Withdrawal of 10 CFR 50.55a Request P-04
ML070650349
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 02/21/2007
From: Mallon J
Public Service Enterprise Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LR-N07-0038
Download: ML070650349 (2)


Text

pPSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 0 PSEG NuclearLLC 10 CFR 50.55a LR-N07-0038 February 21, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Facility Operating License No. NPF-57 NRC Docket No. 50-354

Subject:

Withdrawal of 10 CFR 50.55a Request P-04

Reference:

1) PSEG letter LR-N06-0394, Inservice Testing (IST) Program - Third Ten Year Interval, October 12, 2006 In Reference 1, PSEG Nuclear LLC (PSEG) requested approval of proposed alternatives to the requirements of the American Society of Mechanical Engineers Code for Operation and Maintenance of Nuclear Power Plants, 2001 Edition through 2003 Addenda, for the third 10-year inservice testing program interval for the Hope Creek Generating Station. Reference 1 included six proposed alternatives.

After discussion with the NRC staff, PSEG has elected to withdraw one of the alternatives proposed in Reference 1, 10 CFR 50.55a Request P-04.

If you have any questions or require additional information, please contact Paul Duke at 856-339-1466.

Respectfully, C-2 Jamie Mallon Licensing Manager 95-2168 REV. 7/99

LR-N07-0038 February 21, 2007 Page 2 cc: S. Collins, Regional Administrator - NRC Region I R. Ennis, Project Manager - Hope Creek, USNRC NRC Senior Resident Inspector - Salem K. Tosch, Manager IV, NJBNE