JPN-02-018, Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures from James A. FitzPatrick Power Plant

From kanterella
Jump to navigation Jump to search
Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures from James A. FitzPatrick Power Plant
ML021680476
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 06/12/2002
From: Ted Sullivan
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
JPN-02-018
Download: ML021680476 (3)


Text

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. Fitzpatrick NPP

ýEntergy P.O. Box 110 Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 SAFEGUARDS INFORMATION T.A. Sullivan Vice President, Operations-JAF June 12, 2002 JPN-02-018 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001

SUBJECT:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-59 Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures

REFERENCES:

1. NRC letter from Samuel J. Collins to Michael R. Kansler, dated February 25, 2002,regarding "Issuance of Order for Interim Safeguards and Security Compensatory Measures" for James A. FitzPatrick Nuclear Power Plant
2. Entergy Nuclear Operations, Inc. letter to USNRC, dated March 18, 2002 (JPN-02-005) regarding "Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures."
3. Entergy Nuclear Operations, inc. letter to Samuel J. Collins, USNRC, dated March 18, 2002 (JPN-02-004) regarding "Request for an Extension of Time to Submit an Answer and Request for Hearing"

Dear Sir or Madam:

On March 18, 2002, Entergy Nuclear Operations, Inc. (ENO) submitted its initial response (Reference 2) to the Interim Safeguards and Security Compensatory Measures Order (Order, Reference 1) issued by the United States Nuclear Regulatory Commission (NRC) on February 25, 2002. Entergy also submitted a request for an extension of time to submit an answer for Sections B.2.a.(1), B.2.a.(2), and B.2.b of the Order (Reference 3)

Pursuant to the requirements of 10 CFR § 50.4 the attachment to this letter contains Entergy's supplemental response to Sections B.2.a.(1), B.2.a.(2), and B.2.b of the Order. This response supercedes and replaces the response submitted with Reference 2 for Sections B.2.a.(1),

B.2.a.(2), and B.2.b. The attached response also identifies the current schedule dates for completion of the Order requirements based upon the latest available information. As required by the Order the actions to implement the Order have been started and unless relief has been NOTICE: Attachment I contains "Safeguards Information".

Upon separation of Attachment I from this letter it becomes "DECONTROLLED"

-;J1

SAFEGUARDS INFORMATION requested all of the actions will be completed no later than August 31, 2002. Attachment 1 to this response contains safeguards information, as defined in 10 CFR § 73.21. Entergy therefore requests that this attachment be withheld from public disclosure.

Pursuant to the requirements of 10 CFR § 2.202(a)(2), the answer to the Order, was transmitted to the Secretary of the Commission under separate cover. Also transmitted under separate cover to the Director, Office of Nuclear Reactor Regulation was a request for an extension of time to submit an answer and request for hearing. A copy of this supplemental response is also being provided to the Secretary of the Commission and the Director, Office of Nuclear Reactor Regulation.

As required by Condition C.2 of the Order, Entergy will notify the Commission when full compliance has been achieved.

If you have any questions or require additional information, please contact Mr. Andy Halliday at 315-349-6055.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1 2 th day of June, 2002.

Verily yours, T.A. Sullivan Vice President, Operations - JAF

Attachment:

1. Supplemental Response to Issuance of Order for Interim Safeguards and Security Compensatory Measures - FitzPatrick, Revision to Sections B.2.a.(1), B.2.a.(2), and B.2.b.

cc: Next page

cc:

Mr. Samuel J. Collins, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 05-E-07 Washington, DC 20555-0001 Secretary Office of the Secretary U.S. Nuclear Regulatory Commission ATTN: Rulemakings and Adjudications Staff Washington, DC 20555-0001 Mr. Dennis C. Dambly Assistant General Counsel for Materials Litigation and Enforcement U.S. Nuclear Regulatory Commission Mail Stop 15-D-21 Washington, DC 20555-0001 Mr. Hubert Miller Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Guy Vissing, Project Manager Project Directorate I Division of Licensing Project Management U.S. Nuclear Regulatory Commission Mail Stop 8C2 Washington, DC 20555-0001 Resident Inspector's Office US Nuclear Regulatory Commission P.O. Box 136 Lycoming, NY 13093