L-10-191, Follow Up to Order EA-09-073

From kanterella
Jump to navigation Jump to search
Follow Up to Order EA-09-073
ML101880035
Person / Time
Site: Perry, 07200069  FirstEnergy icon.png
Issue date: 06/30/2010
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, NRC/NMSS/SFST
References
EA-09-073, L-10-191
Download: ML101880035 (2)


Text

FENOC -- '*

Perry Nuclear Power Station 10 Center Road FirstEnergy Nuclear OperatingCompany Perry, Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 June 30, 2010 L-10-191 10 CFR 2.202 10 CFR 72.212 10 CFR 73.55 ATTN: Document Control Desk Director, Division of Spent Fuel Storage and Transportation Office of Nuclear Material Safety and Safeguards Washington, DC 20555-0001

Subject:

Perry Nuclear Power Plant Unit No. 1 Part 50 Docket No. 50-440, License No. NPF-58 Part 72 Docket No. 72-69 Follow Up For Perry Nuclear Power Plant Order EA-09-073 Iný alefter dated April7,"2009, the Nuclear ReliilatoryCommission,(NRC)issued Order EA-'09O073, Which modifies the FirstEnergy Nucear, Operating Company (FENOC) general license for the proposed independent spent fuel storage installation (ISFSI) for the Perry Nuclear Power Plant (PNPP). The modification to the general license requires additional security measures (ASMs) for the physical protection of the proposed PNPP ISFSI.

In an-April 24, 2009 letter, FENOC committed to report to the NRC when full.

compliance has been achieved with all of the ASMs set forth in Attachment 1, Part D of Order EA-09-073. Implementation of the ASMs was to be completed within 90 days prior to the initial PNPP spent fuel cask load.

FENOC has addressed-all of the ASMs,-including approving the respective Security and Emergency Plan changes associated with the ASMs as committed to in the April 24, 2009 letter. Training to address the associated Emergency Plan change and specifically the new Emergency Action Level for the- Perry ISFSI is:scheduled to be completed in-August'2010..-

]f them are ahy'questions'or if addt'ional information .isrequired,,please contact*L;*

Mr Thomas A.Lentz,Manager' lee

  • nsg;-t'(330)-761-6071V-:. V-...

Perry Nuclear Power Plant Unit No.1 L-10-191 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on June 30, 2010.

Sincerely, Mark B. Bezilla cc: NRC Region III Administrator NRC Resident Inspector NRR Project Manager Secretary, Office of Secretary of the Commission