ML100620155
| ML100620155 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/09/2010 |
| From: | NRC/RGN-II |
| To: | |
| References | |
| Download: ML100620155 (113) | |
Text
FACILITY NAME:
St. Lucie Section 5 REPORTNUMBER: __
~20~O~9~-3~O~1 ________________ _
DRAFT 8IM/IN-PLANT JPM8 CONTENTS:
o Draft SIMULATOR liN-PLANT JPMs Location of Electronic Files:
SUbmittedBY~
"' ___ Verified BY: _______
FACILITY NAME: __
S.;;:;;..t;;.;..
- .=L,;;;.,uc;;;..;;.i=.e ___
Section 5 REPORTNUMBER: __ ~2=_OO~9~-3~O~1~ ______________ ___
(
DRAFT 8IM/IN-PLANT JPM8 CONTENTS:
o Draft SIMULATOR liN-PLANT JPMs
(
Location of Electronic Files:
Submitted BY~
' ___ Verified By: ________
ES 301
~
C t
I R on ro oom II PI t 5 t
n~ an iyS ems o tr u me F orm ES 301 2 Facility: St. Lucie Plant Date of Examination:
10/19/2009 Exam Level: RO Q(]
SRO-I ~ SRO-U D Operating Test No.:
HLC-19 NRC Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System 1 JPM Title Type Code*
Safety Function S-1 Place the alternate PORV in service M,A,S 3
S-2 Perform 184 day 2A Diesel Generator Surveillance N,A,S 6
S-3 Transfer 2A SG Level Control from the MFRV to the 15%
N,S 4S Bypass valve and 100% Bypass valve S-4 Transfer Letdown Level Control to the Alternate LCV (Bank D, S 2
0821040)
C-5 Respond to a Linear Power Range NI Malfunction Unit 1 (Bank D,C 7
0821035)
S-6 Respond to slipped 1 dropped CEA's Unit 2 N,A,S 1
S-7 Respond to a CCW header rupture Unit 2 N,A,L,S 8
C-8 (RO Only) Vent Reactor Vessel Head Using RCGVS Unit 1 D,C,L 4P (Bank 0821090)
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 1 Locally Start 1 A Emergency Diesel Generator During a Station N,A,E 6
Blackout P21 Locally Operate 1 C Auxiliary Feedwater Pump (Bank 0821054)
D,E 4S P31 Hydrogen Purge System Operation - Unit 1 (Bank 0821098)
D,P,R,E 5
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6/4-6/2-3 (C)ontrol room (D)irect from bank
- 9/
- ;;8/
- ;;4 (E)mergency or abnormal in-plant
- 1/;
- ::1/;:::1 (EN)gineered safety feature
- / -
/ ;:::1 (control room system)
(L)ow-Power / Shutdown
- 1/;
- ::1/;:::1 (N)ew or (M)odified from bank including 1 (A)
- 2/;
- ::2/;:::1 (P)revious 2 exams
- 3/
- ;; 3 /
- ;; 2 (randomly selected)
(R)CA
~1/~1/;:::1 (S)imulator E5301 c ontro IR
/I PI oom n-ant 5 iystems o r ut me Form E 5-301-2 Facility: St. Lucie Plant Date of Examination:
10/19/2009 Exam Level: RO ~ SRO-I !Xl SRO-U D Operating Test No.:
HLC-19 NRC Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System 1 JPM Title Type Code*
Safety Function S-1 Place the alternate PORV in service M,A,S 3
S-2 Perform 184 day 2A Diesel Generator Surveillance N,A,S 6
S-3 Transfer 2A SG Level Control from the MFRV to the 15%
N, S 4S Bypass valve and 100% Bypass valve S-4 Transfer Letdown Level Control to the Alternate LCV (Bank D, S 2
0821040)
C-5 Respond to a Linear Power Range NI Malfunction Unit 1 (Bank D,C 7
0821035)
S-6 Respond to slipped 1 dropped CEA's Unit 2 N,A,S 1
S-7 Respond to a CCW header rupture Unit 2 N,A,L, S 8
(
C-8 (RO Only) Vent Reactor Vessel Head Using RCGVS Unit 1 D,C,L 4P (Bank 0821090)
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
P1 1 Locally Start 1A Emergency Diesel Generator During a Station N,A,E 6
Blackout P2 1 Locally Operate 1 C Auxiliary Feedwater Pump (Bank 0821054)
D,E 4S P31 Hydrogen Purge System Operation - Unit 1 (Bank 0821098)
D,P,R,E 5
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO 1 SRO-I/ SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank
- 9/
- ::;8/:::;4 (E)mergency or abnormal in-plant
~1/~1/~1 (EN)gineered safety feature
- / - 1 ~1 (control room system)
(L)ow-Power 1 Shutdown
~1/~1/~1 (N)ew or (M)odified from bank including 1(A)
~2/~2/~1 (P)revious 2 exams
- 3 1
- ::; 3 1 :::; 2 (randomly selected)
(R)CA
~1/~1/~1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 JPM
SUMMARY
DESCRIPTION S-1 PLACE THE ALTERNATE PORV IN SERVICE The applicant will be given directions to place the alternate PORV in service due to the inservice PORV leaking, using 2-0120036 Pressurizer Relief / Safety Valve. When the alternate PORV is placed in service and the block valve is re-opened the PORV will develop a substantial leak. The block valve will not be able to be closed and RCS pressure will continue to lower. The applicant will be expected to manually trip the Unit prior to the automatic TMLP trip. (Modified from Bank 0821048)
S-2 PERFORM 2A DIESEL GENERATOR SURVEILLANCE The applicant will be given directions to perform the 184 day surveillance on the 2A Diesel Generator using 2-0SP-59.01A 2A Emergency Diesel Generator Monthly Surveillance. During the performance of the surveillance, while the Diesel is being loaded the governor will malfunction and the Diesel will continue to load without governor control from the control room. The applicant will be expected to manually trip the Diesel Generator.
S-3 TRANSFER 2A SG LEVEL CONTROL FROM THE MFRV TO THE 15%
BYPASS VALVE AND THE 100% BYPASS VALVE.
2A MFRV is not controlling in automatic and must be taken out of service at 100% power. Appendix C of 2-0700030 Main Feedwater will be implemented to place the 15% and 100% bypass valves in service and remove the MFRV.
S-4 TRANSFER LETDOWN LEVEL CONTROL VALVE TO THE ALTERNATE LCV The in-service letdown level control valve is operating erratically. The applicant will be instructed to place the alternate LCV in service using 2-NOP-02.02, Charging and Letdown.
C-5 RESPOND TO A LINEAR POWER RANGE NI MALFUNCTION UNIT 1 Numerous annunciators are in at 100% power on Unit 1. The applicant is directed to respond to the annuncaitors and determine a Linear Range NI channel has failed. 1-0NP-99.01 Loss of Technical Specification Instrumentation should be implemented to bypass affected RPS channels.
S-6 RESPOND TO SLIPPED / DROPPED CEA'S A CEA will be slipped approximately 15 inches. 2-0110030 CEA Off - Normal Operation and Realignment will be implemented to re-align the CEA. While the CEA is being aligned but still misaligned >7.0 inches, another CEA will drop to the bottom of the core. This will require the applicant to manually trip the Unit.
! \\
l ES-301 S-1 Control Roomlln-Plant Systems Outline Form ES-301-2 JPM
SUMMARY
DESCRIPTION PLACE THE ALTERNATE PORV IN SERVICE The applicant will be given directions to place the alternate PORV in service due to the inservice PORV leaking, using 2-0120036 Pressurizer Relief / Safety Valve. When the alternate PORV is placed in service and the block valve is re-opened the PORV will develop a substantial leak. The block valve will not be able to be closed and RCS pressure will continue to lower. The applicant will be expected to manually trip the Unit prior to the automatic TMLP trip. (Modified from Bank 0821048)
S-2 PERFORM 2A DIESEL GENERATOR SURVEILLANCE S-3 S-4 The applicant will be given directions to perform the 184 day surveillance on the 2A Diesel Generator using 2-0SP-59.01 A 2A Emergency Diesel Generator Monthly Surveillance. During the performance of the surveillance, while the Diesel is being loaded the governor will malfunction and the Diesel will continue to load without governor control from the control room. The applicant will be expected to manually trip the Diesel Generator.
TRANSFER 2A SG LEVEL CONTROL FROM THE MFRV TO THE 15%
BYPASS VALVE AND THE 100% BYPASS VALVE.
2A MFRV is not controlling in automatic and must be taken out of service at 100% power. Appendix C of 2-0700030 Main Feedwater will be implemented to place the 15% and 100% bypass valves in service and remove the MFRV.
TRANSFER LETDOWN LEVEL CONTROL VALVE TO THE ALTERNATE LCV The in-service letdown level control valve is operating erratically. The applicant will be instructed to place the alternate LCV in service using 2-NOP-02.02, Charging and Letdown.
C-5 RESPOND TO A LINEAR POWER RANGE NI MALFUNCTION UNIT 1 Numerous annunciators are in at 100% power on Unit 1. The applicant is directed to respond to the annuncaitors and determine a Linear Range NI channel has failed. 1-0NP-99.01 Loss of Technical Specification Instrumentation should be implemented to bypass affected RPS channels.
S-6 RESPOND TO SLIPPED / DROPPED CEA'S A CEA will be slipped approximately 15 inches. 2-0110030 CEA Off - Normal Operation and Realignment will be implemented to re-align the CEA. While the CEA is being aligned but still misaligned> 7.0 inches, another CEA will drop to the bottom of the core. This will require the applicant to manually trip the Unit.
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 JPM
SUMMARY
DESCRIPTION S-7 RESPOND TO A CCW HEADER RUPTURE UNIT 2 The Unit will be in Mode 3, NOP, NOT. A confirmed CCW header rupture has just occurred and the US has directed the RCO to carry out the actions of 2-0310030 Component Cooling Water - Off-Normal Operation to perform applicable steps for a ruptured CCW header. Annunciator LB-1 0 will clear indicating the rupture is in the lA' header. When the candidate performs steps to restore CCW to the "N" header from the "B" header HCV-14-1 0 will not open.
This will require the RCP's to be stopped within 10 minutes.
C-8 (RO Only) VENT REACTOR VESSEL HEAD USING RCGVS - Unit 1 Control Room. A LOCA has occurred on Unit 1. A non-condensable bubble in the reactor vessel has formed. ONP 1-0120037 Reactor Coolant Gas Vent System Off-Normal Operation will be used to vent the non-condensable gas.
P-1 LOCALLY START THE 1A EMERGENCY DIESEL GENERATOR DURING A STATION BLACKOUT Unit 1 is in a station blackout. Direction is given to start the 1A Diesel Generator lAW 1-EOP-99 Appendix C. The Diesel Generator does not start when the start switch is placed in START. The Diesel Generator will start when the Normal /
Isolate switches are placed in isolate and the engine control switch is placed to start. Voltage and frequency will be adjusted locally / manually and the output breaker will be closed.
P-2 LOCALLY OPERATE THE 1C AUXILIARY FEEDWATER PUMP Unit 1 is in EOP-15 Functional Recovery. The 1 C Auxiliary Feedwater pump is not able to be operated form the control room. Direction is given to operate the 1 C Auxiliary Feedwater pump lAW 1-EOP-99 Appendix G Local Operation of the 1 C Auxiliary Feedwater Pump.
P-3 HYDROGEN PURGE SYSTEM OPERATION Unit 1 is in a Loss of Coolant Accident. 1-EOP-03 LOCA is in use. Direction is given to locally operate the Hydrogen Purge System lAW 1-EOP-99 Appendix N.
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 JPM
SUMMARY
DESCRIPTION S-7 RESPOND TO A CCW HEADER RUPTURE UNIT 2 The Unit will be in Mode 3, NOP, NOT. A confirmed CCW header rupture has just occurred and the US has directed the RCO to carry out the actions of 2-0310030 Component Cooling Water - Off-Normal Operation to perform applicable steps for a ruptured CCW header. Annunciator LB-1 0 will clear indicating the rupture is in the 'A' header. When the candidate performs steps to restore CCW to the "N" header from the "B" header HCV-14-1 0 will not open.
This will require the RCP's to be stopped within 10 minutes.
C-8 (RO Only) VENT REACTOR VESSEL HEAD USING RCGVS - Unit 1 Control Room. A LOCA has occurred on Unit 1. A non-condensable bubble in the reactor vessel has formed. ONP 1-0120037 Reactor Coolant Gas Vent System Off-Normal Operation will be used to vent the non-condensable gas.
P-1 LOCALLY START THE 1A EMERGENCY DIESEL GENERATOR DURING A STATION BLACKOUT P-2 Unit 1 is in a station blackout. Direction is given to start the 1 A Diesel Generator lAW 1-EOP-99 Appendix C. The Diesel Generator does not start when the start switch is placed in START. The Diesel Generator will start when the Normal!
Isolate switches are placed in isolate and the engine control switch is placed to start. Voltage and frequency will be adjusted locally / manually and the output breaker will be closed.
LOCALLY OPERATE THE 1 C AUXILIARY FEEDWATER PUMP Unit 1 is in EOP-15 Functional Recovery. The 1 C Auxiliary Feedwater pump is not able to be operated form the control room. Direction is given to operate the 1 C Auxiliary Feedwater pump lAW 1-EOP-99 Appendix G Local Operation of the 1 C Auxiliary Feedwater Pump.
P-3 HYDROGEN PURGE SYSTEM OPERATION Unit 1 is in a Loss of Coolant Accident. 1-EOP-03 LOCA is in use. Direction is given to locally operate the Hydrogen Purge System lAW 1-EOP-99 Appendix N.
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE Locally Start 1A Emergency Diesel Generator During a Station Blackout NRC P-1 Developed/Revised by:
Charles Rogers Training Management Approval: --------
9/21/09 Date Date JPM NRC P-1/Rev 0
+43' RAB Swgr/1A EDG Rm Page 1 of 9
(
e FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE Locally Start 1 A Emergency Diesel Generator During a Station Blackout NRC P-1 Developed/Revised by:
Charles Rogers Training Management Approval: --------
9/21/09 Date Date JPM NRC P-1/Rev 0
+43' RAB Swgr/1A EDG Rm Page 1 of 9
JOB PERFORMANCE MEASURE Start the 1A Diesel Generator locally during SBO Faulted JPM Yes Facility JPM #:
N/A K/A Rating(s):
Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the 1A EDG is at rated frequency and voltage.
Evaluation Location:
Performance Level:
Simulator
References:
In Plant X
Lab Other Perform Simulate X
Discuss 1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix C, Diesel Generator Local Start Validation Time: 15 minutes Time Critical:
Tools/Equipment/Procedures Needed:
1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix C, Diesel Generator Local Start Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC P-1/Rev 0
+43' RAB Swgr/1A EDG Rm Page 2 of 9
(
JOB PERFORMANCE MEASURE Task:
Start the 1 A Diesel Generator locally during SSO Faulted JPM Yes Facility JPM #:
N/A K/A Rating(s):
Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the 1A EDG is at rated frequency and voltage.
Evaluation Location:
Performance Level:
Simulator
References:
In Plant X
Lab Other Perform Simulate X
Discuss 1-EOP-99, "Appendices/Figures/TableslData Sheets," Appendix C, Diesel Generator Local Start Validation Time: 15 minutes Time Critical:
Tools/Equipment/Procedures Needed:
1-EOP-99, "Appendices/Figures/TableslData Sheets," Appendix C, Diesel Generator Local Start Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC P-1/Rev 0
+43' RAB Swgr/1 A EDG Rm Page 2 of 9
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
Start the 1A Diesel Generator locally during SBO.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet.
INITIAL CONDITIONS:
o Unit 1 is in a Station Blackout event.
o The plant is stable in a hot standby condition, and 1-EOP-1 0, 'SBO', is being implemented.
o 1 B EDG started and tripped on overs peed and can NOT be reset.
o 1A EDG did NOT automatically start and can NOT be manually started from the Control Room.
INITIATING CUES:
The US has directed you to start the 1A EDG locally lAW 1-EOP-99, "Appendices/Figuresrrables/Data Sheets," Appendix C.
JPM NRC P-1/Rev 0
+43' RAB Swgr/1A EDG Rm Page 3 of 9 l
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
Start the 1 A Diesel Generator locally during SBO.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet.
INITIAL CONDITIONS:
o Unit 1 is in a Station Blackout event.
o The plant is stable in a hot standby condition, and 1-EOP-1 0, 'SBO', is being implemented.
o 1 B EDG started and tripped on overs peed and can NOT be reset.
o 1A EDG did NOT automatically start and can NOT be manually started from the Control Room.
INITIATING CUES:
The US has directed you to start the 1 A EDG locally lAW 1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix C.
JPM NRC P-1/Rev 0
+43' RAB Swgr/1 A EDG Rm Page 3 of 9
START TIME: ___
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 1-EOP-99, "Appendices/Figures/TableslData Sheets,"
Appendix C, Diesel Generator Local Start, 1AEDG STEP 1:
PLACE the EDG Output Breaker, NORMALIISOLATE switch in ISOLATE.
CRITICAL STANDARD:
POSITION Breaker 2-20211 Normal/Isolate switch to ISOLATE.
EXAMINER'S CUE:
Normal/Isolate Switch is in ISOLATE EVALUATOR NOTE:
This breaker is in RAB+43' Switchgear Room A on the 1A3 4.16 KV bus.
COMMENTS:
STEP 2 (2 & 3): INVESTIGATE status of local alarm panel. If there are NO alarms present, Then ENSURE BOTH overspeed trip levers are in the LATCHED position.
STEP
__ SAT
__ UNSAT STANDARD:
INVESTIGATE local alarm panel status. VERIFY that engine overspeed trip __ SAT latches on the 12-and 16-cylinder diesel engines are RESET (each latch is horizontal and each limit switch is set).
EXAMINER'S CUE:
There are NO local alarms. BOTH Overs peed Trip latches are HORIZONTAL and their respective limit switches are SET.
COMMENTS:
CAUTION If an auto start signal is present the EDG will automatically start when the lockout relay is reset.
STEP 3 (4) :
ENSURE the lockout relay is RESET.
STANDARD:
VERIFY lockout relay is RESET with blue light LIT.
EXAMINER'S CUE:
COMMENTS:
Lockout relay flag is BLACK, Switch is in VERTICAL position, Blue light is LIT.
- Cues are to be used only if JPM performance is being simulated in the plant.
__ UNSAT
__ SAT
__ UNSAT JPM NRC P-1/Rev 0
+43' RAB Swgr Rm /1A EDG Rm Page 4 of 9
(
START TIME: ___ _
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 1-EOP-99, "Appendices/Figures/Tables/Data Sheets,"
Appendix C, Diesel Generator Local Start, 1A EDG STEP 1:
PLACE the EDG Output Breaker, NORMAL/ISOLATE switch in ISOLATE.
CRITICAL STANDARD:
POSITION Breaker 2-20211 Normaillsolate switch to ISOLATE.
EXAMINER'S CUE:
Normal/Isolate Switch is in ISOLATE EVALUATOR NOTE:
This breaker is in RAB+43' Switchgear Room A on the 1A3 4.16 KV bus.
COMMENTS:
STEP SAT
__ UNSAT
~----------~
STEP 2 (2 & 3): INVESTIGATE status of local alarm panel. If there are NO alarms present, Then ENSURE BOTH overspeed trip levers are in the LATCHED position.
STANDARD:
INVESTIGATE local alarm panel status. VERIFY that engine overs peed trip __ SAT latches on the 12-and 16-cylinder diesel engines are RESET (each latch is horizontal and each limit switch is set).
EXAMINER'S CUE:
There are NO local alarms. BOTH Overs peed Trip latches are HORIZONTAL and their respective limit switches are SET.
COMMENTS:
CAUTION If an auto start signal is present the EDG will automatically start when the lockout relay is reset.
STEP 3 (4):
ENSURE the lockout relay is RESET.
STANDARD:
VERIFY lockout relay is RESET with blue light LIT.
EXAMINER'S CUE:
Lockout relay flag is BLACK, Switch is in VERTICAL position, Blue light is LIT.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
UNSAT SAT
__ UNSAT JPM NRC P-1/Rev 0
+43' RAB Swgr Rm 11A EDG Rm Page 4 of 9
STEP 4 (5):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 1f the EDG does NOT start, Then PLACE the engine start switch to START.
POSITION engine start switch to START EXAMINER'S CUE:
Engine start switch is in START. Diesel does NOT start.
Green and Amber start lights are ON EXAMINER'S NOTE: FAULTED STEP COMMENTS:
STEP 6 (6.A):
1f the EDG still does NOT start, Then PERFROM ALL of the following:
A. PLACE NORMAL/ISOLATE switches in ISOLATE.
Voltage Control STANDARD:
POSITION Voltage Control switch to ISOLATE EXAMINER'S CUE:
Switch is in ISOLATE COMMENTS:
STEP 7(6.A):
1f the EDG still does NOT start, Then PERFROM ALL of the following:
A. PLACE NORMAL/ISOLATE switches in ISOLATE.
Frequency Control STANDARD:
POSITION Frequency Control switch to ISOLATE EXAMINER'S CUE:
Switch is in ISOLATE COMMENTS:
STEP 8 (6.A):
1f the EDG still does NOT start, Then PERFROM ALL of the following:
A. PLACE NORMAL/ISOLATE switches in ISOLATE.
Start Circuit STANDARD:
POSITION Start Circuit switch to ISOLATE EXAMINER'S CUE:
Switch is in ISOLATE COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
FAULTED STEP SAT UNSAT CRITICAL STEP SAT
~_UNSAT CRITICAL STEP SAT
~_UNSAT CRITICAL STEP
~_SAT UNSAT JPM NRC P-1/Rev 0
+43' RAB Swgr Rm I1A EDG Rm Page 5 of 9
(
STEP 4 (5):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 1f the EDG does NOT start, Then PLACE the engine start switch to START.
POSITION engine start switch to START EXAMINER'S CUE:
Engine start switch is in START. Diesel does NOT start.
Green and Amber start lights are ON EXAMINER'S NOTE: FAULTED STEP COMMENTS:
STEP 6 (6.A):
1f the EDG still does NOT start, Then PERFROM ALL of the following:
A. PLACE NORMAL/ISOLATE switches in ISOLATE.
Voltage Control STANDARD:
POSITION Voltage Control switch to ISOLATE EXAMINER'S CUE:
Switch is in ISOLATE COMMENTS:
STEP 7(6.A):
1f the EDG still does NOT start, Then PERFROM ALL of the following:
A. PLACE NORMAL/ISOLATE switches in ISOLATE.
Frequency Control STANDARD:
POSITION Frequency Control switch to ISOLATE EXAMINER'S CUE:
Switch is in ISOLATE COMMENTS:
STEP 8 (6.A):
1f the EDG still does NOT start, Then PERFROM ALL of the following:
A. PLACE NORMAL/ISOLATE switches in ISOLATE.
Start Circuit STANDARD:
POSITION Start Circuit switch to ISOLATE EXAMINER'S CUE:
Switch is in ISOLATE COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
FAULTED STEP SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRC P-1/Rev 0
+43' RAB Swgr Rm I1A EDG Rm Page 5 of 9
(-
STEP 9 (6.B) :
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 11 the EDG still does NOT start, Then PERFROM ALL of the following:
B. PLACE engine control to START POSITION: engine control to START EXAMINER'S CUE:
Diesel STARTS and accelerates to 900 rpm, Green Light is OFF, Red light ON COMMENTS:
STEP 10 (6.C): 11 the EDG still does NOT start, Then PERFROM ALL of the following:
C. When the EDG reaches 900 rpm, Then PERFORM BOTH of the following on the DG Local Control Panel:
- 1. ADJUST Voltage using the Manual Voltage Adjust Switch to obtain 4160 volts.
STANDARD:
OBSERVE "A.C. Voltmeter Gen." voltage EXAMINER'S CUE:
Diesel output is 4160 volts COMMENTS:
STEP 12 (6.C): 11 the EDG still does NOT start, Then PERFROM ALL of the following:
C. When the EDG reaches 900 rpm, Then PERFORM BOTH of the following:
- 2. ADJUST the speed using the Engine Speed Control Switch to obtain 60 hertz.
STANDARD:
OBSERVE "Frequency meter" EXAMINER'S CUE:
Diesel output is 60 hertz COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT SAT UNSAT JPM NRC P-1/Rev 0
+43' RAB Swgr Rm /1A EDG Rm Page 6 af9
(
STEP 9 (6.B} :
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
.!f the EDG still does NOT start, Then PERFROM ALL of the following:
B. PLACE engine control to START POSITION: engine control to START EXAMINER'S CUE:
Diesel STARTS and accelerates to 900 rpm, Green Light is OFF, Red light ON COMMENTS:
STEP 10 (6.C}:.!f the EDG still does NOT start, Then PERFROM ALL of the following:
C. When the EDG reaches 900 rpm, Then PERFORM BOTH of the following on the DG Local Control Panel:
- 1. ADJUST Voltage using the Manual Voltage Adjust Switch to obtain 4160 volts.
STANDARD:
OBSERVE "A.C. Voltmeter Gen." voltage EXAMINER'S CUE:
Diesel output is 4160 volts COMMENTS:
STEP 12 (6.C}:.!f the EDG still does NOT start, Then PERFROM ALL of the following:
C. When the EDG reaches 900 rpm, Then PERFORM BOTH of the following:
- 2. ADJUST the speed using the Engine Speed Control Switch to obtain 60 hertz.
STANDARD:
OBSERVE "Frequency meter" EXAMINER'S CUE:
Diesel output is 60 hertz COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT SAT UNSAT JPM NRC P-1/Rev 0
+43' RAB Swgr Rm I1A EDG Rm Page 6 of 9
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (6.0): Jf the EDG still does NOT start, Then PERFROM ALL of the following:
D. PLACE NORMAL/ISOLATE switches in NORMAL.
Voltage Control STANDARD:
POSITION Voltage Control switch to NORMAL EXAMINER'S CUE:
Switch is in NORMAL COMMENTS:
STEP 14 (6.0): Jf the EDG still does NOT start, Then PERFROM ALL of the following:
D. PLACE NORMAL/ISOLATE switches in NORMAL.
Frequency Control STANDARD:
POSITION Frequency Control switch to NORMAL EXAMINER'S CUE:
Switch is in NORMAL COMMENTS:
STEP 15( 6.0): Jf the EDG still does NOT start, Then PERFROM ALL of the following:
D. PLACE NORMAL/ISOLATE switches in NORMAL.
Start Circuit STANDARD:
POSITION Start Circuit switch to NORMAL EXAMINER'S CUE:
Switch is in NORMAL COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT JPM NRC P-1/Rev 0
+43' RAB Swgr Rm 11A EDG Rm Page 7 of 9
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (6.D): Ji the EDG still does NOT start, Then PERFROM ALL of the following:
D. PLACE NORMAL/ISOLATE switches in NORMAL.
Voltage Control STANDARD:
POSITION Voltage Control switch to NORMAL EXAMINER'S CUE:
Switch is in NORMAL COMMENTS:
STEP 14 (6.D): Ji the EDG still does NOT start, Then PERFROM ALL of the following:
D. PLACE NORMAL/ISOLATE switches in NORMAL.
Frequency Control STANDARD:
POSITION Frequency Control switch to NORMAL EXAMINER'S CUE:
Switch is in NORMAL COMMENTS:
CRITICAL STEP SAT
__ UNSAT CRITICAL STEP SAT
__ UNSAT
*-----------------------------+-----~I STEP 15( 6.D): Ji the EDG still does NOT start, Then PERFROM ALL of the following:
CRITICAL STEP D. PLACE NORMAL/ISOLATE switches in NORMAL.
__ SAT Start Circuit STANDARD:
POSITION Start Circuit switch to NORMAL
__ UNSAT EXAMINER'S CUE:
Switch is in NORMAL COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
JPM NRC P-1/Rev 0
+43' RAB Swgr Rm 11A EDG Rm Page 7 of 9
I STEP 16 (7):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY the EDG is operating normally.
VERIFY normal operating CONDITIONS.
EXAMINER'S CUE:
If asked, frequency is 60 Hz and output voltage is 4160 volts. No alarms are present.
COMMENTS:
STEP (done):
NOTIFY the Control Room that the 1A Diesel Generator has been RESTORED in accordance with Appendix C.
STANDARD:
NOTIFY Control Room that 1A EDG has been STARTED lAW 1-EOP-99, Appendix C.
EXAMINER'S CUE:
US acknowledges and tells the candidate that the Normal/Isolate switch for 1A EDG output breaker will be operated by an other Control Room Operator.
COMMENTS:
SAT UNSAT SAT UNSAT I_~ ___________
E_N_D_O_F_TA_S_K ____________ ---, _________ !
STOP TIME: ___ _
- Cues are to be used only if JPM performance is being simulated in the plant.
JPM NRC P-1/Rev 0
+43' RAB Swgr Rm I1A EDG Rm Page 8 of 9
(
STEP 16 (7):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY the EDG is operating normally.
VERIFY normal operating CONDITIONS.
EXAMINER'S CUE:
If asked, frequency is 60 Hz and output voltage is 4160 volts. No alarms are present.
COMMENTS:
STEP (done):
NOTIFY the Control Room that the 1A Diesel Generator has been RESTORED in accordance with Appendix C.
I STANDARD:
NOTIFY Control Room that 1A EDG has been STARTED lAW 1-EOP-99, Appendix C.
EXAMINER'S CUE:
US acknowledges and tells the candidate that the Normal/Isolate switch for 1A EDG output breaker will be operated by an other Control Room Operator.
COMMENTS:
.~
E_N_D_O_F_TA_S_K ____________ ~
___.~ __
STOP TIME:
- Cues are to be used only if JPM performance is being simulated in the plant.
JPM NRC P-1/Rev 0
+43' RAB Swgr Rm I1A EDG Rm Page 8 of 9
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
o Unit 1 is in a Station Blackout event.
o The plant is stable in a hot standby condition, and 1-EOP-10, 'SBO', is being implemented.
o 1 B EDG started and tripped on overs peed and can NOT be reset.
o 1A EDG did NOT automatically start and can NOT be manually started from the Control Room.
INITIATING CUES:
The US has directed you to start the 1A EDG locally lAW 1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix C.
Page 9 of 10
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
o Unit 1 is in a Station Blackout event.
o The plant is stable in a hot standby condition, and 1-EOP-10, 'SBO', is being implemented.
o 1 B EDG started and tripped on overs peed and can NOT be reset.
o 1A EDG did NOT automatically start and can NOT be manually started from the Control Room.
INITIATING CUES:
The US has directed you to start the 1A EDG locally lAW 1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix C.
Page 9 of 10
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE LOCALLY OPERATE 1C AUXILIARY FEEDWATER PUMP NRC P-2 U1 Cable Spreading Room 11C AFW Pump Room Developed/Revised by: __
C~h.:..:.:.u~ck:.....:...R~oSLge~r-=--s __
Date Training Management Approval: _______
Date NRC JPM P-2 Rev 0 U1 Cable Spreading Room / 1C AFW Pump Room Page 1 of 7
(
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE LOCALLY OPERATE 1C AUXILIARY FEEDWATER PUMP NRC P-2 U1 Cable Spreading Room 11C AFW Pump Room Developed/Revised by: __
C=---h_uc-'-k_R_o->;Lge=---rs-=-----_
Date Training Management Approval: _______
Date NRC JPM P-2 Rev 0 U1 Cable Spreading Room 11C AFW Pump Room Page 1 of 7
Locally Operate 1C Auxiliary Feedwater Pump Faulted JPM?
No Facility JPM #:
0821054 K/A Rating(s):
061 A2.04 pump failure or improper operation 3.4/3.8 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the US reports that Steam Generator levels are rising.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other Performance Level:
Perform Simulate X
1-EOP-99, "Appendices/FigureslTables/Data Sheets," Appendix G, Local Operation of the 1 C Auxiliary Feedwater Pump Validation Time: 15 minutes Time Critical:
Tools/Equipment/Procedures Needed:
1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix G, Local Operation of the 1 C Auxiliary Feedwater Pump Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
Hot Steam Piping Hearing Protection Standard PPE Radiological Protection and RWP Requirements:
None NRC JPM P-2 Rev 0 U1 Cable Spreading Room / 1C AFW Pump Room Page 2 of 7 Locally Operate 1 C Auxiliary Feedwater Pump Faulted JPM?
No Facility JPM #:
0821054 KIA Rating(s):
061 A2.04 pump failure or improper operation 3.4 13.8 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the US reports that Steam Generator levels are rising.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other Performance Level:
Perform Simulate X
1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix G, Local Operation of the 1 C Auxiliary Feedwater Pump Validation Time: 15 minutes Time Critical:
Tools/Equipment/Procedures Needed:
1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix G, Local Operation of the 1 C Auxiliary Feedwater Pump Discuss Specific Safety Rules. Personal Protective Equipment and Hazards associated with the task.
Hot Steam Piping Hearing Protection Standard PPE Radiological Protection and RWP Requirements:
None NRC JPM P-2 Rev 0 U1 Cable Spreading Room / 1C AFW Pump Room Page 2 of 7
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
Locally Operate 1 C Auxiliary Feedwater Pump Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 is engaged in mitigating multiple events using 1-EOP-15, "Functional Recovery." 1 C AFW Pump operation can NOT be performed from the Control Room.
INITIATING CUES:
The US has directed you to locally operate the 1 C Auxiliary Feedwater Pump and associated valves lAW 1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix G, Local Operation of the 1C Auxiliary Feedwater Pump.
NRC JPM P-2 Rev 0 U1 Cable Spreading Room 11C AFW Pump Room Page 3 of 7 JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
Locally Operate 1 C Auxiliary Feedwater Pump Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 1 is engaged in mitigating multiple events using 1-EOP-15, "Functional Recovery." 1 C AFW Pump operation can NOT be performed from the Control Room.
INITIATING CUES:
The US has directed you to locally operate the 1 C Auxiliary Feedwater Pum p and associated valves lAW 1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix G, Local Operation of the 1 C Auxiliary Feedwater Pump.
NRC JPM P-2 Rev 0 U1 Cable Spreading Room 11C AFW Pump Room Page 3 of 7
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
STEP 1 (1 ):
STANDARD:
Appendix G, Local Operation of the 1C Auxiliary Feedwater Pump OPEN BOTH supply breakers to MV-08-3, 1 C AFW Pump Trip and Throttle Valve, on the 1 AB DC Bus.
60308 60310 POSITION 1 AB DC Bus Breaker 60308 to OFF.
EXAMINER'S CUE:
Bkr 60308 for MV-08-3 is positioned OFF POSITION 1AB DC Bus breaker 60310 to OFF.
EXAMINER'S CUE:
Bkr 60310 for MV-08-3 is positioned OFF COMMENTS:
STEP 2 (2):
STANDARD:
ENSURE BOTH 1 C AFW Pump motor operated discharge valves are CLOSED.
- MV-09-11 (1A S/G)
- MV-09-12(1BS/G)
ENSURE MV-09-11 is CLOSED.
EXAMINER'S CUE:
Control Room indicates MV-09-11 is closed (preferred)
Or MV-09-11 local position indicator is FULLY DOWN ENSURE MV-09-12 is CLOSED.
EXAMINER'S CUE:
COMMENTS:
Control Room indicates MV-09-12 is closed (preferred)
Or MV-09-12 local position indicator is FULLY DOWN CRITICAL STEP
__ SAT
__ UNSAT
__ SAT
__ UNSAT NRC JPM P-2 Rev 0 U1 Cable Spreading Room / 1C AFW Pump Room Page 4 of 7 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
STEP 1 (1 ):
STANDARD:
Appendix G, Local Operation of the 1 C Auxiliary Feedwater Pump OPEN BOTH supply breakers to MV-08-3, 1 C AFW Pump Trip and Throttle Valve, on the 1 AB DC Bus.
60308 60310 POSITION 1AB DC Bus Breaker 60308 to OFF.
EXAMINER'S CUE:
Bkr 60308 for MV-08-3 is positioned OFF POSITION 1AB DC Bus breaker 60310 to OFF.
EXAMINER'S CUE:
Bkr 60310 for MV-08-3 is positioned OFF COMMENTS:
STEP 2 (2):
STANDARD:
ENSURE BOTH 1 C AFW Pump motor operated discharge valves are CLOSED.
MV-09-11 (1A S/G)
MV-09-12 (1B S/G)
ENSURE MV-09-11 is CLOSED.
EXAMINER'S CUE:
Control Room indicates MV-09-11 is closed (preferred)
Or MV-09-11 local position indicator is FULLY DOWN ENSURE MV-09-12 is CLOSED.
EXAMINER'S CUE:
COMMENTS:
Control Room indicates MV-09-12 is closed (preferred)
Or MV-09-12 local position indicator is FULLY DOWN CRITICAL STEP SAT UNSAT SAT UNSAT NRC JPM P-2 Rev 0 U1 Cable Spreading Room 11C AFW Pump Room Page 4 of 7
STEP 3 (3):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ENSURE MV-08-3, 1 C AFW Pump Trip and Throttle Valve, is CLOSED.
OBSERVE MV-08-03 position. DETERMINES MV-08-3 is closed.
EXAMINER'S CUE:
MV-08-3 local position indicator is FULLY DOWN. Valve stem is showing threads.
EXAMINER'S NOTE: MV-08-3 is normally closed on Unit 1. MV-08-3 is normally open on Unit 2.
COMMENTS:
STEP 4 (4}:
ENSURE at least ONE steam supply valve to the 1 C AFW Pump is OPEN.
- MV-08-13
- MV-08-14 STANDARD:
OPEN either steam supply valve MV-08-13 or MV-08-14 by LATCHING the manual lever downward, and POSITIONING the valve handwheel fully COUNTER-CLOCKWISE OR Alternate method is to use the pushbuttons to open the valves.
EXAMINER'S CUE:
MV-08-13 or MV-08-14 local position indicator is FULLY UP.
EXAMINER'S NOTE:
If asked, the Control Room can not operate MV-08-13 or MV-08-14 COMMENTS:
STEP 5 (5}:
OPEN MV-08-03, 1 C AFW Pump Trip and Throttle Valve, as required to maintain 1 C AFW Pump discharge pressure approximately 100 psi greater than S/G(s) pressure.
STANDARD:
SLOWLY OPEN MV-08-3 and gradually RAISE turbine speed such that local discharge pressure gauge reads 100 psi> S/G pressure (Control Room communications are required for this & next JPM step).
EXAMINER'S CUE:
When asked, RCO reports SIG pressure is 900 psia; after candidate slowly opens MV-08-3, cue that handwheel ROTATED, and 1C AFW Pump discharge pressure (PI-09-7C) reads 1000 psia.
COMMENTS:
SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT NRC JPM P-2 Rev 0 U1 Cable Spreading Room / 1C AFW Pump Room Page 5 of 7
(
STEP 3 (3}:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ENSURE MV-08-3, 1C AFW Pump Trip and Throttle Valve, is CLOSED.
OBSERVE MV-08-03 position. DETERMINES MV-08-3 is closed.
EXAMINER'S CUE:
MV-08-3 local position indicator is FULLY DOWN. Valve stem is showing threads.
EXAMINER'S NOTE: MV-08-3 is normally closed on Unit 1. MV-08-3 is normally open on Unit 2.
COMMENTS:
STEP 4 (4}:
ENSURE at least ONE steam supply valve to the 1 C AFW Pump is OPEN.
- MV-08-13
- MV-08-14 STANDARD:
OPEN either steam supply valve MV-08-13 or MV-08-14 by LATCHING the manual lever downward, and POSITIONING the valve handwheel fully COUNTER-CLOCKWISE OR Alternate method is to use the pushbuttons to open the valves.
EXAMINER'S CUE:
MV-08-13 or MV-08-14 local position indicator is FULLY UP.
EXAMINER'S NOTE:
If asked, the Control Room can not operate MV-08-13 or MV-08-14 COMMENTS:
STEP 5 (5}:
OPEN MV-08-03, 1 C AFW Pump Trip and Throttle Valve, as required to maintain 1 C AFW Pump discharge pressure approximately 100 psi greater than S/G( s) pressure.
STANDARD:
SLOWLY OPEN MV-08-3 and gradually RAISE turbine speed such that local discharge pressure gauge reads 100 psi> S/G pressure (Control Room communications are required for this & next JPM step).
EXAMINER'S CUE:
When asked, RCO reports S/G pressure is 900 psia; after candidate slowly opens MV-08-3, cue that handwheel ROTATED, and 1C AFW Pump discharge pressure (PI-09-7C) reads 1000 psia.
COMMENTS:
SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT
-~
NRC JPM P-2 Rev 0 U1 Cable Spreading Room 11C AFW Pump Room Page 5 of 7
(
STEP 6 (6):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST OPEN the 1 C AFW Pump motor operated discharge valves(s) as directed by the Control Room to establish feedwater flow to the S/G(s).
OPEN either or both discharge valve(s) MV-09-11 or MV-09-12 by LATCHING the manual lever downward, and POSITIONING the valve handwheel fully COUNTER-CLOCKWISE to feed the Steam Generators, while in communication with the Control Room.
EXAMINER'S CUE:
As the candidate opens MV-09-11 and/or MV-09-12, cue that flow noise is heard in the respective feedwater pipes. 1 C AFW pump discharge pressure now reads 950 psia.
COMMENTS:
CRITICAL STEP SAT UNSAT END OF TASK r*~S~T~E~P--7~:~--~--A-p-p~lic-a-n~t-re~t~u-rn-s-t~o-s~te=p~5-a~n~d~t~hr~o~tt~le-s--M~V~-0~8~-~3~to~in-c-re-a-s-e-1~C~A~F~W~p-u-m-p+---~---------
STANDARD:
discharge pressure to 1000 psia.
SLOWLY OPEN MV-08-3 and gradually RAISE turbine speed such that local discharge pressure gauge reads 1000 psi (Control Room communications are required for this).
EXAMINER'S CUE: Cue that handwheel on MV-08-3 ROTATED COUNTER CLOCKWISE, and 1C AFW Pump discharge pressure (PI-09-7C) reads 1000 psia. US reports that level is rising in the respective S/G(s).
COMMENTS:
END OF TASK STOP TIME: ___ _
CRITICAL STEP SAT UNSAT NRC JPM P-2 Rev 0 U1 Cable Spreading Room 11C AFW Pump Room Page 6 of 7
(
STEP 6 (6):
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST OPEN the 1 C AFW Pump motor operated discharge valves(s) as directed by the Control Room to establish feedwater flow to the S/G(s).
CRITICAL STANDARD:
STEP OPEN either or both discharge valve(s) MV-09-11 or MV-09-12 by LATCHING the manual lever downward, and POSITIONING the valve SAT handwheel fully COUNTER-CLOCKWISE to feed the Steam Generators, while in communication with the Control Room.
EXAMINER'S CUE:
As the candidate opens MV-09-11 and/or MV-09-12, cue that flow noise is heard in the respective feedwater pipes. 1C AFW pump discharge pressure now reads 950 psia.
COMMENTS:
UNSAT END OF TASK r*~=~~------~~--------~~~=-~~~~~~~~------------~----+-------~*------
STEP 7:
Applicant returns to step 5 and throttles MV-08-3 to increase 1 C AFW pump discharge pressure to 1000 psia.
CRITICAL STANDARD:
SLOWLY OPEN MV-08-3 and gradually RAISE turbine speed such that local discharge pressure gauge reads 1000 psi (Control Room communications are required for this).
EXAMINER'S CUE: Cue that handwheel on MV-08-3 ROTATED COUNTER CLOCKWISE, and 1C AFW Pump discharge pressure (PI-09-7C) reads 1000 psia. US reports that level is rising in the respective S/G(s).
COMMENTS:
END OF TASK STOP TIME: ___
STEP SAT UNSAT NRC JPM P-2 Rev 0 U1 Cable Spreading Room 11C AFW Pump Room Page 6 of 7
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 1 is engaged in mitigating multiple events using 1-EOP-15, "Functional Recovery." 1 C AFW Pump operation can NOT be performed from the Control Room.
INITIATING CUES:
The US has directed you to locally operate the 1 C Auxiliary Feedwater Pump and associated valves lAW 1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix G, Local Operation of the 1 C Auxiliary Feedwater Pump.
Page 7 of 7
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 1 is engaged in mitigating multiple events using 1-EOP-15, "Functional Recovery." 1C AFW Pump operation can NOT be performed from the Control Room.
INITIATING CUES:
The US has directed you to locally operate the 1 C Auxiliary Feedwater Pum p and associated valves lAW 1-EOP-99, "Appendices/Figures/Tables/Data Sheets," Appendix G, Local Operation of the 1 C Auxiliary Feedwater Pump.
Page 7 of 7
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE HYDROGEN PURGE SYSTEM OPERATION - UNIT 1 Unit 1 RAB 43' FAN ROOM NRC P-3 Developed/Revised by: __
C-"-h_a---'-rle---'---s_R_o""--'ge-----'rs'---_
Training Management Approval ______
Date Date NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 1 of 11
(
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE HYDROGEN PURGE SYSTEM OPERATION - UNIT 1 Unit 1 RAB 43 1 FAN ROOM NRC P-3 Developed/Revised by:
Charles Rogers Training Management Approval --------
Date Date NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 1 of 11
Hydrogen Purge System Operation - Unit 1 Faulted JPM?
No Facility JPM #:
0821098 K/A Rating(s):
028 A4.01 HRPS controls 4.0 /4.0 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the Hydrogen Purge System is in operation with a 100 CFM flowrate established.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other 1-EOP-99, Appendix N, Hydrogen Purge System Operation Validation Time: 20 minutes Tools/Equipment/Procedures Needed:
1-EOP-99, Appendix N, Hydrogen Purge System Operation Performance Level:
Perform Simulate X
Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
RWP Required NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 2 of 11
(
Hydrogen Purge System Operation - Unit 1 Faulted JPM?
No Facility JPM #:
0821098 K/A Rating(s):
028 A4.01 HRPS controls 4.0 I 4.0 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the Hydrogen Purge System is in operation with a 100 CFM flowrate established.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other 1-EOP-99, Appendix N, Hydrogen Purge System Operation Validation Time: 20 minutes Tools/Equipment/Procedures Needed:
1-EOP-99, Appendix N, Hydrogen Purge System Operation Performance Level:
Perform Simulate X
Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
RWP Required NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 2 of 11
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
Hydrogen Purge System Operation - Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system lAW 1-EOP-99, Appendix N. Establish a 1 OOCFM flowrate using HVE-7B.
NOTE TO EXAMINER:
Initiating cue identifies student as SNPO. Since on-shift SNPO would have key for Purge Valve Room on 19.5' elevation, examiner will obtain key prior to start of JPM and give to student when discussing tools needed for this task.
NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 3 of 11
(
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
Hydrogen Purge System Operation - Unit 1 The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system lAW 1-EOP-99, Appendix N. Establish a 1 OOCFM flowrate using HVE-7B.
NOTE TO EXAMINER:
Initiating cue identifies student as SNPO. Since on-shift SNPO would have key for Purge Valve Room on 19.5' elevation, examiner will obtain key prior to start of JPM and give to student when discussing tools needed for this task.
NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 3 of 11
START TIME: ___
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Operate the Containment Hydrogen Purge System as follows:
STEP 1 (1):
ENSURE ONE RAB Main Exhaust Fan, HVE-10A (B), is RUNNING, if available.
SAT STANDARD:
ENSURE HVE-10A or HVE-10B is RUNNING UNSAT EXAMINER'S CUE:
HVE-10B is RUNNING (from initiating cue)
COMMENTS:
STEP 2 (2) :
VERIFY the following valves are LOCKED CLOSED:
V25015, Pen.58 to HVE-7A / 7B Gate - Filter Bypass
-- SAT STANDARD:
VERIFY V25015 is LOCKED CLOSED
-- UNSAT EXAMINER'S CUE:
V25015 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED.
EVALUATOR'S NOTE: Penetration 58 is between filter train and containment wall COMMENTS:
STEP 3 (2) :
VERIFY the following valves are LOCKED CLOSED:
SAT V-25-16, Pen. 58 to HVE-7A / 7B Gate - Filter Bypass STANDARD:
VERIFY V-25-16 is LOCKED CLOSED UNSAT EXAMINER'S CUE:
V-25-16 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED EVALUATOR'S NOTE: Penetration 58 is between filter train and containment wall COMMENTS:
NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 4 of 11
(
(
START TIME: ___
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Operate the Containment Hydrogen Purge System as follows:
STEP 1 (1}:
ENSURE ONE RAB Main Exhaust Fan, HVE-1 OA (B), is RUNNING, if available.
SAT STANDARD:
ENSURE HVE-1 OA or HVE-1 OB is RUNNING UNSAT EXAMINER'S CUE:
HVE-108 is RUNNING (from initiating cue)
COMMENTS:
STEP 2 (2}:
VERIFY the following valves are LOCKED CLOSED:
V25015, Pen.58 to HVE-7 A / 7B Gate - Filter Bypass
-- SAT STANDARD:
VERIFY V25015 is LOCKED CLOSED
-- UNSAT EXAMINER'S CUE:
V25015 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED.
EVALUATOR'S NOTE: Penetration 58 is between filter train and containment wall COMMENTS:
STEP 3 (2}:
VERIFY the following valves are LOCKED CLOSED:
SAT V-25-16, Pen. 58 to HVE-7A / 7B Gate - Filter Bypass STANDARD:
VERIFY V-25-16 is LOCKED CLOSED UNSAT EXAMINER'S CUE:
V-25-16 handwheel ROTATED CLOCKWISE until hard stop REACHED and LOCKED EVALUATOR'S NOTE: Penetration 58 is between filter train and containment wall COMMENTS:
NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 4 of 11
STEP 4 (3} :
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CLOSE FCV-25-9, Pen-57 to HVE-7 Intake DEPRESS the CLOSE pushbutton for FCV-25-9 until FCV-25-9 indicates CLOSED.
EXAMINER'S CUE:
FCV-25-9 is CLOSED.
EVALUATOR'S NOTE: The pushbutton for FCV-25-9 is located inside CRITICAL STEP SAT UNSAT Junction Box B1117 on the column south west of FCV-25-9.
The valve position indicator is located on the outside cover of Junction Box B1117. Position indication can also be verified by using the dial indicator and mechanical pointer located on FCV-25-9.
COMMENTS:
STEP 5 (4) :
UNLOCK and OPEN the following valves:
V25013, Pen. 57 to HVE-7A /78 Gate Suction STANDARD:
UNLOCK and OPEN V25013 EXAMINER'S CUE:
V25013 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE: Penetration 57 is between filter train and containment wall COMMENTS:
CRITICAL STEP SAT UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 5 of 11 STEP 4 (3):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CLOSE FCV-25-9, Pen-57 to HVE-7 Intake DEPRESS the CLOSE pushbutton for FCV-25-9 until FCV-25-9 indicates CLOSED.
EXAMINER'S CUE:
FCV-25-9 is CLOSED.
EVALUATOR'S NOTE: The pushbutton for FCV-25-9 is located inside CRITICAL STEP SAT UNSAT Junction 80x 81117 on the column south west of FCV-25-9.
The valve position indicator is located on the outside cover of Junction 80x 81117. Position indication can also be verified by using the dial indicator and mechanical pointer located on FCV-25-9.
COMMENTS:
STEP 5 (4):
UNLOCK and OPEN the following valves:
V25013, Pen. 57 to HVE-7A 17B Gate Suction STANDARD:
UNLOCK and OPEN V25013 EXAMINER'S CUE:
V25013 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE: Penetration 57 is between filter train and containment wall COMMENTS:
CRITICAL STEP SAT UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 5 of 11
STEP 6 (4}:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST UNLOCK and OPEN the following valves:
V-25-14, Pen. 57 to HVE-7A I 7B Gate Suction STANDARD:
UNLOCK and OPEN V-25-14 EXAMINER'S CUE:
V-25-14 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE: Penetration 57 is between filter train and containment wall COMMENTS:
STEP 7 (5}:
VERIFY V-25-18, HVE-7A I 7B Disch. Gate to SBVS, is CLOSED.
STANDARD:
VERIFY V-25-18 is CLOSED EXAMINER'S CUE:
V-25-18 handwheel ROTATED CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE: V-25-18 is located next to V-25-17 in overhead COMMENTS:
STEP 8 (6}:
OPEN V-25-17, "HVE-7A/7B Disch. Gate to Vent Stack."
STANDARD:
POSITION V-25-17 to OPEN EXAMINER'S CUE:
V-25-17 handwheel ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE: Valve is above HVE-68 COMMENTS:
CRITICAL STEP SAT UNSAT SAT UNSAT CRITICAL STEP SAT UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 6 of 11
(
STEP 6 (4) :
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST UNLOCK and OPEN the following valves:
V-25-14, Pen. 57 to HVE-7 A / 7B Gate Suction STANDARD:
UNLOCK and OPEN V-25-14 EXAMINER'S CUE:
V-25-14 handwheel UNLOCKED and ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE: Penetration 57 is between filter train and containment wall COMMENTS:
STEP 7 (5):
VERIFY V-25-18, HVE-7A / 7B Disch. Gate to SBVS, is CLOSED.
STANDARD:
VERIFY V-25-18 is CLOSED EXAMINER'S CUE:
V-25-18 handwheel ROTATED CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE: V-25-18 is located next to V-25-17 in overhead COMMENTS:
STEP 8 (6):
OPEN V-25-17, "HVE-7A/7B Disch. Gate to Vent Stack."
STANDARD:
POSITION V-25-17 to OPEN EXAMINER'S CUE:
V-25-17 handwheel ROTATED COUNTER CLOCKWISE until hard stop REACHED EVALUATOR'S NOTE: Valve is above HVE-68 COMMENTS:
CRITICAL STEP SAT UNSAT SAT UNSAT CRITICAL STEP SAT UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 6 of 11 I
STEP 9 (7):
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST UNLOCK and OPEN the following valves:
V25011, Makeup Air Before Pen. 56 Gate (19.5' Elev.)
STANDARD:
UNLOCK and OPEN V25011 EXAMINER'S CUE: When candidate reaches this step state that V25011 handwheel has been UNLOCKED and OPENED by an other operator.
EVALUATOR'S NOTE: Located in the Purge valve room, 19.5' between the RAB and Fuel Handling Bldg COMMENTS:
STEP 10 (7):
UNLOCK and OPEN the following valves:
V-25-12, Makeup Air Before Pen. 56 Gate (19.5' Elev.)
STANDARD:
UNLOCK and OPEN V-25-12 EXAMINER'S CUE:
When candidate reaches this step state that V-25-12 handwheel has been UNLOCKED and OPENED by an other operator.
EVALUATOR'S NOTE: Located in the Purge valve room, 19.5' between the RAB and Fuel Handling Bldg COMMENTS:
CRITICAL STEP
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 7 of 11
(
(
STEP 9 (7):
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST UNLOCK and OPEN the following valves:
V25011, Makeup Air Before Pen. 56 Gate (19.5' Elev.)
STANDARD:
UNLOCK and OPEN V25011 EXAMINER'S CUE: When candidate reaches this step state that V25011 handwheel has been UNLOCKED and OPENED by an other operator.
EVALUATOR'S NOTE: Located in the Purge valve room, 19.5' between the RAB and Fuel Handling Bldg COMMENTS:
STEP 10 (7):
UNLOCK and OPEN the following valves:
V-25-12, Makeup Air Before Pen. 56 Gate (19.5' Elev.)
STANDARD:
UNLOCK and OPEN V-25-12 EXAMINER'S CUE:
When candidate reaches this step state that V-25-12 handwheel has been UNLOCKED and OPENED by an other operator.
EVALUATOR'S NOTE: Located in the Purge valve room, 19.5' between the RAB and Fuel Handling Bldg COMMENTS:
CRITICAL STEP SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 7 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE Hydrogen Purge Fans will not operate if FCV-25-1 0 position is between full closed and approximately 10% open.
STEP 11 (8):
ENSURE FCV-25-10, HVS-4 Plenum to HVE-7 Intake, is THROTTLED OPEN.
STANDARD:
POSITION FCV-25-10 to THROTTLED OPEN.
EXAMINER'S CUE:
FCV-25-10 IS ROTATED COUNTER CLOCKWISE, currently at 50%.
EVALUATOR'S NOTE: Control panel is located on column near north end of the 6A filter train COMMENTS:
STEP 12 (9):
START ONE Hydrogen Purge Fan.
HVE-7A OR HVE-7B STANDARD:
DEPRESS START pushbutton for HVE-7B, (from initiating cue)
EXAMINER'S CUE:
HVE-7B RED light ON, GREEN light OFF.
EVALUATOR'S NOTE: Control panel is located on column next to fans COMMENTS:
CRITICAL STEP
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT STEP 13 (10):
THROTTLE OPEN FCV-25-9, Pen-57 to HVE-7 Intake, to obtain between CRITICAL STANDARD:
90 and 100 CFM on FR-25-1, Local Flow Recorder STEP DEPRESS THE OPEN PUSHBUTTON to obtain desired flowrate of between 90 and 100cfm
__ SAT EXAMINER'S CUE: FCV-25-9 rotating COUNTER CLOCKWISE, FR-25-1 INDICATES approximately 95cfm
__ UNSAT COMMENTS:
NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 8 of 11
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE Hydrogen Purge Fans will not operate if FCV-25-1 0 position is between full closed and approximately 10% open.
STEP 11 (8):
ENSURE FCV-25-10, HVS-4 Plenum to HVE-7Intake, is THROTTLED OPEN.
STANDARD:
POSITION FCV-25-10 to THROTTLED OPEN.
EXAMINER'S CUE:
FCV-25-10 IS ROTATED COUNTER CLOCKWISE, currently at 50%.
EVALUATOR'S NOTE: Control panel is located on column near north end of the 6A filter train COMMENTS:
STEP 12 (9):
START ONE Hydrogen Purge Fan.
STANDARD:
HVE-7A OR HVE-7B DEPRESS START pushbutton for HVE-7B, (from initiating cue)
EXAMINER'S CUE:
HVE-7B RED light ON, GREEN light OFF.
EVALUATOR'S NOTE: Control panel is located on column next to fans COMMENTS:
CRITICAL STEP SAT
__ UNSAT CRITICAL STEP SAT
__ UNSAT STEP 13 (10):
THROTTLE OPEN FCV-25-9, Pen-57 to HVE-7 Intake, to obtain between CRITICAL 90 and 100 CFM on FR-25-1, Local Flow Recorder STEP STANDARD:
DEPRESS THE OPEN PUSHBUTTON to obtain desired flowrate of SAT between 90 and 100cfm EXAMINER'S CUE: FCV-25-9 rotating COUNTER CLOCKWISE, FR-25-1 INDICATES approximately 95cfm COMMENTS:
__ UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 8 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE
- High charcoal temperatures are postulated to occur only as a result of restricted air flows rates less than 55 cfm.
- Iodine desorption occurs at approximately 300°F and charcoal ignition at approximately 640°F STEP 14 ( 11 ):
MONITOR the following on TR-25-2 in the Control Room Channel 1, Before Hydrogen Purge Charcoal Absorber (TE-25-18)
Channel 2, Hydrogen Purge Charcoal Absorber (TE-25-19)
Channel 3, Hydrogen Purge Charcoal Absorber (TE-25-20)
Channel 4, After Hydrogen Purge Charcoal Absorber (TE-25-21)
STANDARD:
REQUEST Control Room Monitor the above points on TR-25-2 EXAMINER'S CUE:
Control Room is MONITORING Channels 1, 2, 3 & 4.
COMMENTS:
NOTE Hydrogen Purge Fans will not operate if FCV-25-10 position is between full closed and approximately 10% open.
STEP 15 (12}:
ADJUST FCV-25-10 to maintain charcoal absorber temperature below alarm set point on TR-25-2 (RTGB-106).
STANDARD:
OPEN FCV-25-10 as necessary to MAINTAIN temperature <190°F EXAMINER'S CUE:
Control Room informs you that TR-25-2 is Indicating 190°F and Increasing. RCO DIRECTS you to ADJUST flow to MAINTAIN temperature at <190°F.
If asked, Alarm Setpoint is 190°F.
EXAMINER'S CUE:
Open Pushbutton DEPRESSED momentarily, Control Informs you that TR-25-2 is INDICATING 175°F and Stable EVALUATOR'S NOTE: Located on the east side of the filter train, Indications by local TE: TI-25-HVE-7-1 and TI-25-HVE-7-2 COMMENTS:
SAT UNSAT CRITICAL STEP SAT UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 9 of 11
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE
- High charcoal temperatures are postulated to occur only as a result of restricted air flows rates less than 55 cfm.
- Iodine desorption occurs at approximately 300°F and charcoal ignition at approximately 640°F STEP 14 (11 ):
MONITOR the following on TR-25-2 in the Control Room Channel 1, Before Hydrogen Purge Charcoal Absorber (TE-25-18)
Channel 2, Hydrogen Purge Charcoal Absorber (TE-25-19)
Channel 3, Hydrogen Purge Charcoal Absorber (TE-25-20)
Channel 4, After Hydrogen Purge Charcoal Absorber (TE-25-21)
STANDARD:
REQUEST Control Room Monitor the above points on TR-25-2 EXAMINER'S CUE:
Control Room is MONITORING Channels 1, 2, 3 & 4.
COMMENTS:
NOTE Hydrogen Purge Fans will not operate if FCV-25-1 0 position is between full closed and approximately 10% open.
STEP 15 (12}:
ADJUST FCV-25-10 to maintain charcoal absorber temperature below alarm set point on TR-25-2 (RTGB-1 06).
STANDARD:
OPEN FCV-25-10 as necessary to MAINTAIN temperature <190°F EXAMINER'S CUE:
Control Room informs you that TR-25-2 is Indicating 190°F and Increasing. RCO DIRECTS you to ADJUST flow to MAINTAIN temperature at <190°F.
If asked, Alarm Setpoint is 190°F.
EXAMINER'S CUE:
Open Pushbutton DEPRESSED momentarily, Control Informs you that TR-25-2 is INDICATING 175°F and Stable EVALUATOR'S NOTE: Located on the east side of the filter train, Indications by local TE: TI-25-HVE-7-1 and TI-25-HVE-7-2 COMMENTS:
SAT UNSAT CRITICAL STEP SAT UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 9 of 11
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 16 (13):
Monitor Plant Stack radiation levels and Containment hydrogen concentration during purge operation.
STANDARD:
REQUEST Control Room to MONITOR radiation and hydrogen levels EXAMINER'S CUE:
Control Room Informs you that they will Monitor Plant Vent Radiation levels, and containment hydrogen concentration.
COMMENTS:
END OF TASK STOP TIME: ___ _
SAT UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 10 of 11 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 16 (13):
Monitor Plant Stack radiation levels and Containment hydrogen concentration during purge operation.
STANDARD:
REQUEST Control Room to MONITOR radiation and hydrogen levels EXAMINER'S CUE:
Control Room Informs you that they will Monitor Plant Vent Radiation levels, and containment hydrogen concentration.
COMMENTS:
END OF TASK STOP TIME: ___ _
SAT UNSAT NRC JPM P-3 Rev 0 Unit 1 RAB 43' FAN ROOM Page 10 of 11
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system lAW 1-EOP-99, Appendix N. Establish a 100CFM flowrate using HVE-7B.
NRC P-3 Page 11 of 11
(-
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The unit is engaged in mitigating a LOCA. SIAS has been reset and RAB Main Exhaust Fan, HVE-10B is running. The TSC and Chemistry have given permission to place the Hydrogen Purge System in operation to ventilate the Containment.
INITIATING CUES:
You are the SNPO. You have been directed by the Unit Supervisor to locally operate the Hydrogen Purge system lAW 1-EOP-99, Appendix N. Establish a 1 OOCFM flowrate using HVE-7B.
NRC P-3 Page 11 of 11
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO A LEAKING POWER OPERATED RELIEF VALVE - UNIT 2 NRC S-1 Developed/Revised by: __
---'La---'rr"--y R,--iC-,,--h __
Training Management Approval: -------
Date JPM NRC S-1 Rev.O Simulator Page 1 of 8
(
(
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO A LEAKING POWER OPERATED RELIEF VALVE - UNIT 2 NRC S-1 Developed/Revised by: ___
La_rr1---y _Ri_ch __
Training Management Approval: -------
Date JPM NRC S-1 Rev.O Simulator Page 1 of 8
JOB PERFORMANCE MEASURE Task:
Respond to a leaking Power Operated Relief Valve Faulted JPM?
Yes Facility JPM #:
Modified from facility JPM 0821048 to make faulted KIA Rating(s):
. 010 A2.03 PORV failures 3.9 I 3.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the Reactor has been manually tripped prior to exceeding the automatic TMLP trip.
Evaluation Location:
Simulator X
References:
In Plant Lab Other ONOP 2-0120036, "Pressurizer Relief/Safety Valve" 2-ARP-01-HOO, Annunciator Response Procedure Validation Time: 10 minutes Tools/Equipment/Procedures Needed:
ONOP 2-0120036, "Pressurizer Relief/Safety Valve" Performance Level:
Perform X
Simulate Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-1 Rev.O Simulator Page 2 of 8
(
JOB PERFORMANCE MEASURE Task:
Respond to a leaking Power Operated Relief Valve Faulted JPM?
Yes Facility JPM #:
Modified from facility JPM 0821048 to make faulted KIA Rating(s):
010 A2.03 PORV failures 3.9 / 3.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the Reactor has been manually tripped prior to exceeding the automatic TMLP trip.
Evaluation Location:
Simulator X
References:
In Plant Lab Other ONOP 2-0120036, "Pressurizer Relief/Safety Valve" 2-ARP-01-HOO, Annunciator Response Procedure Validation Time: 10 minutes Tools/Equipment/Procedures Needed:
ONOP 2-0120036, "Pressurizer Relief/Safety Valve" Performance Level:
Perform X
Simulate Time Critical:
No Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-1 Rev.O Simulator Page 2 of 8
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is:
Respond to a Leaking Power Operated Relief Valve - Unit 2 The performance level to be used for this JPM is Perform This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state conditions, MOL. Annunciator H-32, QT LEVEL HIGH/LOW, has activated. The ARP for H-32 has been addressed. Quench Tank level, temperature, and pressures are rising slowly.
INITIATING CUES:
You are the Desk RCO. The US has directed you to respond to the off-normal condition per ONP 2-0120036, "Pressurizer Relief/Safety Valve" off-normal procedure.
JPM NRC S-1 Rev.O Simulator Page 3 of 8
(
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS SPECIFIC DIRECTIONS:
The task you are to perform is:
Respond to a Leaking Power Operated Relief Valve - Unit 2 The performance level to be used for this JPM is Perform This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state conditions, MOL. Annunciator H-32, QT LEVEL HIGH/LOW, has activated. The ARP for H-32 has been addressed. Quench Tank level, temperature, and pressures are rising slowly.
INITIATING CUES:
You are the Desk RCO. The US has directed you to respond to the off-normal condition per ONP 2-0120036, "Pressurizer Relief/Safety Valve" off-normal procedure.
JPM NRC S-1 Rev.O Simulator Page 3 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
STEP 1 (7.2.1.A)
STANDARD:
ONP 2-0120036, "Pressurizer Relief/Safety Valve" Determine which PORV is open or leaking by observing acoustic flow monitors or PORV position indicating lights.
OBSERVE acoustic flow monitors and valve position indication for V14 7 4 and V1475 for ABNORMAL indication. Determines V 1474, in service PORV is leaking.
EXAMINER'S CUE:
NONE EXAMINERS NOTE: One acoustic monitor may be illuminated COMMENTS:
STEP 2: (7.2.1.B)
If a PORV has failed OPEN, Then place the control switch to OVERRIDE position and verify valve closure by:
STANDARD:
DETERMINE that V1474 has NOT FAILED OPEN EXAMINER'S CUE:
None EXAMINERS NOTE: If Applicant goes to 'Override" this will have no effect.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
__ UNSAT SAT
__ UNSAT JPM NRC S-1 Rev. 0 Simulator Page 4 of 8 I I
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
ONP 2-0120036, "Pressurizer Relief/Safety Valve" STEP 1 (7.2.1.A}
Determine which PORV is open or leaking by observing acoustic flow monitors or PORV position indicating lights.
STANDARD:
OBSERVE acoustic flow monitors and valve position indication for V1474 and V1475 for ABNORMAL indication. Determines V 1474, in service PORV is leaking.
EXAMINER'S CUE:
NONE EXAMINERS NOTE: One acoustic monitor may be illuminated COMMENTS:
STEP 2: (7.2.1.B}
If a PORV has failed OPEN, Then place the control switch to OVERRIDE position and verify valve closure by:
STANDARD:
DETERMINE that V1474 has NOT FAILED OPEN EXAMINER'S CUE:
None EXAMINERS NOTE: If Applicant goes to 'Override" this will have no effect.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT JPM NRC S-1 Rev. 0 Simulator Page 4 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (7.2.1.C}
li PORVs start to show signs of leakage as indicated by either tailpipe temperature greater than 210°F.Q[ tailpipe temperature greater than 190°F and other parameters indicate leakage (i.e.,
Quench Tank or acoustic parameters), Then PERFORM the following as necessary:
- 1.
liV1474 indicates flow, Then close PORV Block valve V1476 and verify temperature decreases on TIA-111 O.
STANDARD:
OBSERVE TIA-111 0 is > 190°F and acoustic monitor shows flow to VERIFY V1474 indicates LEAKAGE. POSITION PORV Block V1476 control switch to CLOSE.
EXAMINER'S CUE: NONE EXAMINERS NOTE: Applicant may energize all available Pressurizer heaters in response to lowering pressure.
COMMENTS:
STEP 4 (7.2.1.D}
Place the alternate PORV in service if available.
STANDARD:
POSITION PORV Block Valve, V1477 to OPEN.
EXAMINER'S CUE:
NONE, or if Applicant calls the SNPO to attempt to reset the PORV block valve breaker, the SNPO will call back in about one minute and state the breaker will not reset.
EXAMINERS NOTE: When block valve is taken to open, at approximately 50%
valve position the breaker will trip. Block valve indication will be lost. PORV V1477 will leak substantially. Pressurizer pressure will continue to lower. The applicant will be required to manually trip the Reactor prior to RPS TMLP automatic trip.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT FAULTED STEP SAT UNSAT JPM NRC S-1 Rev. 0 Simulator Page 5 of 8
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (7.2.1.C)
If PORVs start to show signs of leakage as indicated by either tailpipe temperature greater than 21 OaF ~
tailpipe temperature greater than 190°F and other parameters indicate leakage (Le.,
Quench Tank or acoustic parameters), Then PERFORM the following as necessary:
- 1.
If V14 7 4 indicates flow, Then close PORV Block valve V1476 and verify temperature decreases on TIA-111 O.
STANDARD:
OBSERVE TIA-111 0 is> 190°F and acoustic monitor shows flow to VERIFY V1474 indicates LEAKAGE. POSITION PORV Block V1476 control switch to CLOSE.
EXAMINER'S CUE: NONE EXAMINERS NOTE: Applicant may energize all available Pressurizer heaters in response to lowering pressure.
COMMENTS:
STEP 4 (7.2.1.D}
Place the alternate PORV in service if available.
STANDARD:
POSITION PORV Block Valve, V1477 to OPEN.
EXAMINER'S CUE:
NONE, or if Applicant calls the SNPO to attempt to reset the PORV block valve breaker, the SNPO will call back in about one minute and state the breaker will not reset.
EXAMINERS NOTE: When block valve is taken to open, at approximately 50%
valve position the breaker will trip. Block valve indication will be lost. PORV V1477 will leak substantially. Pressurizer pressure will continue to lower. The applicant will be required to manually trip the Reactor prior to RPS TMLP automatic trip.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT FAULTED STEP SAT UNSAT JPM NRC S-1 Rev. 0 Simulator Page 5 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done):
Manually trip the Reactor STANDARD:
DETERMINES Pressurizer pressure is lowering and cannot be maintained.
Trips the Reactor prior to RPS TMLP automatic trip.
EXAMINER'S CUE:
US ACKNOWLEDGES Manual trip is inserted EXAMINERS NOTE:
Applicant should trip the Reactor when 2/4 TMLP pre trips are present.
COMMENTS:
END OF TASK STOP TIME:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT JPM NRC S-1 Rev. 0 Simulator Page 6 of 8
(
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP (done):
Manually trip the Reactor STANDARD:
DETERMINES Pressurizer pressure is lowering and cannot be maintained.
Trips the Reactor prior to RPS TMLP automatic trip.
EXAMINER'S CUE:
US ACKNOWLEDGES Manual trip is inserted EXAMINERS NOTE:
Applicant should trip the Reactor when 2/4 TMLP pre trips are present.
COMMENTS:
END OF TASK STOP TIME:
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT JPM NRC S-1 Rev. 0 Simulator Page 6 of 8
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP RESTORE IC-74 100% power. Unfreeze the simulator ENSURE recorders are NOT FROZEN ENSURE Annunciator H-32, QT LEVEL HIGH/LOW, has activated and QT temperature and pressure are rising.
EXECUTE 8-1, Placing alternate PORV in service. Freeze the simulator. Leak on V1475 auto triggers on V1477 red light. V1477 breaker trips when valve is approximately 50% open (7 seconds).
JPM NRC S-1 Rev. 0 Simulator Page 7 of 8
(
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP RESTORE IC-74 100% power. Unfreeze the simulator ENSURE recorders are NOT FROZEN ENSURE Annunciator H-32, OT LEVEL HIGH/LOW, has activated and OT temperature and pressure are rising.
EXECUTE 8-1, Placing alternate PORV in service. Freeze the simulator. Leak on V1475 auto triggers on V1477 red light. V1477 breaker trips when valve is approximately 50% open (7 seconds).
JPM NRC S-1 Rev. 0 Simulator Page 7 of 8
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state conditions, MOL. Annunciator H-32, QT LEVEL HIGH/LOW, has activated. The ARP for H-32 has been addressed. Quench Tank level, temperature, and pressures are rising slowly.
INITIATING CUES:
You are the Desk RCa. The US has directed you to respond to the off-normal condition per ONP 2-0120036, "Pressurizer Relief/Safety Valve" off-normal procedure.
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state conditions, MOL. Annunciator H-32, QT LEVEL HIGH/LOW, has activated. The ARP for H-32 has been addressed. Quench Tank level, temperature, and pressures are rising slowly.
INITIATING CUES:
You are the Desk RCO. The US has directed you to respond to the off-normal condition per ONP 2-0120036, "Pressurizer Relief/Safety Valve" off-normal procedure.
e FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM 184 DAY 2A DIESEL GENERATOR SURVEILLANCE NRC S-2 Developed/Revised by: __
-=La-,rryL-R-,ic.:.......:h __
Training Management Approval: -------
'l-/¥-tJfj Date Date JPM NRC S-2 Rev 0 SIMULATOR Page 1 of 14
\\
(
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE PERFORM 184 DAY 2A DIESEL GENERATOR SURVEILLANCE NRC S-2 Developed/Revised by:
Larry Rich Training Management Approval: -------
Date JPM NRC S-2 Rev 0 SIMULATOR Page 1 of 14
JOB PERFORMANCE MEASURE Task: Perform 184 day Diesel Generator Surveillance.
Alternate Path JPM?
Yes Facility JPM #:
N/A K/A Rating(s):
064 A2.02 Load, VARS, etc. 2.7 I 2.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is completed when the 2A Diesel Generator has been manually tripped.
Evaluation Location:
Performance Level:
Simulator X
References:
In Plant Lab Other Perform X
.2-0SP-59.01A 2A Emergency Diesel Generator Monthly Surveillance Simulate Discuss Validation Time: 20 minutes Time Critical:
Tools/Equipment/Procedures Needed:
2-0SP-59.01A 2A Emergency Diesel Generator Monthly Surveillance Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-2 Rev 0 SIMULATOR Page 2 of 14
(
JOB PERFORMANCE MEASURE Task: Perform 184 day Diesel Generator Surveillance.
Alternate Path JPM?
Yes Facility JPM #:
N/A K/A Rating(s):
064 A2.02 Load, VARS, etc. 2.7/2.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is completed when the 2A Diesel Generator has been manually tripped.
Evaluation Location:
Performance Level:
Simulator X
References:
In Plant Lab Other Perform X
2-0SP-59.01A 2A Emergency Diesel Generator Monthly Surveillance Simulate Discuss Validation Time: 20 minutes Time Critical:
Tools/Equipment/Procedures Needed:
2-0SP-59.01 A 2A Emergency Diesel Generator Monthly Surveillance Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-2 Rev 0 SIMULATOR Page 2 of 14
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Perform 184 day Diesel Generator Surveillance.
The performance level to be used for this JPM is PERFORM.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the aSSigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is at 100% power steady state. No equipment is out of service.
INITIATING CUES:
The US directs you to perform the 184 day 2A Emergency Diesel Generator Surveillance starting with step 7.1.24 of 2-0SP-59.01 A 2A Emergency Diesel Generator Monthly Surveillance.
All previous steps have been completed and Signed off by the SNPO.
NOTE: Examiner will time the Hz when directed by you.
JPM NRC S-2 Rev 0 SIMULATOR Page 3 of 14 SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Perform 184 day Diesel Generator Surveillance.
The performance level to be used for this JPM is PERFORM.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the aSSigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is at 100% power steady state. No equipment is out of service.
INITIATING CUES:
The US directs you to perform the 184 day 2A Emergency Diesel Generator Surveillance starting with step 7.1.24 of 2-0SP-59.01 A 2A Emergency Diesel Generator Monthly Surveillance.
All previous steps have been completed and signed off by the SNPO.
NOTE: Examiner will time the Hz when directed by you.
JPM NRC S-2 Rev 0 SIMULATOR Page 3 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
STEP 1: (7.1.24) 2-0SP-59.01A 2A Emergency Diesel Generator Monthly Surveillance Information step informing the Operator to use a stop watch and perform a fast start of the 2A Diesel Generator. Start time will be recorded when the start switch is taken to START and the RTGS meters FIRST reach approximately 60 HZ and 4160 volts. During an unloaded fast start is normal for the governor to oscillate around 60 HZ for several seconds.
STANDARD:
READS and understands step as to when the clock will be started and stopped for the fast start of the 2A Diesel Generator.
EXAMINERS CUE: NONE EXAMINERS NOTE:
Applicant may request a second Operator to time Volts or Hz. If so state 'I will time Hz'. Give time of 6.5 seconds after diesel starts.
COMMENTS:
__ SAT
__ UNSAT I
NOTE I
If start time exceeds 10 sec. notify US immediately.
CRITICAL L-__________ ~~~~~~~~~~~~~~~~~
~ STEP STEP 2: (7.1.24.A)
Start the 2A Diesel from RTGS-201 and record the elapsed start STANDARD:
time:
sec. Record the time of the diesel start in the Chronological log.
STARTS AND RECORDS the 2A diesel start time from the time the stan switch is taken to START until the RTGS meters indicate approximately 60 HZ and 4160 volts.
EXAMINERS CUE: Acknowledges 2A diesel start time.
The other RO will record the start time in the Chronological log.
COMMENTS:
__ UNSAT 4 of 14
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___
STEP 1: (7.1.24) 2-0SP-59.01A 2A Emergency Diesel Generator Monthly Surveillance Information step informing the Operator to use a stop watch and perform a fast start of the 2A Diesel Generator. Start time will be recorded when the start switch is taken to START and the RTGB meters FIRST reach approximately 60 HZ and 4160 volts. During an unloaded fast start is normal for the governor to oscillate around 60 HZ for several seconds.
STANDARD:
READS and understands step as to when the clock will be started and stopped for the fast start of the 2A Diesel Generator.
EXAMINERS CUE: NONE EXAMINERS NOTE:
Applicant may request a second Operator to time Volts or Hz. If so state 'I will time Hz'. Give time of 6.5 seconds after diesel starts.
COMMENTS:
SAT UNSAT I
NOTE I
If start time exceeds 10 sec. notify US immediately.
CRITICAL L-__________ ~~~~~~~~~~~~~~~~~~
____________ ~ STEP STEP 2: (7.1.24.A)
Start the 2A Diesel from RTGB-201 and record the elapsed start STANDARD:
time:
sec. Record the time of the diesel start in the Chronological log.
STARTS AND RECORDS the 2A diesel start time from the time the stan switch is taken to START until the RTGB meters indicate approximately 60 HZ and 4160 volts.
EXAMINERS CUE: Acknowledges 2A diesel start time.
The other RO will record the start time in the Chronological log.
COMMENTS:
SAT UNSAT 4 of 14
STEP 3: (7.1.24.8)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY the diesel has been started from ambient conditions and RECORD Diesel Generator 2A Voltage and Frequency below.
- Voltage (3950 - 4370 volts)
Volts
- Frequency (60 - 60.3 Hz)
Hz
- 1. VERIFY voltage and frequency are within the specified range.
STANDARD:
RECORDS Voltage and Frequency.
EXAMINERS CUE: NONE COMMENTS:
STEP 4: (7.1.24.B.2)
If frequency is NOT operating within the correct range, Then PERFORM the following:
- a. INFORM Electrical Maintenance to obtain frequency readings.
- b. ENSURE frequency is within the acceptance band and Electrical Maintenance is complete.
STANDARD:
DETERMINES Voltage and Frequency are within required range.
EXAMINERS CUE: NONE COMMENTS:
(
STEP 3: (7.1.24.B}
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY the diesel has been started from ambient conditions and RECORD Diesel Generator 2A Voltage and Frequency below.
- Voltage (3950 - 4370 volts)
Volts
- Frequency (60 - 60.3 Hz)
Hz
- 1. VERIFY voltage and frequency are within the specified range.
STANDARD:
RECORDS Voltage and Frequency.
EXAMINERS CUE: NONE COMMENTS:
STEP 4: (7.1.24.B.2}
If frequency is NOT operating within the correct range, Then PERFORM the following:
- a. INFORM Electrical Maintenance to obtain frequency readings.
- b. ENSURE frequency is within the acceptance band and Electrical Maintenance is complete.
STANDARD:
DETERMINES Voltage and Frequency are within required range.
EXAMINERS CUE: NONE COMMENTS:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5: (7.1.24.C)
If the diesel start time is acceptable, Then SIGN-OFF the test in Check Sheet 10 of OP 2-0010125.
STANDARD:
COMMENTS:
DETRMINES start time is acceptable.
EXAMINERS CUE: The other RO will sign-off the test in OP 2*
0010125.
STEP 6 (7.1.24.D)
After engine starts, walk down both engines. Check for alarms, water and oil leaks, fan belt problems and any other abnormal conditions, including a change in noise, which could be indicative of a leak in the exhaust system.
STANDARD:
INFORMS the SNPO to perform the above.
EXAMINERS CUE: Acknowledge as the SNPO he will perform the above.
COMMENTS:
__ SAT
__ UNSAT
__ SAT
__ UNSAT 6 of 14 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5: (7.1.24.C)
If the diesel start time is acceptable, Then SIGN-OFF the test in Check Sheet 10 of OP 2-0010125.
STANDARD:
COMMENTS:
DETRMINES start time is acceptable.
EXAMINERS CUE: The other RO will sign-off the test in OP 2-0010125.
STEP 6 (7.1.24.0)
After engine starts, walk down both engines. Check for alarms, water and oil leaks, fan belt problems and any other abnormal conditions, including a change in noise, which could be indicative of a leak in the exhaust system.
STANDARD:
INFORMS the SNPO to perform the above.
EXAMINERS CUE: Acknowledge as the SNPO he will perform the above.
COMMENTS:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CAUTION
- Running the diesel with governor oil NOT visible in the sightglass (high or low) could result in loss of governor control.
- Synchronization or load changes shall not be performed with improper governor oil levels.
NOTE To ensure proper governor oil level is maintained, notify Electrical Maintenance to add or drain oil as necessary.
STEP 7: (7.1.24.E) Verify governor oil level is visible in the sight glass.
Governor oil:
12 cylinder 16 cylinder SAT SAT SNPO SNPO Record volume if added:
ounces ounces STANDARD:
INFORMS the SNPO to determine the above.
EXAMINERS CUE: SNPO acknowledges to record the above.
COMMENTS:
STEP 8: (7.1.25)
Perform this step for all diesel surveillances other than as required in Step 24, above. The SNPO will perform a local diesel start and warm up prior to loading. All Normal I Isolate switches should remain in NORMAL during the local start and warmup.
STANDARD:
DETERMINES all of Step 25 is N/A due to performing step 24.
EXAMINERS CUE: NONE.
COMMENTS:
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CAUTION
- Running the diesel with governor oil NOT visible in the sightglass (high or low) could result in loss of governor control.
- Synchronization or load changes shall not be performed with improper governor oil levels.
I NOTE I To ensure proper governor oil level is maintained, notify Electrical Maintenance to add or I drain oil as necessary.
I STEP 7: (7.1.24.E) Verify governor oil level is visible in the sight glass.
Governor oil:
12 cylinder 16 cylinder SAT SAT __
SNPO SNPO Record volume if added:
ounces ounces STANDARD:
INFORMS the SNPO to determine the above.
EXAMINERS CUE: SNPO acknowledges to record the above.
COMMENTS:
SAT UNSAT r-------------------------------------------------------------------+------------~
STEP 8: (7.1.25)
Perform this step for all diesel surveillances other than as required in Step 24, above. The SNPO will perform a local diesel start and warm up prior to loading. All Normal I Isolate switches should remain in NORMAL during the local start and warmup.
STANDARD:
DETERMINES all of Step 25 is N/A due to performing step 24.
EXAMINERS CUE: NONE.
COMMENTS:
__ UNSAT 7 of 14
I I
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE A generator voltage outside the 4000 to 4300 volt range does not render the Diesel Generator inoperable provided the voltage remains within the administrative limits of 3950 to 4370 volts. However, it does signify that adjustment of the voltage regulator is required.
Notify the System Engineer if the voltage is outside this range.
STEP 9: (7.1.26)
Check the voltage regulator and governor controls for operability:
A. Verify the generator steady-state voltage is from 4000 to 4300 volts when the 2A EDG voltage status Amber light is lighted.
STANDARD: DETERMINES Amber light is illuminated and voltage is between 4000 and 4300 volts EXAMINERS CUE: NONE COMMENTS:
I STEP 10: (7.1.26)
B. Make a small change to the manual voltage and governor controls and verify proper response as follows:
- 1. Adjust the Generator output voltage approximately 200 volts from nominal Generator voltage in both directions (approximately 4000 volts to 4400 volts) using DG Voltage switch to ensure proper operation of the Voltage Regulator.
STANDARD:
ADJUSTS the voltage control approximately 200 volts and determines proper response.
EXAMINERS CUE: NONE COMMENTS:
SAT UNSAT
-- SAT I
UNSAT 8 of 14
(
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE A generator voltage outside the 4000 to 4300 volt range does not render the Diesel Generator inoperable provided the voltage remains within the administrative limits of 3950 to 4370 volts. However, it does signify that adjustment of the voltage regulator is required.
Notify the System Engineer if the voltage is outside this range.
STEP 9: (7.1.26)
Check the voltage regulator and governor controls for operability:
A. Verify the generator steady-state voltage is from 4000 to 4300 volts when the 2A EDG voltage status Amber light is lighted.
STANDARD: DETERMINES Amber light is illuminated and voltage is between 4000 and 4300 volts EXAMINERS CUE: NONE COMMENTS:
STEP 10: (7.1.26)
B. Make a small change to the manual voltage and governor controls and verify proper response as follows:
STANDARD:
- 1. Adjust the Generator output voltage approximately 200 volts from nominal Generator voltage in both directions (approximately 4000 volts to 4400 volts) using DG Voltage switch to ensure proper operation of the Voltage Regulator.
ADJUSTS the voltage control approximately 200 volts and determines proper response.
EXAMINERS CUE: NONE COMMENTS:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11: (7.1.26)
B. Make a small change to the manual voltage and governor controls and verify proper response as follows:
- 2. Adjust the Generator frequency 0.5 Hz from nominal Generator frequency in both directions (approximately 59.5 Hz to 60.5 Hz) using DG Governor switch to ensure proper operation of the Electro-Hydraulic Governor.
STANDARD:
ADJUSTS governor control 0.5 Hz from normal in both directions.
Determines governor is operating properly.
EXAMINERS CUE: NONE COMMENTS:
NOTE When a Diesel Generator is paralleled to the 4.16 KV bus the LOOP undervoltage relay protection scheme is blocked and therefore not available to protect the Diesel Generator from tripping due to a system disturbance. For this reason the Diesel Generator is considered Out of Service during the entire length of time the Diesel Generator is tied to the 4.16 KV bus during surveillance testing.
STEP 12: (7.1.27) Insert the Sync Plug and place in DG-2A.
STANDARD:
INSERTS Sync Plug and places in DG-2A.
EXAMINERS CUE: NONE COMMENTS:
SAT UNSAT CRITIAL STEP SAT UNSAT 9 of 14
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11: (7.1.26)
B. Make a small change to the manual voltage and governor controls and verify proper response as follows:
- 2. Adjust the Generator frequency 0.5 Hz from nominal Generator frequency in both directions (approximately 59.5 Hz to 60.5 Hz) using DG Governor switch to ensure proper operation of the Electro-Hydraulic Governor.
STANDARD:
ADJUSTS governor control 0.5 Hz from normal in both directions.
Determines governor is operating properly.
EXAMINERS CUE: NONE COMMENTS:
NOTE When a Diesel Generator is paralleled to the 4.16 KV bus the LOOP undervoltage relay protection scheme is blocked and therefore not available to protect the Diesel Generator I from tripping due to a system disturbance. For this reason the Diesel Generator is I considered Out of Service during the entire length of time the Diesel Generator is tied to the 4.16 KV bus during surveillance testing.
STEP 12: (7.1.27) Insert the Sync Plug and place in DG-2A.
STANDARD:
INSERTS Sync Plug and places in DG-2A.
EXAMINERS CUE: NONE I COMMENTS:
I I
I I
I
_SAT--i I
UNSAT I
I I I I CRITIAL STEP SAT UNSAT 9 of 14
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: (7.1.28) Ensure incoming voltage is slightly higher than running voltage and that the Sync Scope is moving slowly in the fast direction.
STANDARD:
ENSURES incoming voltage is slightly higher than running voltage and tha the Sync Scope is moving slowly in the fast direction. Makes adjustments a~
necessary to ensure the above.
EXAMINERS CUE: NONE EXAMINERS NOTE:
Applicant will probably be required to adjust incoming to be slightly greater than running.
COMMENTS:
CAUTION Failure to ensure the EDG assumes an initial load of at least 100 kW may result in a reverse power trip.
STEP 14: (7.1.29) Slow Sync Scope to no more than one (1) revolution per 60 seconds and close 2A Diesel Output breaker (2-20211) just before it reaches the 12 o'clock position. Record time of breaker closure in the Chronological log.
STANDARD:
ADJUSTS governor as needed to ensure no more than one (1) revolution per 60 seconds and closes 2A Diesel Output breaker just before it reaches the 12 o'clock position. Records time of breaker closure in the Chronological log.
EXAMINERS CUE: The other RO will record time of breaker closure.
COMMENTS:
__ SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT 10 of 14
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: (7.1.28) Ensure incoming voltage is slightly higher than running voltage and that the Sync Scope is moving slowly in the fast direction.
STANDARD:
ENSURES incoming voltage is slightly higher than running voltage and tha the Sync Scope is moving slowly in the fast direction. Makes adjustments a~
necessary to ensure the above.
EXAMINERS CUE: NONE EXAMINERS NOTE:
Applicant will probably be required to adjust incoming to be slightly greater than running.
COMMENTS:
I CAUTION I
Failure to ensure the EDG assumes an initial load of at least 100 kW may result in a reverse power trip.
STEP 14: (7.1.29) Slow Sync Scope to no more than one (1) revolution per 60 seconds and close 2A Diesel Output breaker (2-20211) just before it reaches the 12 o'clock position. Record time of breaker closure in the Chronological log.
STANDARD:
ADJUSTS governor as needed to ensure no more than one (1) revolution per 60 seconds and closes 2A Diesel Output breaker just before it reaches the 12 o'clock position. Records time of breaker closure in the Chronological log.
EXAMINERS CUE: The other RO will record time of breaker closure.
COMMENTS:
__ UNSAT CRITICAL STEP SAT UNSAT 10 of 14
(-
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 15: (7.1.30) If the 2A Diesel Output breaker fails to close, Then slow down Sync Scope further or stop at the 12 o'clock position for approximately 5 seconds, Then attempt to close breaker.
STANDARD:
Determines step N/A. Output breaker is closed.
EXAMINERS CUE: NONE COMMENTS:
NOTE While synchronized to the grid, the diesel will not load properly unless the voltage regulator is adjusted so that the MEGAVAR meter is in the laq (out)direction.
STEP 16: (7.1.31) If the diesel generator has been running unloaded or at low load (less than 700 KW) for greater than four and one-half hours, Then perform the following:
STANDARD: Determines all of step 31 is N/A.
EXAMINERS CUE: NONE.
COMMENTS:
11 of 14 I
i STEP 15: (7.1.30)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST If the 2A Diesel Output breaker fails to close, Then slow down Sync Scope further or stop at the 12 o'clock position for approximately 5 seconds, Then attempt to close breaker.
STANDARD:
Determines step N/A. Output breaker is closed.
EXAMINERS CUE: NONE I COMMENTS:
NOTE While synchronized to the grid, the diesel will not load properly unless the voltage regulator is adjusted so that the MEGAVAR meter is in the lag (out)direction.
STEP 16: (7.1.31) If the diesel generator has been running unloaded or at low load (less than 700 KW) for greater than four and one-half hours, Then perform the following:
STANDARD: Determines all of step 31 is N/A.
EXAMINERS CUE: NONE.
COMMENTS:
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 17: (7.1.32) Load the 2A Diesel to within a band of 3685 to 3800 KW in steps of 500 FAULTED to 700 KW, with at least one minute between steps and 0.5 to 1.0 MVAR STEP lag (out), as follows:
NOTE
- The Control Room kW chart recorder is the preferred means to accurately monitor EDG loading during surveillance.
- If WR-1606, DG Watts, recorder is NOT available, EDG 2A Watt meter on 2A EDG Local Control Panel shall be used.
A. Document which indication will be used:
STANDARD:
DETERMINES WR-1606, DG Watts, located in the Control Room will be used. Loads Diesel in steps of 500 to 700 KW.
EXAMINERS CUE: NONE EXAMINERS NOTE: Applicant should manually trip the Diesel prior to exceeding the 3985 KW limit to successfully pass this step.
COMMENTS:
NOTE: As applicant adjusts governor and load increases greater than 1500 KW, Diesel load will increase with no Operator input. The applicant should realize the governor is not controlling and manually trip the Diesel from the RTGB trip pushbutton.
STOP TIME: ____
__ SAT
__ UNSAT 12 of 14 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 17: (7.1.32) Load the 2A Diesel to within a band of 3685 to 3800 KW in steps of 500 FAULTED to 700 KW, with at least one minute between steps and 0.5 to 1.0 MVAR STEP lag (out), as follows:
NOTE
- The Control Room kW chart recorder is the preferred means to accurately monitor EDG loading during survei[lance.
- If WR-1606, DG Watts, recorder is NOT avai[able, EDG 2A Watt meter on 2A EDG Loca[ Control Panel shall be used.
A. Document which indication will be used:
STANDARD:
DETERMINES WR-1606, DG Watts, located in the Control Room will be used. Loads Diese[ in steps of 500 to 700 KW.
EXAMINERS CUE: NONE EXAMINERS NOTE: Applicant should manually trip the Diesel prior to exceeding the 3985 KW limit to successfully pass this step.
COMMENTS:
I NOTE: As applicant adjusts governor and load increases greater than 1500 KW, Diesel load will increase with no Operator input. The applicant should realize the I governor is not controlling and manually trip the Diesel from the RTGB trip l
pushbutton.
STOP TIME: ____ _
__ SAT
__ UNSAT 12 of 14
IC #1 100% power JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET Execute S-2 EDG failure prior to the applicant starting the Diesel Generator. Will auto trigger when Diesel load is >1500 KW.
Clear EDG KW Recorder between Applicants.
Start Graph of A201_A1_A5_1 13 of 14
(
(
\\.
IC #1 100% power JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET Execute S-2 EDG failure prior to the applicant starting the Diesel Generator. Will auto trigger when Diesel load is >1500 KW.
Clear EDG KW Recorder between Applicants.
Start Graph of A201_A1_A5_1 13 of 14
JOB PERFORMANCE MEASURE CANDIDANT CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is at 100% power steady state. No equipment is out of service.
INITIATING CUES:
The US directs you to perform the 184 day 2A Emergency Diesel Generator Surveillance starting with step 7.1.24 of 2-0SP-59.01 A 2A Emergency Diesel Generator Monthly Surveillance.
All previous steps have been completed and signed off by the SNPO.
NOTE: Examiner will time the Hz when directed by you.
14 of 14 l
(
JOB PERFORMANCE MEASURE CANDIDANT CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is at 100% power steady state. No equipment is out of service.
INITIATING CUES:
The US directs you to perform the 184 day 2A Emergency Diesel Generator Surveillance starting with step 7.1.24 of 2-0SP-59.01 A 2A Emergency Diesel Generator Monthly Surveillance.
All previous steps have been completed and signed off by the SNPO.
NOTE: Examiner will time the Hz when directed by you.
14 of 14
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER 2A SG LEVEL CONTROL FROM THE MFRV TO THE 15% BYPASS VALVE AND 100%
BYPASS VALVE NRC 5-3 Developed/Revised by: ___
La_rryL-R_ic_h __
Training Management Approval: ______
Date JPM NRC S-3 Rev 0 Simulator Page 1 of 12
(
JOB PERFORMANCE MEASURE FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER 2A SG LEVEL CONTROL FROM THE MFRV TO THE 15% BYPASS VALVE AND 100%
BYPASS VALVE NRC 5-3 Developed/Revised by: __
~La~rr~y R~ic~h __
Training Management Approval: -------
'1- //-01 Date Date JPM NRC S-3 Rev 0 Simulator Page 1 of 12
JOB PERFORMANCE MEASURE Task: Transfer 2A SG level control from the MFRV to the 15% Bypass valve and the 100% Bypass valve.
Alternate Path JPM?
No Facility JPM #:
N/A K/A Rating(s):
059 A4.08 Feed regulating valve controller 3.0 I 2.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when SG level is being controlled by the Main Feedwater 15% bypass valve and the 100% bypass valve.
Evaluation Location:
Simulator X
References:
In Plant Lab Other Appendix C of 2-0700030 Main Feedwater Validation Time: 25 minutes Tools/Equipment/Procedures Needed:
None Performance Level:
Perform X
Simulate Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-3 Rev 0 Simulator Page 2 of 12
(
JOB PERFORMANCE MEASURE Task: Transfer 2A SG level control from the MFRV to the 15% Bypass valve and the 100% Bypass valve.
Alternate Path JPM?
No Facility JPM #:
N/A K/A Rating(s):
059 A4.08 Feed regulating valve controller 3.0 / 2.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when SG level is being controlled by the Main Feedwater 15% bypass valve and the 100% bypass valve.
Evaluation Location:
Simulator X
References:
In Plant Lab Other Appendix C of 2-0700030 Main Feedwater Validation Time: 25 minutes Tools/Equipment/Procedures Needed:
None Performance Level:
Perform X
Simulate Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-3 Rev 0 Simulator Page 2 of 12
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Transfer 2A SG level control from the MFRV to the 15% Bypass valve and the 100% Bypass valve.
The performance level to be used for this JPM is Perform This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is at 100% power. The 2A MFRV is not controlling in automatic. Management has decided to remove the 2A MFRV from service and place the Main Feedwater 15% bypass and 100%
bypass valve in service.
INITIATING CUES:
You are the RCO. The US has directed you to perform Appendix C, starting with step 4 of 2-0700030 Main Feedwater and place the 15% Main Feedwater valve and 100% bypass valve is in service.
JPM NRC S-3 Rev 0 Simulator Page 3 of 12 JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS
( \\
SPECIFIC DIRECTIONS:
(
The task you are to perform is: Transfer 2A SG level control from the MFRV to the 15% Bypass valve and the 100% Bypass valve.
The performance level to be used for this JPM is Perform This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is at 100% power. The 2A MFRV is not controlling in automatic. Management has decided to remove the 2A MFRV from service and place the Main Feedwater 15% bypass and 100%
bypass valve in service.
INITIATING CUES:
You are the RCO. The US has directed you to perform Appendix C, starting with step 4 of 2-0700030 Main Feedwater and place the 15% Main Feedwater valve and 100% bypass valve is in service.
JPM NRC S-3 Rev 0 Simulator Page 3 of 12
START TIME: ___
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Appendix C of 2-0700030 Transferring 2A SG level control from the MFRV (FCV-9011) to the 15% bypass valve (LCV-9005) and the 100°11 Bypass valve (MV-09-3)
STEP 1 (4.A)
ENSURE LlC-9005, 2A LOW PWR MIA STATION is in AUTOMATIC.
STANDARD:
ENSURES LlC-9005, 2A LOW PWR MIA STATION is in AUTOMATIC.
EXAMINER'S CUE: NONE COMMENTS:
STEP 2 (4.8)
ENSURE FIC-9011, 2A HIGH PWR MIA STATION is in MANUAL.
STANDARD:
ENSURES FIC-9011, 2A HIGH PWR MIA STATION is in MANUAL.:.
EXAMINER'S CUE: NONE COMMENTS:
SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 4 of 12
(
(
START TIME: ___ _
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Appendix C of 2-0700030 Transferring 2A SG level control from the MFRV (FCV-9011) to the 15% bypass valve (LCV-9005) and the 100%
Bypass valve (MV-09-3)
STEP 1 (4.A}
ENSURE L1C-9005, 2A LOW PWR MIA STATION is in AUTOMATIC.
STANDARD:
ENSURES L1C-9005, 2A LOW PWR MIA STATION is in AUTOMATIC.
EXAMINER'S CUE: NONE COMMENTS:
STEP 2 (4.B}
ENSURE FIC-9011, 2A HIGH PWR MIA STATION is in MANUAL.
STANDARD:
ENSURES FIC-9011, 2A HIGH PWR MIA STATION is in MANUAL.:.
EXAMINER'S CUE: NONE COMMENTS:
SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 4 of 12
I STEP 3: {4.C}
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY FCV-9011 will respond to MANUAL control by simultaneously PERFORMING Both of the following:
Bypass Valve starts to OPEN, AND
- 2. MAINTAIN 2A SG level at 60% to 70%.
CRITICAL STEP SAT UNSAT STANDARD:
SLOWLY CLOSE FCV-9011 until LCV-9005, SG 2A 15% Bypass Valve starts to OPEN while maintaining 2A SG level at 60% to 70%.
EXAMINER'S CUE: NONE COMMENTS:
STEP 4: {4.D}
If FCV-9011 is NOT responding to MANUAL control, Then CONSIDER Manual-Local control per Appendix A of this procedure.
STANDARD:
DETERMINES FCV-9011 IS responding to manual EXAMINER'S CUE: NONE COMMENTS:
SAT UNSAT JPM NRCS-3 RevO Simulator Page 5 of 12
(
STEP 3: (4.C}
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST VERIFY FCV-9011 will respond to MANUAL control by simultaneously PERFORMING Both of the following:
Bypass Valve starts to OPEN, AND
- 2. MAINTAIN 2A SG level at 60% to 70%.
CRITICAL STEP SAT UNSAT STANDARD:
SLOWLY CLOSE FCV-9011 until LCV-9005, SG 2A 15% Bypass Valve starts to OPEN while maintaining 2A SG level at 60% to 70%.
EXAMINER'S CUE: NONE COMMENTS:
STEP 4: (4.D)
If FCV-9011 is NOT responding to MANUAL control, Then CONSIDER Manual-Local control per Appendix A of this procedure.
STANDARD:
DETERMINES FCV-9011 IS responding to manual EXAMINER'S CUE: NONE COMMENTS:
SAT UNSAT JPM NRCS-3 RevO Simulator Page 5 of 12
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5: (4.E)
If FCV-9011 is responding to MANUAL control, Then continue to SLOWLY CRITICAL CLOSE FCV-9011, SG 2A FEED REG Valve until LCV-9005, SG 2A 15%
Bypass Valve is -20% to 50% Open.
STANDARD:
SLOWL Y CLOSES FCV-9011, SG 2A FEED REG Valve until LCV-9005, SG 2A 15% Bypass Valve is -20% to 50% Open.
EXAMINER'S CUE: NONE COMMENTS STEP 6: (4.F)
PLACE LlC-9005, 2A Low Power MIA Station, in MANUAL.
STANDARD:
PLACES LlC-9005, 2A Low Power MIA Station, in MANUAL.
EXAMINER'S CUE: NONE COMMENTS:
STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 6 of 12
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5: (4.E)
If FCV-9011 is responding to MANUAL control, Then continue to SLOWLY CRITICAL CLOSE FCV-9011, SG 2A FEED REG Valve until LCV-9005, SG 2A 15%
Bypass Valve is -20% to 50% Open.
STANDARD:
SLOWL Y CLOSES FCV-9011, SG 2A FEED REG Valve until LCV-9005, SG 2A 15% Bypass Valve is -20% to 50% Open.
EXAMINER'S CUE: NONE COMMENTS:
STEP 6: (4.F)
PLACE LlC-9005, 2A Low Power MIA Station, in MANUAL.
STANDARD:
PLACES LlC-9005, 2A Low Power MIA Station, in MANUAL.
EXAMINER'S CUE: NONE COMMENTS:
STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 6 of 12
STEP 7: (4.G}
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST MAINTAIN LCV-9005, SG 2A 15% Bypass Valve -20% to 50% Open and 2A SG level at 65% while PERFORMING ALL of the following simultaneously:
- 1. SLOWLY OPEN MV-09-3, SG 2A 100% Bypass Valve, AND
- 2. SLOWLY CLOSE FCV-9011, SG 2A FEED REG Valve.
AND CRITICAL STEP SAT UNSAT
- 3. POSITIONING LCV-9005, SG 2A 15% Bypass Valve, as necessary to maintain -20% to 50% Open.
STANDARD:
SLOWLY OPENS MV-09-3, SG 2A 100% Bypass Valve while SLOWLY CLOSING FCV-9011, SG 2A FEED REG Valve AND position LCV-9005, SG 2A 15% Bypass Valve, as necessary to maintain -20% to 50% Open.
EXAMINER'S CUE: NONE COMMENTS:
STEP 8: (4.H}
CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG CRITICAL Valve is Closed and then PERFORM the following:
STEP
- 1. SELECT the [VALVE TEST] Button on the left hand side of the 'A' Train FW Flat Panel Display.
-- SAT UNSAT STANDARD:
SELECT the [VALVE TEST] Button on the left hand side of the 'A' Train Fv\\
Flat Panel Display.
EXAMINER'S CUE: NONE COMMENTS:
JPM NRCS-3 RevO Simulator Page 7 of 12
(
STEP 7: (4.G)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST MAINT AIN LCV-9005, SG 2A 15% Bypass Valve -20% to 50% Open and 2A SG level at 65% while PERFORMING ALL of the following simultaneously:
- 1. SLOWLY OPEN MV-09-3, SG 2A 100% Bypass Valve, AND
- 2. SLOWLY CLOSE FCV-9011, SG 2A FEED REG Valve.
AND
- 3. POSITIONING LCV-9005, SG 2A 15% Bypass Valve, as necessary to maintain -20% to 50% Open.
STANDARD:
SLOWL Y OPENS MV-09-3, SG 2A 100% Bypass Valve while SLOWLY CLOSING FCV-9011, SG 2A FEED REG Valve AND position LCV-9005, SG 2A 15% Bypass Valve, as necessary to maintain -20% to 50% Open.
EXAMINER'S CUE: NONE COMMENTS:
STEP 8: (4.H)
CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 1. SELECT the [VALVE TEST] Button on the left hand side of the 'A' Train FW Flat Panel Display.
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT STANDARD:
SELECT the [VALVE TEST] Button on the left hand side of the 'A' Train Fv\\
Flat Panel Display.
EXAMINER'S CUE: NONE COMMENTS:
JPM NRCS-3 RevO Simulator Page 7 of 12
STEP 9: (4.H}
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 2. SELECT the [2A S/G VALVE TESTING] Button on the Overlay.
SELECTS the [2A S/G VALVE TESTING] Button on the Overlay.
EXAMINER'S CUE: NONE COMMENTS:
STEP 10: ( 4.H} CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 3. SELECT the [100% BYPASS VALVE OPERATIONS] Button.
STANDARD:
SELECT the [100% BYPASS VALVE OPERATIONS] Button.
EXAMINER'S CUE: NONE COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 8 of 12 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 9: (4.H)
CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 2. SELECT the [2A S/G VALVE TESTING] Button on the Overlay.
STANDARD:
SELECTS the [2A S/G VALVE TESTING] Button on the Overlay.
EXAMINER'S CUE: NONE COMMENTS:
I STEP 10: (4.H) CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 3. SELECT the [100% BYPASS VALVE OPERATIONS] Button.
STANDARD:
SELECT the [100% BYPASS VALVE OPERATIONS] Button.
EXAMINER'S CUE: NONE COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 8 of 12
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11: (4.H) CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 4. VERIFY the MAN Info Tag MFRV FIC-9011 MIA STATION STATUS is LIT (white background).
STANDARD:
VERIFIES the MAN Info Tag MFRV FIC-9011 MIA STATION STATUS is LIT (white background).
EXAMINER'S CUE: NONE COMMENTS:
NOTE Selecting FX_10 MAN will DISABLE the communication tie between the Main Feed Reg Valve and the 15% Bypass Valve.
STEP 12: (4.H) CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 5. SELECT the [FX_10 MAN] Button.
STANDARD:
SELECT the [FX_10 MAN] Button.
EXAMINER'S CUE: NONE COMMENTS:
SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 9 of 12
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 11: (4.H) CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 4. VERIFY the MAN Info Tag MFRV FIC-9011 MIA STATION STATUS is LIT (white background).
I STANDARD:
VERIFIES the MAN Info Tag MFRV FIC-9011 MIA STATION STATUS is LIT (white background).
I EXAMINER'S CUE: NONE COMMENTS:
js:
NOTE Selecting FX_10 MAN will DISABLE the communication tie between the Main Feed Reg
~alve and the 15% Bypass Valve.
STEP 12: (4.H) CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 5. SELECT the [FX_10 MAN] Button.
STANDARD:
SELECT the [FX_10 MAN] Button.
EXAMINER'S CUE: NONE COMMENTS:
i SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRCS-3 RevO Simulator Page 9 of 12 I
I I
I I
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: (4.H) CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 6. PLACE LlC-9005, 2A Low Power MIA Station, in AUTOMATIC and VERIFY the following:
- a. LCV-9005, SG 2A 15% Bypass Valve, is -20% to 50% Open.
AND
- b. 2A SG level is being maintained at 60% to 70%.
CRITICAL STEP SAT UNSAT STANDARD:
PLACES LlC-9005, 2A Low Power MIA Station, in AUTOMATIC and verifies LCV-9005 is 20% to 50% open and SG level is being maintained at 60% to 70%.
EXAMINER'S CUE: Inform the applicant the end of task.
COMMENTS:
END OF TASK JPM NRCS-3 RevO Simulator Page10of12
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13: (4.H) CONTINUE with Step 4.G until FCV-9011, SG 2A FEED REG Valve is Closed and then PERFORM the following:
- 6. PLACE LlC-9005, 2A Low Power MIA Station, in AUTOMATIC and VERIFY the following:
- a. LCV-9005, SG 2A 15% Bypass Valve, is -20% to 50% Open.
AND
- b. 2A SG level is being maintained at 60% to 70%.
CRITICAL STEP SAT UNSAT STANDARD:
PLACES LlC-9005, 2A Low Power MIA Station, in AUTOMATIC and verifies LCV-9005 is 20% to 50% open and SG level is being maintained at 60% to 70%.
EXAMINER'S CUE: Inform the applicant the end of task.
COMMENTS:
END OF TASK JPM NRCS-3 RevO Simulator Page 10 of 12
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP Ie #1 100% power. No lesson associated with this JPM JPM NRC S-3 RevO Simulator Page 11 of 12
(
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP C>
Ie #1 100% power. No lesson associated with this JPM JPM NRC S-3 RevO Simulator Page 11 of 12
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is at 100% power. The 2A MFRV is not controlling in automatic. Management has decided to remove the 2A MFRV from service and place the Main Feedwater 15% bypass and 100%
bypass valve in service.
INITIATING CUES:
You are the RCO. The US has directed you to perform Appendix C, starting with step 4 of 2-0700030 Main Feedwater and place the 15% Main Feedwater valve and 100% bypass valve is in service.
Page 12 of 12
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is at 100% power. The 2A MFRV is not controlling in automatic. Management has decided to remove the 2A MFRV from service and place the Main Feedwater 15% bypass and 100%
bypass valve in service.
INITIATING CUES:
You are the RCO. The US has directed you to perform Appendix C, starting with step 4 of 2-0700030 Main Feedwater and place the 15% Main Feedwater valve and 100% bypass valve is in service.
Page 12 of 12
e FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER LETDOWN LEVEL CONTROL TO THE ALTERNATE LCV - UNIT 2 NRC S-4 Developed/Revised by: __
--=-:La:..c.:.....rry~Ri~ch~_
q*(¥oC}
Date Training Management Approval: _______ _ __
Date NRC JPM S-4 Rev 0 Simulator Page 1 of 10
(
(
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE TRANSFER LETDOWN LEVEL CONTROL TO THE ALTERNATE LCV - UNIT 2 NRC 5-4 Developed/Revised by: __
---=-:La:..:.:...crr-"---Y -,---,-Ri~ch~_
Training Management Approval: ______
Date NRC JPM S-4 Rev 0 Simulator Page 1 of 10
(
JOB PERFORMANCE MEASURE Transfer Letdown Level Control to Alternate LCV Faulted JPM?
No Facility JPM #:
0821040 K/A Rating(s):
011 A4.05 Letdown flow controller 3.2 I 2.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when Letdown Level Control is transferred to the Alternate Level Control valve.
Evaluation Location:
Simulator X
References:
In Plant Lab 2-NOP-02.02 "Charging and Letdown" Validation Time: 15 minutes Tools/Equipment/Procedures Needed:
2-NOP-02.02 "Charging and Letdown" Other Performance Level:
Perform X
Simulate Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC JPM S-4 Rev 0 Simulator Page 2 of 10
(
JOB PERFORMANCE MEASURE Transfer Letdown Level Control to Alternate LCV Faulted JPM?
No Facility JPM #:
0821040 K/A Rating(s):
011 A4.05 Letdown flow controller 3.2 12.9 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when Letdown Level Control is transferred to the Alternate Level Control valve.
Evaluation Location:
Simulator X
References:
In Plant Lab 2-NOP-02.02 "Charging and Letdown" Validation Time:
15 minutes Tools/Equipment/Procedures Needed:
2-NOP-02.02 "Charging and Letdown" Other Performance Level:
Perform X
Simulate Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC JPM S-4 Rev 0 Simulator Page 2 of 10
(
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Transfer Letdown Level Control to the Alternate Level Control Valve -
Unit 2 The performance level to be used for this JPM is Perform.
(Circle the performance level being used for this implementation of the JPM.)
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-211 OP) has begun to operate erratically, indicating a problem with the valve control cirCUitry.
INITIATING CUES:
The US has directed you to place the alternate level control valve in service lAW 2-NOP-02.02, "Charging and Letdown."
NRC JPM S-4 Rev 0 Simulator Page 3 of 10
(
(
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Transfer Letdown Level Control to the Alternate Level Control Valve-Unit 2 The performance level to be used for this JPM is Perform.
(Circle the performance level being used for this implementation of the JPM.)
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-211 OP) has begun to operate erratically, indicating a problem with the valve control circuitry.
INITIATING CUES:
The US has directed you to place the alternate level control valve in service lAW 2-NOP-02.02, "Charging and Letdown."
NRC JPM S-4 Rev 0 Simulator Page 3 of 10
START TIME: ___ _
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 2-NOP-02.02 Charging and Letdown Placing LCV-211 OQ, Level Control Valve in Service STEP 1 (6.5.1 ): Place V2520 to BYPASS STANDARD:
PLACE V2520 to Bypass.
EXAMINER'S CUE:
NONE COMMENTS:
STEP 2 (6.5.2): Slowly REDUCE PIC-2201, Pressure, setpoint to 250 psig.
STANDARD:
Slowly ADJUST PIC-2201 to LOWER pressure to 250 psig.
EXAMINER'S CUE:
NONE EXAMINERS NOTE: Annunciator M-5 "Letdown Pressure High/Low" is an expected alarm.
COMMENTS:
I NOTE Step 6.5.3 is NOT applicable if HIC-1ii 0 is in MANUAL STEP 3 (6.5.3): PLACE HIC-iii 0 in MANUAL by performing the following:
A.
BALANCE HIC-iii 0 MANUAL to AUTO controller output signals by Critical Step SAT UNSAT Critical Step SAT UNSAT I Critical Step SAT previewing and using the MANUAL control knob to match the manual
-- UNSAT and auto controller output signals.
STANDARD:
PREVIEW signal by DEPRESSING the Green 'B' pushbutton and ADJUST HIC-iii0 manual signal to MATCH auto EXAMINER'S CUE:
NONE COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 fRey 0 Simulator Page 4 of 10
(
I START TIME: ___ _
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 2-NOP-02.02 Charging and Letdown Placing LCV-211 00, Level Control Valve in Service STEP 1 (6.5.1 ): Place V2520 to BYPASS STANDARD:
PLACE V2520 to Bypass.
EXAMINER'S CUE:
NONE COMMENTS:
I STEP 2 (6.5.2): Slowly REDUCE PIC-2201, Pressure, setpoint to 250 psig.
STANDARD:
Slowly ADJUST PIC-2201 to LOWER pressure to 250 psig.
EXAMINER'S CUE:
NONE EXAMINERS NOTE: Annunciator M-5 "Letdown Pressure High/Low" is an expected alarm.
COMMENTS:
I I '--
I IL NOTE Step 6.5.3 is NOT applicable if HIC-111 0 is in MANUAL I
I STEP 3 (6.5.3): PLACE HIC-111 0 in MANUAL by performing the following:
A.
BALANCE HIC-111 0 MANUAL to AUTO controller output signals by Critical Step SAT UNSAT Critical Step SAT UNSAT I Critical Step SAT previewing and using the MANUAL control knob to match the manual
-- UNSAT I
and auto controller output signals.
STANDARD:
PREVIEW signal by DEPRESSING the Green 'B' pushbutton and ADJUST HIC-1110 manual signal to MATCH auto EXAMINER'S CUE:
NONE COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 IRev 0 Simulator Page 4 of 10 I
I
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (6.5.3): PLACE HIC-1110 in MANUAL by performing the following:
B. PLACE HIC-1110 to MANUAL.
Critical Step SAT STANDARD:
PLACE HIC-111 0 to MANUAL by DEPRESSING the Yellow 'M' pushbutton EXAMINER'S CUE:
NONE UNSAT COMMENTS:
I NOTE I With only one Charging Pump running, dual indication may not be received on both Critical Step Letdown Level Control valves SAT STEP 5 (6.5.4):
PLACE Level Control Valve selector switch to BOTH.
STANDARD:
POSITION the Letdown Level selector switch to the BOTH position.
-- UNSAT EXAMINER'S CUE:
NONE COMMENTS:
STEP 6 (6.5.5): VERIFY Letdown flow RAISES, as indicated on FIA-2202, Flow.
STANDARD:
VERIFY flow rise on FIA-2202 SAT EXAMINER'S CUE:
NONE UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 fRev 0 Simulator Page 5 of 10 I
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 4 (6.5.3): PLACE HIC-1i10 in MANUAL by performing the following:
B.
PLACE HIC-iii 0 to MANUAL.
Critical Step SAT STANDARD:
PLACE HIC-iii 0 to MANUAL by DEPRESSING the Yellow 'M' pushbutton EXAMINER'S CUE:
NONE UNSAT COMMENTS:
~--------------------------------------------+--------~
I I'
NOTE I With only one Charging Pump running, dual indication may not be received on both LLetdown Level Control valves STEP 5 (6.5.4):
PLACE Level Control Valve selector switch to BOTH.
STANDARD:
POSITION the Letdown Level selector switch to the BOTH position.
EXAMINER'S CUE:
NONE I COMMENTS:
I I 1--'*
i STEP 6 (6.5.5): VERIFY Letdown flow RAISES, as indicated on FIA-2202, Flow.
I STANDARD:
VERIFY flow rise on FIA-2202 EXAMINER'S CUE:
NONE i
I COMMENTS:
Critical Step SAT UNSAT SAT UNSAT
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4/Rev 0 Simulator Page 5 of 10
(
I JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 (6.5.6): PLACE Level Control Valve selector switch to LCV-2110Q.
STANDARD:
POSITION Letdown Level Control valve selector switch to PCV*211 OQ EXAMINER'S CUE:
NONE COMMENTS:
STEP 8 (6.5.7): Perform the following:
A. ADJUST HIC-1110 for minimum flow.
STANDARD:
ADJUST to MINIMUM letdown flow as observed on FIA-2202 EXAMINER'S CUE:
NONE COMMENTS:
STEP 9 (6.5.7): Perform the following:
B. Direct I&C to adjust L Y111 0, Pressurizer Level control signal limiter.
STANDARD:
Informs I&C of the current minimum letdown flow value and directs them to adjust L Y111 0, Pressurizer Level control signal limiter.
EXAMINER'S CUE:
None EVALUATOR'S NOTE: On the Simulator the letdown flow is not exactly 29 gpm, direct the student to continue with the task after I&C is contacted. The procedure does not require waiting for I&C to complete the task.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
Critical Step SAT UNSAT Critical Step SAT UNSAT SAT UNSAT NRC JPM S-4 fRey 0 Simulator Page 6 of 10 I
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 7 (6.5.6): PLACE Level Control Valve selector switch to LCV-2110Q.
STANDARD:
POSITION Letdown Level Control valve selector switch to PCV-211 OQ EXAMINER'S CUE:
NONE COMMENTS:
STEP 8 (6.5.7): Perform the following:
A. ADJUST HIC-1110 for minimum flow.
STANDARD:
ADJUST to MINIMUM letdown flow as observed on FIA-2202 EXAMINER'S CUE:
NONE COMMENTS:
STEP 9 (6.5.7): Perform the following:
B. Direct I&C to adjust L Y111 0, Pressurizer Level control signal limiter.
STANDARD:
Informs I&C of the current minimum letdown flow value and directs them to adjust L Y111 0, Pressurizer Level control signal limiter.
EXAMINER'S CUE:
None EVALUATOR'S NOTE: On the Simulator the letdown flow is not exactly 29 gpm, direct the student to continue with the task after I&C is contacted. The procedure does not require waiting for I&C to complete the task.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
Critical Step SAT UNSAT Critical Step SAT UNSAT SAT UNSAT NRC JPM S-4 fRey 0 Simulator Page 6 of 10
(
STEP 10 (6.5.8):
A.
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST PLACE H IC-111 0 in AUTO by performing the following:
BALANCE HIC-1110, LEVEL, controller AUTO to MANUAL output SAT signals, using the BIAS control knob while previewing the AUTO signal.
STANDARD:
PREVIEW signal by DEPRESSING the Green 'B' pushbutton and ADJUST UNSAT H IC-111 0 auto signal to MATCH manual using the upper BIAS knob.
EXAMINER'S CUE:
NONE COMMENTS:
STEP 11 (6.5.8}:
PLACE HIC-111 0 in AUTO by performing the following:
Critical Step B.
PLACE HIC-1110, LEVEL, controller to AUTO.
SAT STANDARD:
PLACE HIC-111 0 in AUTO by DEPRESSING the White 'A' pushbutton EXAMINER'S CUE:
NONE UNSAT COMMENTS:
STEP 12 (6.5.9}: Slowly RAISE PIC-2201, Pressure setpoint to 430 psig.
Critical Step STANDARD:
Slowly Adjust PIC-2201 setpoint to RAISE pressure to 430 psig and ENSURE that red needle follows and MATCHES the black needle SAT EXAMINER'S CUE:
NONE UNSAT COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4/Rev 0 Simulator Page 7 of 10 I
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 10 (6.5.8):
PLACE HIC-111 0 in AUTO by performing the following:
STANDARD:
A.
BALANCE HIC-111 0, LEVEL, controller AUTO to MANUAL output signals, using the BIAS control knob while previewing the AUTO signal.
PREVIEW signal by DEPRESSING the Green 'B' pushbutton and ADJUST HIC-1110 auto signal to MATCH manual using the upper BIAS knob.
EXAMINER'S CUE:
NONE COMMENTS:
STEP 11 (6.5.8):
PLACE HIC-111 0 in AUTO by performing the following:
B.
PLACE HIC-111 0, LEVEL, controller to AUTO.
STANDARD:
PLACE HIC-111 0 in AUTO by DEPRESSING the White 'A' pushbutton EXAMINER'S CUE:
NONE COMMENTS:
STEP 12 (6.5.9): Slowly RAISE PIC-2201, Pressure setpoint to 430 psig.
STANDARD:
COMMENTS:
Slowly Adjust PIC-2201 setpoint to RAISE pressure to 430 psig and ENSURE that red needle follows and MATCHES the black needle EXAMINER'S CUE:
NONE
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT Critical Step SAT UNSAT Critical Step SAT UNSAT NRC JPM S-4 fRey 0 Simulator Page 7 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (6.5.1.Ql ADJUST HIC-111 0, LEVEL, for a flow consistent with current plant conditions.
STANDARD:
ADJUST HIC-111 0 to current plant conditions with the BIAS knob.
EXAMINER'S CUE:
NONE EVALUATOR'S NOTE: Adjustment is not needed if pressurizer level is at setpoint.
COMMENTS:
STEP 14 (6.5.11):
When temperature on TIC-2224 returns to normal PLACE V2520 to AUTO.
STANDARD:
PLACES V2520 to AUTO.
EXAMINER'S CUE:
NONE COMMENTS:
STEP (done):
NOTIFY the US that the Letdown Level Control has been transferred to the Alternate Level Control valve, LCV-21100 and that I&C Department has been notified to adjust L Y111 0, Pressurizer Level control signal limiter.
STANDARD:
NOTIFY the US that the Letdown Level Control has been TRANSFERRED to LCV-211 00.
EXAMINER'S CUE:
US Acknowledges.
COMMENTS:
END OF TASK STOP TIME:
- Cues are to be used only if JPM performance is being simulated in the plant.
Critical Step SAT UNSAT Critical Step SAT UNSAT SAT UNSAT NRC JPM S-4 fRey 0 Simulator Page 8 of 10 I
STEP 13 (6.5.1Ql JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ADJUST HIC-111 0, LEVEL, for a flow consistent with current plant conditions.
Critical Step STANDARD:
ADJUST HIC-111 0 to current plant conditions with the BIAS knob.
EXAMINER'S CUE:
NONE EVALUATOR'S NOTE: Adjustment is not needed if pressurizer level is at setpoint.
COMMENTS:
SAT UNSAT STEP 14 (6.5.11):
When temperature on TIC-2224 returns to normal PLACE V2520 Critical Step to AUTO.
STANDARD:
PLACES V2520 to AUTO.
SAT EXAMINER'S CUE:
NONE UNSAT COMMENTS:
I STEP (done):
NOTIFY the US that the Letdown Level Control has been transferred to the Alternate Level Control valve, LCV-211 OQ and that I&C Department has been notified to adjust L Y111 0, Pressurizer Level control signal limiter.
I I STANDARD NOTIFY the US that the Letdown Level Control has been TRANSFERRED to LCV-211 OQ.
SAT UNSAT EXAMINER'S CUE:
US Acknowledges.
COMMENTS:
l END OF TASK
---~~~~--'-------'
STOP TIME:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM S-4 IRev 0 Simulator Page 8 of 10
(
- 1. RESTORE IC-1.
- 2. UNFREEZE the Simulator.
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
- 3. No Lesson is needed for this JPM.
JPM 0821040/Rev 13 Simulator or U2 Control Room Page 9 of 10
(
(
- 1. RESTORE Ie-i.
- 2. UNFREEZE the Simulator.
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP
- 3. No Lesson is needed for this JPM.
JPM 0821040/Rev 13 Simulator or U2 Control Room Page 9 of 10
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-211 OP) has begun to operate erratically, indicating a problem with the valve control circuitry.
INITIATING CUES:
You are the DRCO. The US has directed you to place the alternate level control valve in service lAW 2-NOP-02.02, "Charging and Letdown."
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is operating at 100% power, steady state, MOL conditions. The in-service letdown level control valve (LCV-211 OP) has begun to operate erratically, indicating a problem with the valve control circuitry.
INITIATING CUES:
You are the ORCa. The US has directed you to place the alternate level control valve in service lAW 2-NOP-02.02, "Charging and Letdown."
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO A LINEAR POWER RANGE NI CHANNEL MALFUNCTION, UNIT 1 NRC C-5 Developed/Revised by: _---=-Ch:...:...=a:.:...:...rle=-=s~R.:..=..:ogi2...::e:..:_.::rs~_
Approval -------
9/28/09 Date Date NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 1 of 12
(
e FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO A LINEAR POWER RANGE NI CHANNEL MALFUNCTION, UNIT 1 NRC C-5 Developed/Revised by:
Charles Rogers
-~~~~~-
Approval ~~~~~~_
9/28/09 Date Date NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 1 of 12
JOB PERFORMANCE MEASURE Respond to a Linear Power Range NI Channel Malfunction Unit 1 Faulted JPM?
NO Facility JPM #:
0821035 K/A Rating(s):
Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when it is verified that the Technical Specification action items are met.
Evaluation Location:
Simulator In Plant X
Lab Other Performance Level:
Perform Simulate X
References:
1-0NP-99.01, "Loss of Tech Spec Instrumentation" Validation Time: 15 minutes Time Critical:
Tools/Equipment/Procedures Needed:
1-0NP-99.01, "Loss of Tech Spec Instrumentation", Key to RPS Cabinet "A" Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC JPM C*5 Rev 0 UNIT 1 CONTROL ROOM Page 2 of 12 JOB PERFORMANCE MEASURE Respond to a Linear Power Range NI Channel Malfunction Unit 1 Faulted JPM?
NO Facility JPM #:
0821035 K/A Rating(s):
Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when it is verified that the Technical Specification action items are met.
Evaluation Location:
Simulator In Plant X
Lab Other Performance Level:
Perform Simulate X
References:
1-0NP-99.01, "Loss of Tech Spec Instrumentation" Validation Time: 15 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
1-0NP-99.01, "Loss of Tech Spec Instrumentation", Key to RPS Cabinet "A" Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 2 of 12
l SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Perform actions in accordance with 1-0NP-99.01 Loss of Tech Spec I nstru mentation.
The performance level to be used for this JPM is Simulate This is NOT a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The plant is operating at 100% power, steady state conditions, MOL.
Numerous annunciators are activated including:
a L-12, LOCAL POWER DENSITY CHANNEL TRIP a
L-18, LOCAL POWER DENSITY CHANNEL PRE TRIP a
L-20, REACTOR POWER RANGE SUBCHANNEL DEVIATION a
L-22, TM/LP CHANNEL TRIP a
L-26, NUCLARI L'lT POWER CHANNEL DEVIATION a
L-28, TM/LP CHANNEL PRE TRIP INITIATING CUES:
The Unit Supervisor has directed you to investigate and perform any required actions 1-0NP-99.01, "Loss of Tech Spec Instrumentation" NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 3 of 12
(
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Perform actions in accordance with 1-0NP-99.01 Loss of Tech Spec I nstrum entation.
The performance level to be used for this JPM is Simulate This is NOT a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The plant is operating at 100% power, steady state conditions, MOL.
Numerous annunciators are activated including:
o L-12, LOCAL POWER DENSITY CHANNEL TRIP o
L-18, LOCAL POWER DENSITY CHANNEL PRE TRIP o
L-20, REACTOR POWER RANGE SUBCHANNEL DEVIATION o
L-22, TM/LP CHANNEL TRIP o
L-26, NUCLARI 6T POWER CHANNEL DEVIATION o
L-28, TM/LP CHANNEL PRE TRIP INITIATING CUES:
The Unit Supervisor has directed you to investigate and perform any required actions 1-0NP-99.01, "Loss of Tech Spec Instrumentation" NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page30f12
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
STEP 1 (6.2.1}: COMPARE meter indications on all channels to determine the validity of the alarmlindication.
STANDARD:
RPS Q-power channels: JI-003A, 003B, 003C and 003D.
EXAMINER'S CUE:
ALL CHANNELS ARE 100%.
COMMENTS:
STEP 2 (6.2.1}: COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
ASI Y channels on RTGB A thru D.
EXAMINER'S CUE:
ALL ASI Y CHANNELS ON RTGB ARE READING NORMAL INDICATIONS EXCEPT "C" CHANNEL, ASI Y WHICH IS FULL SCALE LOW.
COMMENTS:
f--
STEP 3 (6.2.1}: COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
Power range control channels JR-01 0 on RTGB.
EXAMINER'S CUE:
BOTH CHANNELS ARE 100%.
COMMENTS:
STEP 4 (6.2.1}: COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
Linear power range indication for each subchannel at RPS Cabinets.
EXAMINER'S CUE:
ALL CHANNELS INDICATE 100% EXCEPT "C", WHICH INDICATES 50% AT THE RPS Cabinets.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT SAT UNSAT SAT UNSAT NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 4 of 12
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STARTTIME: ___ _
STEP 1 (6.2.1}: COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
RPS Q-power channels: JI-003A, 0038, 003C and 0030.
EXAMINER'S CUE:
ALL CHANNELS ARE 100%.
COMMENTS:
SAT UNSAT r---
STEP 2 (6.2.1}: COMPARE meter indications on all channels to determine the validity of the alarm/indication.
SAT STANDARD:
ASI Y channels on RTGB A thru D.
EXAMINER'S CUE:
ALL ASI Y CHANNELS ON RTGB ARE READING UNSAT NORMAL INDICATIONS EXCEPT "C" CHANNEL, ASI Y WHICH IS FULL SCALE LOW.
COMMENTS:
~------------
STEP 3 (6.2.1}: COMPARE meter indications on all channels to determine the validity of the alarm/indication.
SAT STANDARD:
Power range control channels J R-01 0 on RTG 8.
EXAMINER'S CUE:
BOTH CHANNELS ARE 100%.
UNSAT COMMENTS:
I I I STEP 4 (6.2.1}: COMPARE meter indications on all channels to determine the validity of the alarm/indication.
SAT STANDARD:
Linear power range indication for each subchannel at RPS Cabinets.
EXAMINER'S CUE:
ALL CHANNELS INDICATE 100% EXCEPT "C", WHICH UNSAT INDICATES 50% AT THE RPS Cabinets.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 4 of 12 I
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 5 (6.2.1 ): COMPARE meter indications on all channels to determine the validity of the alarmlindication.
STANDARD:
Wide range instruments JI-001 thru 4 and JR-011 at the RPS Cabinets.
EXAMINER'S CUE:
ALL CHANNELS INDICATE 100% AT THE RPS CABINETS.
COMMENTS:
STEP 6 (6.2.1 ): COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
Wide range instruments JI-001 thru 4 and JR-011 at the RPS Cabinets.
EXAMINER'S CUE:
NUCLEAR POWER DELTA - T METER POINTER INDICATES -10. (TO LEFT OF 0)
COMMENTS: The step is used ONLY if candidate asks indication on Nuclear Power Delta -
T Meter.
__ SAT
__ UNSAT
__ SAT
__ UNSAT r-------------------------------------------------------------_+-----------.-
STEP 6 (6.2.1 ): COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
Determine the malfunction to be the Linear Power Range Safety Channel "C" at the RPS Cabinets.
EXAMINER'S CUE:
IDENTIFY LINEAR POWER RANGE SAFETY CHANNEL "C" TO BE MALFUNCTIONING AT THE RPS CABINETS.
COMMENTS:
__ UNSAT
~.-----------------------------------------------------------+----------~
STEP 7 (6.2.1 ): COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
Determine the malfunction to be the Linear Power Range Safety Channel "C" at the RPS Cabinets.
EXAMINER'S CUE:
WHEN LOWER DETECTOR SELECTED ON THE METER SELECT SWITCH THE INDICATION IS 0%, WHEN UPPER DETECTOR SELECTED THE INDICATION IS 100%.
COMMENTS: This step is used ONLY if the candidate selects to determine if the lower or the upper detector has failed. In this case the lower detector has failed low.
- Cues are to be used only if JPM performance is being simulated in the plant.
__ UNSAT NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 5 of 12
(
(
STEP 5 (6.2.1):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST COMPARE meter indications on all channels to determine the validity of the alarm/indication.
Wide range instruments JI-001 thru 4 and JR-011 at the RPS Cabinets.
EXAMINER'S CUE:
ALL CHANNELS INDICATE 100% AT THE RPS CABINETS.
COMMENTS:
STEP 6 (6.2.1): COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
Wide range instruments JI-001 thru 4 and JR-011 at the RPS Cabinets.
EXAMINER'S CUE:
NUCLEAR POWER DELTA - T METER POINTER INDICATES -10. (TO LEFT OF 0)
COMMENTS: The step is used ONLY if candidate asks indication on Nuclear Power Delta -
T Meter.
-"~--- - ----".-.~
STEP 6 (6.2.1): COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
Determine the malfunction to be the Linear Power Range Safety Channel "C" at the RPS Cabinets.
EXAMINER'S CUE:
IDENTIFY LINEAR POWER RANGE SAFETY CHANNEL "C" TO BE MALFUNCTIONING AT THE RPS CABINETS.
COMMENTS:
I------~--
STEP 7 (6.2.1): COMPARE meter indications on all channels to determine the validity of the alarm/indication.
STANDARD:
Determine the malfunction to be the Linear Power Range Safety Channel "C" at the RPS Cabinets.
EXAMINER'S CUE:
WHEN LOWER DETECTOR SELECTED ON THE METER SELECT SWITCH THE INDICATION IS 0%, WHEN UPPER DETECTOR SELECTED THE INDICATION IS 100%.
COMMENTS: This step is used ONLY if the candidate selects to determine if the lower or the upper detector has failed. In this case the lower detector has failed low.
--.-~--.--
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT SAT UNSAT SAT UNSAT NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 5 of 12
STEP 8 (6.2.4):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST 1f a malfunction of a Linear Range Safety Channel (RPS A, B, C, or D) has occurred, Then PERFORM the following:
A. PERFORM ONE of the following:
- 1. BYPASS the failed channel Variable High Power, TM/LP and LPD Trip Unit Bistables.
- 2. PLACE the failed channel Variable High Power, TM/LP and LPD Trip Unit Bistables in TRIP in accordance with Appendix B, Placing Trip Units in Trip.
OBTAIN the keys for the "C" channel Variable High Power, TM/LP, and LPD Trip unit bistables.
BYPASS Variable High Power, TM/LP and LPD Trip unit bistables at the RPS Cabinets.
EXAMINER'S CUE:
If asked which of the above would the US like to perform state the channels are to be BYPASSED.
EXAMINER'S CUE:
KEYS LOGGED OUT.
EXAMINER'S CUE:
When BYPASSED State: Keys are turned clockwise and YELLOW LIGHTS LIT FOR THE THREE BISTABLES AT RPS CABINET "C".
NOTE: THE OPERATOR SHOULD RECOGNIZE THE KEYS MUST BE LOGGED OUT COMMENTS:
STEP 9 (6.2.4.B): If power level is greater than or equal to 15%, Then PERFORM ONE of the following:
- 1. BYPASS the affected channel Loss Load Trip Unit Bistable.
- 2. PLACE the affected channel Loss Load Trip Unit Bistable in Trip in accordance with Appendix B, Placing Trip Units in Trip.
STANDARD:
OBTAIN the key for the Loss of Load Trip unit bypass.
BYPASS the Loss of Load Trip Unit Bistable at the RPS Cabinet 'C'.
EXAMINER'S CUE: If asked which of the above would the US like to perform state the channel is to be BYPASSED.
EXAMINER'S CUE: KEY LOGGED OUT.
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 6 of 12 I
I JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 8 (6.2.4): If a malfunction of a Linear Range Safety Channel (RPS A, B, C, or D) has occurred, Then PERFORM the following:
A.
PERFORM ONE of the following:
- 1. BYPASS the failed channel Variable High Power, TM/LP and LPD Trip Unit Bistables.
- 2. PLACE the failed channel Variable High Power, TM/LP and LPD Trip Unit Bistables in TRIP in accordance with Appendix B, Placing Trip Units in Trip.
STANDARD:
OBTAIN the keys for the "C" channel Variable High Power, TM/LP, and LPD Trip unit bistables.
BYPASS Variable High Power, TM/LP and LPD Trip unit bistables at the RPS Cabinets.
EXAMINER'S CUE:
If asked which of the above would the US like to perform state the channels are to be BYPASSED.
EXAMINER'S CUE:
KEYS LOGGED OUT.
EXAMINER'S CUE:
When BYPASSED State: Keys are turned clockwise and YELLOW LIGHTS LIT FOR THE THREE BISTABLES AT RPS CABINET "C".
NOTE: THE OPERATOR SHOULD RECOGNIZE THE KEYS MUST BE LOGGED OUT COMMENTS:
-~-~~~
STEP 9 (6.2.4.B): If power level is greater than or equal to 15%, Then PERFORM ONE of the following:
- 1. BYPASS the affected channel Loss Load Trip Unit Bistable.
- 2. PLACE the affected channel Loss Load Trip Unit Bistable in Trip in accordance with Appendix B, Placing Trip Units in Trip.
STANDARD:
OBTAIN the key for the Loss of Load Trip unit bypass.
BYPASS the Loss of Load Trip Unit Bistable at the RPS Cabinet 'C'.
EXAMINER'S CUE: If asked which of the above would the US like to perform state the channel is to be BYPASSED.
EXAMINER'S CUE: KEY LOGGED OUT.
- Cues are to be used only if JPM performance is being simulated in the plant.
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 6 of 12
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST EXAMINER'S CUE: Key is turned clockwise and the Yellow light is lit on RPS Cabinet "C".
COMMENTS; This task will be simulated by candidate.
STEP 1 0 (6.2.4.0);
At the Comparator Averager, (rear of RPS Cabinet "A") PLACE the CRITICAL failed toggle switch (A=5, B=6, C=7, D=8) in OFF.
STEP STANDARD; LOCATE the "C" toggle switch (#7) and places in OFF.
EXAMINER'S CUE:
TOGGLE SWITCH #7 IDENTIFIED AND PLACED IN OFF.
EXAMINER'S NOTE:
Key has been logged out by the Unit Supervisor. Clears the subchannel deviation alarms on the unaffected channels.
COMMENTS; Key to the RPS Cabinets will be controlled by the Unit Supervisor for the exam. When step reached direct candidate to Unit Supervisor for key to open RPS Cabinet door. This task is simulated with the exception of opening the RPS door to view the Comparator Averager in the rear of RPS Cabinet "A".
__ UNSAT
+----------~
STEP 11 (6.2.4.E);
ENSURE a deviation entry is made in accordance with 1-0010123, Administrative Control of Valves, Locks, and Switches SAT STANDARD:
LOG the deviation entry EXAMINER'S CUE:
DEVIATION ENTRY COMPLETED
__ UNSAT COMMENTS; STEP 12 (6.2.4.F);
DECLARE the failed channel out of service.
STANDARD; LOG the "C" channel RPS LR instrument in OOS log.
SAT EXAMINER'S CUE:
LOG ENTRY COMPLETED.
__ UNSAT COMMENTS:
L-_______________________________________________________________ -L ___________ _
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 7 of 12
(
(
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST EXAMINER'S CUE: Key is turned clockwise and the Yellow light is lit on RPS Cabinet "C".
COMMENTS: This task will be simulated by candidate.
-~
STEP 10 {6.2.4.D}:
At the Comparator Averager, (rear of RPS Cabinet "A") PLACE the failed toggle switch (A=5, 8=6, C=7, 0=8) in OFF.
STANDARD:
LOCATE the "C" toggle switch (#7) and places in OFF.
EXAMINER'S CUE:
TOGGLE SWITCH #7 IDENTIFIED AND PLACED IN OFF.
EXAMINER'S NOTE:
Key has been logged out by the Unit Supervisor. Clears the subchannel deviation alarms on the unaffected channels.
COMMENTS: Key to the RPS Cabinets will be controlled by the Unit Supervisor for the exam. When step reached direct candidate to Unit Supervisor for key to open RPS Cabinet door. This task is simulated with the exception of opening the RPS door to view the Comparator Averager in the rear of RPS Cabinet "A".
CRITICAL STEP SAT UNSAT
--.-.. ---~~
STEP 11 {6.2.4.E}:
ENSURE a deviation entry is made in accordance with 1-0010123, Administrative Control of Valves, Locks, and Switches SAT STANDARD:
LOG the deviation entry EXAMINER'S CUE:
DEVIATION ENTRY COMPLETED UNSAT I COMMENTS:
i STEP 12 {6.2.4.F}:
DECLARE the failed channel out of service.
STANDARD:
LOG the "C" channel RPS LR instrument in OOS log.
-- SAT EXAMINER'S CUE:
LOG ENTRY COMPLETED.
UNSAT COMMENTS:
-~---"--
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 7 of 12 I
I I
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 13 (6.2.4.G) :
NOYIFY the I & C Department as soon as practical.
STANDARD:
CALL the I & C Department and NOTIFY them of the "C n LR NI failure.
EXAMINER'S CUE:
I&C. ACKNOWLEDGES.
COMMENTS:
STEP 14 (6.2.4.H} :
.!f power level is greater than 75%, Then NOTIFY Reactor Engineering to determine Azimuthal Power Tilt once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> using incore detectors.
STANDARD:
CONTACT Reactor Engineering Department and inform them of the requirements for Azimuthal Tilt.
EXAMINER'S CUE:
REACTOR ENGINEERING ACKNOWLEDGES.
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT SAT UNSAT NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 8 of 12 STEP 13 (6.2.4.G) :
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOYIFY the I & C Department as soon as practical.
STANDARD:
CALL the I & C Department and NOTIFY them of the "C" LR NI failure.
EXAMINER'S CUE:
I&C. ACKNOWLEDGES.
COMMENTS:
SAT UNSAT
-.------------------------------------------------------------------~----------~
STEP 14 (6.2.4.H) :
!f power level is greater than 75%, Then NOTIFY Reactor Engineering to determine Azimuthal Power Tilt once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> using incore detectors.
I STANDARD:
CONTACT Reactor Engineering Department and inform them of the requirements for Azimuthal Tilt.
EXAMINER'S CUE:
REACTOR ENGINEERING ACKNOWLEDGES.
COMMENTS:
SAT UNSAT L __________
'--_~ __ ~I
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 8 of 12
STEP 15 (6.2.4.1):
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST REFER to Technical Specifications to ensure compliance with all applicable actions.
STANDARD:
NOTIFY US to reference Technical Specification, Table 3.3-1, Section 3.2.4.
EXAMINER'S CUE:
US ACKNOWLEDGES.
COMMENTS:
SAT UNSAT END OF TASK
_._-----------------'----=----------------'------
STOP TIME: ___ _
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 9 of 12 STEP 15 (62.4.1):
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST REFER to Technical Specifications to ensure compliance with all applicable actions.
SAT STANDARD:
NOTIFY US to reference Technical Specification, Table 3.3-1, Section 3.2.4.
EXAMINER'S CUE:
US ACKNOWLEDGES.
UNSAT COMMENTS:
L ___________________ -=E'-N-=D_O=-F=--T'-'-A-=..S-'-'K ____________ -'--______....
STOP TIME:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-5 Rev 0 UNIT 1 CONTROL ROOM Page 9 of 12
JOB PERFORMANCE MEASURE Examiner Aid (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The plant is operating at 100% power, steady state conditions, MOL.
Numerous annunciators are activated including:
o L-12, LOCAL POWER DENSITY CHANNEL TRIP o L-18, LOCAL POWER DENSITY CHANNEL PRE TRIP o
L-20, REACTOR POWER RANGE SUBCHANNEL DEVIATION o L-22, TM/LP CHANNEL TRIP o
L-26, NUCLARI t, T POWER CHANNEL DEVIATION o L-28, TM/LP CHANNEL PRE TRIP INITIATING CUES:
The Unit Supervisor has directed you to investigate and perform any required actions 1-0NP-99.01, "Loss of Tech Spec Instrumentation" Page 10 of 8
(
JOB PERFORMANCE MEASURE Examiner Aid (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The plant is operating at 100% power, steady state conditions, MOL.
Numerous annunciators are activated including:
o L-12, LOCAL POWER DENSITY CHANNEL TRIP o L-18, LOCAL POWER DENSITY CHANNEL PRE TRIP o
L-20, REACTOR POWER RANGE SUBCHANNEL DEVIATION o
L-22, TM/LP CHANNEL TRIP o
L-26, NUCLARI t,T POWER CHANNEL DEVIATION o L-28, TM/LP CHANNEL PRE TRIP INITIATING CUES:
The Unit Supervisor has directed you to investigate and perform any required actions 1-0NP-99.01, "Loss of Tech Spec Instrumentation" Page 10 of 8
-u OJ (Q
CD 8-co WR LOG SAFETY AND LINEAR POWER RANGE SAFETY CHANNEL DRAWER o
o RPS NUCLEAR INSTRUMENTS LOG PERCENT POWE 200
-1 OUTPUT LOG CAL RATE TEST TEST SELECT LCR 3
4 MSV ZERO +7 DPM RATE U-L 2
\\
f 5
OPR I
I TEST
\\
I
,U RATE DPM 7
\\
/
\\
/
LOG L
- ~i) :~:E lQJ lQJ lQJ 1- /\\ ~6 OPR" ~
'TEST D POWER ON AVE o
TRIP RESET
@@@ o 0 WR CAL UPPER GAIN LOWER GAIN
@ @EN~i:fij' OUTPUT
~
NORMAL ZPMB LOG LOG TROUBLE LOG TEST RATE TEST SCALER o
LlN~AR PER ENT PO ER 200 METER SELECT PRTEST L
AVG ZERO 200%
U
\\
J CAL OPR
\\
I TEST
'a'AVGotJ '0 TEST (U+L)J2 UtS OJ
~
0 (T!RCO!0711403-F9-RO)
C-a CII
""C m
- 0
'T1 rna
><;0 3:5
- i" >
CDZ
.... (")
- m
- c.
S m C/J C
- 0 m
WR LOG SAFETY AND LINEAR POWER RANGE SAFETY CHANNEL DRAWER o
o RPS NUCLEAR INSTRUMENTS LOG PERCENT POWER 200
-1 OUTPUT RATE DPM 7
o 200 LOG CAL RATE TEST TEST SELECT METER SELECT PRTEST 0TRIPRESET
©©© 0 0 @
ZPMB LOG LOG LOG TEST RATE TEST SCALER TROUBLE
-AVE
, CAL AVE D D D L
AVG ZERO 200%
~~~
U,
\\
J CAlOPR
\\
I TEST (Q) (Q) (Q) a'AVGotJ '0 TEST TEST WR CAL UPPER GAIN LOWER GAIN (U"'L)i2 UPPER
~LOWER POWER ON U6"
@IN:i~;([)
OUTPUT TRIPRESET~
©©© LIN LIN 1 LIN 2 TROUBLE NORMAL AVERAGE CONTROL PR TRIPS 0
0 (T!RCO!0711403-F9-RO) c...
0 OJ
""C m
- 0
"'TI mo
~ ;0 3s
- '
- t:-
~ z
- t>(')
c: m S
m
- t:-en c
- 0 m
"lJ ill co (1)
N S,
ill UNIT2 REACTOR PROTECTIVE SYSTEM CALIBRATION AND INDICATION PANEL (UNIT 1 SIMILAR)
R.P.S. CALIBRATION & INDICATION PANEL NUCLEAR PWR - L<.T (%)
OPERATE CAL CHECK-2 ~
DYNMAIC T@ETCALCHECK.l o
OFF _INC TMILP TEST CIT POWER CALCULATOR TEST 3 PUMP LOOP 2A
~
2PUMPOPP LOO::UMP 2 PUMP 4 PUMP LOOP 2B OFF __ INC FLOW DEPENDENT SET POINT SELECTOR (JUMPERED OUT)
" T POWER TEST DYNAMIC TEST 0
VARHI PWR TRIP RESET
- .\\ TTEST PUMPiSETPOINT ERROR
+ lOV ZERO
- 10V
- .IT POWER NOT SELECTED e
.:IT POWER BLOCKED EXT DVM INPUT MPWR CALIBRATE
- TCOlD CALIBRATE NUCLEAR PWR CALIBRATE
+ 00.368
(§)
D.C. VOLTS THOT
~
DEC _INC TCO~D PTRIP NUCLEAR P PRE-TRIP PWR PVAR 0 AUX T COLD PRE-TRIP SP CAL
.. T PWR TRIP SP FINE METER INPUT I
BISTABLE
~
o TRIP UNIT INPUT (T/RCOI0711404-F25-R 11) c... a OJ
""C m
- 0 ma
~ :;0 3 S 3' >>
~z
>>("')
c.: m S
m >>
en c
- 0 m
UNIT2 REACTOR PROTECTIVE SYSTEM CALIBRATION AND INDICATION PANEL (UNIT 1 SIMILAR)
R.P.S. CALIBRATION & INDICATION PANEL NUCLEAR PWR - !l T (%)
OPERATE CAL CHECK*2 ~
DYNMAIC TE@TCALCHECK'l o
OFF
- INC TMiLP TEST
.'IT POWER CALCULATOR TEST 2 PUMP OPP LOOPS 3 PU~P C6'6~~A 2 PUMP 4 PUMP LOOP 2B ~w OFF INC FLOW DEPENDENT SET POINT SELECTOR (JUMPEREO OUT)
'"' T POWER TEST DYNAMIC TEST 0
VAR HI PWR TRIP RESET e
..\\ TTEST
- PUMP/SET POINT ERROR
+ lOV ZERO
- 10V 0
-!"o"'
,.IT POWeR NOT SELECTED e
,:'iT POWER BLOCKED INPUT (I)
SlrWR CALIBRATE TCOLD CALIBRATE NUCLEAR PWR CALIBRATE
+ 00.368 D.C. VOLTS THOT
~. NU~i%~g~D PT::RE'TRIP DEC INC P VAR 0 AUX T g~CD PRE.TRIP SP FINE
METEF INPUT BISTABLE AUCT*l AUCT*2
- W+
TRIP UNIT INPUT (T.lRCOI0711404-F25-R 11) c... a OJ
'"C m
- 0 "T1 ma
~:;o 3s S" >>
~ z l>(")
jim S
m >>
en c
- 0 m
fj FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE Respond to slipped CEA's Unit 2 NRC S-6 Developed/Revised by: __
C_hu_c_k _Ro-""g,--er_s __
Training Management Approval: -------
Date JPM NRC S-6/ Rev 0 SIMULATOR Page 1 of 10 FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE Respond to slipped CEA's Unit 2 NRC S-6 Developed/Revised by: __
C_hu_c_k _Ro--",9'---..er_s __
Training Management Approval: -------
(
Date JPM NRC S-6/ Rev 0 SIMULATOR Page 1 of 10
JOB PERFORMANCE MEASURE Task:
Respond to slipped CEA's Unit 2 Alternate Path JPM?
Yes Facility JPM #:
N/A KIA Rating(s):
001. A2.11 Situations requiring a reactor trip. 4.4/4.7 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is completed when reactor is manually tripped.
Evaluation Location:
Performance Level:
Simulator X
In Plant Lab Other Perform X
Simulate Discuss
References:
2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT Appendix H Validation Time: 15 minutes Time Critical:
Tools/Equipment/Procedures Needed:
2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT Appendix H Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-6/ Rev 0 SIMULATOR Page 2 of 10
(
JOB PERFORMANCE MEASURE Task:
Respond to slipped CEA's Unit 2 Alternate Path JPM?
Yes Facility JPM #:
N/A K/A Rating(s):
001. A2.11 Situations requiring a reactor trip. 4.4 / 4.7 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is completed when reactor is manually tripped.
Evaluation Location:
Performance Level:
Simulator X
In Plant Lab Other Perform X
Simulate Discuss
References:
2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT Appendix H Validation Time: 15 minutes Time Critical:
No Tools/Equipment/Procedures Needed:
2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT Appendix H Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-6/ Rev 0 SIMULATOR Page 2 of 10
(
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Realign CEA # 56 using 2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT Appendix H.
The performance level to be used for this JPM is SIMULATE.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is at 100% power. CEA # 8 has slipped 15 inches. 2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT has been entered, Appendix A is complete and CEA # 8 is ready to be withdrawn and realigned with its group by using Appendix H.
INITIATING CUES:
The US directs you to align CEA # 8 with its group in accordance with 2-0110030, CEA OFF-NORMAL OPERATION AND REALIGNMENT, Appendix H.
JPM NRC S-6/ Rev 0 SIMULATOR Page 3 of 10 SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Realign CEA # 56 using 2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT Appendix H.
The performance level to be used for this JPM is SIMULATE.
This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
The Unit is at 100% power. CEA # 8 has slipped 15 inches. 2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT has been entered, Appendix A is complete and CEA # 8 is ready to be withdrawn and realigned with its group by using Appendix H.
INITIATING CUES:
The US directs you to align CEA # 8 with its group in accordance with 2-0110030, CEA OFF-NORMAL OPERATION AND REALIGNMENT, Appendix H.
JPM NRC S-6/ Rev 0 SIMULATOR Page 3 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___
2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT Appendix H.
STEP 1: (1)
While realigning CEAs, observe the following SAT A. Regulating CEAs shall be withdrawn in sequence and overlap between groups shall NOT exceed 54 inches.
UNSAT B. Do NOT exceed a sustained SUR of 1.4 DPM (alarm 1.3 DPM).
C. Criticality shall be anticipated any time CEAs are being withdrawn.
D. If deviation between CEAs in any group approaches 3 inches, stop group withdrawal and realign CEAs.
E. While CEA is misaligned, individual CEA positions within the group shall be determined at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> except when the CEA position deviation circuit is out of service, then verify CEA positions at least once every four hours.
STANDARD:
REVIEWS limits while realigning CEA # 8. Determines step 2 is N/A EXAMINERS CUE: None COMMENTS:
JPM NRC S-6/ Rev 0 SIMULATOR Page 4 of 10
(
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___
2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT Appendix H.
STEP 1: (1)
While realigning CEAs, observe the following SAT A. Regulating CEAs shall be withdrawn in sequence and overlap between groups shall NOT exceed 54 inches.
UNSAT B. Do NOT exceed a sustained SUR of 1.4 DPM (alarm 1.3 DPM).
C. Criticality shall be anticipated any time CEAs are being withdrawn.
D. If deviation between CEAs in any group approaches 3 inches, stop group withdrawal and realign CEAs.
E. While CEA is misaligned, individual CEA positions within the group shall be determined at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> except when the CEA position deviation circuit is out of service, then verify CEA positions at least once every four hours.
STANDARD:
REVIEWS limits while realigning CEA # 8. Determines step 2 is N/A EXAMINERS CUE: None COMMENTS:
JPM NRC S-6/ Rev 0 SIMULATOR Page 4 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST CAUTION Reactor Power shall NOT be increased above the stable power level established following the CEA(s) misalignment.
STEP 2 (3.A):
Prior to realigning of CEA, contact Reactor Engineering and supply them with the following information.
- 1. Power level at which recovery is to be made.
- 2. Rate of CEA movement during recovery.
- 3. Movement of other CEAs to support recovery.
STANDARD:
CONTACTS Reactor Engineering EXAMINERS CUE:
RE ACKNOWLEDGES. Informs Applicant no concerns with CEA recovery.
EXAMINERS NOTE: Applicant may state 'we would have another RO control Boric Acid flow so power does not increase'. State other RO is on station as needed.
NOTE: power does not increase, no need for boration.
COMMENTS:
STEP 3 (3.B): Place the mode select switch in the manual individual mode.
STANDARD: POSITION mode select switch to manual individual.
EXAMINERS CUE: None COMMENTS:
STEP 4 (3.C) Select the misaligned CEA on the individual CEA selection switches.
STANDARD: POSITION individual CEA selection switches to 0,8.
EXAMINERS CUE: None COMMENTS:
__ SAT
__ UNSAT CRITICAL STEP SAT
__ UNSAT CRITICAL STEP
__ SAT
__ UNSAT JPM NRC S-6/ Rev 0 SIMULATOR Page 5 of 10
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST I
CAUTION I
Reactor Power shall NOT be increased above the stable power level established following the CEA( s) misalignment.
STEP 2 (3.A):
Prior to realigning of CEA, contact Reactor Engineering and supply them with the following information.
- 1. Power level at which recovery is to be made.
- 2. Rate of CEA movement during recovery.
- 3. Movement of other CEAs to support recovery.
STANDARD:
CONTACTS Reactor Engineering EXAMINERS CUE:
RE ACKNOWLEDGES. Informs Applicant no concerns with CEA recovery.
EXAMINERS NOTE: Applicant may state 'we would have another RO control Boric Acid flow so power does not increase'. State other RO is on station as needed.
NOTE: power does not increase, no need for boration.
COMMENTS:
STEP 3 (3.B): Place the mode select switch in the manual individual mode.
STANDARD: POSITION mode select switch to manual individual.
EXAMINERS CUE: None COMMENTS:
STEP 4 (3.C) Select the misaligned CEA on the individual CEA selection switches.
STANDARD: POSITION individual CEA selection switches to 0, 8.
EXAMINERS CUE: None COMMENTS:
SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRC S-6/ Rev 0 SIMULATOR Page 5 of 10
STEP 5 (3.D)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Select the group of the misaligned CEA on the group select switch.
STANDARD: POSITION group select switch to group 5.
EXAMINERS CUE: None COMMENTS:
STEP 6: (3.E) If CEA motion inhibit is present, Then:
- 1. Depress and hold the CEA motion inhibit bypass pushbutton.
STANDARD:
DEPRESSES AND HOLDS the CEA motion inhibit bypass pushbutton.
EXAMINERS CUE: None COMMENTS:
STEP 7: (3.E) If CEA motion inhibit is present, Then:
- 2. Depress then release the bypass enable pushbutton.
STANDARD:
DEPRESSES THEN RELEASES the bypass enable pushbutton.
EXAMINERS CUE: None COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRC S-6/ Rev 0 SIMULATOR Page 6 of 10
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST
!sTEP 5 (3.0) Select the group olthe misaligned CEA on the group select switch.
i STANDARD: POSITION group select switch to group 5.
EXAMINERS CUE: None COMMENTS:
I I STEP 6: (3.E) If CEA motion inhibit is present, Then:
- 1. Depress and hold the CEA motion inhibit bypass pushbutton.
STANDARD:
DEPRESSES AND HOLDS the CEA motion inhibit bypass pushbutton.
EXAMINERS CUE: None COMMENTS:
I STEP 7 (3.E) If CEA motion inhibit is present, Then:
I
- 2. Depress then release the bypass enable pushbutton.
I STANDARD:
DEPRESSES THEN RELEASES the bypass enable pushbutton.
EXAMINERS CUE: None COMMENTS:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT JPM NRC S-6/ Rev 0 SIMULATOR Page 6 of 10 i
STEP 8: (3.F)
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Realign CEA to the group position while borating as necessary to maintain Reactor Power at or below the power level which resulted from the CEA insertion.
ST ANDARD: POSITION the rod motion switch to the withdraw position and withdraws CEA
- 8, and OBSERVE indications for rod motion.
EXAMINERS NOTE: Inform Applicant other RO will perform boration if needed.
EXAMINERS CUE: None COMMENTS:
STEP 9 : (N/A) As CEA # 8 is being withdrawn to 136 inches out CEA # 9 drops to the bottom of the core.
STANDARD:
DETERMINES CEA #9 has dropped to the bottom of the core.
EXAMINERS CUE: None EXAMINERS NOTE: Faulted Step - CEA # 9 drops to the bottom of the core when CEA #8 reaches 126",
COMMENTS:
CRITICAL STEP SAT UNSAT FAULTED STEP SAT UNSAT JPM NRC S-6/ Rev 0 SIMULATOR Page 7 of 10 I I I
(
I I
I STEP 8: (3.Fl STANDARD:
COMMENTS:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Realign CEA to the group position while borating as necessary to maintain Reactor Power at or below the power level which resulted from the CEA insertion.
POSITION the rod motion switch to the withdraw position and withdraws CEA
- 8, and OBSERVE indications for rod motion.
EXAMINERS NOTE: Inform Applicant other RO will perform boration if needed.
EXAMINERS CUE: None STEP 9 : (N/A) As CEA # 8 is being withdrawn to 136 inches out CEA # 9 drops to the bottom of the core.
STANDARD:
DETERMINES CEA #9 has dropped to the bottom of the core.
EXAMINERS CUE: None EXAMINERS NOTE: Faulted Step - CEA # 9 drops to the bottom of the core when CEA #8 reaches 126".
COMMENTS:
CRITICAL STEP SAT UNSAT FAULTED STEP SAT UNSAT JPM NRC S-6/ Rev 0 SIMULATOR Page 7 of 10
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE If two CEA's are misaligned, with one misaligned greater than or equal to 15 inches and the other misaligned greater than 7.0 inches, then actions of two CEAs misaligned from any other CEA in its group by greater than or equal to 15 inches would apply.
IMMEDIATE OPERATOR ACTIONS FROM 2-0110030, "CEA OFF-NORMAL OPERATION AND REALIGNMENT" STEP 7.1.4 REQUIRES THE BELOW ACTIONS:
STEP 1 0 (7.1.4) 1f 2 or more CEA's are misaligned from any other CEA in their group by greater than 15 inches and / or dropped, while in Mode 1 or 2, Then manually trip ther reactor and turbine and carry out 2-EOP-01, Standard Post Trip Actions. Determines that 2 CEAs are misaligned and trips the reactor.
STANDARD: DETERMINES that 2 CEAs are misaligned and trips the reactor. The Reactor and turbine are manually tripped lAW Step 7.1.4 of Immediate Operator Actions and "Standard Post Trip Actions" are begun.
EXAMINERS CUE: None COMMENTS:
STEP 11 REPORT to the US that the reactor is tripped STANDARD: REPORTS to the US that the reactor has tripped.
EXAMINERS CUE: US Acknowledges, Inform the Candidate JPM is complete COMMENTS:
END OF TASK STOP TIME: ____
CRITICAL STEP
__ SAT
__ UNSAT
__ SAT
__ UNSAT JPM NRC S-6/ Rev 0 SIMULATOR Page 8 of 10
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST Ilf two CEA's are misaligned, with one mis~i~~;d greater than or equal to 15 inches and I
i the other misaligned greater than 7.0 inches, then actions of two CEAs misaligned from any other CEA in its group by greater than or equal to 15 inches would apply.
IMMEDIATE OPERATOR ACTIONS FROM 2-0110030, "CEA OFF-NORMAL OPERATION AND REALIGNMENT" STEP 7.1.4 REQUIRES THE BELOW ACTIONS:
STEP 1 0 (7.1.4)
If 2 or more CEA's are misaligned from any other CEA in their group by greater than 15 inches and / or dropped, while in Mode 1 or 2, Then manually trip ther reactor and turbine and carry out 2-EOP-01, Standard Post Trip Actions. Determines that 2 CEAs are misaligned and trips the reactor.
STANDARD: DETERMINES that 2 CEAs are misaligned and trips the reactor. The Reactor and turbine are manually tripped lAW Step 7.1.4 of Immediate Operator Actions and "Standard Post Trip Actions" are begun.
EXAMINERS CUE: None COMMENTS:
STEP 11 REPORT to the US that the reactor is tripped STANDARD: REPORTS to the US that the reactor has tripped.
EXAMINERS CUE: US Acknowledges, Inform the Candidate JPM is complete COMMENTS:
END OF TASK STOP TIME: ____ _
__ UNSAT JPM NRC S-6/ Rev 0 SIMULATOR Page 8 of 10
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET RESTORE IC set for 100% power, MOL. UNFREEZE the Simulator.
EXECUTE S-6 'Slipped CEA # 8' TRIGGER slip CEA # 8 Make sure CEA MOTION INHIBIT ALARM K-11 and K-30 CEA Position Deviation motion block (ADS) ARE IN ALARM.
TRIGGER step 'Drop CEA #9' When CEA # 8 is withdrawn 4 inches out CEA # 9 drops into the core.
PRIOR to each student performing the JPM, return the Group Select switch to Group 5 and the Individual Select and digital CEA select rotary switches to a CEA in group 5 that is NOT CEA 8 or
- 9.
NOTE: Have an entire copy of 2-0110030 "CEA Off-Normal Operation and Realignment" copied to give the examiner for the student usage.
JPM NRC S-6/ Rev 0 SIMULATOR Page 9 of 10
(
{
\\
JOB PERFORMANCE MEASURE SIMULATOR SETUP SHEET RESTORE IC set for 100% power, MOL. UNFREEZE the Simulator.
EXECUTE S-6 'Slipped CEA # 8' TRIGGER slip CEA # 8 Make sure CEA MOTION INHIBIT ALARM K-11 and K-30 CEA Position Deviation motion block (ADS) ARE IN ALARM.
TRIGGER step 'Drop CEA #9' When CEA # 8 is withdrawn 4 inches out CEA # 9 drops into the core.
PRIOR to each student performing the JPM, return the Group Select switch to Group 5 and the Individual Select and digital CEA select rotary switches to a CEA in group 5 that is NOT CEA 8 or
- 9.
NOTE: Have an entire copy of 2-0110030 "CEA Off-Normal Operation and Realignment" copied to give the examiner for the student usage.
JPM NRC S-6/ Rev 0 SIMULATOR Page 9 of 10
JOB PERFORMANCE MEASURE CANDIDANT CUESHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is at 100% power. CEA # 8 has slipped 15 inches. 2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT has been entered, Appendix A is complete and CEA # 8 is ready to be withdrawn and realigned with its group by using Appendix H.
INITIATING CUES:
The US directs you to align CEA # 8 with its group in accordance with 2-0110030, CEA OFF-NORMAL OPERATION AND REALIGNMENT, Appendix H.
JPM NRC S-6/ Rev 0 SIMULATOR Page 10 of 10
(
JOB PERFORMANCE MEASURE CANDIDANT CUESHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
The Unit is at 100% power. CEA # 8 has slipped 15 inches. 2-0110030 CEA OFF-NORMAL OPERATION AND REALIGNMENT has been entered, Appendix A is complete and CEA # 8 is ready to be withdrawn and realigned with its group by using Appendix H.
INITIATING CUES:
The US directs you to align CEA # 8 with its group in accordance with 2-0110030, CEA OFF-NORMAL OPERATION AND REALIGNMENT, Appendix H.
JPM NRC S-6/ Rev 0 SIMULATOR Page 10 of 10
JOB PERFORMANCE MEASURE cG FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO A CCW HEADER RUPTURE UNIT 2 NRC 5-7 Developed/Revised by: __
~L~ar---Lry~R_ic_h __
Training Management Approval: -------
Date JPM NRC S-7 Rev 0 Simulator Page 1 of 8
(
JOB PERFORMANCE MEASURE FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE RESPOND TO A CCW HEADER RUPTURE UNIT 2 NRC 5-7 Developed/Revised by: ___
L_ar-Lry_R_ic_h __
Training Management Approval: -------
Date JPM NRC S-7 Rev 0 Simulator Page 1 of 8
(
JOB PERFORMANCE MEASURE Task: Respond to a CCW Header rupture Unit 2 Alternate Path JPM?
Yes Facility JPM #:
N/A K/A Rating(s):
00S.A2.02 High I Low CCW surge tank level 3.2 I 3.5 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when all Reactor Coolant Pumps have been stopped..
Evaluation Location:
Performance Level:
Simulator X
References:
In Plant Lab Other 2-0310030 Component Cooling Water - Off Normal Operation Validation Time: 10 minutes Tools/Equipment/Procedures Needed:
None Perform X
Simulate Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-7 Rev 0 Simulator Page 2 of 8
(
JOB PERFORMANCE MEASURE Task: Respond to a CCW Header rupture Unit 2 Alternate Path JPM?
Yes Facility JPM #:
N/A KIA Rating(s):
00S.A2.02 High I Low CCW surge tank level 3.2 I 3.5 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when all Reactor Coolant Pumps have been stopped..
Evaluation Location:
Performance Level:
Simulator X
References:
In Plant Lab Other 2-0310030 Component Cooling Water - Off Normal Operation Validation Time: 10 minutes Tools/Equipment/Procedures Needed:
None Perform X
Simulate Time Critical:
Discuss Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None JPM NRC S-7 Rev 0 Simulator Page 2 of 8
(
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Respond to a CCW header rupture Unit 2.
The performance level to be used for this JPM is Perform This is a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is in Mode 3, normal operating temperature and pressure.
INITIATING CUES:
A suspected CCW leak has occurred. CCW surge tank alarms Annunciators LA-1O and LB-10 came in one minute ago. The SNPO has been directed to carry out the local actions as defined in the annunciator summaries for the above alarms. The US has directed you to carry out the actions of 2-031 0030 Component Cooling Water - Off Normal Operation, Step 6.2.5.
ELEMENTS OF THIS JPM ARE TIME CTITICAL JPM NRC S-7 Rev 0 Simulator Page 3 of 8
(
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is: Respond to a CCW header rupture Unit 2.
The performance level to be used for this JPM is Perform This is a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
SPECIFIC DIRECTIONS FOR SIMULATOR JPMs:
All simulator JPM steps, including communications, shall be performed for this JPM.
You are to operate any plant equipment that is necessary for the completion of this JPM.
The simulator will provide the cues as you perform this JPM.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
Unit 2 is in Mode 3, normal operating temperature and pressure.
INITIATING CUES:
A suspected CCW leak has occurred. CCW surge tank alarms Annunciators LA-10 and LB-10 came in one minute ago. The SNPO has been directed to carry out the local actions as defined in the annunciator summaries for the above alarms. The US has directed you to carry out the actions of 2-0310030 Component Cooling Water - Off Normal Operation, Step 6.2.5.
ELEMENTS OF THIS JPM ARE TIME CTITICAL JPM NRC S-7 Rev 0 Simulator Page 3 of 8
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
2-0310030 Component Cooling Water - Off Normal Operation NOTE Annunciators LA-1 0, CCW Surge Tank Compartment A Level Low, and LB-10, CCW Surge Tank Level High / Compartment B Level Low, will alarm on a rupture of either the "A", "B", or "N" CCW Header, or failure of the makeup system.
STEP 1 (6.2.5.A)
If a CCW Header is ruptured, Then PERFORM the following:
A. VERIFY that the "N" Header automatically isolates from the "A" and "B" Headers due to low levels in both compartments of the CCW Surge Tank by closure of the following:
STANDARD:
- HCV-14-SA
- HCV-14-SB
- HCV-14-9
- HCV-14-10 DETERMINES HCV-14-SA, HCV-14-SB, HCV-14-9, HCV-14-10 have closed. Time Critical clock starts when Applicant has completed this step.
Time Start ____ (Time 1)
EXAMINER'S CUE: NONE (If asked when LA-10 and LB-10 came in, state they came in one (1) minute ago.) (If asked when L-14
'RCP CCW Flow Low 10 minute Timer Started' state one (1) minute ago.
EXAMINERS NOTE: Annunciator LB-10 will clear 75 seconds after the simulator is unfrozen. This indicates that the rupture is occurring on the 'A' header.
EXAMINERS NOTE: If the applicant calls the SNPO for status of the CCW surge tank, state 'LCV-14-1 is open and a continuous makeup is occurring' EXAMINERS NOTE: If the applicant enters APPENDIX A CCW LEAK SEARCH, state another RO will perform APPENDIX A.
COMMENTS:
__ SAT UNSAT JPM NRCS-7 RevO Simulator Page 4 of 8 JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST START TIME: ___ _
2-0310030 Component Cooling Water - Off Normal Operation NOTE Annunciators LA-1 0, CCW Surge Tank Compartment A Level Low, and L8-10, CCW Surge Tank Level High / Compartment 8 Level Low, will alarm on a rupture of either the "A", "8", or "N" CCW Header, or failure of the makeup system.
STEP 1 (6.2.5.A)
If a CCW Header is ruptured, Then PERFORM the following:
A. VERIFY that the "N" Header automatically isolates from the "A" and "8" Headers due to low levels in both compartments of the CCW Surge Tank by closure of the following:
STANDARD:
- HCV-14-SA
- HCV-14-S8
- HCV-14-9
- HCV-14-10 DETERMINES HCV-14-SA, HCV-14-S8, HCV-14-9, HCV-14-10 have closed. Time Critical clock starts when Applicant has completed this step.
Time Start. _____ (Time 1)
EXAMINER'S CUE: NONE (If asked when LA-10 and LB-10 came in, state they came in one (1) minute ago.) (If asked when L-14
'RCP CCW Flow Low 10 minute Timer Started' state one (1) minute ago.
EXAMINERS NOTE: Annunciator LB-10 will clear 75 seconds after the simulator is unfrozen. This indicates that the rupture is occurring on the 'A' header.
EXAMINERS NOTE: If the applicant calls the SNPO for status of the CCW surge tank, state 'LCV-14-1 is open and a continuous makeup is occurring' EXAMINERS NOTE: If the applicant enters APPENDIX A CCW LEAK SEARCH, state another RO will perform APPENDIX A.
COMMENTS:
SAT UNSAT JPM NRCS-7 RevO Simulator Page 4 of 8
(
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE CCW has been isolated to the following nAn Essential Header Components:
2A HPSI Pump 2A CS Pump 2A and 2B Containment Fan Coolers 2A SDC Heat Exchanger 3A and 3C Control Room AlC Units (Fuel Pool Heat Exchanger, if aligned to nAn Essential Header)
CAUTION Loss of component cooling water flow through any of the heat exchangers listed below can result in severe thermal stress and flashing upon re-admittance of cooling flow:
2A HPSI Pump 2A CS Pump 2A and 2B Containment Fan Coolers 2A SDC Heat Exchanger 3A and 3C Control Room A/C Units Fuel Pool Heat Exchanger, if aligned to nAn Essential Header I STEP 2 (6.2.5.B2 B. If Annunciator LB-10, CCW Surge Tank Level High I Compartment B Level Low, alarm clears, indicating that the rupture is in the nAn Essential CCW Header, Then PERFORM the following:
- 1. STOP the CCW Pump currently supplying the nAn Header:
STANDARD:
CRITICAL STEP
__ SAT
__ UNSAT JPM NRCS-7 RevO Simulator Page 5 of 8
(
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST NOTE CCW has been isolated to the following "A" Essential Header Components:
2A HPSI Pump 12A CS Pump 2A and 2B Containment Fan Coolers 2A SOC Heat Exchanger 3A and 3C Control Room AlC Units (Fuel Pool Heat Exchanger, if aligned to "A" Essential Header)
CAUTION Loss of component cooling water flow through any of the heat exchangers listed below can result in severe thermal stress and flashing upon re-admittance of cooling flow:
2A HPSI Pump 2A CS Pump 2A and 2B Containment Fan Coolers 2A SOC Heat Exchanger 3A and 3C Control Room A/C Units l Fuel Pool Heat Exchanger, if aligned to "A" Essential Header STEP 2 (6.2.5.B)
B. If Annunciator LB-10, CCW Surge Tank Level High I Compartment B Level Low, alarm clears, indicating that the rupture is in the "A" Essential CCW Header, Then PERFORM the following:
- 1. STOP the CCW Pump currently supplying the "A" Header:
- 2C CCW Pump STANDARD:
DETERMINES LB-10 has cleared and stops the 2A CCW pump EXAMINER'S CUE: NONE COMMENTS:
CRITICAL STEP SAT UNSAT JPM NRCS-7 RevO Simulator Page 5 of 8
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (6.2.5.B)
FAULTED STEP If Annunciator LB-1 0, CCW Surge Tank Level High / Compartment B Level Low, alarm clears, indicating that the rupture is in the "A" Essential CCW Header, Then PERFORM the following:
UNSAT
- a. CLOSE HCV-14-8B.
- b. CLOSE HCV-14-10.
- c. OPEN HCV-14-8B.
- d. OPEN HCV-14-10 (5 second time delay to open).
STANDARD: DETERMINES HCV-14-10 will not open. STOPS all four Reactor Coolant Pumps within 10 minutes of loss of N header.
Time Critical Clock Stop (Time 2) Time 1 minus Time 2 must be less than or equal to 10 minutes.
EXAMINER'S CUE: NONE EXAMINERS NOTE: Applicant may elect to enter 2-0120034 Reactor Coolant Pump., however the RCP's must be stopped within 10 minutes of losing CCW.
EXAMINERS NOTE: RCP bearing temperatures may reach the trip setpoint prior to the 10 minute time limit. Applicant may trip the RCP's on bearing temperature.
EXAMINERS NOTE: By the time Annunciator L-7 "RCP CCW Flow Low Trip" comes in the Applicant should have tripped the RCP's.
COMMENTS:
STOP TIME: ____
END OF TASK JPM NRCS-7 RevO Simulator Page 6 of 8
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 3: (6.2.5.B)
FAULTED STEP If Annunciator LB-1 0, CCW Surge Tank Level High I Compartment B Level Low, alarm clears, indicating that the rupture is in the "A" Essential CCW Header, Then PERFORM the following:
UNSAT
- a. CLOSE HCV-14-SB.
- b. CLOSE HCV-14-10.
- c. OPEN HCV-14-SB.
- d. OPEN HCV-14-10 (5 second time delay to open).
STANDARD: DETERMINES HCV-14-10 will not open. STOPS all four Reactor Coolant Pumps within 10 minutes of loss of N header.
Time Critical Clock Stop (Time 2) Time 1 minus Time 2 must be less than or equal to 10 minutes.
EXAMINER'S CUE: NONE EXAMINERS NOTE: Applicant may elect to enter 2-0120034 Reactor Coolant Pump., however the RCP's must be stopped within 10 minutes of losing CCW.
EXAMINERS NOTE: RCP bearing temperatures may reach the trip setpoint prior to the 10 minute time limit. Applicant may trip the RCP's on bearing temperature.
EXAMINERS NOTE: By the time Annunciator L-7 "RCP CCW Flow Low Trip" comes in the Applicant should have tripped the RCP's.
COMMENTS:
STOP TIME: _____
END OF TASK JPM NRCS-7 RevO Simulator Page 6 of 8
JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP RESTORE IC-73 'Temp for S-7' EXECUTE S-7 CCW Surge Tank UNFREEZE and TRIGGER 'Open 14-1' when applicant has stated he has completed the board walkdown.
NOTE: LB-10 should clear in 75 seconds.
JPM NRC S-7 RevO Simulator Page 7 of 8 JOB PERFORMANCE MEASURE SIMULATOR JPM SETUP RESTORE IC-73 'Temp for S-T EXECUTE S-7 CCW Surge Tank UNFREEZE and TRIGGER 'Open 14-1' when applicant has stated he has completed the board walkdown.
NOTE: LB-10 should clear in 75 seconds.
JPM NRC S-7 RevO Simulator Page 7 of 8
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is in Mode 3, normal operating temperature and pressure.
INITIATING CUES:
A suspected CCW leak has occurred. CCW surge tank alarms Annunciators LA-10 and LB-10 came in one minute ago. The SNPO has been directed to carry out the local actions as defined in the annunciator summaries for the above alarms. The US has directed you to carry out the actions of 2-0310030 Component Cooling Water - Off Normal Operation, Step 6.2.5.
ELEMENTS OF THIS JPM ARE TIME CTITICAL Page 8 of 8 Simulator JPM NRC S-7 RevO
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
Unit 2 is in Mode 3, normal operating temperature and pressure.
INITIATING CUES:
A suspected CCW leak has occurred. CCW surge tank alarms Annunciators LA-10 and LB-10 came in one minute ago. The SNPO has been directed to carry out the local actions as defined in the annunciator summaries for the above alarms. The US has directed you to carry out the actions of 2-0310030 Component Cooling Water - Off Normal Operation, Step 6.2.5.
ELEMENTS OF THIS JPM ARE TIME CTITICAl Page 8 of 8 Simulator JPM NRC S-7 RevO
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE VENT REACTOR VESSEL HEAD USING RCGVS - UNIT 1 NRC C-8 Unit 1 Control Room Developed/Revised by: __
C_ha_rl_es_R_o----"g'--er_s __
Approval --------
9/26/09 Date Date NRC JPM C-8 Rev.O Unit 1 Control Room Page 1 of 8
(
FPL St. Lucie Nuclear Plant Operations Training JOB PERFORMANCE MEASURE VENT REACTOR VESSEL HEAD USING RCGVS - UNIT 1 NRC C-8 Unit 1 Control Room Developed/Revised by: __
C_ha_r_les_Ro---",g,--er_s __
Approval _______
9/26/09 Date Date NRC JPM C-8 Rev.O Unit 1 Control Room Page 1 of 8
JOB PERFORMANCE MEASURE Vent the reactor vessel head using the Reactor Coolant Gas Vent System on Unit 1.
Faulted JPM?
Facility JPM #:
K/A Rating(s):
Duty Area(s):
No 0821090 002 K4.03 Venting the RCS 2.9 I 3.2 N/A Task Information: N/A Task Standard:
This JPM is complete when the candidate has successfully vented the reactor vessel head and secured from the vent lineup.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other Performance Level:
Perform Simulate X
Discuss ONP 1-0120037, "Reactor Coolant Gas Vent System Off-Normal Operation."
Validation Time: 10 minutes Time Critical:
Tools/Equipment/Procedures Needed:
ONP 1-0120037, Reactor Coolant Gas Vent System Off-Normal Operation.
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC JPM C-8 Rev.O Unit 1 Control Room Page 2 of8 JOB PERFORMANCE MEASURE Task:
Vent the reactor vessel head using the Reactor Coolant Gas Vent System on Unit 1.
Faulted JPM?
No Facility JPM #:
0821090 K/A Rating(s):
002 K4.03 Venting the RCS 2.9 I 3.2 Duty Area(s):
N/A Task Information: N/A Task Standard:
This JPM is complete when the candidate has successfully vented the reactor vessel head and secured from the vent lineup.
Evaluation Location:
Simulator
References:
In Plant X
Lab Other Performance Level:
Perform Simulate X
Discuss ONP 1-0120037, "Reactor Coolant Gas Vent System Off-Normal Operation."
Validation Time: 10 minutes Time Critical:
Tools/Equipment/Procedures Needed:
(
ONP 1-0120037, Reactor Coolant Gas Vent System Off-Normal Operation.
Specific Safety Rules, Personal Protective Equipment and Hazards associated with the task.
None Radiological Protection and RWP Requirements:
None NRC JPM C-8 Rev.O Unit 1 Control Room Page 2 of 8
(
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is:
Vent the reactor vessel head using the Reactor Coolant Gas Vent System on Unit 1.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1, forming a noncondensable bubble in the Reactor Vessel Head.
Pressurizer Level has been restored to 80% with Pressurizer Pressure at 650 psia.
The subsequent actions of ONP 1-0120037 have been completed up to the point of venting.
Calculations show the void size is about 800 cubic feet, and the MAXIMUM vent time is 31 minutes.
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to vent the Reactor Vessel Head to Containment lAW ONP 1-0120037, beginning with step 14. The Unit Supervisor has issued the appropriate keys to perform the task.
NRC JPM C-8 Rev.O Unit 1 Control Room Page 3 of8
(
(
SPECIFIC DIRECTIONS:
JOB PERFORMANCE MEASURE INITIAL CONDITIONS AND SPECIFIC DIRECTIONS The task you are to perform is:
Vent the reactor vessel head using the Reactor Coolant Gas Vent System on Unit 1.
The performance level to be used for this JPM is Simulate This is not a time critical JPM.
During the performance of the task, I will tell you which steps to simulate or discuss.
I will provide you with the appropriate cues for steps that are simulated or discussed.
You may use any approved reference materials normally available in the execution of this task, including logs.
Indicate to me that you have finished the assigned task by returning the Candidate Cue Sheet that I provided to you.
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1, forming a noncondensable bubble in the Reactor Vessel Head.
Pressurizer Level has been restored to 80% with Pressurizer Pressure at 650 psia.
The subsequent actions of ONP 1-0120037 have been completed up to the point of venting.
Calculations show the void size is about 800 cubic feet, and the MAXIMUM vent time is 31 minutes.
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to vent the Reactor Vessel Head to Containment lAW ONP 1-0120037, beginning with step 14. The Unit Supervisor has issued the appropriate keys to perform the task.
NRC JPM C-8 Rev.O Unit 1 Control Room Page 3 of 8
(
START TIME: ___ _
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ONP 1-0120037, Reactor Coolant Gas Vent System Off-Normal Operation, Step 14.A STEP 1 (14A):
COMMENCE venting as follows:
CRITICAL STEP A. OPEN V1442, Reactor Vent Valve B to Hdr, to vent reactor vessel head.
SAT STANDARD:
At CRAC, POSITION V1442 keyswitch to OPEN.
EXAMINER'S CUE:
V1442 shows Green light OFF, Red light ON COMMENTS:
STEP 2 (14A):
COMMENCE venting as follows:
__ UNSAT CRITICAL STEP A. OPEN V1446, Hdr Vent to Containment (A), to commence venting.
SAT STANDARD:
At CRAC, POSITION V1446 keyswitch to OPEN.
EXAMINER'S CUE:
V1446 shows Green light OFF, Red light ON UNSAT COMMENTS:
STEP 3 (14B):
COMMENCE venting as follows:
~N/,,-,A,--_ SAT B. OPEN V1443, Hdr OR V1441, AND V1445.
N/A UNSAT STANDARD:
At CRAC, POSITION keyswitches to OPEN.
EXAMINER'S CUE: NONE COMMENTS: This Step is N/A due to venting to the Containment
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-8 Rev.O Unit 1 Control Room Page 4 af8 START TIME: ___
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST ONP 1-0120037, Reactor Coolant Gas Vent System Off-Normal Operation, Step 14.A STEP 1 (14A):
COMMENCE venting as follows:
CRITICAL STEP A.
OPEN V1442, Reactor Vent Valve 8 to Hdr, to vent reactor vessel head.
SAT STANDARD:
At CRAC, POSITION V1442 keyswitch to OPEN.
EXAMINER'S CUE:
V1442 shows Green light OFF, Red light ON COMMENTS:
STEP 2 (14A):
COMMENCE venting as follows:
UNSAT CRITICAL STEP A.
OPEN V1446, Hdr Vent to Containment (A), to commence venting.
SAT STANDARD:
At CRAC, POSITION V1446 keyswitch to OPEN.
EXAMINER'S CUE:
V1446 shows Green light OFF, Red light ON UNSAT COMMENTS:
STEP 3 (148):
COMMENCE venting as follows:
-,-,-,N/C!....A,--_ SAT
- 8. OPEN V1443, Hdr OR V1441, AND V1445.
N/A UNSAT STANDARD:
At CRAC, POSITION keyswitches to OPEN.
EXAMINER'S CUE: NONE COMMENTS: This Step is N/A due to venting to the Containment
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-8 Rev.O Unit 1 Control Room Page 4 of 8
STEP 4 (14C):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST COMMENCE venting as follows:
C. OPEN V1443 OR V1441 AND 1449.
At CRAC, POSITION V1446 keyswitches to OPEN.
EXAMINER'S CUE: None COMMENTS This Step is N/A due to venting to the Containment STEP 5 (15}:
TERMINATE venting when (any of the following):
A.
Time period determined in Step 5.3.4 is met (31 minutes per cue)
B.
Pressurizer pressure decreases by 200 psi C.
Pressurizer level decreases below 25% level D.
Reactor coolant subcooling less than 20°F N/A SAT N/A UNSAT SAT UNSAT E.
The reactor vessel head is refilled as indicated by QSPDS reactor vessel level display STANDARD:
MONITOR above parameters and DETERMINE that QSPDS indicating a full reactor vessel head (no voids) is a termination criterion EXAMINER'S CUE:
Elapsed time is 27 minutes; Pressurizer pressure is 530 psia, dropping slowly Pressurizer level is 40%
RCS subcooling is 30°F RVLMS on QSPDS indicates all sensor levels bright orange (digital values = 100%)
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-8 Rev.O Unit 1 Control Room Page 5 of8
(
STEP 4 (14C):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST COMMENCE venting as follows:
C. OPEN V1443 OR V1441 AND 1449.
At CRAC, POSITION V1446 keyswitches to OPEN.
EXAMINER'S CUE: None COMMENTS This Step is N/A due to venting to the Containment STEP 5 (15}:
TERMINATE venting when (any of the following):
A.
Time period determined in Step 5.3.4 is met (31 minutes per cue)
B.
Pressurizer pressure decreases by 200 psi
- c. Pressurizer level decreases below 25% level D.
Reactor coolant subcooling less than 20°F N/A SAT N/A UNSAT SAT UNSAT E.
The reactor vessel head is refilled as indicated by QSPDS reactor vessel level display STANDARD:
MONITOR above parameters and DETERMINE that QSPDS indicating a full reactor vessel head (no voids) is a termination criterion EXAMINER'S CUE:
Elapsed time is 27 minutes; Pressurizer pressure is 530 psia, dropping slowly Pressurizer level is 40%
RCS subcooling is 30°F RVLMS on QSPDS indicates all sensor levels bright orange (digital values = 100%)
COMMENTS:
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-8 Rev.O Unit 1 Control Room Page 5 of8
c JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (15ALTERNATE): TERMINATE venting when (any of the following):
STANDARD:
F.
Time period determined in Step 5.3.4 is met (31 minutes per cue)
G.
Pressurizer pressure decreases by 200 psi H.
Pressurizer level decreases below 25% level I.
Reactor coolant subcooling less than 20°F J.
The reactor vessel head is refilled as indicated by QSPDS reactor vessel level display MONITOR above parameters and DETERMINE that QSPDS indicating a full reactor vessel head (no voids) is a termination criterion EXAMINER'S CUE:
THIS STEP ONLY TO BE USED if the candidate opens V 1444 instead of the correct valve V1442 in step 14.
Elapsed time is 31minutes; Pressurizer pressure is 530 psia, dropping slowly Pressurizer level is 40%
RCS subcooling is 30°F RVLMS on QSPDS indicates VOIDS in levels 1-7 levels.
COMMENTS: THIS STEP WILL ONLY BE USED if candidate opens V-1444 instead of the correct valve V1442 in step 14.
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT NRC JPM C-8 Rev.O Unit 1 Control Room Page 6 of 8
(
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST STEP 6 (15AL TERNATE): TERMINATE venting when (any of the following):
STANDARD:
F.
Time period determined in Step 5.3.4 is met (31 minutes per cue)
G.
Pressurizer pressure decreases by 200 psi H.
Pressurizer level decreases below 25% level I.
Reactor coolant subcooling less than 20°F J.
The reactor vessel head is refilled as indicated by QSPDS reactor vessel level display MONITOR above parameters and DETERMINE that QSPDS indicating a full reactor vessel head (no voids) is a termination criterion EXAMINER'S CUE:
THIS STEP ONLY TO BE USED if the candidate opens V 1444 instead of the correct valve V1442 in step 14.
Elapsed time is 31 minutes; Pressurizer pressure is 530 psia, dropping slowly Pressurizer level is 40%
RCS subcooling is 30°F RVLMS on QSPDS indicates VOIDS in levels 1-7 levels.
COMMENTS: THIS STEP WILL ONLY BE USED if candidate opens V-1444 instead of the correct valve V1442 in step 14.
- Cues are to be used only if JPM performance is being simulated in the plant.
SAT UNSAT NRC JPM C-8 Rev.O Unit 1 Control Room Page 6 of 8
(
STEP 6 (15):
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST TERMINATE venting when (any of the following):
A. Time period determined in Step 5.3.4 is met (31 minutes per cue)
B. Pressurizer pressure decreases by 200 psi C. Pressurizer level decreases below 25% level D. Reactor coolant subcooling less than 20°F E. The reactor vessel head is refilled as indicated by QSPDS reactor vessel level display At CRAC, POSITION V1442 keyswitches to CLOSE.
EXAMINER'S CUE:
V1442 shows Green lights ON, Red light OFF COMMENTS:
STEP 7 (15):
TERMINATE venting when (any of the following):
F.
Time period determined in Step 5.3.4 is met (31 minutes per cue)
G. Pressurizer pressure decreases by 200 psi H. Pressurizer level decreases below 25% level I.
Reactor coolant subcooling less than 20°F J.
The reactor vessel head is refilled as indicated by QSPDS reactor vessel level display STANDARD:
At CRAC, POSITION V1446 keyswitches to CLOSE.
EXAMINER'S CUE:
V1446 shows Green lights ON, Red light OFF COMMENTS: Terminate JPM after this step is completed.
END OF TASK STOP TIME: ___ _
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-8 Rev.O Unit 1 Control Room Page 7 of 8 STEP 6 (15}:
STANDARD:
JOB PERFORMANCE MEASURE PERFORMANCE CHECKLIST TERMINATE venting when (any of the following):
A. Time period determined in Step 5.3.4 is met (31 minutes per cue)
B. Pressurizer pressure decreases by 200 psi C. Pressurizer level decreases below 25% level D. Reactor coolant subcooling less than 20°F E. The reactor vessel head is refilled as indicated by QSPDS reactor vessel level display At CRAC, POSITION V1442 keyswitches to CLOSE.
EXAMINER'S CUE:
V1442 shows Green lights ON, Red light OFF COMMENTS:
STEP 7 (15}:
TERMINATE venting when (any of the following):
F.
Time period determined in Step 5.3.4 is met (31 minutes per cue)
G. Pressurizer pressure decreases by 200 psi H. Pressurizer level decreases below 25% level I.
Reactor coolant subcooling less than 20°F J.
The reactor vessel head is refilled as indicated by QSPDS reactor vessel level display STANDARD:
At CRAC, POSITION V1446 keyswitches to CLOSE.
EXAMINER'S CUE:
V1446 shows Green lights ON, Red light OFF COMMENTS: Terminate JPM after this step is completed.
END OF TASK STOP TIME:
CRITICAL STEP SAT UNSAT CRITICAL STEP SAT UNSAT
- Cues are to be used only if JPM performance is being simulated in the plant.
NRC JPM C-8 Rev.O Unit 1 Control Room Page 7 of 8
(
(
JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1, forming a noncondensable bubble in the Reactor Vessel Head.
Pressurizer Level has been restored to 80% with Pressurizer Pressure at 650 psia.
The subsequent actions of ONP 1-0120037 have been completed up to the point of venting.
Calculations show the void size is about 800 cubic feet, and the MAXIMUM vent time is 31 minutes.
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to vent the Reactor Vessel Head to Containment lAW ONP 1-0120037, beginning with step 14. The Unit Supervisor has issued the appropriate keys to perform the task.
Page 8 of 8 JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF THE TASK)
INITIAL CONDITIONS:
A LOCA has occurred on Unit 1, forming a noncondensable bubble in the Reactor Vessel Head.
Pressurizer Level has been restored to 80% with Pressurizer Pressure at 650 psia.
The subsequent actions of ONP 1-0120037 have been completed up to the point of venting.
Calculations show the void size is about 800 cubic feet, and the MAXIMUM vent time is 31 minutes.
INITIATING CUES:
You are the Desk RCO. The Unit Supervisor has directed you to vent the Reactor Vessel Head to Containment lAW ONP 1-0120037, beginning with step 14. The Unit Supervisor has issued the appropriate keys to perform the task.
Page 8 of 8