MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024 License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-201, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis L-22-104, Annual Radiological Environmental Operating Report2022-04-28028 April 2022 Annual Radiological Environmental Operating Report L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-22-105, Annual Radiological Effluent Release Report2022-04-27027 April 2022 Annual Radiological Effluent Release Report L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant2022-03-16016 March 2022 Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) 2024-01-24
[Table view] Category:Order
MONTHYEARML23237B4412023-09-29029 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Federal Register Notice, Direct and Indirect License Transfer Issuance Order ML23237B4282023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 2, Draft Conforming License Amendments ML23237B4302023-09-28028 September 2023 Energy Harbor Nuclear Corp. - Vistra Operations Company LLC - Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (EPID L-2023-LLM-0000) (Public) ML19303C9532019-12-0202 December 2019 Firstenergy Nuclear Operating Company - Enclosure 1, Order, Direct and Indirect Transfer of Licenses and Draft Conforming Amendments for Beaver Valley Units 1 and 2, Davis-Besse Unit 1, and Perry Unit 1 ML16083A5122016-04-15015 April 2016 Order Approving Application Regarding the Direct Transfer of License Resulting from Transfer of Ownership Interests from the Ohio Edison Company to Firstenergy Nuclear Generation, LLC L-15-012, Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation2015-06-0202 June 2015 Completion of Required Action by NRC Order EA-12-051, Reliable Spent Fuel Pool Instrumentation L-08-205, Revision of the National Pollutant Discharge Elimination System Permit2008-06-0505 June 2008 Revision of the National Pollutant Discharge Elimination System Permit ML0722605352007-08-15015 August 2007 Confirmatory Order (Effective Immediately) Firstenergy Nuclear Operating Company ML0713403332007-05-14014 May 2007 First Energy Nuclear Operating Company (FENOC) (Davis-Besse Nuclear Power Plant; Perry Nuclear Power Plant; Beaver Valley Nuclear Plant, Units 1 and 2) - Demand for Information ML0619905242006-12-28028 December 2006 Order Approving Application Regarding Proposed Corporate Restructuring ML0619902522006-12-28028 December 2006 Order Approving Application Regarding Proposed Corporate Restructuring ML0619905932006-12-28028 December 2006 Order Approving Application Regarding Proposed Corporate Restructuring ML0534601822005-12-16016 December 2005 Corrected Order Approving Transfer of Licensees and Conforming Amendments Related to Beaver Valley, Units 1 and 2, Davis-Besse, Unit 1 and Perry Unit 1 ML0505900112005-02-25025 February 2005 Order Prohibiting Involvement in NRC-Licensed Activities (OI Report Nos. 3-2000-025 and 3-2000-025S) ML0309106252003-04-29029 April 2003 EA-03-039, Addressee List, (Order Issued by Program Office or OE for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Per ML0309401982003-04-29029 April 2003 Issuance of Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel 2023-09-29
[Table view] |
Text
FENOC _10 Perry Nuclear Power Station Center Road FirstEnergyNuclear Operating Company Perry, Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 June 5, 2008 L-08-205 ATTN: Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C. 20555-0001
SUBJECT:
Perry Nuclear Power Plant Docket No. 50-440, NPF-58 Revision of the National Pollutant Discharge Elimination System Permit Enclosed is a copy of the Ohio Environmental Protection Agency Director's Final Findings and Orders. The order modifies the Perry National Pollution Discharge Elimination System permit and approves the use of a cooling water treatment additive, Nalco H150M in the cooling water system and intake that discharges to FirstEnergy -
Perry outfall 31EO0016004 to control zebra mussels. The order was effective May 6, 2008.
The enclosed information is submitted as required by the Perry Operating License, NPF-58, Appendix B,-Environmental Protection Plan, Section 3.2.
There are no regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Ms. Elizabeth Ryan, Chemistry Specialist, at (440) 280-5536.
Sinceree Mark B. Bezilla f ,
Enclosure:
Ohio EPA Director's Final Findings and Orders cc: RC. Region I11l NRC Resident Inspector NRC froject Manager : . .
1~ o~
Enclosure L-08-205 Ohio EPA Director's Final Findings and Orders
State of Ohio Environmental Protection Agency STREET AflDRESS: MAILING ADDRESS:
STREET ADDRESSý Lazarus Government Center TELE: (614) 644-3020 FAX: (614) 644-3184 P.O. Box 1049 www.epa.slate.ohus 50 W. Town St., Suite 700 Columbus, OH 43216-1049 Columbus, Ohio 43215 May 6, 2008 'y- 06,P/,
Oo3O- -/
RE: Director's Final Findings and Orders FirstEnergy Nuclear Generation Corporation OEPA Permit No. 31B00016 Mark Bezilla FirstEnergy Nuclear Generation Corporation Perry Nuclear Power Station 10 Center Road Perry, OH 44081 Transmitted herewith is one copy of the Director's Final Findings and Orders in the referenced matter.
You are hereby notified that this action of the Director is final and may be appealed to the Environmental Review Appeals Commission pursuant to Section 3745.04 of the Ohio Revised Code. The appeal must be in writing and set forth the action complained of and the grounds upon which the appeal is based. The appeal must be filed with the Commission within thirty (30) days after notice of the Director's action. The appeal must be accompanied by a filing fee of $70.00 which the Commission, in its discretion, may reduce if by affidavit you demonstrate that payment of the full amount of the fee would cause extreme hardship. Notice of the filing of the appeal shall be filed with the Director within three (3) days of filing with the Commission. Ohio EPA requests that a copy of the appeal be served upon the Ohio Attorney General's Office, Environmental Enforcement Section. An appeal may be filed with'the Environmental Review Appeals Commission at the following address:.
Environmental Review Appeals Commission 309 South Fourth Street, Room 222 Columbus, Ohio 43215 Patti L. Smith, Supervisor Permit Processing Unit Division of Surface Water PLS/EN Certified Mail cc: Marie Underwood Eric Nygaard Journal Room Permit File 31B00016 Ted Strickland, Governor Lee Fisher, Lieutenant Governor Chris Korleski, Director Printed on Recycled Paper Ohio EPA is an Equal Opportunity Employer
Date Issued: May 6, 2008 - *n,1 Date Effective: May 6, 2008 BEFORE THE OHIO ENVIRONMENTAL PROTECTION AGENCY In the matter of: FirstEnergy Nuclear Generation Corp.: Director's Final Findings Cooling Water Additive Request
FINDINGS-~-
- 1. FirstEnergy Nuclear Generation Corporation, owns and operates an electric power generating station, hereinafter referred to as FirstEnergy - Perry, located at 10 Center Road, Perry, Ohio.
- 2. FirstEnergy - Perry currently holds an NPDES permit (No. 31B00016, OH0053461) for the discharge of wastewater to Lake Ede.
- 3. Part II, Other Requirements, C. of the aforementioned NPDES permit requires that, "In the event that the permittee's operation shall require the use of a cooling water treatment additive, written permission must be obtained from the Ohio Environmental Protection Agency. The permittee shall demonstrate that the use of the additive in the concentrations expected will not be harmful or inimical to aquatic life as determined by acute static bioassays."
- 4. On April 24, 2008, FirstEnergy - Perry applied to the Ohio EPA to receive written permission for the use of Nalco H1 50M in the cooling water system and intake that discharges to FirstEnergy - Perry outfall 31E00016004 to control zebra mussels.
- 5. The proposed discharge concentration of Nalco H150M contained in the final effluent entering Lake Ede is less than 0.02 mg/I.
- 6. The static acute bioassay information contained in FirstEnergy - Perry's April 24, 2008 application adequately demonstrates that the proposed discharge concentration for the Nalco HI50M of less than 0.02 mg/I, respectively should not be harmful or inimical to aquatic life, as determined by the procedures in OAC Rules 3745-1-04(D) and OAC Chapter 3745-2.
I certify this to be a true and accurate copy of the official documents as filed in the records of the Ohio Environmental Protection Agency.
Dat .........
- 7. The Director has given consideration to, and based his determination on, evidence relating to the technical feasibility and economic reasonableness of complying with these Orders and to evidence relating to conditions calculated to result from compliance with these Orders, and its relation to the benefits to the people of the State to be derived from such compliance in accomplishing the purposes of Chapter 6111 of the Revised Code.
ORDERS
- 1. The proposed use of the Nalco Hi 50M at FirstEnergy - Perry is approved and is subject to compliance with all applicable laws, rules, regulations, standards, and the conditions contained herein.
- 2. In order to make an alternative proposal, or if additional cooling water additives are needed, a separate request must be submitted to the Ohio EPA, Division of Surface Water, Permit and Compliance Section, Industrial Permits Unit.
- 3. The cooling water additive treatment program may only be applied in accordance with the proposal approved by the Director of the Ohio Environmental Protection Agency. There may be no deviation from the approved proposal without the express, written approval of the Agency. Any deviation from the proposal or the above conditions may lead to revocation of these Findings and Orders and/or other sanctions and penalties provided under Ohio law. Approval of this proposal does not constitute an assurance that the cooling water additive treatment program will operate in compliance with all Ohio laws and regulations.
Additionally, the terms and conditions of this approval do not relieve a permitted facility from complying with all monitoring requirements and effluent limitations that have been established in its NPDES permit.
Z'kA Ž.,iMay q4.6 Date 6, 2008 Assistant Director