NOV 2 2 1985
Docket No. 50-346
Toledo Edison Company
ATTN: Mr. Joe Williams, Jr.
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. J. Holmes,
F. Maura, and J. Ulie of this office on September 3 through September 6, 1985,
of activities at Davis-Besse Nuclear Power Station authorized by NRC Operating
License No. NPF-3, and to the discussion of our findings with you at the
conclusion of the inspection, and to subsequent discussion with your staff
concerning open items on October 31, 1985.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed Appendix. A written response
is required.
In addition, this inspection identified two issues which must be resolved prior
to plant startup following the current outage. The first issue, discussed in
paragraph 2.b of the enclosed report, concerns the pctential simultaneous
spurious operation of the Pressurizer Power Operated Relief Valve and its
associated block valve. The second issue, discussed in paragraph 4.a of the
enclosed report, concerns the appropriate fill depth of silicone foam sealed
fire barrier penetration seals.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter, the enclosures, and your response to this letter will be placed in the
NRC's Public Document Room.
The responses directed by this letter and the accompanying Notice are not sub-
ject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
8511260402 851122
ADOCK 05000346
G
i
I
5s/
-,
.
Toledo Edison Company
2
NOV 2 2 FAS
1
We will gladly discuss any questions you have concerning this inspection.
'
Sincerely,
c0
.
C.
. Pape'riello, Director
Division of Reactor Safety
Enclosures:
1.
Appendix, Notice
of Violation
2.
Inspection Report
No. 50-346/85028(DRS)
cc w/ enclosures:
L. Storz, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
James W. Harris, State of Ohio
Robert H. Quillin, Ohio
Department of Health
.. m
0WS
RIII
RIJ
RIII
RII
RI
RIII
RIT
-l/ /
//
a/)I Pap rielloll ryrf
o
Holmes /rr
H ur
is.
1dgmond
JYc
,
, y ' W ,Weil,fyi/jf
w
s
11/16/85
o arg
pg
s/2/ts
Ws is
l
,,