MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-201, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis L-22-104, Annual Radiological Environmental Operating Report2022-04-28028 April 2022 Annual Radiological Environmental Operating Report L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-22-105, Annual Radiological Effluent Release Report2022-04-27027 April 2022 Annual Radiological Effluent Release Report L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant2022-03-16016 March 2022 Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) 2024-01-24
[Table view] |
Text
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 FENOC Z-.1o.1**,
=7 17ý71771 Perty Nuclear PowerStation 10 Center Road Perry, Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 April 8,2011 L-11-122 10 CFR 50.90 10 CFR 73.54 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, License No. NPF-58 Response to Request for Additional Information Regarding the Request for Approval of the Perry Nuclear Power Plant Cyber Security Plan License Amendment Request (TAC No. ME4367)
By letter dated July 22, 2010, in accordance with the provisions of 10 CFR 50.4 and 10 CFR 50.90, the FirstEnergy Nuclear Operating Company (FENOC) submitted a request for an amendment to the Facility Operating License (FOL) for the Perry Nuclear Power Plant (PNPP), relative to incorporation of a proposed cyber security plan. The amendment request included the proposed cyber security plan, proposed changes to Section 2.E of the FOL, and a proposed cyber security plan implementation schedule.
By letter dated November 29, 2010, FENOC submitted a proposed cyber security plan that amended Section 2.1, "Scope and Purpose," of the PNPP Cyber Security Plan to clarify the balance of plant structures, systems, and components that will be included in the scope of the cyber security program.
By letter dated January 20, 2011, the Nuclear Regulatory Commission (NRC) staff requested additional information to complete its review. FENOC responded to that request for additional information (RAI) on February 15, 2011. By letter dated March 10, 2011, the NRC staff requested additional information. Attachment 1 provides responses to this second set of NRC questions.
Attachments 1 and 2 and the Enclosure to this letter contain security-related information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of the Attachments and Enclosure, this letter is uncontrolled.
OFFICIAL USE ONLY- SECURITY-RELATED INFORMATION
OFFICIAL USE ONLY - SECURITY-RELATED INFORMATION WITHHOLD IN ACCORDANCE WITH 10 CFR 2.390 Perry Nuclear Power Plant L-11-122 Page 2 FENOC has revised the cyber security plan implementation schedule and the proposed PNPP Cyber Security Plan to conform to the responses provided for the RAIs. FENOC hereby submits the revised implementation schedule (Attachment 2) to replace the proposed implementation schedule provided via letter dated July 22, 2010 and the enclosed proposed PNPP Cyber Security Plan to replace the proposed cyber security plan provided via letter dated November 29, 2010.
FENOC requests that the attachments and enclosure, which contain security-related information, be withheld from public disclosure in accordance with 10 CFR 2.390.
There are no regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Thomas A. Lentz, Manager - Fleet Licensing, at 330-761-6071.
I declare under penalty of perjury that the foregoing is true and correct. Executed on April e;_, 2011.
Sincerely,
/
Mark B. Bezilla Attachments:
- 1. Response to Request for Additional Information Regarding the Request for Approval of the Perry Nuclear Power Plant Cyber Security Plan License Amendment Request
- 2. Perry Nuclear Power Plant Cyber Security Plan Implementation Schedule
Enclosure:
Perry Nuclear Power Plant Cyber Security Plan cc: NRC Region III Administrator NRC Resident Inspector Nuclear Reactor Regulation Project Manager Executive Director, Ohio Emergency Management Agency, State of Ohio (NRC Liaison) (w/o Attachments and Enclosure)
Utility Radiological Safety Board (w/o Attachments and Enclosure)
Attachments 1 and 2 and the Enclosure to this letter contain security-related information.
Withhold from public disclosure under 10 CFR 2.390.
Upon removal of the Attachments and Enclosure, this letter is uncontrolled.