L-89-333, Special Rept Informing of non-functional Fire Barrier Penetration Not Returned to Functional Status within 7 Days. Fire Protection Impairments Issued for Access to Areas of Const Work.Compensatory Measures Implemented
| ML17347B336 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/14/1989 |
| From: | Woody C FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| L-89-333, NUDOCS 8909200238 | |
| Download: ML17347B336 (7) | |
Text
REGULATORY INFORMATION DISTRXBUTION SYSTEM (RIDS)
ACCESSION NBR:8909200238 DOC.DATE: 89/09/14 NOTARIZED: NO DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light C 05000251 AUTH.NAME AUTHOR AFFILIATION WOODY,C.O.
Florida Power
& Light Co.
RECIP.NAME RECIPIENT AFFXLIATION Document Control Branch (Document Control Desk)
SUBTECT: Special rept informing of fire protection sys impairments.
DISTRIBUTION CODE:
IE22D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.
NOTES RECIPIENT ID.CODE/NAME PD2-2 LA EDISON,G COPIES RECXPIENT LTTR ENCL ID CODE/NAME 1
1 PD2-2 PD 1
1 COPIES LTTR ENCL 1
1 INTERNAL: ACRS MICHELSON ACRS WYLIE AEOD/DSP/TPAB DEDRO NRR/DEST/CEB 8H NRR/DEST/ICSB 7
NRR/DEST/MTB 9H NRR/DEST/RSB 8E NRR/DLPQ/HFB.10 NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RES/DSIR/EIB 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 ACRS MOELLER AEOD/DOA AEOD/ROAB/DSP IRM/DCTS/DAB NRR/DEST/ESB 8D NRR/DEST/MEB 9H NRR/DEST/PSB 8D NRR/DEST/SGB 8D NRR/DLPQ/PEB 10
/
BP PB 10 REG FIL 02 RCH FILE 01 2
2 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 2
2 1
1 1
1 EXTERNAL: EG&G WILLIAMS,S LPDR NSIC MAYS,G NUDOCS FULL TXT 4
1 1
1 4
L ST LOBBY WARD 1
NRC PDR 1
NSIC MURPHY,G.A 1
1 1
1 1
1 1
NOZE IO ALL i RZKSit RECZPERIS PURSE HELP US 'IO REDOCE HASTE!
CDNZACI'IHE DXUMEÃZ CXWZHOL DESK, RXM P1-37 (EÃT. 20079) m EIaMQCQS KRR MME HKH DISTBIBVTICN IZSTB POR DOCUMENX8 'COO DON~T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 40 ENCL 40 I
D S
S
I
P..
ox14000,Juno Beach,FL 33408-0420 SEtTEMBER 1 4
>989 L-89-333 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.
C.
20555 Gentlemen:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Special Report Breached Fire Barriers and Other Fire Protection S stem Im airments In accordance with Technical Specification 6.9.3.c, the attached Special Report is provided for your information.
Should there be any questions on this information, please contact us ~
Very truly yours, r~'.
O.
Woody Acting Senior Vice President Nuclear COW/JRH/cm Attachment cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, Turkey Point Plant 8909200288 890914 PDC an Fpl Group companY
Attachment:
SPECIAL REPORT FIRE PROTECTION SYSTEM IMPAIRMENTS REQUIRING NRC NOTIFICATION PURPOSE0 Technical Specification (TS) 3.14.5.b requires the submission of a report to the NRC if a non-functional fire barrier penetration is not returned to functional status within 7 days.
TS 3.14 also states that certain other conditions require NRC notification.
In accordance with the above requirements, this special report is being submitted in order to notify the NRC.
EVENT.
See the attached list for Fire Protection Impairments (FPIs) being reported.
CAUSE AND CORRECTIVE ACTIONS:
FPIs 2715 and 2725 were issued for access to areas of construction
. work.
FPI 2733 was issued for an impaired fire door part which is now on order.
The remaining FPI's were issued as a result of Fire Protection surveillances currently being performed.
The plant continues to implement the compensatory measures as applicable.
STATUS UPDATE:
See the attached list for Fire Protection Impairments previously reported which have been closed.
SPECIAL REPORT FIRE PROTECTION SYSTEM IMPAIRMENTS OPENED SINCE LAST REPORT WHICH HAVE BEEN OPEN FOR LONGER THAN TECH SPEC LIMITS FPI ¹ FEATURE TYPE OPENED CLOSED 2647 2648 2649 2651 2653 2654 2657 2658 2659 2661 2662 2664 2665 2667 2671 2672 2673 2674 2675 2676 2681 2682 2683 2684 2685 2686 2687 2688 2696 2702 2703 2704 2705 2706 2707 2712 2713 2714 2715 2722 2723 2725 2728 2729 2733 BARRIER 062E BARRIER 063F BARRIER 062W STRUCTRUAL STEEL 031 STRUCTRUAL STEEL 101 BARRIER 073N BARRIER 075F BARRIER 074F PENETRATION 058E-E009 PENETRATION 045F-M006 BARRIER 046E BARRIER 045E STRUCTRUAL STEEL 062 PENETRATION 004W2-M008 PENETRATION 073S-M003 PENETRATION 070S-M007 PENETRATION 070S-M009 BARRIER 012S BARRIER 012N STRUCTRUAL STEEL 067 BARRIER THERMOLAB 3K1811 PENETRATION 019W-E011 PENETRATION 019W-E018 PENETRATION 01 9S-E006 PENETRATION 019W-E002 BARRIER 013E BARRIER 013S STRUCTRUAL STEEL 025 BARRIER 021S BARRIER 014N BARRIER 022E PENETRATION 097E-E011 BARRIER 02281 BARRIER 021F BARRIER 022F BARRIER 054F BARRIER 02282 PENETRATION 108AF-E005 BARRIER 54F-H001 BARRIER 01 ic BARRIER 024E DOOR 41-1 BARRIER 041-C BARRIER 01 is DOOR 019-1 07/24/89 07/24/89 07/25/89 07/25/89 07/26/89 07/26/89 07/27/89 07/27/89 07/27/89 07/27/89 07/28/89 07/28/89 07/31/89 08/01/89 08/02/89 08/02/89 08/02/89 08/02/89 08/02/89 08/03/89 08/03/8'9 08/03/89 08/03/89 08/03/89 08/03/89 08/03/89 08/03/89 08/04/89 08/08/89 08/10/89 08/10/89 08/10/89 08/10/89 08/10/89 08/10/89 08/11/89 08/11/89 08/11/89 08/11/89 08/15/89 08/15/89 08/16/89 08/16/89 08/17/89 08/17/89
/
/
08/10/89 08/11/89 08/22/89 08/21/89 08/09/8'9 08/11/89 08/11/89 08/18/89
/
/
08/14/89
/
/
/
/
/
/
/
/
/
/
/
/
08/24/89 08/23/89 08/17/89 08/li/89
/
/
/
/
/
/
/
/
/
/
/
/
08/22/89
/
/
/
/
/
/
/
/
/
/
/
/
/
/
. /
/
/
/
/
/
08/21/89
/
/
/
/
/
/
/
/
/ /
/
/
FIRE PROTECTION. SYSTEM IMPAIRMENTS PREVIOUSLY NOT REPORTED CLOSED FPI ¹ FEATURE TYPE CLOSED FPL LETTER Ec DATE 1380 2313 2316 2381 2385 2392 2394 2401 2404 2435 2443 2537 2544 2552 2554 2556 2558 2561 2574 2575 2579 2582 2583 2590 2594 2596 2597 2601 2603 2606 2607 2608 2609 2619 2625 2626 2637 2639 PENETRATION 108AE-Hooi DOOR 67-1 DOOR 68-1 DOOR 67-1, REF.
FPI 2313 DOOR 68-1, REF ~
FP I 2316 DOOR 70-1, REF.
FP I 2317 DOOR 71-1, REF.
FPI 2318 DOOR 106-2 DOOR 98-2 DOOR 94-1, REF.
FP I 2315 DOOR 96-1, REF.
FP I 231 4 BARRIER THERMOLAG PB3900 PENETRATION 019S-E005 BARRIER 061N BARRIER THERMOLAG 3A1354 BARRIER THERMOLAG 3A1352 BARRIER THERMOLAG 3K1600 BARRIER THERMOLAG 3A1324 BARRIER THERMOLAG 3A452 PENETRATION 003E-M003 BARRIER THERMOLAG 4J 1760 BARRIER THERMOLAG 4J 1761 BARRIER THERMOLAG PB4877 DAMPER 43A BARRIER THERMOLAG 3K1622 BARRIER THERMOLAG 3AUT10 BARRIER THERMOLAG 3AXT10 BARRIER THERMOLAG 3A064 BARRIER THERMOLAG 3K1843 BARRIER THERMOLAG PB4519 BARRIER THERMOLAG 4K1518 BARRIER THERMOLAG 3K1632 BARRIER THERMOLAG 4K1403 PENETRATION 028W-M003 PENETRATION 030F-M041 PENETRATION 030F-M042 BARRIER 010S PENETRATION 030F-M021 08/21/89 08/21/89 08/21/89 08/04/89 08/04/89 08/04/89 08/04/89 08/15/89 08/07/89 08/04/89 08/04/89 08/15/89 08/Oi/89 08/01/89 08/10/89 08/15/89 08/15/89 08/15/89 08/01/89 08/22/89 08/11/89 08/11/89 08/15/89 08/14/89 08/17/89 08/03/89 08/01/89 08/01/89 08/04/89 08/17/89 08/03/89 08/10/89 08/03/89 08/01/89 08/01/89 08/01'/89 08/14/89 08/03/89 L-88-56 L-89-130 L-89-130 L-89-154 L-89-154 L-89-1 54 L-89-154 L-89-154 L-89-154 L-89-154 L-89-154 L-89-285 L-89-285 L-89-285 L-89-285 L-89-285 L-89-285 L-89-285 L-89-285 L-89-285 L-89-285 L-89-285 L-89-285 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 L-89-301 02/08/88 04/04/89 04/04/89 04/21/89 04/21/89 04/21/89 04/21/89 04/21/89 04/21/89 04/21/89 04/21/89 08/07/89 08/07/89 08/07/89 08/07/89 08/07/89 08/07/89 08/07/89 08/07/89 08/07/89 08/07/89 08/07/89 08/07/89 08/16/89 08/16/89 08/16/89 08/16/89 08/16/89 08/16/89 08/16/89 08/ib/89 08/16/89 08/16/89 08/16/89 08/16/89 08/16/89 08/16/89 08/16/89