IE Insp Repts 50-553/79-08 & 50-554/79-08 on 790621-22.No Noncompliance Noted.Major Areas Inspected:Dust Abatement, Fuel Storage,Waste Oil Storage & Site Insp
ML19207A373
Person / Time
Site: Phipps Bend  Tennessee Valley Authority icon.png
Issue date: 07/11/1979
From: Andrews D, Cunningham A, Hufham J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19207A369 List:
References
50-553-79-08, 50-553-79-8, 50-554-79-08, 50-554-79-8, NUDOCS 7908170283
Download: ML19207A373 (3)


Text

{{#Wiki_filter:I [ga atog% UNITED STATES y \\+ /1 NUCLEAR REGULATORY COMMISSION 5, kM ' j REGION 11 _7

s! ,8 101 MAnlETT A sT., NA, SUITE 3100 p Y, AT LANTA, GEORGI A 30303 gc ..... Report Nos.

50-553/79-8 and 50-554/79-8 Licensee: Tennessee Valley Authority - 500A Chestnut Street Chattanooga, Tennessee 37401 Facility Name: Phipps Bend Nuclear Plant Units 1 and 2 Docket Nos.

50-553 and 50-554 License Nos.

CPPR-162 and CPPR-163 Inspection at Phip s Bend, Nuclear Plant near Kingsport, Tennessee Inspectors: / a fffg [[//'/79 A. L. "Cttaningham, f ' Date ' Signed / t fftuW $A Yf d D. 1. Andrew V 17a te ' Signed C 1 (( '79 Approved by: , ( 3.

.u v J W. lufham, Se ~ on Chief, FF&MS Branch Dpte Signgd I SUMMARY Inspection on June 21-22, 1979 Areas Inspected This routine unannounced inspection involved 12 inspector-hours onsite in the areas of dust abatement; fuel storage; waste oil storage; and site inspection.

Results Of the four areas inspected, no apparent items of noncompliance or deviations were identified.

C gG'3 e 79081 70 .,,,y,,. < a t a,.,6_,

-. J DETAILS 1.

Persons Contacted Licensee Employees

  • W.

P". Kelleghan, Project Manager

  • G. Wadewitz, Construction Engineer
  • R. Kaczmerak, Project Enginear
  • J. M. Cromer, Prcject Engineer
  • Attended exit interview 2.

Exit Interview The those persons indicated in Paragraph I aboveinspection scope a 1979, with , . 3.

Licensee Action on Previous Inspection Findings Inspection disclosed (0 pen) Unresolved Item (50-533/79-04-01 and 50-55 that ust Abatement.

dust evolution attending charging and operation of concretinterim t arr not yet completed.

e batch plant was 4.

Unresolved Items Unresolved items were not identified during this inspection 5.

Dust Abatement . The inspector discussed with licensee representatives their pro corrective action concerning unresolved item posed interim 04-01 involving mitigation of excessive dust emission attending ch50-553 - 79-and operation of the concrete batch plant.

Inspection disclosed that arging informed licensee representativesimplementation of the corrective ac The inspector that the subject item would remain open . until such time that dust abatement and control could be verified. corrective action was fully implemente 6.

Fuel Storage As a result of the finding disclosed during the previous environmental protection inspection (50-553/79-04 9), the diked fuel storage area was inspected.and 50-554/79-04, Details I, paragrapii heavy spillage of diesel fuel at Inspection disclosed continued the later discussions with licensee repcesentativesloading area outside the dike.

In with a catch basin would be constructed.that to prevent recurrenc a ng ramp equipped 1979).

ramp construction would be A licensee representative further stated that initiated within the month (June, eur 'r n'. <: n? , (f b ts -

. I-2-7.

Waste Oil Storage Inspection included a tour of the used motor oil storage sector in the vehicle maintenance area. Inspection disclosed continued impending problems involving open containers of used motor oil, profuse spillage of used motor oil in the general area and along the adjacent berm of the site drainage ditch se rving that sector of the vehicle maintenance area.

A licensee representative stated that the subject finding tras largely one of house-keeping.

He further stated that immediate efforts would be implemented to correct the above finding.

8.

General Site Inspection The inspector conducted a detailed tour of the site to acquaint the accom-panying NRC Region II inspector with the site.