Semantic search
Jump to navigation
Jump to search
Site | Start date | Title | |
---|---|---|---|
05000461/LER-1995-007, Responds to Violation Noted in Insp Rept 50-461/95-12.CPS LER 95-007-00 Issued Via Util ,Provides Info Re Subj NOV & Adequately Addresses Requirements Noted in NOV to Provide Reason for Violation & Corrective Actions | Clinton | 6 November 1995 | Responds to Violation Noted in Insp Rept 50-461/95-12.CPS LER 95-007-00 Issued Via Util ,Provides Info Re Subj NOV & Adequately Addresses Requirements Noted in NOV to Provide Reason for Violation & Corrective Actions |
05000461/LER-1990-003, Forwards LER 90-003-01 Re 13 Rosemount Transmitters Being Inoperable Due to Loose Housing Covers & Broken Neck Seal. LER Revised to Update Info Provided,Including Licensee Contact,C/A & Maint Work Document Numbers | Clinton | 13 July 1995 | Forwards LER 90-003-01 Re 13 Rosemount Transmitters Being Inoperable Due to Loose Housing Covers & Broken Neck Seal. LER Revised to Update Info Provided,Including Licensee Contact,C/A & Maint Work Document Numbers |
05000461/LER-1990-010 | Clinton | 24 July 1990 | LER 90-010-01:on 900508,emergency Diesel Generators Declared Inoperable Due to Joints in Shutdown Svc Water Sys Piping for HXs Not Having Required tie-rods Installed.Caused by Intallation Error.Stress Analysis performed.W/900724 Ltr |
05000461/LER-1988-016, Forwards LER 88-016-00 Re Failure to Recognize Location & Extent of Penetration Seal Repair Results in Violation of Secondary Containment Integrity | Clinton | 17 June 1988 | Forwards LER 88-016-00 Re Failure to Recognize Location & Extent of Penetration Seal Repair Results in Violation of Secondary Containment Integrity |