-0909 January 2024 Letter to Tom Jonathan, Chief, Tuscarora Nation, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8492024-01-0909 January 2024 Letter to W. Frank Adams, Chief, Upper Mattaponi Tribe Re Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8462024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8352024-01-0909 January 2024 Letter to Acee Watt, Thpo, United Keetoowah Band of Cherokee Indians in Oklahoma Re Notice of Availability of the Draft Site-Specific Environmental Impact Statement for North Anna Power Station Subsequent License Renewal ML24003A8422024-01-0909 January 2024 Letter to Paul Barton, Thpo, Eastern Shawnee Tribe of Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8432024-01-0909 January 2024 Letter to Robert Gray, Chief, Pamunkey Indian Tribe, Notice of Availability of the Draft Site-Specific EIS for North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8362024-01-0909 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML24003A8442024-01-0909 January 2024 Letter to Russell Townsend, Thpo, Eastern Band of Cherokee Indians ML24003A8402024-01-0909 January 2024 Letter to Katelyn Lucas, Thpo, Delaware Nation, Oklahoma, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML24003A8452024-01-0909 January 2024 Letter to Stephen Adkins, Chief, Chickahominy Indian Tribe, Notice of Availability of Draft Site-Specific Environmental Impact Statement for North Anna Power Station Units 1 and 2, Subsequent License Renewal ML23332A1852024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23332A0872024-01-0404 January 2024 Notice of Availability of the Draft Site-Specific Environmental Impact Statement for the North Anna Power Station, Units 1 and 2, Subsequent License Renewal ML23360A6352024-01-0404 January 2024 Letter to Dominion Availability for North Anna Units 1 and 2 Draft Site Specific Environmental Impact Statement ML23332A1472023-12-21021 December 2023 Issuance of Environmental Scoping Summary Report Associated with the Staff'S Review of the North Anna Power Station, Units 1 and 2, Subsequent License Renewal Application ML23283A3052023-12-20020 December 2023 Review of Appendix F to DOM-NAF2, Qualification of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion Energy VIPRE-D Computer Code (EPID L-2022-LLT-0003) (Nonproprietary) ML23346A0972023-12-11011 December 2023 License Amendment Request to Revise the Emergency Plan Relocation of the Technical Support Center - Response to NRC Request for Additional Information ML23346A1022023-12-11011 December 2023 2024 North Anna Power Station Brq Inspection Notification Letter ML24012A0942023-12-0707 December 2023 GL Report from Dominion Virginia Power Regarding Transfer of Devices ML24012A0892023-12-0707 December 2023 GL Registration from Dominion Virginia Power ML23334A2432023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23362A0602023-11-29029 November 2023 ISFSI, Submittal of Cask Registration for Spent Fuel Storage IR 05000339/20234022023-11-27027 November 2023 Security Baseline Inspection Report 05000338 and 05000339/2023402 IR 05000338/20230032023-11-13013 November 2023 Integrated Inspection Report 05000338/2023003 and 05000339/2023003 ML23311A2042023-10-0909 October 2023 Annual Submittal of Technical Specification Bases Changes Pursuant to Technical Specification 5.5.13.d IR 05000338/20234032023-10-0505 October 2023 Reissue - North Anna Power Station - Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 (Cover Letter) ML23279A0612023-10-0505 October 2023 Paragon Energy Solutions LLC, Part 21 Final Report Re Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23230A0502023-10-0202 October 2023 5 of the Quality Assurance Topical Report - Review of Program Changes ML23275A0992023-09-28028 September 2023 Subsequent License Renewal Application Third 10 CFR 54.21(b) Annual Amendment IR 05000338/20230112023-09-26026 September 2023 Quadrennial Focused Engineering Inspection Commercial Grade Dedication Report 05000338/2023011 and 05000339/2023011 ML23242A3482023-09-11011 September 2023 Cyber Security Inspection Report 05000338/2023403 and 05000339/2023403 - Cover ML23254A0242023-09-0606 September 2023 Paragon Energy Solutions LLC, Potential Defect with Eaton Jd and Hjd Series Molded Case Circuit Breakers (Mccbs) ML23249A2592023-09-0606 September 2023 Core Operating Limits Report Cycle 30, Pattern Ukr, Revision 0 ML23214A2022023-09-0505 September 2023 Staff Assessment of Updated Seismic Hazards Following the NRC Process for the Ongoing Assessment of Natural Hazards Information 2024-02-01
[Table view] Category:License-Operator Examination Report
MONTHYEARML22234A0282022-08-19019 August 2022 NA-2022-6 Examination Report and Cover Letter IR 05000338/20203012020-09-16016 September 2020 NRC Operator License Examination Report 05000338/2020301, 05000339/2020301 IR 05000338/20123022013-01-15015 January 2013 Er 05000338-12-302, 05000339-12-302; 12/18-19/2012; North Anna Power Station; Operator License Examinations IR 05000338/20123012012-10-17017 October 2012 Er 05000338-12-301, 05000339-12-301; 09/10-14/2012 and 09/19/2012; North Anna Power Station; Operator License Examinations IR 05000338/20103012010-08-0404 August 2010 Er 05000338-10-301, 05000339-10-301, on 06/07-23/2010 and 06/16/2010, North Anna Power Station, Operator License Examinations ML0821800072008-08-0505 August 2008 Er 05000338-08-301, 05000339-08-301, on 06/02-20/2008 and 06/24/2008; North Anna Power Station; Licensed Operator Examinations ML0818405022008-07-0202 July 2008 Retake Exam 05000338-06-302 Draft Job Performance Measures (Part 2 of 2) ML0635203872006-12-18018 December 2006 Initial Retake Examination Report - 05000338-06302 and 0500339-06302 IR 05000338/20063012006-08-0202 August 2006 Er 05000338-06-301, 05000339-06-301; 5/22-26/2006, 6/5-9/2006, 6/14/2006; North Anna Power Station; Licensed Operator Examinations ML0220703442002-07-25025 July 2002 Examination Reports 050-338/2002-301 & 50-339/2002-301on June 10-4, 24-25 & June 6, 2002. Eleven of Thirteen Applicants Passed Both Written & Operating Examinations. One RO & One SRO Failed Written Examination ML0220000992002-07-10010 July 2002 Stations, Units 1 & 2 -- Requested Information on Proposed Site-Specific Operator Licensing Examination Schedules & Estimated Number of Applicants, Regulatory Issue Summary 2002-09 ML0037616232000-10-19019 October 2000 Sept/2000 Exam 50-338/2000-301 North Anna Exam Report - Reactor & Senior Reactor Operator Initial Examinations 2022-08-19
[Table view] |
See also: IR 05000338/2006302
Text
December 18, 2006
Virginia Electric and Power Company
ATTN: Mr. David A. Christian
Senior Vice President and
Chief Nuclear Officer
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060
SUBJECT: NORTH ANNA POWER STATION - NRC INITIAL RETAKE EXAMINATION
REPORT 05000338/2006302 AND 0500339/2006302
Dear Mr. Christian:
On November 14, 2006, a written retake examination was administered by members of your
staff to one employee of your company and on November 15, 2006, the Nuclear Regulatory
Commission (NRC) administered an administrative operating retake examination to one other
employee of your company. Both employees had reapplied for a license to operate the North
Anna Power Station.
At the conclusion of the examination, the examiner discussed the examination questions and
preliminary findings with those members of your staff identified in the enclosed report.
One Reactor Operator (RO) applicant passed the written retake examination, and one Senior
Reactor Operator (SRO) applicant passed the administrative operating retake examination.
There were no post examination comments submitted.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter
and its enclosure will be available electronically for public inspection in the NRC Public
Document Room or from the Publicly Available Records (PARS) component of NRC's
document system (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this letter, please contact me at (404) 562-4607.
Sincerely,
\\RA\\
Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.: 50-338, 50-339
License Nos.: NPF-4, NPF-7
Enclosure: NRC Initial Retake Examination
ML063520387
OFFICE RII:DRS RII:DRP RII:DRS
SIGNATURE GWL1 GXG RCH
NAME GLaska EGurthrie BHaag
DATE 12/15 /2006 12/ 15 /2006 12/ 18 /2006
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
NUCLEAR REGULATORY COMMISSION
REGION II
Docket Nos.: 50-338, 50-339
License Nos.: NPF-4, NPF-7
Report No.: 05000338/2006302, 05000339/2006302
Licensee: Virginia Electric and Power Company (VEPCO)
Facility: North Anna Power Station
Location: 1022 Haley Drive
Mineral, VA 23117
Dates: Written Examination - November 14, 2006
Administrative Operating Test - November 15, 2006
Examiner: G. Laska, Chief, Senior Operations Examiner
Approved by: Robert C. Haag, Chief
Operations Branch
Division of Reactor Safety
Enclosure 1
SUMMARY OF FINDINGS
ER 05000338/2006302, 05000339/2006302; 11/14-15/2006; North Anna Power Station;
Licensed Operator Examinations.
The NRC examiner conducted operator licensing initial retake examinations in accordance with
the guidance in NUREG-1021, Revision 9, Operator Licensing Examination Standards for
Power Reactors. This examination implemented the operator licensing requirements of
10 CFR §55.41, §55.43, and §55.45.
Members of the North Anna Power Station training staff administered the Reactor Operator
(RO) retake written examination on November 14, 2006. The NRC administered the
administrative operating test retake to one Senior Reactor Operator (SRO) on November 15,
2006. The written retake examination outline was developed by the NRC. The RO retake
written examination and the outline and SRO administrative operating test were developed by
the North Anna Power Station training staff.
One RO passed the written examination and one SRO passed the administrative operating test.
Each applicant was issued an operator license commensurate with the level of examination
administered.
There were no post examination comments.
No findings of significance were identified.
Report Details
4. OTHER ACTIVITIES
4OA5 Operator Licensing Initial Examinations
a. Inspection Scope
The NRC developed the written examination outline and the licensee developed the
written examination, the administrative operating test outline, and administrative
operating test in accordance with NUREG-1021, Operator Licensing Examination
Standards for Power Reactors, Revision 9. The NRC and licensees examination team
reviewed the proposed examinations. Examination changes agreed upon between the
NRC and the licensee were made according to NUREG-1021 and incorporated into the
final version of the examination materials.
The examiner reviewed the licensees examination security measures while preparing
and administering the examinations to ensure examination security and integrity
complied with 10 CFR 55.49, Integrity of examinations and tests.
The examiner evaluated one Reactor Operator RO and one SRO applicants who were
being assessed under the guidelines specified in NUREG-1021. Members of the North
Anna Power Station training staff administered the written examination on November 14,
2006. The NRC examiner administered the administrative operating test November 15,
2006. The evaluations of the applicants and review of documentation were performed
to determine if the applicants, who applied for licenses to operate the North Anna Power
Station, met the requirements specified in 10 CFR 55, Operators Licenses.
b. Findings
No findings of significance were identified.
The NRC determined that the details provided by the licensee for the administrative
operating test were within the range of acceptability expected for a proposed
examination.
One RO passed the retake written examination and one SRO passed the administrative
operating test.
The RO written examination, with knowledge and abilities (K/As), question
references/answers and examination references, may be accessed in the ADAMS
system (ADAMS Accession Numbers ML063340480 and ML063340496).
Copies of all individual examination reports were sent to the facility Training Manager for
evaluation and determination of appropriate remedial training.
2
4OA6 Meetings
Exit Meeting Summary
On November 15, 2006, the examiner discussed generic issues with Mr. Christopher A.
McClain and members of his staff. The inspectors asked the licensee whether any
materials examined during the inspection should be considered proprietary. No
proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED
Licensee personnel
C. McClain, Nuclear Training Manager
S. Hughes, Manager, Nuclear Operations
W. Shura, Supervisor Nuclear Training
S. Crawford, Sr. Instructor, Nuclear Training
K. Link, Sr. Instructor, Nuclear Training
G. Salonone, Technical Specialist III, Station Licensing
NRC personnel
J. Reece, Senior Resident Inspector