PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 0 PSEG Nuclear LLC JUL 14 2010 LR-N10-0235 10CFR 50.90 LAR H09-07 10CFR 50.4 LAR S09-08 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SALEM GENERATING STATION - UNIT 1 and UNIT 2 FACILITY OPERATING LICENSE NOS. DPR 70 and DPR-75 NRC DOCKET NOS. 50-272 and 50-311 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NO. NPF-57 NRC DOCKET NO-50-354
Subject:
References:
REQUEST FOR APPROVAL OF THE SALEM-HOPE CREEK CYBER SECURITY PLAN (1)
Letter LR-09-0264, Christine Neely to US NRC Document Control Desk, "REQUEST FOR APPROVAL OF THE SALEM-HOPE CREEK CYBER SECURITY PLAN", dated November 23, 2009.
(2) Letter from Richard Ennis, NRC to Mr. Thomas Joyce, "HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNIT NOS. I AND 2 - LICENSE AMENDMENT REQUEST FOR APPROVAL OF THE CYBER SECURITY PLAN", dated May 18, 2010 (3) Letter from Richard Correia NRC to Jack Roe NEI, "NUCLEAR ENERGY INSTITUTE 08-09, "CYBER SECURITY PLAN TEMPLATE, REV. 6"", dated May 5, 2010 Enclosures 1, 2 and 3 to this letter contain sensitive information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of Enclosures 1, 2 and 3, this letter is uncontrolled.
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 2 c-j01 f+
95-2168 REV. 7/99 PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 PSEG Nuclear LLC JUL 142010 LR-N10-0235 LAR H09-07 LAR S09-08 10CFR 50.90 10CFR 50.4 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SALEM GENERATING STATION - UNIT 1 and UNIT 2 FACILITY OPERATING LICENSE NOS. DPR 70 and DPR-75 NRC DOCKET NOS. 50-272 and 50-311 HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NO. NPF-57 NRC DOCKET NO. 50-354
Subject:
REQUEST FOR APPROVAL OF THE SALEM-HOPE CREEK CYBER SECURITY PLAN
References:
(1)
Letter LR-09-0264, Christine Neely to US NRC Document Control Desk, "REQUEST FOR APPROVAL OF THE SALEM-HOPE CREEK CYBER SECURITY PLAN", dated November 23, 2009.
(2)
Letter from Richard Ennis, NRC to Mr. Thomas Joyce, "HOPE CREEK GENERATING STATION AND SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2 - LICENSE AMENDMENT REQUEST FOR APPROVAL OF THE CYBER SECURITY PLAN", dated May 18, 2010 (3)
Letter from Richard Correia NRC to Jack Roe NEI, "NUCLEAR ENERGY INSTITUTE 08-09, "CYBER SECURITY PLAN TEMPLATE, REV. 6"", dated May 5,2010 Enclosures 1, 2 and 3 to this letter contain sensitive information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of Enclosures 1, 2 and 3, this letter is uncontrolled.
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 95*2168 REV. 7/99
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390'JUL 14 201G Document Control Desk Page 2 LR-N10-0235 PSEG Nuclear submitted a request to the NRC for approval of the Salem-Hope Creek Cyber Security Plan on November 23, 2009 (Reference 1). Subsequent to that submittal, the NRC responded (Reference 2) with a request for PSEG Nuclear to provide a revised submittal which would address the NRC's significant generic concerns with the original submittal. Based on direction provided in Reference 2, PSEG Nuclear is hereby officially withdrawing its original request (Reference 1) (ADAMS Accession No. ML093350605) as submitted in its entirety and concurrently, in accordance with the provisions of 10 CFR §50.4 and §50.90, submits this revised request for an amendment to the Facility Operating Licenses (FOL) for Salem Nuclear Generating Station Unit 1 and Unit 2 and Hope Creek Generating Station. This proposed amendment requests NRC approval of the Salem-Hope Creek Cyber Security Plan, provides an implementation schedule, and adds a sentence to the existing FOL Physical Protection license condition to require PSEG Nuclear to fully implement and maintain in effect all provisions of the Commission-approved Cyber Security Plan.
This proposed amendment conforms to the model application provided in NEI 08-09 Revision 6 which has been approved for use by the NRC as a template for submittal of a Cyber Security Plan (Reference 3). provides an evaluation of the proposed change. Enclosure 1 also contains the following attachments:
- Attachment 1 provides the existing FOL pages marked up to show the proposed change.
" Attachment 2 provides a table of deviations PSEG has taken to guidance provided in NEI 08-09 Revision 6. provides a copy of the Salem-Hope Creek Cyber Security Plan Implementation Schedule commitments. provides a copy of the Salem-Hope Creek Cyber Security Plan which is a stand alone document that will be incorporated by reference into the Salem-Hope Creek Physical Security Plan upon approval. PSEG Nuclear requests that Enclosures 1, 2 and 3, which contains sensitive information, be withheld from public disclosure in accordance with 10 CFR 2.390.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Official for the State Of New Jersey.
PSEG Nuclear requests an implementation period of 60 days for the Facility Operating License changes following NRC approval of the license amendment.
There are four regulatory commitments contained in this submittal. They are listed in.
SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 'JUl 1420ffJ Document Control Desk Page 2 LR-N10-0235 PSEG Nuclear submitted a request to the NRC for approval of the Salem-Hope Creek Cyber Security Plan on November 23, 2009 (Reference 1). Subsequent to that submittal, the NRC responded (Reference 2) with a request for PSEG Nuclear to provide a revised submittal which would address the NRC's significant generic concerns with the original submittal. Based on direction provided in Reference 2, PSEG Nuclear is hereby officially withdrawing its original request (Reference 1) (ADAMS Accession No. ML093350605) as submitted in its entirety and concurrently, in accordance with the provisions of 10 CFR §50.4 and §50.90, submits this revised request for an amendment to the Facility Operating Licenses (FOL) for Salem Nuclear Generating Station Unit 1 and Unit 2 and Hope Creek Generating Station. This proposed amendment requests NRC approval of the Salem-Hope Creek Cyber Security Plan, provides an implementation schedule, and adds a sentence to the existing FOL Physical Protection license condition to require PSEG Nuclear to fully implement and maintain in effect all provisions of the Commission-approved Cyber Security Plan.
This proposed amendment conforms to the model application provided in NEI 08-09 Revision 6 which has been approved for use by the NRC as a template for submittal of a Cyber Security Plan (Reference 3). provides an evaluation of the proposed change. Enclosure 1 also contains the following attachments:
- provides the existing FOL pages marked up to show the proposed change.
- provides a table of deviations PSEG has taken to guidance provided in NEI 08-09 Revision 6. provides a copy of the Salem-Hope Creek Cyber Security Plan Implementation Schedule commitments. provides a copy of the Salem-Hope Creek Cyber Security Plan which is a stand alone document that will be incorporated by reference into the Salem-Hope Creek PhYSical Security Plan upon approval. PSEG Nuclear requests that Enclosures 1, 2 and 3, which contains sensitive information, be withheld from public disclosure in accordance with 10 CFR 2.390.
In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Official for the State Of New Jersey.
PSEG Nuclear requests an implementation period of 60 days for the Facility Operating License changes following NRC approval of the license amendment.
There are four regulatory commitments contained in this submittal. They are listed in.
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Document Control Desk Page 3 LR-N10-0235 If you should have any questions regarding this submittal, please contact Lee Marabella at (856) 339-1208 or James Shank at (856) 339-1834.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, Robert Braun Senior Vice President - Nuclear - Evaluation of Proposed Change - Proposed Technical Specification Changes (Mark-ups) - Evaluation of NEI 08-09 Revision 6 Deviations - Salem-Hope Creek Cyber Security Plan Implementation Schedule Commitments - Salem-Hope Creek Cyber Security Plan C:
Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Mr. R. Ennis, Project Manager - Salem Unit 1 and Unit 2 and Hope Creek USNRC Senior Resident Inspector - Hope Creek Generating Station USNRC Senior Resident Inspector - Salem Generating Station Mr. P. Mulligan, Manager IV Bureau of Nuclear Engineering Corporate Commitment Tracking Coordinator Commitment Coordinator - Salem Commitment Coordinator - Hope Creek SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Document Control Desk Page 3 LR-N10-0235 If you should have any questions regarding this submittal, please contact Lee Marabella at (856) 339-1208 or James Shank at (856) 339-1834.
I declare under penalty of perjury that the foregoing is true and correct.
Sincerely, 1?~
Robert Braun Senior Vice President - Nuclear - Evaluation of Proposed Change - Proposed Technical Specification Changes (Mark-ups) - Evaluation of NEI 08-09 Revision 6 Deviations - Salem-Hope Creek Cyber Security Plan Implementation Schedule Commitments - Salem-Hope Creek Cyber Security Plan C:
Mr. S. Collins, Administrator - Region I U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Mr. R. Ennis, Project Manager - Salem Unit 1 and Unit 2 and Hope Creek USNRC Senior Resident Inspector - Hope Creek Generating Station USNRC Senior Resident Inspector - Salem Generating Station Mr. P. Mulligan, Manager IV Bureau of Nuclear Engineering Corporate Commitment Tracking Coordinator Commitment Coordinator - Salem Commitment Coordinator - Hope Creek SECl,JRITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390
SECURITY-RELATED INFORMATION-WITHHOLD UNDER 10 CFR 2.390 Document Control Desk Page 4 LR-N 10-0235 (The bcc list should not be submitted as part of the DCD submittal - remove this page prior to submittal and make the bcc distribution accordingly)
President and CNO Vice President - Salem Vice President - HC Vice President, Operations Support Director - Regulatory Affairs Plant Manger - Salem Plant Manger - HC Regulatory Assurance Manager - HC Regulatory Assurance Manager - Salem Licensing Manager 4
SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Document Control Desk Page 4 LR-N 10-0235 (The bcc list should not be submitted as part of the DCD submittal - remove this page prior to submittal and make the bcc distribution accordingly)
President and CNO Vice President - Salem Vice President - HC Vice President, Operations Support Director - Regulatory Affairs Plant Manger - Salem Plant Manger - HC Regulatory Assurance Manager - HC Regulatory Assurance Manager - Salem Licensing Manager 4
SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390