Text
.
/pnano, o
o UNITED STATES
[
NUCLEAR REGULATORY COMMISSION
- g' g
,
ae REGION 11
oK 101 MARIETTA ST., N.W., EUITE 3100
'o ATLANTA. G ECRGIA 30303
.....
Report Nos. 30-553/ 7')-13 and 50-554/79-12 Licensee: Tennessee Valley Authority 500A Chestnut Street Chattanooga, Tennessee 37401 Facility Name: Phipps Bend Units 1 and 2 Docket Nos. 50-553 and 50-554 License Nos. CPPR-162 and CPPR-163 Inspection at P ipps Bend Site near Kingsport, Tennessee Inspecto f
,
3 W. P.
einsorge Date' Signed Approved by:
/a' /
/2 [
A. R.*Herdt, 'Section Chief, RCES Brar:ch Dhte Signed SUMMARY Inspection on August 29-31, 1979 Areas Inspected This routine, unannounced inspection involved 20 inspector-hours onsite in the area of Review of QA Manual-Welding Activities.
Results Of the area inspected, no items of noncompliance or deviations were identified.
1204 095 79102 4 0 3 Z5
\\
DETAILS 1.
Persons Contacted Licensee Employees
- W. P. Kelleghan, Pr: ject Manager
- D. E. Hitchock, Supervisor, Site QA Unit
- T. V. Abbatiello, Assistant Construction Engineer, QC
- J. C. Cofield, Assistant Conatruction Engineer, PE
- J. J. Ritts, ENDES, Licensing Engineer R. M. Jessee. ENDES Welding W. K. Burner, Manager Welding Quality Control Other licensee employees contacted included seven construction craftsmen, five technicians, and two office personnel.
- Attended exit interview.
2.
Exit Interview The inspection scope and findings were summarized on August 31, 1979 with those persons indicated in Paragraph 1 above.
3.
Licensee Action on Previous Inspection Findings (Closed) Infraction 553/554/79-07-02, Failure to control calibration on electrode ovens. TVA letter of response dated July 31, 1979 has been reviewed and determined to be acceptable by Region II.
The inspector held discussions with Phipps Bend Project Manager and examined the corrective actions as stated in the letter of response. The inspector concluded that TVA had determined the full exteat of the subject noncompliance, performed the necessary survey and followup actions to correct the present conditions and developed the necessary corrective actions to preclude recurrence of similar circumstances. The corrective actions identified in the letter of response have been implemented.
(Closed) Deficiency 553/554/79-07-03, Failure to include nonessential variables in GTA and GMA Welding Procedures. TVA letter of response dated July 31, 1979 has been reviewed and determined to be acceptable by Region II.
The inspector held discussions with Phipps Bend Project Manager and examined the corrective actions as stated in the letter of response.
The inspector concluded that TVA had determined the full extent of the subject noncompliance, performed the necessary survey and followup actions to correct the present conditions and developed the necessary corrective actions to preclude recurrence of similar circumstances. The corrective action identified in the letter of response have been implemented.
4.
Unresolved Items
'
.
Unresolved items were not identified during this inspection.
1204 096
.
-2-
\\
5.
Independent Inspection Effort The inspector conducted a general inspection of the reactor base mats, auxiliary building, fabrication shops, weld material issue stations, and radiographic laboratory to observe construction progress and construction activities such as welding, stud welding, concrete placement, material handling and control housekeeping and storage.
a.
The inspector observed activities at weld material issue stations ta determine adequacy of: weld material storage / segregation, oven temperatures, issue records and return of unused weld material. The inspector also observed work areas for uncontrolled weld material.
Within the areas inspected, no items of noncompliance or deviations were identified.
6.
Review of QA Manual - Welding Activities The "0EDC Quality Assurance Program Requirements Manual for Design Procure-ment and Construction" (PRM) references requirements and committments. The
" Quality Assurance Program Manual" (QAP) and " Quality Assurance Program Procedures" ( QAPP) defines the QA program, defines requirements and requires that programs be established to control specified elements. The
" Construction Engineering Manual" (CEP) expends and implements the QAP's and QAPP's for construction site use.
The following documents control Q2ality Requirements:
a.
QAPP 3, Rev. 1, " Design Control" QAPP 4, Rev. 1, " Procurement Document Control" QAPP 7, Rev. 1, " Control of Purchased Material, Equipment, and Services" QAPP 8, Rev. O, " Identification and Control of Materials, Parts and Components" CEP 4.01, Rev. 8, " Procurement Document Control" CEP 7.02, Rev. 4, " Receiving Inspection" CEP 8.01, Rev. 2, " Identification and Marking of Materials, Parts and Components" CEP 17.01, Rev. 2, " Quality Assurance Records" b.
The following documents control Work and Quality Inspection Procedures:
QAPP 5, Rev. 1, " Instructions, Procedures and Drawings" CEP 5.01, Rev. 6, " Construction Engineering Procedures; Quality Control Instructions; and Receiving Inspection, Storage, and Preventive Maintenance Instructions" CEP 5.04, Rev. 3, " Work Packages" CEP 6.02, Rev. 5, " Control and Distribution of Constructiort Engineer-ing Procedures, Quality Control Instructions, Receiving Inspection, Storage and Preventive Maintenance Instructions; and Manuals" 1204 097
.
s-3-c.
The following documents control Control of Material:
QAPP 7, Rev. O, " Control of Purc' lased Material, Equipment and Services" QAPP 8, Rev. O, " Identification and Control of Material, Parts, and Components" QAPP 13, Rev. O, " Handling, Storage and Shipping" QAPP 14, Rev. O, " Inspection, Test and Operating Status" QAPP 15, Rev. 1, " Nonconforming Materials, Parts, and Components" CEP 7.02, Rev. 4, " Receiving Inspection" CEP 8.01, Rev. 2, " Identification and Marking of Materials, Parts, and Components" CEP 8.02, Rev. 2, " Warehouse Control Materials, Parts, and Components" CEP 8.03, Rev. 8, " Control of Welding Materials" CEP 13.01, Rev. 1, " Handling of Nuclear Components" CEP 13.02, Rev. 1, " Storage and Preservation of Materials, Components and Systems" CEP 13.03, Rev. 1, " Warehouse Storage Area Inspection" CEP 14.01, Rev. 1, " Inspection and Test Status" CEP '5.01, Rev. 10, " Control of Quality Control Investigation Reports" CEI-15.03, Rev. O, " Control of Nonconformance Report" d.
The following documents control Control of Process:
QAPP 9, Rev. O, " Control of Special Process" CEP 2.05, Rev. 4, " Qualification, Training, and Certification NDE Personnel" CEP 2.10, Rev. 3, " Qualification and Certification of Inspection, and Testing Personnel" CEP 2.11, Rev. 2, " Qualification of Welders and Welding Operators" CEP 9.01, Rev. 4, " Release for Drilling, Chipping, Excavation, Cutting Welding, Bonding and Sandblasting of Permanent Plant Features" CEP 9.03, Rev. O, " Qualification of Welding Procedures" CEP 9.08, Rev. O, " Process Control" The following documents control Test Control and Control of Test e.
Equipment:
QAPP 11, Rev. O, " Test Control" QAPP 12, Rev. O, " Control of Measuring and Test Equipment" CEP 12.01, Rev. 5, " Control of Measuring and Test Equipment" CEP 12.02, Rev. O, "Lontrol of Certified Tools Used for Quality Work" Within the area inspected, no items of noncompliance or deviations were identified.
.
e