Letter Sequence Supplement |
---|
|
|
MONTHYEARL-MT-17-083, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2017-12-19019 December 2017 License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program Project stage: Request ML18022A1062018-01-22022 January 2018 NRR E-mail Capture - Monticello Nuclear Generating Plant - Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-425 Project stage: Acceptance Review L-MT-18-010, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2018-03-28028 March 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors Project stage: Request L-MT-18-020, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control2018-04-24024 April 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control Project stage: Supplement L-MT-18-043, Online Reference Portal for NRC Review of License Amendment Requests to Adopt TSTF-425 and 10 CFR 50.692018-07-31031 July 2018 Online Reference Portal for NRC Review of License Amendment Requests to Adopt TSTF-425 and 10 CFR 50.69 Project stage: Request L-MT-18-058, Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to ...2018-10-23023 October 2018 Response to Request for Additional Information: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to ... Project stage: Response to RAI L-MT-18-073, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee...2018-11-20020 November 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee... Project stage: Supplement ML19007A0902019-01-28028 January 2019 Issuance of Amendment Adoption of TSTF-425, Relocate Surveillance Frequencies to Licensee Control-RITSTF Initiative 5B Project stage: Approval ML19065A2002019-03-11011 March 2019 Correction to License Amendment No. 200 Related to Adoption of TSTF-425, Relocated Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B Project stage: Acceptance Review 2018-03-28
[Table View] |
|
---|
Category:Letter type:L
MONTHYEARL-MT-24-038, Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI2024-10-15015 October 2024 Subsequent License Renewal Application Response to Request for Additional Information - 3rd Round RAI L-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-24-029, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI2024-09-13013 September 2024 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information-Supplement to Set 1 Part 2 and Response to 2ci Round RAI L-MT-24-028, Response to RCI for RR-017 ISI Impracticality2024-08-28028 August 2024 Response to RCI for RR-017 ISI Impracticality L-MT-24-022, – Preparation and Scheduling of Operator Licensing Examinations2024-07-0909 July 2024 – Preparation and Scheduling of Operator Licensing Examinations L-MT-24-019, Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii)2024-06-10010 June 2024 Submittal of ASME Section XI, Section IWB-3720 Analytical Evaluation in Accordance with 10 CFR 50.55a(b)(2)(xliii) L-MT-24-017, Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-01602024-06-0404 June 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 (EPID-L-2023-LLA-0160 L-MT-24-015, Response to Request for Additional Information - Alternative Request VR-09 for OMN-172024-05-16016 May 2024 Response to Request for Additional Information - Alternative Request VR-09 for OMN-17 L-MT-24-013, 2023 Annual Radiological Environmental Operating Report2024-05-14014 May 2024 2023 Annual Radiological Environmental Operating Report L-MT-24-016, 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2024-05-0808 May 2024 2023 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-24-002, Submittal of Revision 41 to the Updated Safety Analysis Report2024-04-17017 April 2024 Submittal of Revision 41 to the Updated Safety Analysis Report L-MT-24-004, Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP)2024-04-17017 April 2024 Submittal of 10 CFR 72.48 Report for Monticello Nuclear Generating Plant (MNGP) L-MT-24-006, Subsequent License Renewal Application Annual Update 1 and Supplement 92024-02-29029 February 2024 Subsequent License Renewal Application Annual Update 1 and Supplement 9 L-MT-24-007, Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval2024-02-15015 February 2024 Response to NRC Request for Additional Information on Proposed Inservice Inspection Alternative RR-002 for the Sixth Ten-Year ISI Interval L-MT-24-001, 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval2024-01-30030 January 2024 10 CFR 50.55a Request RR-017 - Inservice Inspection (ISI) Impracticality in Accordance with 10 CFR 50.55a(g)(5)(iii) During the Fifth Ten-Year Interval L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-053, Condition Prohibited by Technical Specifications Due to Inoperable Main Steam Line Low Pressure Isolation Switch2023-12-0404 December 2023 Condition Prohibited by Technical Specifications Due to Inoperable Main Steam Line Low Pressure Isolation Switch L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-030, Subsequent License Renewal Application Supplement 32023-07-0404 July 2023 Subsequent License Renewal Application Supplement 3 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-019, Submittal of 2022 Annual Radiological Environmental Operating Report2023-05-10010 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report L-MT-23-020, Submittal of 2022 Annual Radioactive Effluent Release Report2023-05-10010 May 2023 Submittal of 2022 Annual Radioactive Effluent Release Report L-MT-23-021, Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 322023-05-0202 May 2023 Core Operating Limits Report (COLR) for the Monticello Nuclear Generating Plant for Cycle 32 L-MT-23-017, 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP)2023-04-18018 April 2023 2022 Annual Report of Individual Monitoring for the Monticello Nuclear Generating Plant (MNGP) L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 L-MT-23-013, Core Operating Limits Report (COLR) for Cycle 31, Revision 32023-03-28028 March 2023 Core Operating Limits Report (COLR) for Cycle 31, Revision 3 L-MT-23-012, Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 22023-03-17017 March 2023 Core Operating Limits Report (COLR) for Monticello Nuclear Generating Plant Cycle 31, Revision 2 L-MT-23-008, 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003)2023-02-0707 February 2023 10CFR50.55a Request to Use Later Edition of ASME Section XI for ISI Code of Record (RR-003) L-MT-23-004, CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program2023-01-23023 January 2023 CFR 50.55a Request RR-001, Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI for the Monticello Third Interval Containment Inservice Inspection Program L-MT-23-005, Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088)2023-01-0606 January 2023 Response to the NRC Request for Additional Information Regarding the 50.55a Request Pr 08, HPCI Pump Quarterly Testing (EPID Number L-2022-LLR-0088) L-MT-22-049, Industry Groundwater Protection Initiative Special Report2022-12-15015 December 2022 Industry Groundwater Protection Initiative Special Report L-MT-22-052, L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative2022-12-15015 December 2022 L-MT-22-052 Monticello Nuclear Generating Plant 10 CFR 50.55a Request No. Pr 08, Request for HPCI Pump Quarterly Alternative L-MT-22-046, 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462022-12-13013 December 2022 2022 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-22-048, Update to the Monticello Technical Specification Bases2022-11-28028 November 2022 Update to the Monticello Technical Specification Bases 2024-09-26
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARL-MT-24-025, Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements2024-09-26026 September 2024 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 L-MT-23-025, Subsequent License Renewal Application Supplement 22023-06-26026 June 2023 Subsequent License Renewal Application Supplement 2 L-MT-23-010, Subsequent License Renewal Application Supplement 12023-04-0303 April 2023 Subsequent License Renewal Application Supplement 1 ML23009A3542023-01-0909 January 2023 Subsequent License Renewal Application Sections 1 - 4 and Appendices a - D L-MT-22-010, License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency2022-03-18018 March 2022 License Amendment Request to Revise Technical Specification 3.6.1.8 Residual Heat Removal (RHR) Drywell Spray Header and Nozzle Surveillance Frequency L-MT-21-072, License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank2021-12-13013 December 2021 License Amendment Request: Revise MNGP Technical Specifications to Support a Ten-Year Inspection of the Diesel Generator Fuel Oil Storage Tank L-MT-21-067, Update to the Monticello Technical Specification Bases2021-11-29029 November 2021 Update to the Monticello Technical Specification Bases ML21320A2262021-11-15015 November 2021 License Amendment Request: Standard Emergency Plan and Consolidated Emergency Operations Facility for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-21-043, Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-06-30030 June 2021 Supplement to License Amendment Request: Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b L-MT-20-023, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-11-0303 November 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR L-MT-20-018, License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-22022 September 2020 License Amendment Request: Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements L-MT-20-003, License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b2020-03-30030 March 2020 License Amendment Request: Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times-RITSTF Initiative 4b ML20058F9432020-02-27027 February 2020 and Prairie Island Nuclear Generating Plant, Units 1 and 2 - License Amendment Request: Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules Revision 4 L-MT-18-073, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee...2018-11-20020 November 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee... L-MT-18-009, License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note2018-11-12012 November 2018 License Amendment Request: Revise Limiting Condition for Operation (LCO) of Specification 3.5.1, Emergency Core Cooling System - Operating, to Remove the LCO Note L-MT-18-060, License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.12018-11-12012 November 2018 License Amendment Request: Revise the Safety Limit Minimum Critical Power Ratio in Reactor Core Safety Limit 2.1.1 L-MT-18-051, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control,2018-09-11011 September 2018 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control, L-MT-18-006, Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements2018-07-0303 July 2018 Application to Revise Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements L-MT-18-020, Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control2018-04-24024 April 2018 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Control L-MT-18-010, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2018-03-28028 March 2018 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-MT-17-083, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program2017-12-19019 December 2017 License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program L-MT-17-058, Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control2017-10-20020 October 2017 Application to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control ML17095A1142017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 2 of 5 ML17095A1202017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 5 of 5 ML17090A2012017-03-31031 March 2017 License Amendment Request to Revise Technical Specification for Plant/Unit Staff Qualifications Education and Experience Eligibility Requirements for Licensed Operators ML17095A1152017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 3 of 5 ML17095A1132017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 1 of 5 ML17095A1182017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attachment 4, Supporting Calculations for EAL Thresholds, Part 4 of 5 ML17095A1122017-03-31031 March 2017 License Amendment Request to Revise Emergency Action Level Scheme: Attach. 1, EAL Comparison Matrix Document (Deviations & Differences) and Attachments 2 & 3, Red-Line & Clean Versions of EAL Technical Bases Document L-MT-16-031, Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code2016-07-28028 July 2016 Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing, and to Request an Alternative to the ASME Code L-MT-16-014, License Amendment Request: Revise Battery Charger Surveillance Requirement 3.8.4.22016-04-0404 April 2016 License Amendment Request: Revise Battery Charger Surveillance Requirement 3.8.4.2 ML16047A2722016-02-10010 February 2016 License Amendment Request: Revise Technical Specification 5.5.11 to Provide a Permanent Extension of the Integrated Leakage Rate (Type a) Test Frequency from Ten to Fifteen Years L-MT-15-032, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure2015-09-0202 September 2015 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.5.1.3.b to Correct the Alternate Nitrogen System Pressure L-MT-15-048, License Amendment Request: Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process2015-07-15015 July 2015 License Amendment Request: Revise Technical Specifications to Adopt TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation, Using the Consolidated Line Item Improvement Process L-MT-14-043, License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification2014-05-30030 May 2014 License Amendment Request for Fuel Storage Changes Supplement to Proposed Spent Fuel Pool Boral Monitoring Program Technical Specification ML14126A7272014-05-0505 May 2014 Supplement to License Amendment Request (LAR) for Cyber Security Plan Implementation Date Extension L-MT-14-009, License Amendment Request: Revision to Required Actions for Technical Specification 3.5.1, Emergency Core Cooling System (ECCS)2014-04-0404 April 2014 License Amendment Request: Revision to Required Actions for Technical Specification 3.5.1, Emergency Core Cooling System (ECCS) ML14072A3902014-03-13013 March 2014 License Amendment Request for Fuel Storage Changes, Supplement to Propose a Spent Fuel Pool Boral Monitoring Program Technical Specification ML13333B6742013-11-27027 November 2013 License Amendment Request (LAR) for Northern States Power Company, Minnesota (NSPM) Cyber Security Plan Implementation Date Extension L-MT-13-081, Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses2013-08-14014 August 2013 Maximum Extended Load Line Limit Analysis Plus License Amendment Request - Request for Additional Information Responses L-MT-13-055, License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology2013-07-15015 July 2013 License Amendment Request for Transition to Areva Atrium 10XM Fuel and Areva Safety Analysis Methodology L-MT-13-046, License Amendment Request for Fuel Storage Changes, Supplement to Respond to NRC Staff Requests for Additional Information2013-05-16016 May 2013 License Amendment Request for Fuel Storage Changes, Supplement to Respond to NRC Staff Requests for Additional Information L-MT-13-030, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs2013-04-19019 April 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs L-MT-13-010, License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits2013-03-11011 March 2013 License Amendment Request: Reduce the Reactor Steam Dome Pressure Specified in the Reactor Core Safety Limits L-MT-12-102, License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month.2013-01-0404 January 2013 License Amendment Request: Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. 2024-09-26
[Table view] |
Text
2807 West County Road 75 Monticello, MN 55362 fl, Xcel Energy*
RESPONSIBL E BY NATUR E 800.895.4999 xcelenergy.com April 24, 2018 L-MT-18-020 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Monticello Nuclear Generating Plant Docket Number 50-263 Renewed Facility Operating License No. DPR-22 Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (EPID L-2017-LLA-0434)
References:
- 1. NSPM Letter (L-MT-17-083) to NRC Document Control Desk, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, dated December 19, 2017 (ADAMS Accession No. ML17353A189)
- 2. Nuclear Energy Institute (NEI) 04-10, Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies, Revision 1, dated April 2007 (ADAMS Accession No. ML071360456)
- 3. Technical Specifications Task Force (TSTF) Standard Technical Specifications (STS) Change TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - [Risk Informed Technical Specifications Task Force] RITSTF Initiative 5b," Revision 3, dated March 18, 2009 (ADAMS Accession No. ML090850642)
Pursuant to 10 CFR 50.90, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested to amend renewed Facility Operating License DPR-22 for the Monticello Nuclear Generating Plant (MNGP) in Reference 1. The proposed amendment would modify the MNGP Technical Specifications (TS) by relocating specific surveillance frequencies to a licensee-controlled program with implementation of NEI 04-10, Risk-Informed Technical
Document Control Desk Page 2 Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies," (Reference 2). The changes were consistent with NRG-approved lndustry/TSTF STS change TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - [Risk Informed Technical Specifications Task Force] RITSTF Initiative 5b,"
Revision 3 (Reference 3).
After submittal of Reference 1, it was determined that errors existed in Attachment 2 of the license amendment request (LAR), which described the Probabilistic Risk Assessment (PRA) technical adequacy. Specifically, the errors were in Table 2-1 and involved the incorrect listing of Supporting Requirements (SRs) for two of the open Fire PRA Facts & Observations (F&Os). This supplement corrects the SRs of the two F&Os.
The enclosure to this letter describes the errors and identifies the correct SRs for the two F&Os. The attachment to the enclosure contains page replacements for the corrected SRs.
The information provided in this letter does not alter the evaluations performed in accordance with 10 CFR 50.92 in Reference 1. In accordance with 10 CFR 50.91, NSPM is notifying the State of Minnesota of this supplement to the LAR by transmitting a copy of the letter and enclosure to the designated State Official.
Please contact Sara Scott, Licensing Manager, at 612-330-6698, if additional information or clarification is required.
Summary of Commitments This letter makes no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
-11,/4 Executed on April 24, 2018.
Christopher R. Church Site Vice President, Monticello Nuclear Generating Plant Northern States Power Company - Minnesota Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC State of Minnesota
L-MT-18-020 NSPM Enclosure ENCLOSURE Supplement to License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program
1.0 BACKGROUND
Pursuant to 10 CFR 50.90, Northern States Power Company, a Minnesota corporation (NSPM), doing business as Xcel Energy, requested to amend renewed Facility Operating License DPR-22 for the Monticello Nuclear Generating Plant (MNGP) in Reference 1. The proposed amendment would modify the MNGP Technical Specifications (TS) by relocating specific surveillance frequencies to a licensee-controlled program with implementation of NEI 04-10, Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies, (Reference 2). The changes were consistent with NRC-approved Industry/TSTF STS change TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - [Risk Informed Technical Specifications Task Force] RITSTF Initiative 5b,"
Revision 3 (Reference 3).
After submittal of Reference 1, it was determined that errors existed in Attachment 2 of the license amendment request (LAR), which described the Probabilistic Risk Assessment (PRA) technical adequacy. Specifically, the errors were in Table 2-1 and involved the incorrect listing of Supporting Requirements (SRs) for two of the open Fire PRA Facts & Observations (F&Os). This supplement corrects the SRs of the two F&Os.
The attachment to the enclosure contains page replacements for the corrected SRs.
2.0 DESCRIPTION
OF SUPPLEMENT Reference 1, Attachment 2, Table 2-1, lists each open Fire PRA F&O by identifier along with the associated SRs, a description of the peer review finding (F&O), a discussion of the resolution, and the impact of the F&O on the TSTF-425 application. The SRs listed for two of the F&Os in Table 2-1 were in error. These F&Os and the associated errors were:
F&O 4 An incorrect SR (SR FSS-C8) was inadvertently copied into the SR column instead of the relevant SRs (SRs FSS-C5 and FSS-D9) for the F&O. The proper SRs to reference are FSS-C5 and FSS-D9. These SRs address different issues than the quoted SR FSS-C8.
F&O FO Three of five SRs were erroneously not listed for F&O-2. The SRs not listed were FSS-H4, FSS-H5, and FSS-H9. The FSS-H SRs all pertain to documentation requirements.
Page 1 of 2
L-MT-18-020 NSPM Enclosure The affected pages have been updated and are provided as page replacements in the attachment to this enclosure. The changes are noted for F&O 4-20 and F&O FO-2 with right hand margin revision bars.
The errors are limited to the listing of the SRs in Table 2-1 of Reference 1. The corrections to the listed SRs do not change NSPMs conclusions regarding the PRA technical adequacy. The justifications provided in the TSTF proposal and the safety evaluation prepared by the NRC staff remain applicable to the MNGP and continue to justify the amendment to incorporate the changes to the MNGP TS. Additionally, the changes do not alter the evaluations performed in accordance with 10 CFR 50.92 in Reference 1.
3.0 REFERENCES
- 1. NSPM Letter (L-MT-17-083) to NRC Document Control Desk, License Amendment Request: Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program, dated December 19, 2017 (ADAMS Accession No. ML17353A189)
- 2. Nuclear Energy Institute (NEI) 04-10, Risk-Informed Technical Specification Initiative 5b, Risk-Informed Method for Control of Surveillance Frequencies, Revision 1, dated April 2007 (ADAMS Accession No. ML071360456)
- 3. Technical Specifications Task Force (TSTF) Standard Technical Specifications (STS) Change TSTF-425, "Relocate Surveillance Frequencies to Licensee Control - [Risk Informed Technical Specifications Task Force] RITSTF Initiative 5b," Revision 3, dated March 18, 2009 (ADAMS Accession No. ML090850642)
Page 2 of 2
L-MT-18-020 NSPM Enclosure ATTACHMENT Monticello Nuclear Generating Plant Supplement to License Amendment Request:
Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program PAGE REPLACEMENTS FOR PROBABILISTIC RISK ASSESSMENT (PRA)
TECHNICAL ADEQUACY (ATTACHMENT 2 OF ORIGINAL SUBMITTAL)
Replacement Pages for L-MT-17-083, Attachment 2:
Page 17 of 27 Page 24 of 27 (2 pages to follow)
L-MT-17-083 NSPM Table 2-1 MNGP Open Fire PRA Peer Review Findings F&O Number SR Peer Review Finding Resolution Impact on Application cutsets indicate the correct basic event has not been chosen to be flagged. This particular example is not expected to be risk significant.
- 4. Individual components identified in Table D-1 of the ES notebook as not credited were not failed in the PRM
[e.g.FPAP1AXXXR12-S - CONDENSATE PUMP P-1A FAILS TO RUN (SHORT TERM)]
- 5. Conversely - Basic events that were not failed in the model, yet were not included in table C-1 as credited [e.g., ABSLPCIAXG -
LPCI MCC FAULT (MCC-133A)]
Finding 4-11 FSS-D4 From 2015 Full Scope Fire PRA Peer Validation studies of the three fire If the assumption of a Review: modeling models used in the fire 20°C ambient PRA were performed. In each case, temperature cannot be An initial ambient temperature of 20°C was the model biases are dispositioned justified for certain plant utilized in the fire modeling calculations for as reasonable for their use based areas, and the risk all MNGP fire zones. This ambient upon Chapter 4 of NUREG-1934. evaluations of specific temperature does not appear to be The F&O closure review team found STI changes could be appropriate for areas that are not the validation studies to be impacted by this temperature controlled such as the Turbine appropriate for cases in which the incorrect assumption, Building, Diesel Generator Building, and ambient temperature is 20°C or less. then sensitivity studies areas of the Reactor Building. Additional justification is required for would be performed on plant areas which may have higher a case by case basis.
ambient temperatures.
Finding 4-20 FSS-C5, From 2015 Full Scope Fire PRA Peer The fire PRA Single Compartment The effect of treatment FSS-D9 Review: Analyses have been updated to of the main control document the analysis associated board sensitive Although the damage criteria for sensitive with the treatment of sensitive electronics is unlikely to electronics is defined in the Single electronics. The F&O closure review impact the STI change Compartment Analysis Notebook 016015- team determined that the methods evaluations. The risk Page 17 of 27
L-MT-17-083 NSPM Table 2-1 MNGP Open Fire PRA Peer Review Findings F&O Number SR Peer Review Finding Resolution Impact on Application CFAST results have sensitivity cases due to ventilation-limited cases for the incorrect application the development of ventilation limited estimating the time to hot gas layer of this method, then conditions. The baseline CFAST results do formation. However, the F&O finding sensitivity studies not result in damage to a generic target closure review team identified issues would be performed on over a 60 minute time interval. The CFAST with the sensitivity case and its a case by case basis.
sensitivity cases that were originally run applicability in certain situations.
with additional ventilation to verify constant Additional justification concerning the exposure damage times would likely result treatment of the ventilation-limited in damage to a generic Thermoplastic (TP) modeling for those areas needs to target when assessed in the heat soak be developed.
model.
Finding FO-2 FSS-D4, From 2017 Focused Scope Fire PRA The various documentation issues This is a documentation FSS-D3, Peer Review: identified in this F&O have been issue and has no FSS-H4, addressed. However, the F&O impacts on quantitative FSS-H5, A number of documentation issues have finding closure review team results. Therefore it will FSS-H9 been identified. These include: determined that additional have no impact on STI information needs to be included in evaluations.
a) There are a number of scenarios that the documentation concerning the appear to credit the thermal heat soak impacts of accumulation of damage method listed in the Fire Modeling Database at low temperature on cables and on (FMDB) but the Hot Gas Layer (HGL) times the impacts of cable size on the heat do not match any scenario listed in Report soak methodology.
016015-RPT-06. An example is Equipment C-18 in tblIgnitionScenarios of the fire modeling database. Scenario 2 and the corresponding comment indicates HGL time is 25 minutes based on heat soak time.
Table J-6 in Section J-6 of Report 016015-RPT-06 does not list any damage times from any ignition source - secondary combustible grouping of 25 minutes. The database should be checked for additional examples and addressed as necessary.
Page 24 of 27