MONTHYEARL-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report L-2023-041, Annual Radiological Environmental Operating Report for Calendar Year 20222023-04-0404 April 2023 Annual Radiological Environmental Operating Report for Calendar Year 2022 L-2023-051, Report of 10 CFR 50.59 Plant Changes2023-04-0404 April 2023 Report of 10 CFR 50.59 Plant Changes L-2023-021, Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-03-28028 March 2023 Units, 1 and 2, Turkey Point, Units 3 and 4, Seabrook Station and Point Beach, Units 1 and 2 - Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update L-2023-042, Periodic Update of Population Data within 10 and 50 Miles of the Plant2023-03-27027 March 2023 Periodic Update of Population Data within 10 and 50 Miles of the Plant L-2023-026, Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 42023-03-27027 March 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information Set 4 L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2023-025, Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-12023-03-15015 March 2023 Fleet Relief Request (Frr) 23-01, Proposed Alternative to ASME Section XI Authorizing Implementation of ASME Code Case N-752-1 L-2023-029, and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 and Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) L-2023-039, Cycle 27 Core Operating Limits Report2023-03-0707 March 2023 Cycle 27 Core Operating Limits Report L-2023-032, 2022 Annual Radioactive Effluent Release Report2023-02-28028 February 2023 2022 Annual Radioactive Effluent Release Report L-2023-038, 2022 Annual Operating Report2023-02-28028 February 2023 2022 Annual Operating Report L-2023-016, Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan2023-02-15015 February 2023 Radiological Emergency Plan - Revision 74 Report of Changes to Emergency Plan L-2023-019, Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 20222023-02-15015 February 2023 Annual Summary of Commitment Changes Implemented Without Prior NRC Notification for Calendar Year 2022 L-2023-009, Owner'S Activity Report2023-01-31031 January 2023 Owner'S Activity Report L-2022-188, Unusual or Important Environmental Event - Turtle Mortality2022-12-19019 December 2022 Unusual or Important Environmental Event - Turtle Mortality L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-12-0909 December 2022 Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 L-2022-175, Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2022-12-0202 December 2022 Application to Adopt 10 CPR 50.69, 'Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2022-11-0909 November 2022 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums L-2022-165, Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response2022-10-26026 October 2022 Subsequent License Renewal Application - Aging Management Request for Additional Information (RAI) 4.3.1-1a(second Round) - Class 1 Fatigue Response L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22022-10-0404 October 2022 Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 2024-01-08
[Table view] |
Text
Florida Power & Light Company, 6501 S. Ocean Drive, Jensen Beach, FL 34957 IFPL May 19, 2011 L-2011-179 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: St. Lucie Plant Unit 1 Docket No. 50-335 Renewed Facility Operating License No. DPR-67 Response to NRC PRA Licensing Branch Request for Additional Information Regarding Extended Power Uprate License Amendment Request
References:
(1) R. L. Anderson (FPL) to U.S. Nuclear Regulatory Commission (L-2010-259),
"License Amendment Request for Extended Power Uprate, November 22, 2010, Accession No. ML103560419.
(2) Email T. Orf (NRC) to C. Wasik (FPL),
Subject:
St. Lucie Unit 1 EPU - request for additional information (PRA Licensing), April 22, 2011, Accession No. ML111120260.
By letter L-2010-259 dated November 22, 2010 [Reference 1], Florida Power & Light Company (FPL) requested to amend Renewed Facility Operating License No. DPR-67 and revise the St. Lucie Unit 1 Technical Specifications (TS). The proposed amendment will increase the unit's licensed core thermal power level from 2700 megawatts thermal (MWt) to 3020 MWt and revise the Renewed Facility Operating License and TS to support operation at this increased core thermal power level. This represents an approximate increase of 11.85% and is therefore considered an extended power uprate (EPU).
By email from the NRC Project Manager dated April 22, 2011 [Reference 2], additional information related to the proposed EPU was requested by the NRC staff in the PRA Licensing Branch (APLA) to support their review of the EPU LAR. The request for additional information (RAI) identified two questions. The response to these RAIs is provided in Attachment I to this letter.
r h/)
an FPL Group company
L-2011-179 Page 2 of 2 In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the designated State of Florida official.
This submittal does not alter the significant hazards consideration or environmental assessment previously submitted by FPL letter L-2010-259 [Reference 1].
This submittal contains no new commitments and no revision to existing commitments Should you have any questions regarding this submittal, please contact Mr. Christopher Wasik, St. Lucie Extended Power Uprate LAR Project Manager, at 772-429-7138.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge.
Executed on I9t - .2O If Very truly yours, Richard L. Anderson Site Vice President St. Lucie Plant Attachment cc: Mr. William Passetti, Florida Department of Health
L-2011-179 Attachment 1 Page 1 of 3 Response to Request for Additional Information The following information is provided by Florida Power & Light in response to the U. S. Nuclear Regulatory Commission's (NRC) Request for Additional Information (RAI). This information was requested to support Extended Power Uprate (EPU) License Amendment Request (LAR) for St.
Lucie Nuclear Plant Unit 1 that was submitted to the NRC by FPL via letter (L-2010-259) dated November 22, 2010 (Accession Number ML103560419).
In an email dated April 22, 2011 from NRC (Tracy Orf) to FPL (Chris Wasik), Accession Number ML111120260,
Subject:
St. Lucie Unit 1 EPU - request for additional information (PRA Licensing), the NRC requested additional information regarding FPL's request to implement the EPU. The RAI consisted of two (2) questions from the NRC's PRA Licensing Branch (APLA).
These two RAI questions and the FPL responses are documented below.
APLA-1 Section 2.13.2.5 of Attachment 5 states the following on shutdown operations risk:
"With the exception of EPU's impact on time available for operatoractions, no further impact of EPU is expected... Reductions in available times for operatorsto take compensatory or mitigating actions could vary from several to ten or more minutes, dependent on shutdown conditions. The safety evaluation demonstrates that the shorter available time window under EPU would not adversely impact safety consequences."
Provide additional information for how the safety evaluation demonstrates that shorter available time windows under the EPU would not impact safety consequences.
Specifically, address how the EPU impacts the ability of the operator to close containment and provide additional information regarding the reliability and availability of equipment used for shutdown conditions. In addition, explain the impact of the EPU on alternate decay heat removal systems.
Response
The safety evaluation referred to in Section 2.13.2.5 is a risk assessment of St. Lucie Unit 1 shutdown cooling (SDC) system operation functions. The most significant impact identified in the post-EPU risk assessment is that during mid-loop (or during reduced inventory) operation actions in response to loss of shutdown cooling could be subject to a shorter available time window.
As a practice at St. Lucie, shutdown operations with open containment are restricted to plant conditions with normal and high inventory shutdown states. During normal and high inventory shutdown states it is expected that adequate time will be available for operators to respond to events and implement containment closure and that the risk impact will be non-significant.
For mid-loop (or during reduced inventory) operation, in accordance with plant procedures, prior to establishing a plant evolution that would require containment closure, the containment closure teams are required to be trained and tested to ensure that containment
L-2011-179 Attachment 1 Page 2 of 3 can be closed within the specified time to boil. For EPU the time to boil will be shorter; however, the procedures and the associated personnel training that will be maintained for the EPU ensure that the EPU impact on containment closure is not significant.
The technical evaluation in Section 2.8.4.4 of Attachment 5 demonstrates continued compliance with the SDC system cooldown performance requirements at EPU conditions.
No plant changes to the SDC system have been made for EPU operating conditions and there are no adverse affects on the design and operating characteristics of the SDC system with respect to its shutdown and long-term cooling function. Therefore, the reliability and availability of the equipment used to shutdown cooling is not expected to change.
To manage shutdown risk, St. Lucie uses a tiered risk assessment procedure that involves a qualitative assessment of the configuration of the plant and the availability of various key safety functions. For the EPU, the design aspect has been analyzed to satisfy design basis requirements with necessary procedure and configuration changes, and these changes introduced no significant risk to the shutdown risk management process and implementation.
Alternate decay heat removal systems are discussed in Section 2.5.4 of Attachment 5.
APLA-2 Section 2.13.2.6.1.4 of Attachment 5 states the following on pressurizer level control program:
"The pressurizerlevel control program will change for EPU. Currently,the pressurizer level varies from 33.09% at 15% power to 65.6% at 100% power.After EPU, the pressurizerlevel will be 33.09% at 15% power, reach 65.6% at approximately 90% power and maintain that level through 100% power."
With a ten percent power uprate, one hundred percent power at pre-EPU conditions corresponds to approximately ninety percent power at EPU conditions; the pressurizer level remains constant at 65.6% at both of these conditions. Fifteen percent power at pre-EPU conditions approximately corresponds to 13.5% power at EPU conditions. Please explain why a ten percent power increase keeps the lower limit constant at 33.09%
pressurizer level at 15% power for both pre-EPU and EPU conditions.
Response
For the pressurizer level control program, the program was revised because of changes in the reactor coolant system (RCS) normal operating temperatures and not because of a change in core thermal power (see Section 2.4.2 of Attachment 5). The primary design objective of the pressurizer water level program is to accommodate RCS shrink and swell during normal operational transients while minimizing changes to RCS mass inventory. The pressurizer water level program is defined by upper and lower breakpoints, where the x-axis value of each breakpoint is RCS average temperature (Tavg) and the y-axis value is % level. The lower %
level breakpoint is defined such that there is margin to keeping the pressurizer heaters covered at low power. The upper % level breakpoint is usually defined by margin to maximum level
L-2011-179 Attachment 1 Page 3 of 3 technical specification which limits inventory for LOCA and allows for an in-surge without filling the pressurizer. The % level values for the two breakpoints do not change for EPU. The Tavg values for the two breakpoints are changed to reflect the EPU change in Tavg as a function of reactor power. The lower Tavg breakpoint value is changed slightly such that it continues to correspond to 15% reactor power. Keeping the pressurizer level setpoint flat from 0% to 15% is in the range that the turbine is off-line. The upper Tavg breakpoint value is changed for EPU to correspond to 90% reactor power. Keeping the setpoint flat at both ends of the power range allows for temperature fluctuations without having the level setpoint change. This provides for more stable charging and letdown control. The level setpoint increases from the minimum to the maximum as RCS temperatures increase. This minimizes the demands on the charging and letdown systems to maintain RCS inventory.