L-2012-266, NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
NRC Regulatory Issue Summary 2012-07, Preparation and Scheduling of Operator Licensing Examinations
ML12202A039
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 07/12/2012
From: Jensen J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2012-266, RIS 2012-07
Download: ML12202A039 (2)


Text

July 12, 2012 0

FPL.

L-2012-266 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 NRC Regulatory Issue Summary 2012-07 Preparation And Scheduling of Operator Licensing Examinations On June 8, 2012, NRC issued Regulatory Issue Summary (RIS) 2012-07, Preparationand Scheduling of Operator Licensing Examinations. RIS 2012-07 requests licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs).

The NRC stated that this information would help the NRC to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2012-07.

Enclosed please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.

Please contact us if there are any questions regarding this submittal.

truly yours,

-J~phJensen

-Siite Vice President St. Lucie Plant JJ/tit Enclosure cc/enc: Malcolm T. Widmann, DRS, OB, RII Florida Power & Light Company

ý_koos,-20 6501 S. Ocean Drive, Jensen Beach, FL 34957

-ia NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 09/30/2014 (9-2011) Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collection is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Information Services Branch OPERATOR LICENSING (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, orby Intemet e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and EX.AMINATION DATA Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION St. Lucie Plant II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2014 CY2015 CY2016 CY2017 ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2014 CY 2015 CY 2016 CY 2017 NUMBER OF REACTOR 6 0 6 0 OPERATORS NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 0 5 0 NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 12/1/2014 12/05/2016 ALTERNATE DATE 12/8/2014 12/12/2016 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2014 CY 2015 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 0 0 0 0 0 15 0 0 CANDIDATES NRC FORM 536 (9-2011)