Forwards IE Insp Repts 50-553/79-13 & 50-554/79-12 on 790829-31.No Noncompliance Noted
ML19250A713
Person / Time
Site: Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 09/12/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19250A714 List:
References
NUDOCS 7910240320
Download: ML19250A713 (2)


See also: IR 05000553/1979013

Text

(

.

,,

/

UNITED STATES

'

--r

o

~g

!

NUCLEAR REGULATORY COMMISSION

  1. ~Zj

g

s

g

ae

REGION 11

W'

o

101 MARIETT A ST., N.W.. SUITE 3100

o

ATLANTA, GEORGIA 30303

SEP 121979

In Reply efer To:

RII:WPK

50-553/79-13

50-554/79-12

Tennessee Valley Authority

Attn:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, Tennessee 37401

Gentlemen:

This refers to the inspection conducted by W. P. Kleinsorge of this

office on August 29-31, 1979 of activities authorized by NRC Construction

Permit Nos. CPPR-162 and CPPR-163 for the Phipps Bend facility, and to

the discussion of our findings held with W. P. Kelleghan at the conclusion

of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

We have examined actions you have taken with regard to previously identi-

fied enforcement matters. These are discussed in the enclosed inspection

report.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do not hear from you in this

regard within the specified period, the report will be placed in the

Public Document Room.

.

1204

093

7 910 2 4 0 3' M

.

I870

s

Tennessee Valley Authority

2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

IcX

.

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-553/79-13

and 50-554/79-12

cc w/ enclosures:

W. P. Kelleghan, Project Manager

Post Office Box 2000

Surgoinsville, Tennessee 37873

J. F. Cox

400 Commerce Street

W10C131 C

Knoxville, Tennessee 37902

.

1204

094