L-2006-210, Regulatory Issue Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations

From kanterella
Jump to navigation Jump to search
Regulatory Issue Summary 2006-15, Preparation and Scheduling of Operator Licensing Examinations
ML062580068
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/13/2006
From: Johnston G
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-2006-210, RIS-06-015
Download: ML062580068 (2)


Text

Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL34957 September 13, 2006 FPL L-2006-21 0 10 CFR 50.4 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 RE: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Regulatory Issue Summary 2006-15 Preparation And Scheduling of Operator Licensinq Examinations On August 14, 2006, NRC issued Regulatory Issue Summary (RIS) 2006-15, Preparation and Scheduling of OperatorLicensing Examinations. RIS 2006-15 requested licensees to submit, on a voluntary basis, information pertaining to their proposed site-specific operator licensing examination schedules and the estimated number of applicants planning to take operator licensing examinations and the NRC generic fundamentals examinations (GFEs). The NRC stated that this information would help the NRC to more effectively utilize its resources. A response was requested within 30 days of receipt of RIS 2006-15.

Attached please find the completed NRC Form 536, Operator Licensing Examination Data, for St. Lucie Units 1 and 2.

Please contact us if there are any questions regarding this submittal.

Very truly yours, AoronL.ý~dnston Site Vice President St. Lucie Plant GLJ/tlt Attachment

/Abo3 an FPL Group company

NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 08/31/2008 (8-2005) Estimated burden per response to comply with this voluntary Information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This Information collection Is used to plan budgets and resources for operator examinations. Send comments regarding burden estimate to the Records and FOIA/Privacy Services Branch (T-5 F53). U.S.

OPERATOR LICENSING Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Intemet EXAMINATION DATA e-mail to infocollects@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington. DC 20503. If a means used to Impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person Is not required to respond to, the Information collection.

FACILITY NRC REGION Florida Power and Light St Lucie Nuclear Power Plant Units 1 and 2 2 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 1 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 07 CY 08 CY 09 CY 10 NUMBER OF REACTOR 0 3 10 10 OPERATORS NUMBER OF SENIOR REACTOR 0 8 3 3 OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE 0 4 1 1 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/09/2008 09/28/2009 09/30/2010 ALTERNATE DATE 07/28/2008 11/30/2009 10/25/2010 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 07 CY 08 PROPOSED NUMBER MARCH JUNE SEPTEMBER DECEMBER MARCH JUNE SEPTEMBER DECEMBER ESTIMATED NUMBER OF 15 00 0 0 15 0 0 CANDIDATES NRC FORM 536 (8-2005) PRINTED ON RECYCLED PAPER