Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] |
Text
e e -
P.O. Box 128, Ft. Pierce, FL 34954-0128 l
@EE l July 19,1994 L-94-186 10 CFR 73.71 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Safeguards Event Log Entries Second Ouarter 1994 Pursuant to 10 CFR 73.71(c) (2), Florida Power and Light Company is submitting a copy of St. Lucie Plant Safeguards Event Log Entries for the period April 1, 1994 to June 30, 1994.
The enclosed material does not contain safeguards information as defined by 10 CFR 73.21.
Very truly yours, C/ b:$i. 4, D. A. Sager Vice President St. Lucie Plant i DAS/CDW/kw Enclosure I'
cc: Stewart D. Ebneter, Regional Administrator, USNRC Region II Senior Resident Inspector, USNRC, St. Lucie Plant DAS/PSL #1165-94 1
,(If f
>Q ,-_- -- - - -
t
/
7~ 407 2 - -7A ~ "g L 7)]
an FPL Grous comoany
FLORIDA POWER & LIGHT ST. LUCIE PLANT QUARTERLY EVENT LOG SECOND QUARTER 1994 April 1,1994 through June 30,1994 The Plant Disciplinary Policy for individuals who cause unsecured doors was modified on February 2,1993 to increase the severity levels of discipline for offenders. Unit 2 refueling outage started February 15,1994 and ended on April 22,1994.
LOG ENTRY EVENT LOG 0). DATE/ TIE DATE/ TIE EVENT REASON and /or CG)E RESP (MSE 02-94/001 04-01-94/0835 04-01-94!0820 Card Key (CK) # 31 lost off site. Human Error CK # 31 deleted kom computer @ 0821. Acuss history report sNmed no unauthorized activity. -
02-94/002 04-04-94/1351 04-04-94/1310 CK # 310 lost on sde. Human Error CK # 310 found and turned over to security @ 1310. Access history report showed no unauthonzed actNity. CK checked for signs of tempering with negative results, and re-assigned to individual suMering the loss.
02 94/003 04-05-940228 04 05-94/0053 Electronic Security System (ESS) Hardware Fadure Compensatory measures in place @ 0057. System operational @ 0123. All tadure.
required checks made and compensatory rnessures secured @ 0154.
RE: Programs aborted.
02-C4/004 04-05-94/1900 04-05-94/1747 CK # 4093 lost off site. Human Error CK # 4093 deleted from computer @ 1750. Access history report showed no unauthorized activdy.
02-94/005 04-05-94/2130 04-05-94/2114 CK # 3405 test on sde Human Error CK # 3405 deleted from computer @ 2114. Access history report showed no unauthorized actwity. CK checked for signs of tampering with negative results, and re-assigned to indwidual suMering i se loss.
02-94/006 04-06-94/0700 04-06-94/0645 CK # 2770 lost oM site Human Error CK # 2770 deleted from computer @ 0646. Access history report showed no unauthorized activity. CK found, checked for signs of tampering with negatwe results, and re-assigned to indwidual suffering the loss.
02-94/007 04-07-940910 04-07-94!O650 CK # 799 lost on sde Human Error CK # 799 found by security @ 0650. Access history report showed no unauthorized actwily. CK checked for signs of tampenng w4h negative results, and re-assigned to individual suMering the loss-02-94/008 04-07-94/1045 04-07-94/1017 CK # 894 lost on sde Human Error CK # 894 deleted from computer @ 1017. Access hrstory report showed no unauthorized activdy. CK checked for signs of tampering with negative results, and re-assigned to individual suffenng the loss.
02-94/009 04-07-94/1600 04-07-94/1357 Un-searched folder entered site due Human Error to inattentwe secunty officer. Security Officer relieved @ 1401, and folder was pmperty searched Investgation revealed no malevolent intent u2-s,.910 04-08-94/2350 04-08-94/2347 Partial loss of penmeter Ightmg Hardware Fadure Security Officer posted @ 2347. Light levels were below 0 2 foot-candle power and CCTV was degraded. Compensatow measures secured @ 04-09-94/0652 (sunnse).
S/O Posted: Camera Remained: Repoited. Back in service:
04-09-94/1955 04-10-94/0645 04 10-94/1951 04-10-94/2159 02-94/011 04-11-94/0700 04-11-94/0552 CK # 2263 lost off site. Human Error CK # 2263 deleted from computer @ 0553. Access history report showed no unauthorized actwity. CK found, checked for signs of tampering with negative results, and re-assigned to individual suffering the loss.
2
LOG ENTRY EVENT LOG NO. DATEMME DATE/ TINE EVENT REASON and /or CODE RESPONSE 02-94/012 04-14-94/0155 04-13-94/2200 Radio repeaters lost Hardware Failure Phone communicatens with LLEA verified @ 2204. Repeaters operational @
2205 and radios functional. Direct phone line with LLEA remained operational.
Radio Lost: Radios recained and LLEA contact vertfled.
04-13-94/2301 04-13-94!2304 04-13-94/2347 04-13-94/2350 02-94/013 04-15-94/0900 04-15-94/0821 Vdal door SDM inoperatwe Hardware Failure Secunty Officer posted @ 0825. Repaired, tested, back in service @ 1117.
02-94/014 04-15-94/1415 04-15-94/1353 CK # 895 lost on sie Human Error CK # 895 found and tumed over to security @ 1353. Access history report showed no unauthonzed actwity. CK checked for signs of tampering with negathe msults, and re-assigned to individual suffering the loss.
02-90/015 04-23-94/1000 04-23-940955 Vaal door SDM inoperatwe. Hardware Failure Secunty Omcer posted @ 0959 Repaired, tested, back in service @ 1000.
02-94/016 04-25-940800 04-25-94/0733 CK # 1024 lost on site Human Error CK # 1024 deleted from computer @ 0735. Access history report showed no unauthonzed activity.
02-94!017 04-25-94/1550 04-25-94/1540 CK # 2095 lost on site Human Error CK # 2095 found by securdy @ 1540. Access hstory report showed no unauthorized activity. CK checked for signs of tampering with negatue results, and re-assigned to individual suffering the loss.
02-94/018 04-28 94!0730 04-28-94/0713 CK # 2959 lost on site Human Error CK # 2959 deleted from computer @ 0713 Access hestory report showed no unauthorized activity.
02-94/019 04-29-94/0905 04-28-94/0842 CK # 669 lost on site Human Error CK # 669 deleted from computer @ 0843. Access hstory report showed no unauthorized actwity_
02-94/020 04-29-94/1300 04-29-94/1141 CK # 2072 lost off site Human Error CK # 2072 deleted from computer @ 1142. Access history report showed no unauthorized acturty. CK found, checked for signs of tampering with negative results, and re-assigned to indwidual suffering the loss.
02-94/021 05-02-94/1500 05-02-94/1443 CK # 363 lost on site Human Error CK # 363 found by secunty @ 1443. Access history report showed no unauthorized activity. CK checked for signs of tampering with negatwe results, and re-assigned to individual suffering the loss 02-94/022 05-03-94/1145 05-03-94/1056 Door to vital area left unsecured. Human Error Security Omcer posted @ 1059. Area searched with negative results.
02-94/023 05-03-94/1730 05-03-94/1714 ESS fadure Hardware Fadure Compensatory measures in place @ 1722. System operational @ 1755. All required checks made and compensatory measures secured @ 1921.
RE: FEP fadure and free pool exhausted 02-94/024 05-05-94/1300 05-05-94/1229 Vital door locking mechanism Hardware Failure Security Omcer posted @ 1229. Repaired, tested, back in service @ 1304.
inoperatue 02-94/025 05-06-94/0600 05-06-94/0513 V4at door locking mechanism Hardware Failure Security Omcer posted @ 0513. Repaired, tested, back in service @ 0859 inoperative 3
LOG ENTRY EVENT LOG C). DATE/ TIME DATE/ TIME EVENT PIASON and /or' CODE RESPONSE 02-94/026 05-06-94/1100 05-06-94/1053 CK # 2074 lost off site Human Error CK # 2074 deleted from computer @ 1053. Access history report showed no unauthorized activity.
02-94/027 05-09-94/2030 05-09-94/1923 Vital door bcking mechanrsm Hardware Failure inoperatNe.
Security Officer posted @ 1923. Repaired, tested, back in service @ 2017.
02-94/028 05-11-94!0130 05-11-94/0015 North Secunty Buikfing (NSB) search Human Error Compensatory measures in place @ 0015. Equipment repaired, tested, back in equipment inoperatNe service @ 0225.
02-94/029 05-16-94/0800 05-16-94!0729 CK # 169 lost off sde. Human Error CK # 169 deleted from computer @ 0729. Access history report showed no unauthorized actwity. CK tound, checked for signs of tampering with negative results, and re-assigned to individual suffering the loss 02-94!O30 05-16-94/1400 05-16-94/1324 CK # 4130 lost off site. Human Error CK # 4130 deleted from computer @ 1325. Access history report showed no unauthorized activity.
02-94/031 05-17-940530 05-17-94/0515 Vital door locking mechanism Hardware Fadure Secunty Officer posted @ 0515. Repaired. tested, back in service @ 0752.
inoperstwe.
02-94032 05-17-94/2300 05-17-94/2116 Partial loss of penmeter lighting Hardware Faiture Secunty Officers posted @ 2118. Light levels were below 0 2 footcandle power and CCTV was degraded. Light sensor repaired and compensatory measures secured @ 2244.
02-E4033 05-17-94/2305 05-17-94/2154 East Secunty Building (ESB) search Hardware Failure Compensatory measures in place @ 2154 Equipment operational, tested, back equipment inoperatwe in service @ 2218.
02-94/034 05-18-940530 05-18-94/0515 Vital door SDM inoperatwe Hardware Failure Security Officer posted @ 0515. Repaired, tested, back in service @ 0950 02-94/035 05-18-94/1230 05-18-94/1212 PZ-06 CCTV inoperative. Hardware Failure Secunty Officer posted @ 1214. Repaired, tested, back in service @ 1330 02-94/036 05-19-94/0800 05-19-94/0732 CK # 774 lost on site Human Error CK # 774 deleted f om computer @ 0733. Access history report showed no unauthorized actwity.
02-94/037 05-24-94!1755 05-24-94/1751 CK # 2754 lost off site. Human Error CK # 2754 deleted from computer @ 1753. Access hrstory report showed no unauthorized activity.
02-94/038 05-26-94/0815 05-26-94/0809 CK # 591 lost off site. Human Error CK # 591 deleted from computer @ 0810 Access history report showed no unauthorized actuity.
02-94/039 05-26-94/0900 05-26-94/0832 Vital door SDM inoperative. Hardware Failure Security Of5cer posted @ 0832. Repaired, tested, back in service @ 1107-02-94/040 05-26-94/1600 05-26-94/1548 CK #2892 lost on site Human Error CK # 2892 deleted from computer @ 1550. Access history report showed no unauthorized activity.
4
LOG ENTR7 EVENT LOG NO. DATE/ TIME DATE/ TIME EVENT REASO ad /or CODE RESPONSE 02-94/041 05-27-94/0605 05-27-940243 PZ-11E CCTV inoperatwe Hardware Failure PTZ-04 dedicated @ 0243. PZ-11E CCTV regained. PTZ-04 un-dedicated @
0523. Pz-11E inoperatwe again and PTZ-04 dedcated @ 0544. PTZ 04 un-usable @ 0557. Secunty Officer posted @ 0602. Repaired, tested back in service @ 1005.
02-94/042 06-01-94/0400 06-01-94/0349 Door to vital area left unsecured Human Error Secunty Officer posted @ 0352. Area searched with negatue results.
02 94/043 06-01-94/0430 06-01-94/0423 Door to vital area left unsecured Human Error Securty Officer posted @ 0427. Area searched with negatue results.
02-94/044 06-02-94/0500 06 42-9410442 PZ-11E CCTV inoperatwe Hardware Farlure PTZ-05 dedicated @ 0442. Repaired, tested, back in servce @ 0805 02-94/045 06-02-9411145 06-02-94/1101 CK # 1008 lost on site Human Error CK # 1008 deleted from computer @ 1102. Access history report showed no unauthorized actrvity. CK found checked for signs of tampering with negative results, and re-assigned to indtvidual suffering the loss 02-94/046 06-06-94/1800 06-06-94/1507 ESS failure H.edware Failure Compensatory measures in place @ 1518. Compensatory measures held up for four menutes due to extremely severe thunderstorms and winds in excess of 60 mph (no adverse affect on pubhc health and safety). System operational @ 1625 hours0.0188 days <br />0.451 hours <br />0.00269 weeks <br />6.183125e-4 months <br /> All required checks made and compensatory rnessures secured @ 1740 RE: FEP failure and free pool exhausted 02-94/047 06-07-94/1600 06-07-94/1347 Multple IMUX failure Hardware Failure Compensatory measures in place @ 1356. System operational @ 1415. All required checks made and compensatory measures secured @ 1450 RE: Severe thunderstorms 02-94/048 06-07-94/1600 06-07-94/1551 CK # 1088 lost on site Human Error CK # 1088 deleted from computer @ 1552.14 cess history report showed no unauthorized actNity.
02-94/049 06-07-94/1930 06-07-94/1745 Mrsseng Safeguards Information Human Error Sabouards Information post order inadvertentty allowed to leave site in a i document contractu vehicle. Document located and retumed to secunty @ 2015 hours0.0233 days <br />0.56 hours <br />0.00333 weeks <br />7.667075e-4 months <br />.
Document contanicd no information that could have significantty assisted an indwidual to commit an act of ra&@' :e*~;- ,
02-94/050 06-09-94!O420 06-09-94/0339 Vital door locking mechanism Hardware Failure Securty Officer posted @ 0342 Repaired, tested, back in servce @ 0756.
inoperative 02-94/051 06-09-94/1500 06-09-94/1443 PZ-29 CCTV inoperstwe Hardware Failure Security Officer posted @ 1449. Repaired, tested, back in service @ 1603.
02-94/052 06-11-94/2130 06-11-94/2047 Partial loss of penmeter lighting Hardware Failure Security Officers posted @ 2050. Light levels were reduced and CCTV was degraded. Lighting circuit breaker tripped. Breaker reset, hghting restored and compensatory measures secured @ 2125.
02-94/053 06-17-94/1125 06-17-94/1058 Door to vital area left unsecured Human Error Security Officer posted @ 1103. Area searched with negatwe results 02-94'054 06-20-94/0730 06-20-9410655 CK # 963 lost off site Human Error CK # 963 deleted from computer @ 0655 Access history report showed no unauthonzed actwity.
5
LOG ENTRY EVENT LOG NO. DATE/ TIME DATE/ TIME EVENT REASGN and /or CODE RESPONSE 02-941055 06-21-94/1600 06-21-94/1500 Voitors not under positrve control of Human Error escort-Voltor control irrmediately re-estabashed. Two vistors were under visual observation of one escort but distance was too great to maintain post 're control.
Escorts were re-instrteted on proper escort responsbihties.
Human Error = 33 Hardware Failure = 22 i
6
. - . - _ _ _ _ _ ._ .- - _ _ _ - _ _ _ _ _ _ _ - - _ _ _ - - _ - _ _ _ - - _ _ _ _ - _ _ _ - _ _ - _ _ _ - __ . ._ . . - - _ _ . _ _ _ _ _ _ _ _ _ _ - _ _ - - - - _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -