L-81-331, Responds to NRC Re Deviations Noted in IE Insp Repts 50-250/81-12 & 50-251/81-12.No Proprietary Info. Corrective Actions:Containment Purge Exhaust Filters Changed & Preventive Maint Program Developed

From kanterella
(Redirected from L-81-331)
Jump to navigation Jump to search
Responds to NRC Re Deviations Noted in IE Insp Repts 50-250/81-12 & 50-251/81-12.No Proprietary Info. Corrective Actions:Containment Purge Exhaust Filters Changed & Preventive Maint Program Developed
ML17341A474
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 07/31/1981
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML17341A472 List:
References
L-81-331, NUDOCS 8109010259
Download: ML17341A474 (4)


Text

P.O. BOX 529100MIAMI,FL 33152 USNRC REOiON -;

P,TI P NWp oc-@pe'(

Bl ~uc 5

A1!: li Q)Ubz 8 ~8

+ii

.~%i FLORIDA POWER & LIGHTCOMPANY July 31, 1981 L-81-331 Hr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U.

S.

Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Hr. O'Reilly:

Re:

Turkey Point Units 3

8 4

Docket Nos. 50-250, 50-251 IE Inspection Re ort 81-12 Florida Power 8 Light Company has reviewed the subject inspection report and a response is attached.

There is no proprietary information in the report.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/PLP/ras cc:

Harold F. Reis, Esquire 8i090i0259 8i08i7'.

II PDR ADOCK 05000250, 8

PDR'EOPLE...

SERVING PEOPLE

C'

~

1

Re:

Turkey Point Units 3 8 4 Docket Nos. 50-250, 50-251 IE Inspection Report 81-12 FINDING:

Based on the results of the NRC inspection conducted on May 18-22,

1981, certain of your activities appear to deviate from your commitment to the Commission as indicated below.

Your letter of September 23, 1980, indicated that a preventive maintenance program had been established for the containment purge exhaust filters in response to a significant weakness identified in your radiation protection program during the Health Physics Appraisal conducted May 5-16, 1980.

In addition, you stated that a portion of the containment purge exhaust filters had been replaced and the remaining filters were scheduled to be replaced shortly thereafter.

Contrary to the above, on May 20, 1981, the containment purge exhaust filters were found not to have been

replaced, nor had a preventive maintenance program been, established to inspect and change as appropriate the containment purge exhaust filters.

The significance of operating the containment purge exhaust through filters in an unacceptable condition was emphasized in our letter of August 28, 1980.

The inadequate maintenance of these filters directly contributed to the contamination found in the southeast sector of the plant during the Health Physics Appraisal.

RESPONSE

As corrective action, the containment purge exhaust filters were changed on May 22, 1981.

Prior to June 1, 1981, a preventive maintenance program (NPTP-M-PM-53-S-1) was also developed to inspect these filters on a semi-annual basis.

This action should prevent any further problems.

~

~

~,