Category:INSPECTION REPORT
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000498/19973011997-12-18018 December 1997 Insp Repts 50-498/97-301 & 50-499/97-301 on 971020-1205. Violations Noted.Major Areas Inspected:Competency of 6 RO & 8 SROs for Issuance of Operating Licenses at South Texas Project Facility IR 05000498/19970071997-12-10010 December 1997 Insp Repts 50-498/97-07 & 50-499/97-07 on 971005-1115.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970061997-12-0808 December 1997 Insp Repts 50-498/97-06 & 50-499/97-06 on 970810-1004. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19970251997-11-28028 November 1997 Partially Withheld Insp Repts 50-498/97-25 & 50-499/97-25 on 971103-07 (Ref 10CFR73.21).Major Areas Inspected:Physical Security Program,Maint,Audits,Protected Area Barriers, Testing of Intrusion Detection Sys & Control Equipment IR 05000498/19970261997-11-28028 November 1997 Insp Repts 50-498/97-26 & 50-499/97-26 Has Been Cancelled. No Insp Rept Will Be Issued ML20199J5591997-11-21021 November 1997 Insp Repts 50-498/97-24 & 50-499/97-24 on 970915-1112.No Violations Noted.Major Areas Inspected:Electrical,Mechanical & Instrumentation & Control Calculations to Assess Scope of Design Control Weakness ML20199E1971997-11-14014 November 1997 Rev 1 to Insp Repts 50-498/97-05 & 50-499/97-05 on 970629-0809,correcting Errors in Numbering of Insp Followup Sys Open Items & Some Items Identified in Executive Summary IR 05000498/19970231997-11-12012 November 1997 Insp Repts 50-498/97-23 & 50-499/97-23 on 970811-15,25-29 & 0903-04.No Violations Noted.Major Areas Inspected: Operations,Maint & Engineering IR 05000498/19970211997-10-0101 October 1997 Partially Withheld Insp Repts 50-498/97-21 & 50-499/97-21 on 970902-05 (Ref 10CFR73.21).No Violations Noted.Major Areas Inspected:Physical Security Program,Including Access Authorization.Mgt Support & Security Program Audits IR 05000498/19970191997-09-26026 September 1997 Insp Repts 50-498/97-19 & 50-499/97-19 on 970825-28.No Violations Noted.Major Areas Inspected:Implementation of Liquid & Gaseous Radwaste Effluent Mgt Program IR 05000498/19970131997-09-26026 September 1997 Insp Repts 50-498/97-13 & 50-499/97-13 on 970902-04.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program IR 05000498/19970201997-09-16016 September 1997 Insp Repts 50-498/97-20 & 50-499/97-20 on 970811-14.No Violations Noted.Major Areas Inspected:Operations Re Annual Operating Requalification Exams 1999-09-03
[Table view] Category:UTILITY
MONTHYEARIR 05000498/19900271990-09-20020 September 1990 Insp Repts 50-498/90-27 & 50-499/90-27 on 900813-17.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program ML20059K9431990-09-18018 September 1990 Insp Repts 50-498/90-28 & 50-499/90-28 on 900730-0808. Violations Noted.Major Areas Inspected:Onsite Followup of Two Events IR 05000498/19900241990-08-17017 August 1990 Insp Repts 50-498/90-24 & 50-499/90-24 on 900701-0801.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events at Operating Power Reactors & Licensee Action on Previous Findings IR 05000498/19900231990-07-19019 July 1990 Insp Repts 50-498/90-23 & 50-499/90-23 on 900601-30.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Events,Licensee Actions on Previous Insp Findings IR 05000498/19890211989-09-29029 September 1989 Informs That Insp Repts 50-498/89-21 & 50-499/89-21 Canceled & That No Insp Rept Will Be Issued IR 05000498/19890311989-09-28028 September 1989 Insp Repts 50-498/89-31 & 50-499/89-31 on 890814-25.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Activities Associated W/Current Refueling Outage IR 05000498/19890301989-09-26026 September 1989 Insp Repts 50-498/89-30 & 50-499/89-30 on 890801-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Licensee Action on Previous Insp Findings & Preparation for Refueling IR 05000498/19890351989-09-26026 September 1989 Insp Repts 50-498/89-35 & 50-499/89-35 on 890814-18. Violation Noted.Major Areas Inspected:Inadvertent Radioactive Contamination of Portions of Auxiliary Steam Sys Condensate Return Flow Path & Inorganics Basin IR 05000498/19890331989-09-22022 September 1989 Insp Repts 50-498/89-33 & 50-499/89-33 on 890821-25. Violations Noted.Major Areas Inspected:Steam Generator Primary Manway Bolting Removal Problems & Inservice Insp Activities IR 05000498/19890371989-09-20020 September 1989 Insp Repts 50-498/89-37 & 50-499/89-37 on 890911-15. Violations Noted.Major Areas Inspected:Programs for Control of NDE Activities & Design Changes/Mods Activities IR 05000498/19890361989-09-0808 September 1989 Insp Repts 50-498/89-36 & 50-499/89-36 on 890821-25. Violations Noted.Major Areas Inspected:Control of Welding Activities IR 05000498/19890251989-09-0707 September 1989 Insp Repts 50-498/89-25 & 50-499/89-25 on 890724-28 & 0807-11.No Violations or Deviations Noted.Major Areas Inspected:Action on Previously Identified Items & self-assessment Capability IR 05000498/19890221989-08-31031 August 1989 Insp Repts 50-498/89-22 & 50-499/89-22 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected: Followup,Review & Evaluation of Lers,Licensee Action on Previously Identified Insp Findings & Enforcement Action IR 05000498/19890261989-08-25025 August 1989 Insp Repts 50-498/89-26 & 50-499/89-26 on 890718-20.No Violations Noted.Major Areas Inspected:Failure of Unit 2 STP Generator Output Transformer 2A on 890713 IR 05000498/19890231989-08-10010 August 1989 Insp Repts 50-498/89-23 & 50-499/89-23 on 890701-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Actions on Previous Insp Findings, Monthly Maint Observation & Operational Safety Verification IR 05000498/19890151989-08-0303 August 1989 Insp Repts 50-498/89-15 & 50-499/89-15 on 890607-30. Violations Noted.Major Areas Inspected:Followup of Previous Insp Findings,Operations Procedures & Two Amends to Tech Specs IR 05000498/19890141989-08-0202 August 1989 Insp Repts 50-498/89-14 & 50-499/89-14 on 890724-28.No Violations or Deviations Noted.Major Areas Inspected: Licensee Actions to Prevent & Respond to Loss of DHR Described in Generic Ltr 88-17 & Followup on Previous Insps ML20245L5741989-07-26026 July 1989 Insp Repts 50-498/89-17 & 50-499/89-17 on 890601-30. Violations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previous Insp Findings,Operational Safety Verification & Monthly Maint & Surveillance Observations IR 05000498/19890181989-07-24024 July 1989 Insp Repts 50-498/89-18 & 50-499/89-18 on 890626-30 & 0710-14.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Inservice Testing Program for Pumps & Valves & Review of Previous Test Data IR 05000498/19890241989-07-24024 July 1989 NRC Insp Repts 50-498/89-24 & 50-499/89-24 Cancelled IR 05000498/19890201989-07-24024 July 1989 Insp Rept 50-498/89-20 & 50-499/89-20 on 890710-14.No Violations or Deviations Noted.Major Areas Inspected:Records & Document Control Programs IR 05000498/19890191989-07-0505 July 1989 Insp Repts 50-498/89-19 & 50-499/89-19 on 890619-23.No Violations or Deviations Noted.Major Areas Inspected: Followup,Review & Evaluation of LERs & One Open Item IR 05000498/19890131989-06-30030 June 1989 Insp Repts 50-498/89-13 & 50-499/89-13 on 890501-31.No Violations Noted.Major Areas Inspected:Plant Status,Onsite Followup of Plant Events,Esf Sys Walkdown & Monthly Maint Observation ML20245F2151989-06-21021 June 1989 Insp Repts 50-498/89-16 & 50-499/89-16 on 890605-09. Violations Noted.Major Areas Inspected:Audit,Procurement & Receipt,Storage & Handling of Equipment Matls Programs ML20244C3811989-05-26026 May 1989 Insp Repts 50-498/89-11 & 50-499/89-11 on 890401-30. Violations Noted.Major Areas Inspected:Plant Status,Followup of Events,Operational Safety Verification,Monthly Maint Observation & Surveillance Observation ML20244C1461989-05-18018 May 1989 Partially Withheld Insp Repts 50-498/89-10 & 50-499/89-10 on 890410-14 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Physical Security Program,Including Mgt Support, Security Program Plan & Protected Area Barriers ML20247K1991989-05-17017 May 1989 Insp Repts 50-498/89-12 & 50-499/89-12 on 890424-28.No Violations or Deviations Noted.Major Areas Inspected: Licensee Performance & Capabilities During Annual Exercise of Emergency Plan & Procedures IR 05000498/19890081989-05-0404 May 1989 Insp Repts 50-498/89-08 & 50-499/89-08 on 890301-31. Violations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previously Identified Insp Items,Operational Safety Verification & Monthly Maint Observation IR 05000498/19890071989-04-28028 April 1989 Insp Repts 50-498/89-07 & 50-499/89-07 on 890313-17. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings for Units 1 & 2 & Areas Including Control Room & Shift Turnover Observations for Unit 2 ML20245E9001989-04-19019 April 1989 Insp Repts 50-498/89-02 & 50-499/89-02 on 890101-31. Violations Noted.Major Areas Inspected:Plant Status,Esf Sys Walkdown,Monthly Maint & Surveillance Observation & Operational Safety Verififcation IR 05000498/19890041989-04-14014 April 1989 Insp Repts 50-498/89-04 & 50-499/89-04 on 890201-28. Violation Noted.Major Areas Inspected:Plant Status,Esf Sys Walkdown,Monthly Maint Observations,Monthly Surveillance Observations & Operational Safety Verification IR 05000498/19890091989-04-12012 April 1989 Insp Repts 50-498/89-09 & 50-499/89-09 on 890327-31.No Violations or Deviations Noted.Major Areas Inspected: Precriticality Data Review & Startup Test Results Evaluation for Initial Plant Startup IR 05000498/19890011989-03-0909 March 1989 Insp Repts 50-498/89-01 & 50-499/89-01 on 890109-13 & 23-27. No Violations or Deviations Noted.Major Areas Inspected: Calibr Program & Preventive Maint Program Re Calibr of Plant Instrumentation for Components Not Addressed in Tech Spec IR 05000498/19890061989-03-0707 March 1989 Insp Repts 50-498/89-06 & 50-499/89-06 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected: Receipt,Storage & Handling of Emergency Diesel Generator Fuel Oil & High Temp Inside Containment IR 05000498/19890051989-03-0303 March 1989 Insp Repts 50-498/89-05 & 50-499/89-05 on 890213-17.No Violations or Deviations Noted.Major Areas Inspected:Insp of Plant,Including Startup & Core Physics Testing IR 05000498/19890031989-02-28028 February 1989 Insp Repts 50-498/89-03 & 50-499/89-03 on 890206-10.No Violations or Deviations Noted.Major Areas Inspected: Licensee Radwaste Mgt Program,Including Liquid,Gaseous & Solid Radwaste Processing Sys IR 05000498/19880661988-11-0909 November 1988 Partially Withheld Physical Security Insp Repts 50-498/88-66 & 50-499/88-66 on 881017-21 (Ref 10CFR73.21). Violations Noted:Inadequate Compensatory Measures IR 05000498/19880621988-11-0707 November 1988 Page 7 to Insp Repts 50-498/88-62 & 50-499/88-62,correcting Illegibility of Previously Submitted Page IR 05000498/19880691988-11-0404 November 1988 Insp Repts 50-498/88-69 & 50-499/88-69 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected: Preoperational Testing IR 05000498/19880631988-10-27027 October 1988 Insp Repts 50-498/88-63 & 50-499/88-63 on 880901-30.No Violations or Deviations Noted.Major Areas Inspected:Plant Status,Licensee Action on Previous Insp Findings,Monthly Surveillance Observation & Monthly Maint Observation ML20195D9521988-10-26026 October 1988 Insp Repts 50-498/88-62 & 50-499/88-62 on 880912-14 & 881010-14.No Violations or Deviations Noted.Major Areas Inspected:Qc Program & Preoperational Test Procedure Review, & Test Witnessing & Location of Manual Trip Circuit IR 05000498/19880611988-10-26026 October 1988 Insp Repts 50-498/88-61 & 50-499/88-61 on 881003-07.No Violations or Deviation Noted.Major Areas Inspected: Implementation of Fire Protection Program & Compliance W/ Requirements of 10CFR50,App R IR 05000498/19880521988-10-12012 October 1988 Insp Repts 50-498/88-52 & 50-499/88-52 on 880808-0902.No Violations or Deviations Noted.Major Areas Inspected:Maint Procedures,Emergency Procedures & Tech Specs Associated W/ Unit 2 IR 05000498/19880641988-10-12012 October 1988 Insp Repts 50-498/88-64 & 50-499/88-64 on 880921-24.No Violations or Deviations Noted.Major Areas Inspected:Unit 2 Structural Integrity Test & Containment Integrated Leak Rate Test IR 05000498/19880571988-09-30030 September 1988 Insp Repts 50-498/88-57 & 50-499/88-57 on 880829-0902.No Violations or Deviations Noted.Major Areas Inspected:Unit 1 Radwaste Treatment Sys & Preoperational Insp of Unit 2 Water Chemistry & Radiochemistry Programs IR 05000498/19880551988-09-29029 September 1988 Insp Repts 50-498/88-55 & 50-499/88-55 on 880801-31.No Violations or Deviations Noted.Major Areas Inspected:Loose Part Monitoring Sys Test,Remote Reactor Shutdown Test, Control Rod Sys Test & Fuel Handling Bldg Insp IR 05000498/19880541988-09-23023 September 1988 Insp Repts 50-498/88-54 & 50-499/88-54 on 880822-26. Violations Noted.Major Areas Inspected:Plant & Operating Procedures,Operator Readiness Training & Operational Staffing IR 05000498/19880601988-09-20020 September 1988 Partially Withheld Insp Repts 50-498/88-60 & 50-499/88-60 on 880906-07 (Ref 10CFR73.21).No Violations or Deviations Noted.Major Areas Inspected:Fixed Site Physical Protection of SNM of Low Strategic Significance IR 05000498/19880511988-09-20020 September 1988 Insp Repts 50-498/88-51 & 50-499/88-51 on 880725-29.0808-12 & 0829-0901.No Violations or Deviations Noted.Major Areas Inspected:Records Review,Procedures Review,Instrumentation Components & Sys,Work Observations & Heat Shrinkable Tubing IR 05000498/19880591988-09-19019 September 1988 Insp Repts 50-498/88-59 & 50-499/88-59 on 880906-09.No Violations or Deviations Noted.Major Areas Inspected: Completed Preoperational Test Procedures & Review Procedures for & Observe Receipt & Storage of New Fuel 1990-09-20
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000498/19990161999-10-0707 October 1999 Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Maint,Engineering & Plant Support IR 05000498/19990151999-09-29029 September 1999 Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24.No Violations Noted.Major Areas Inspected:Licensed Operators Requalification Program IR 05000199/19990121999-09-14014 September 1999 Insp Repts 50-498/99-12 & 50-199/99-12 on 990816-19.Three Violations Noted & Being Treated as Ncvs.Major Areas Inspected:Access Authorization,Assessment Aids,Security Event Logs & Security Program Audits IR 05000499/19990141999-09-0303 September 1999 Insp Repts 50-499/99-14 & 50-499/99-14 on 990627-0807.NCVs Noted.Major Areas Inspected:Aspects of Licensee Operation, Maint,Engineering & Plant Support PNO-IV-99-037, on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI1999-08-23023 August 1999 PNO-IV-99-037:on 990822,Region IV Dispatched Inspector to STP to Relieve Resident Inspectors & to Provide Assistance to STP Nuclear Operating Co,In Anticipation of Hurricane Bret.Representative Was Also Dispatched to FEMA Region VI IR 05000498/19990081999-08-16016 August 1999 Insp Repts 50-498/99-08 & 50-499/99-08 on 990517-21 & 0607- 10.No Violation Noted.Major Areas Inspected:Corrective Action Program Implementation at Plant IR 05000498/19993011999-07-26026 July 1999 Exam Repts 50-498/99-301 & 50-499/99-301 on 990706-15.Exam results:17 Applicants Passed Exams & Exhibited No Broad Knowledge or Training Weaknesses IR 05000498/19990131999-07-21021 July 1999 Insp Repts 50-498/99-13 & 50-499/99-13 on 990516-0626. Noncited Violations Noted Re Failure to Follow Procedures by Shift Supervisor Authorizing Deviation from Procedure Used to vacuum-fill RHR Sys & to Follow Plant Startup Procedure IR 05000498/19990111999-06-10010 June 1999 Insp Repts 50-498/99-11 & 50-499/99-11 on 990404-0515.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19990091999-05-25025 May 1999 Insp Repts 50-498/99-09 & 50-499/99-09 on 990503-06.No Violations Noted.Major Areas Inspected:Operational Status of Licensee Emergency Preparedness Program ML20206H6361999-05-0505 May 1999 Insp Repts 50-498/99-06 & 50-499/99-06 on 990221-0403. Non-cited Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990071999-04-22022 April 1999 Insp Repts 50-498/99-07 & 50-499/99-07 on 990405-09. Violations Noted.Major Areas Inspected:Radiation Protection Program Focusing on Unit 1 Refueling Outage Activities IR 05000498/19990101999-04-22022 April 1999 Insp Repts 50-498/99-10 & 50-499/99-10 on 990405-09.No Violations Noted.Major Areas Inspected:Review of Licensee Inservice Exam Program Plan & Schedule & Implementation of Program Plan for Facilities IR 05000498/19990051999-03-29029 March 1999 Insp Repts 50-498/99-05 & 50-499/99-05 on 990301-05.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980191999-03-26026 March 1999 Insp Repts 50-498/98-19 & 50-499/98-19 on 990125-0317. Violations Noted.Major Areas Inspected:Operations & Engineering IR 05000498/19990041999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint ML20205A1601999-03-24024 March 1999 Insp Repts 50-498/99-04 & 50-499/99-04 on 990222-25. Violations Noted.Major Areas Inspected:Maint IR 05000498/19980171999-03-23023 March 1999 Cancellation of Insp Repts 50-498/98-17 & 50-499/98-17.No Insp Rept Will Be Issued for Util with Listed Number IR 05000498/19990021999-03-16016 March 1999 Insp Repts 50-498/99-02 & 50-499/99-02 on 990110-0220. No Violations Noted.Major Areas Inspected:Licensee Operations, Maint,Engineering & Plant Support IR 05000498/19990031999-03-0404 March 1999 Insp Repts 50-498/99-03 & 50-499/99-03 on 990222-25.No Violations Noted.Major Areas Inspected:Plant Support ML20203D5711999-02-10010 February 1999 Insp Repts 50-498/98-15 & 50-499/98-15 on 990614-1123. Violations Noted.Major Areas Inspected:Review of Circumstances Surrounding 980614 Fire in Potential Transformer & Subsequent Deenergization of Switchgear E1B ML20203D5611999-02-10010 February 1999 Notice of Violation from Insp on 980614-1123.Violation Noted:From 980614-0615,period Greater than 8 Hours,Unit 1 Channel III 125-volt Battery Bank E1B11 Inoperable with Reactor in Mode 1 & Reactor Not Placed in Hot Standby IR 05000498/19980111999-02-0404 February 1999 Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19990011999-01-27027 January 1999 Insp Repts 50-498/99-01 & 50-499/99-01 on 990104-07.No Violations Noted.Major Areas Inspected:Insp Reviewed Implementation of Solid Radwaste Mgt & Radioactive Matl Transportation Programs & Plant Support IR 05000498/19980161998-12-24024 December 1998 Insp Repts 50-498/98-16 & 50-499/98-16 on 981207-10.No Violations Noted.Major Areas Inspected:Plant Support, Including Alarm Stations,Security Equipment,Vital Area Barriers & Detection Aids & Security Event Logs IR 05000498/19980101998-12-22022 December 1998 Insp Repts 50-498/98-10 & 50-499/98-10 on 981018-1125.No Violations Noted.Major Areas Inspected:License Operations, Maint,Engineering & Plant Support ML20196G9171998-12-0202 December 1998 Notice of Violation from Insp on 981102-05.Violation Noted:Licensee Did Not Make Surveys to Ensure Compliance with 10CFR20.1902,requiring Posting of Each Radiation Area with Conspicuous Sign or Signs Bearing Radiation Symbol IR 05000498/19980201998-12-0202 December 1998 Insp Repts 50-498/98-20 & 50-499/98-20 on 981102-05. Violation Noted.Major Areas Inspected:Radiological Controlled Area Access Controls,Radiation Work Permits, Radiological Surveys & pre-job Health Physics Briefings IR 05000498/19980091998-11-12012 November 1998 Insp Repts 50-498/98-09 & 50-499/98-09 on 980906-1017. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20195F2921998-11-12012 November 1998 Notice of Violation from Insp on 980906-1017.Violation Noted:On 980922,Work Order BS-354091 Contained Maint Instructions That Were Inappropriate to Circumstances IR 05000498/19980181998-10-21021 October 1998 Insp Repts 50-498/98-18 & 50-499/98-18 Has Been Canceled.No Insp Rept Will Be Issued IR 05000498/19980081998-09-28028 September 1998 Insp Repts 50-498/98-08 & 50-499/98-08 on 980726-0905.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support IR 05000498/19980141998-08-31031 August 1998 Insp Repts 50-498/98-14 & 50-499/98-14 on 980706-23.No Violations Noted.Major Areas Inspected:Engineering IR 05000498/19980131998-08-14014 August 1998 Insp Repts 50-498/98-13 & 50-499/98-13 on 980804-07.No Violations Noted.Major Areas Inspected:Licensee Performance & Capabilities During full-scale,biennial Exercise of Emergency Plan & Implementing Procedures IR 05000498/19980071998-08-11011 August 1998 Insp Repts 50-498/98-07 & 50-499/98-07 on 980614-0725.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000498/19983011998-07-14014 July 1998 Insp Repts 50-498/98-301 & 50-499/98-301 on 980601-04.No Violations Noted.Major Areas Inspected:Examiners Evaluated Competency of 6 Senior Operator Applicants for Issuance of Operating Licenses at Plant,Units 1 & 2 & Operations ML20236M3011998-07-0808 July 1998 Notice of Violation from Insp on 980503-0613.Violation Noted:Fire Brigade Training Drill Did Not Assess Each Member'S Knowledge of Role in Fire Fighting Strategy for Area Assumed to Contain Fire IR 05000498/19980061998-07-0808 July 1998 Insp Repts 50-498/98-06 & 50-499/98-06 on 980503-0613. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20237E7231998-06-0202 June 1998 EN-98-042:informs Commission That NRC Will Issue Confirmatory Order Modifying Licensee (Effective Immediately) & Exercise Discretion IAW Section VII.B.6 of Enforcement Policy Not to Issue NOV IR 05000498/19980051998-05-18018 May 1998 Insp Repts 50-498/98-05 & 50-499/98-05 on 980322-0502. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20247M4751998-05-18018 May 1998 Notice of Violation from Insp on 980322-0502.Violation Noted:Combustible Matl,Specifically,Wood Scaffold Installed & Remained in safety-related 2A Isolation Valve Cubicle from Feb 1997 Until April 1998,unattended & W/O Evaluation IR 05000498/19980041998-04-20020 April 1998 Insp Repts 50-498/98-04 & 50-499/98-04 on 980214-0321. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support ML20217A8451998-04-20020 April 1998 Notice of Violation from Insp on 980214-0321.Violation Noted:Licensee Updated UFSAR to Reflect New LOCA Radiological Analysis,Which Increased Thyroid Dose to CR Operator,W/O Obtaining Prior NRC Review & Approval ML20217B5581998-03-24024 March 1998 Notice of Violation from Insp on 980104-0214.Violation Noted:Fire Hose Stations Listed in Addendum 3 of Procedure OPGP03-ZF-0018 Not Operable When Equipment in Area to Be Protected Required to Be Operable by TS IR 05000498/19980121998-03-24024 March 1998 Insp Repts 50-498/98-12 & 50-499/98-12 on 980223-27.No Violations Noted.Major Areas Inspected:Licensee Physical Security Program,Including Review of Access Authorization Program,Testing & Maint & Security Program Plans IR 05000498/19980031998-03-24024 March 1998 Insp Repts 50-498/98-03 & 50-499/98-03 on 980104-0214. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Emergency Facilities ML20202D7781998-02-12012 February 1998 Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection ML20202D7701998-02-12012 February 1998 Notice of Violation from Insp on 980112-15.Violation Noted: Radiation Workers Who Were Likely to Receive Occupational Dose in Excess of 100 Mrems Per Yr Were Not Informed of Presence of Airborne Radioactivity IR 05000498/19970081998-01-23023 January 1998 Insp Repts 50-498/97-08 & 50-499/97-08 on 971116-980103.No Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20197F3461997-12-22022 December 1997 Notice of Violation from Insp on 971112.Violations Noted: Programmatic Calculation Deficiencies,First Identified in Observation 92-01-13 Not Promptly Corrected 1999-09-03
[Table view] |
Text
~
l l
-
.
i l
APPENDIX l
!
I U.S. NUCLEAR REGULATORY COMMISSION
REGION IV
NRC Inspection Report: 50-498/82-09 50-499/82-09 Dockets: 50-498/50-499 Category A2 Licensee: Houston Lighting and Power Company P. O. Box 1700 Houston, Texas 77001 j
.
Facility Name: South Texas Project, Units I and 2
Inspection at: South Texas Project, Matagorda County, Houston, Texas, l San Francisco and Campbell, California i Inspection Conducted: May 1982-Inspectors: M eh - 7/2/82-
/),41. M. Hill, Resident Reactor Inspector Date
'O Details Section A, paras. 1, 2, 3, 4, 5, 7, & 8 d A dMa<v 7///c 2-C. R. Oberg, Inspedtion Specialist, Details Date Section B l
0 mk0 llo-,' 7hku D. G.grJaux, Reside 5t/Ir$pector, Details Gate' "
Section C
' j dokwon R. Boardman, Reactor Inspector, Reactor yhhv Date '
Project Section B, Details Section A, par. 6 Reviewed: /W e ' +-- [p[f T -
Date'
W. G. Hubacek, Consultant STP Approved: rc e -
W. A. Crossman, Chief, Reactor Project Section 8 Date 8207130550 82070s
.
hDRADOCK 05000498 PDR
- _ . - - - . . _ _, _ _ _ _ _ , _ _ - - . _ _ . . . . , , _ _ - _ _ . _ . - - _ _ . . _ . _ _ _ . . . _ , - _ . . - _ _ _ . _ , . -
-
.
2 .
C%d ,00 C. J. Q , Cliief, Reactor System Section 7/u Date n'
Inspection Summary Inspection Conducted During the Period of May 1982 (Report 50-498/82-09; 50-499/82-09)
Areas Inspected: Construction activities related to the transfer of engineering and construction mana0ement functions frc'n Brown & Root (B&R)
to Bechtel Power Corporation (Bechtel) including: Bechtel review of the existing design; assessment of the Quadrex Report findings; site caretaking and maintenance activities; material procurement, control, and procurement documentation. The inspection involved 283 inspector hours by four NRC inspector Results: No violatio is or deviations were identifie _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - - _ _ - _ _ _ _ .
-
,
DETAILS SECTION A Persons Contacted Principal Licensee Employees D. G. Barker, Project Manager
- J. E. Geiger, Project QA Manager
- D. R. Keating, Project QA General Supervisor T. J. Jordan, Project QA Supervisor, Design / Procurement
- J. W. Williams, Project Site Manager S. M. Dew, Engineering Manager
- P. Morrow, Construction Superintendent
- F. Bednarczyk, Project QA Supervisor, Civil J. N. Bailey, Supervising Project Engineer, Special Coordinator Other Personnel B. L. Lex, Project Manager, Bechtel Power Corporation (Bechtel)
- L. W. Hurst, Project QA Manager, Bechtel K. R. Dotterer, Project QA Engineer, Bechtel
- A. W. Stenersen, Deputy Project QA Manager, Bechtel E. Rumbaugh, Assistant Project Manager, Bechtel B. R. McCullough, Construction Manager, Bechtel J. R. Downs, Deputy Construction Manager, Bechtel S. T. Cozzens, Project Quality Engineer, Bechtel W. Straight, Quality Engineer, Bechtel
- J. Crnich, Construction Manager, Ebasco Service, Inc. (Ebasco)
- C. L. Hawn, Quality Program Site Manger, Ebasco R. Cummings, QA Site Supervisor, Ebasco The NRC inspectors also interviewed other licensee and contractor personnel including members of the engineering and QA/QC staff * Denotes those persons attending one or more management meetings during May 198 . Site Tour Routine tours of the site were conducted by the Senior Resident Inspector to observe housekeeping activities; general cleanliness; protection and preservation of equipment and material; personnel access control; and plant status. Areas observed included: Units 1 and 2 Reactor containment buildings, mechanical-electrical auxiliary buildings, fuel handling buildings, and diesel generator building .
.
.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - . - -. -- a
_ _ _ _ _ _ __ _ _ _
_ ____ _ _ - __-
-
.
2 Site-Reservoir, essential cooling pond, and storage areas, including the warehouses, laydown areas, and the welding fabrication sho With regard to the above areas, the inspector confirmed the following:
Safety related and storage areas were free from accumulations of trash, refuse, and debri Work areas were clean and orderl Tools, equipment, and material were returned to their proper storage locations when no longer in us No unsatisfactory conditions were identifie . Site Transition Relative to contractor documentation of plant status, the NRC inspector reviewed the following drawings and supporting documentation packages: Cable Trays FSHE-AX1-079 Structural - Cable Tray Hanger; Section Between Elev. 60'1" and 74'0", Electrical Auxiliary Building-Unit 1 - Sheet 12 of 13 FSHE-AX1-082 Structural - Cable Tray Hangers; Miscellaneous Details, Electrical Auxiliary Building - Unit 1 -
Sheet 1 of 1 FSHE-AX1-034 Structural - Cable Tray Hangers; Section Between Elev. 10'0" and 35'0", Electrical Auxiliary Building - Unit 1 FSHE-AX1-077 Structural - Cable Tray Hanger; Section and Detail, Electrical Auxiliary Building - Unit 1 - Sheet 5 of 10 FSHE-AX1-211-4 Tray Hangers (CM-102-1-N-12-001)
FSHE-FH1-009-0 Tray Hangers (CM-102-1-F-12-001)
FSHE-AX1-066-10 Tray Hangers (CM-102-1-M-12-001) Duct Banks 5-E-10-0-E-2100 Electrical Underground Duct Banks (CM-102-0-B-10-001)
I
I
.
The NRC inspector reviewed the Field Verification Reports which itemized comments made by the QC engineers during the walkdown inspection Comments generally ranged from incomplete installation, material deficiencies, inadequate separations between channels and insufficient room to permit future cable installation by craft personnel. Generally, the drawings which were "Hi-Lited" with different colors and contained written comments by the engineers indicated that efforts to document the construction status of cable tray supports were effectiv Comments relative to documentation review for cable tray supports generally indicated installations were incomplete, and subsequent inspections had not been performed. This was acceptable to the NRC inspector provided that cable tray support welds and related documentation were examined through another portion of the transition program. This item is unresolved pending fur-ther review of welds and documentation for cable tray supports (8209-01).
The NRC inspector reviewed a draft copy of "The Plan for the Change of Responsibility for ASME Section III Components, Component Supports, and Appurtenances on the South Texas Project." The formal copy of this procedure / plan was in routing for review and concurrence. This document supplements Bechtel Procedure No. 5, "As-Built Verification of Safety-Related Installed NSS Components, Rotating / Stationary Mechanical / Nuclear Equipment During the Transition Phase." The purpose of the plan is to identify the ASME Code responsibility for each of the organizations identified therein and prepare documentation that describes the ASME Section III installation status of all components, component supports, and appurtenances, with the exception of piping systems and reactor coolant loop pipin The plan requires the Code Status Report (CSR) and supporting documentation to become part of the project's permanent records stored in a central location and shall include, as applicable: Weld Data Card or suitable alternative completed to the point of fabricatio Applicable Manufacturer's Data Reports, Certified Material Test Reports (CMTR's), and/or Certificates of Compliance (C of C's) for piping materials, filler metal, et Welding Procedure Specifications (WPS's) and Procedure Qualification Records (PQR's) that support the activities noted on the Weld Data Car Welder /NDE personnel qualification Installation or mark-up drawings that provide identification and locatio Drawings are filed with the CS ___ _ _ _ _
4 NDE report Operational travelers, as applicabl This plan is very similar to the plan for the change of responsibility for ASME Section III piping systems. Both plans require a descrip-tion of incomplete items and concurrence of the Authorized Nuclear Inspector (ANI).
NRC review of the CSR's for ASME Section III components, component supports, and appurtenances will be performed following formal approval of this procedure and preparation of the reports.
4. Construction Activities (Restart)
By correspondence dated May 15, 1982, the licensee outlined their program for restart of safety-related construction activities. Milestones were scheduled for the remainder of 1982. A detailed schedule was provided for the Essential Cooling Water (ECW) System, the first safety-related system for which actual field construction effort is anticipate The NRC inspector confirmed during discussion with a licensee QA representative that a checkoff list was being developed. This list contained areas (outstanding items) that must be examined and determined to be accept-able before construction would resume on the ECW system. The licensee representative stated that a similar list was being developed by the construction manager. Review of these lists for adequacy and exam-ination of these areas will be accomplished in subsequent NRC inspections. This item is unresolved pending completion of this review (8209-02).
The inspector reviewed the following ASME Section III piping packages for the ECW system:
--3M361P-EW-1202-WT3 (Intake structure to MEAB)
--3M361P-EW-1205-WT3 (Return line)
The NRC inspector confirmed that the isometric drawings reflected the status of the field installation, supporting documentation was included in the packages, and rework and reinspection requirements from previous NCR's were included as part of the Certification of Code Statu The NRC inspector had no further questions relative to the status of the ECW syste :
- - - - - - - - - _ _ _ . . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
. . .
.
.
5. Storage and Maintenance The NRC inspector observed activities in several warehouses and other designated storage areas with particular attention paid to the following:
. Equipment in various storage areas was segregrated and classified as levels A through D to provide appropriate storage and environmental control for various types of equipmen . Storage areas were not being used to store food, drink, or sal . An active program was in effect to control rodents and small animals.
1 . Racks, crates, and cribbing were carrying the full weight without
'
component distortio . All items were labeled and stored in a manner that allowed access for inspectio . Fire protection systems and equipment were available for us . Sufficient dunnage was available to protect materials and components in storag . Canvas or plastic covering was available for weather protection, as required.
I
. Protective covers and seals were properly attache . Personnel access to the storage locations was adequately controlle ,
l The RRI reviewed the maintenance records for the following safety-related l equipment:
'
l Card N Equipment V-10958 3-inch automatic operated gate valve 1500#
V-0188 3-inch motor operated flex wedge valve l l
V-0185 4-inch motor operated stop check valve 700# l
V-0783 3-inch motor operated flex wedge gate valve 150#
,
V-1391 3-inch motor operated gate valve 150#
t l
[
i l
l
'
l
~
l
,
V-1584 3-inch air operated globe valve 1500#
V-1628 1-inch air operated globe valve 1500#
V-1629 Air operated valve (SS)
V-2346 16-inch butterfly control valve (CS) with appendages V-2348 16-inch butterfly control valve (CS) with appendage V-2417 1-inch air operated globe valve 150# (CS)
V-2420 1-inch air operated valve (SS)
V-2927 Safety valve (SS)
V-2429 Safety valve (SS)
E-0778 800 HP motor for ECW pump #21 E-0314 * 125 Volt class 1E battery charger E-0131 4160 Volt Switchgear El E-0111 Dry type transformer for load center #251 E-1051 200 HP Spent Fuel Pit pump motor E-1032 CRD motor generator set E-1031 CRD motor generator set E-0780 800 HP motor for ECW pump #23 E-0779 800 HP motor for ECW pump #22 E-0751 1000 HP motor for HH (high head) SI pump A E-0743 300 HP motor for RHR pump E-0741 1000 HP motor for HH SI pump C
,
E-0740 1000 HP motor for HH SI pump B
- - -. - .- , . - - _ . - .. . . - _ . - _ , _ .
- - . - ..- _-. .. -- , . - . , - . . ,,-
-
.
- Maintenance record E-0314 for the 125 volt Class 1E battery charger contained a copy of Missed Maintenance Evaluation No. 35, dated May 19, 1982. This form documented the failure to perform scheduled maintenance items B (heat check) and H (protective cover) and required an engineering evaluation to determine any supplemental, corrective, or other maintenance actions that may be required due to failure to perform the scheduled maintenance. The maintenance record contained documentation recording satisfactory performance of these maintenance requirements immediately following identification of this item. The inspector confirmed that the maintenance program identified and documented any scheduled maintenance which was not performed. Appropriate action was initiated to correct the situation. Although closeout of the evaluation by the engineering depart-ment remains, the NRC inspector did not expect any deleterious effects on the battery charger due to the nature of the items and the environmental control in the storage warehouses. The NRC inspector considers the followup action to be within the purview of the engineering department. Since the maintenance program receives continuing review by the NRC resident inspector, no further review of this item is necessar The NRC inspector observed the performance of electrical checks (megger, heat check, and shaft rotation) on several electric motors by electri-cians. The NRC inspector confirmed that the electricians were qualified to perform the assigned maintenance; procedures were approved and in use; and, any discrepanci a were corrected on the spot or documented for further actio The NRC inspector had no further questions relative to equipment maintenance.
! Material Procurement, Material Control, and Procurement Documentation Vendor Control Program (VCP) Review i
The licensee, in its letter to the Director of Region IV, dated October 31,
- 1980, ST-HL-AE-570, SFN
- V-0530-Subject: South Texas Project Units 1 & 2, Docket Nos. STN 50-498, STN 50-499, " Third Interim Report Concerning the Breakdown in the Quality Program - Procurement Cycle of Purchased Material,"
Section 3.2.3, Investigation and Verification, states the following:
" Brown & Root has engaged the services of the NUS Corporation (NUS) for the purpose of performing an independent, third party investigation and verification of the procurement cycle for all safety-related materials and equipment."
-- c=, w -- y, e- 4 + gp gy - --7 +--iw-y y7e- r-y ~--
.
_ _ _ _ _ _ _ _ _ _ _ _ _
. . .
l
\ .
,
On May 18, 1982, the NRC inspector discussed with licensee personnel, the fact that both B&R and NUS are apparently part of the Halliburton Co.,
and whether the licensee considered that relationship compatible with their definition of an " independent, third party investigation and verification."
Licensee personnel, on May 21, 1982, confirmed to the NRC inspec+or that the joint ownership of B&R and NUS by the Halliburton Co., did no' affect their definition of an independent third part Steam Generator Support Column Anchor Bolts The NRC inspector reviewed a sample of vendor Certified Material Test Reports (CMTR's) for steam generator support column anchor bolts on licensee's Purchase Order 4033/8033 with the following findings:
. The size of the anchor bolts, nuts, and jam nuts is 3 inche The nuts are described as " heavy hex". The B&R specification is 1C1195503 . CMTR's show that the nuts and jam nuts were fabricated of Crucible Steel, heat 134951. The nuts are of traceability code C580 which includes 340 pieces in two sublots (#1 and #2).
The Crucible Steel CMTR provided is for a 3-inch bar from which the nuts coulg not be fabricated. CMTR's for code C58D do not show the +10 F Charpy Tests required by ASTM A540. It was also noted that the Nondestructive Test (NDT) report for
" Lots 1 and 2" of heat 134951 are not traceable to code C58D and show 378 pieces in lieu of the 340 which are in code C58D as indicated by mechanical property test report ,
.
Similarly, the CMTRfs for jam nuts identified by code C570, do not include the +10 F Charpy Tests required by ASTM A540, and the NDT report is not traceable to code C57D and covers 257 pieces in lieu of the 230 pieces reflected by the CMTR for heat treatment and mechanical propertie . There was not specific identification in vendor documentation to the heat of material used for fabrication of the anchor bolts, but CMTR's .ere provided for 11985 pounds of 3-inch diameter bar, heat 8060986, from Republic Steel and 3 3/4-inch diameter bar from Copperweld Steel Company, heat 6337 . For the bar of heat 8060986, the CMTR's are mill test reports whigh reflect all required mechanical tests, including bothgthe
+10 Charpy V notch Tests required by ASTM A540 and the +60 F Charpy Tests required by ASME (NF 2333-1). Vendor documentation indicates, however, that the anchor bolts were fabricated by
-- . . _ _ _ .
l
-
.
rolling the threads in lieu of cuttin Thread rolling significantly cold works the bar and can result in mechanical properties significantly different from those values reported, those required by ASTM A540, and those used as the basis for the design of the anchor bolt .
Heat 63373 (41 pcs) was machined from 3 3/4-inch diameter tg 3 1/2-inch bar and then heat treated. Subsequently the +60 F Charpy Test required by the ASME code was performed. After heat treating, the mill CMTR's on mechanical properties were no longer valid,gutonlyoneretestwasperformedwhichdidnotinclude the +10 F Charpy Test required by ASTM AS4 In addition, rolling of the threads would have cold worked the bar severely since there was apparently a reduction in diameter from 3 1/2 inches to 3 inches in the process of rolling the thread . The NRC inspector also noted that no design specification (such as Handbook H-28) was indicated by B&R for these fastener This will renain an unresolved item (8209-03) pending further review by the NRC inspecto b. Structural Plates and Bars and Flat Washers for Reactor Coolant
, System (RCS) Support The STP FSAR, Section 3.8.3.6.5.1, specifies the materials for RCS supports structural shapes, plates, and bars as being ASTM A588 corrosion resistant, high strength, low alloy stee B&R Specification IC11955035E/DCN 6-2-77, provided to the NRC inspector as being the latest revision, in Section 3.1.1 specifies the use of ASTM A36 carbon steel structural plates and bars, 32ksi minimum yield stress, for thickness greater than 8 inches, not ASTM A58 The STP FSAR, Section 3.8.3.6.5.1, also specifies for washers, the use of quenched and tempered carbon steel. B&R Specification 1C11955035E/DCN 6-2-77 also allows " material as specified in ASME materials specification for the bolting materia ASTM A325 is acceptable" which is not covered by the FSAR.
t
__
.
The licensee's Vendor Control Program (VCP) Task Force Purchase Order Closure Report, Revision 2, for P0 #35-1197-4033 does not identify the above anomalies, but does reference B&R specification IC1195S035- (
This will remain an unresolved item (8209-05), pending NRC inspector review of B&R Specification 1C11955035- c. Licensee Control of Galvanizing The licensee FSAR, Section 3.8.3.6.4.1, states that galvanizing of structural and miscellaneous steel conforms to ASTM A123-7 ASTM A123-73, Section 7.2, states that galvanizing of bolts and similar threaded fasteners shall be in accordance with spec-ification A153, for zinc coating (hot dip) on iron and steel hardwar Both ASTM A123 and A153 specify verification of the purity of the galvanizing bath and reference ASTM A143 " Standard Recommended Practice for Safegarding Against Embrittlement of Hot-Dip Galvanized Structural Steel Products and Procedure for Detect-ing Embrittlement." Based on ASTM A143, galvanized fasteners to ASTM A490 would be candidates for hydrogen embrittlement (tensile strength in excess of 150,000 psi). The NRC inspector found 4637 ASTM A490 bolts electro-zinc plated to ASTM A164 (not permitted by FSAR), or with no specification indicated on Mosher Steel Orders HM-540, 608, 628, 794, 1004, arid 1337 which were for bolts ordered for nonsafety-related applications, but were used for safety-related applications as previously reported by the licensee under 10 CFR 50.55(e). The NRC inspector could find no evidence of
,
the invoking or performance of tests to verify the freedom of these fasteners from hydrogen embrittlement, even though ASTM A164-71, Section 5.1, states that after plating and any subsequent oper-ations (such as baking to remove embrittlement), the steel shall be free from the detrimental effects of hydrogen embrittlement and that the test methods, and their evaluation for freedom from hydrogen embrittlement shall be agreed upon by the manufacturer and the purchase Similarly, the NRC inspector could find no evidence that the licensee, or B&R, including the VCP reviews, had verified the accomplishment of the chemical analyses required by ASTM A123 and A153 to determine impurities in the plating bath, although the licensee had committed in his QA program to control of special processes as set forth in 10 CFR 50, Appendix B, Criterion I .. ____ - _____________-___ _-__
. .. .. . . ..
.
This will remain an unresolved item (8209-05) pending further review by the NRC inspector . Welding of ASTM A193 Anchor Bolts The licensee previously reported a construction deficiency related to the fabrication of safety-related anchor bolts from improper material. In reviewing this matter, the NRC inspector ascertained that the B&R design drawing for anchor bolts for STP, drawings 5-A-01, until Revision 2, dated March 8, 1977, required welding of Type VI (ASTM A193) anchor bolts to-their anchor plates. Neither the NRC inspector nor licensee personnel were able to identify a B&R welding procedure for these weld This will remain an unresolved item (8209-06) pending determination of the existing installed welded A193 anchor bolts and the related approved welding procedur Female Threaded Couplings to ASTM A194 ASTM A194 " Specification for Carbon and Alloy Steel Nuts for Bolts for High Pressure and High Temperature Service" covers the requirements for nuts, which are not loaded in tensio Licensee Purchase Order 35-1197-24191 ordered 783 couplings, 2-inch diameter x 9 inches long to ASTM A194, Grade ZH. The form of the couplings (heavy or finished) was not specifie Licensee personnel were unable to provide information to the NRC inspector regarding the desired form of these couplings and verify the adequacy of these couplings for their seismic load. Since this fastener form and loading is not covered by ASTM A194, the NRC inspector questioned why final product testing, to prove design adequacy, was not performe This will remain an unresoved item (8209-07) pending verification by the licensee for design adequacy and final product acceptability of the subject coupling Self Locking Nuts to ASTM A307 ASTM A307 " Standard Specification for Carbon Steel Externally and Internally Threaded Standard Fasteners" does not cover self-locking nuts, nor does the STP FSAR, Section 3.8.3.6. Licensee Purchase Order 35-1197-19775 ordered 375 1-inch x 4-inch black bolts with self-locking nuts and washers to ASTM A307. No design requirements (breakaway torque, etc.) were given for the self-locking nuts.
, . . .
- _ _ - _ - - _ _ _
.
The vendor CMTR and accompanying data show the fasteners to be
"ANC0 nuts," but do not indicate that the fasteners were proof '
tested. The test reports provided are typical for bolts and nut This will remain an unresolved item (8209-08), pending verification of design requirements of the self-locking nuts and the compliance of the bolts and nuts with the requirements of ASTM A30 g. Vendor Documentation The NRC inspector reviewed licensee's records of site procurement of safety related material for regulatory requirements, licensee commitments, invoked B&R specifications and applicable ASTM standard designations. Apparent deficiencies were identified in vendor documentation for material accepted by site personnel as indicated below:
. Material supplied under purchase order 35-1197-12030 for 120 1 1/2-inch diameter heavy hex nuts, ASTM A540 Grade B23, Class 3; and 32 2-inch diameter heavy hex jam nuts, ASTM A540 Grade B23, Class 3 was not provided with the required vendor test report In the case of both sizes and types of nuts, the manufacturer reported only one tension test and no Charpy impact tests. ASTM AS40 requires two tension tests and two Charpy impact tests with each test consisting of three Charpy V-notch specimen . The invoked B&R Specification 3A010SS026-E, " Category I Miscellaneous Steel", specifies ASTM A540 material for anchor bolt material (bolts, nuts, washers) only, and requires MT (or PT) for all size The vendor's test reports for both sizes and types of nuts show no MT or PT was performe This remains an unresolved item (8209-09) pending determination of installation or use of the subject material at the time of this inspectio h. Material Control of Structural Steel Bolts The licensee, in letter dated April 16, 1981, serial ST-HL-AE-655, SFN: V-0530, G. W. Oprea, Jr. , to Karl Seyfrit, Subject:
South Texas Project Units 1 & 2, Docket Nos. STN 50-498 and STN 50-499, Final Report on Material Control of Structural Steel Bolts, states the following:
L
.
"Mosher Steel; supplied structcral bolts (A325 & A490) under a Non-Category I specification. Documentation received consists of CMTR's and C of C's accompanied by a statement from the structural bolt supplier to the effect that all bolts were manufactured to the quality standards set forth by the respective ASTM standards."
The NRC inspector reviewed the subject Mosher Steel CMTR's and discovered that approximately 13,000 1-inch and 1 1/8-inch diameter bolts to ASTM A490 did not have documentation of performance of the proof load (or alternate proof load) as required by Section 5.3 of ASTM A-490-75 to wnich the bolts were certified on purchase orders HM-1004, HM-628, HM-1868, AMJ-2281, DM-1262, HM-540, HM-608, DM-628, HM-794, HM-1377, AMJ-2281, HM-1262, HM-1377, HM-4365, AMJ-2279, HM-1829, and AJM-228 The NRC inspector noted that while material control of structural steel bolts was apparently corrected, the subject of such control of the mating nuts was not addressed. The NRC inspector also noted that licer:see personnel stated that the subcontractors supplying the nonsafety-related bolts and nuts used in safety-related applications, have never been surveyed to determine compliance with requirements of 10 CFR 50 Appendix B or ANSI N45.2 and daughter standards, and are not included in the licensee's Vendor Control Program (VCP) revie This will remain an unresolved item (8209-10) pending further review by the NRC inspecto . Unresolved Items Unresolved items are matters about which more information is required in order to ascertain whether they are acceptable items, violations, or deviations. Ten unresolved items, disclosed ouring the inspection, are discussed in paragraphs 3, 4, and . Management Meetings Meetings were held with management personnel periodically during the course of the inspection to discuss inspection scope and findings.
._ -. _- _- - . , , - - . _ _ _ _ _ - -- - _ , , , _
...
.
DETAILS SECTION 8 Persons Contacted Houston Lighting and Power Company (HL&P)
- +J. White, Special Coordinator, Engineering
- +G. Robertson, Manager, Nuclear Licensing Department
- J. Molleda, Supervising Engineer Bechtel Power Corporation (Bechtel)
- +J. Gormly, Project Manager for Licensing
- R. Scott, Licensing Engineer (EN-617 Coordinator)
- R. Ashley, Licensing Manager, San Francisco Office Quadrex Corporation (Quadrex)
+L. Stanley, Group Manager, Licensing & System Analyses
- Participated in May 11-13, 1982, meeting # Participated in May 24, 1982, meetin + Participated in May 25, 1982, meetin . Status of HL&P and Bechtel Review of Quadrex Report The status of the resolution of Quadrex Report issues was reviewed with HL&P and Bechtel personnel (indicated in paragraph 1 above) during the period May 11-13, 1982. The NRC inspector determined that the list of Quadrex Report issues is based on the Quadrex Report findings (Volume I). The list also includes any significant items from Volumes II and III. Work package EN-619, Quadrex Issue Resolution Summary, is being prepared. A tentative format has been established for the work package and includes identification and resolution informatio The report is now due to be issued as a final work package, approved by HL&P on July 19, 1982. Inspection of the Quadrex, issued by NRC inspectors, will commence after this dat . Visit to Bechtel - San Francisco Offices On May 24, 1982, a visit was made to Bechtel offices in San Francisc The reason for the visit was to obtain answers to questions concerning a report entitled, "An Assessment of the Findings in the Quadrex Corporation Report," dated May 1982. This report was issued on March 15, 1982, for HL&P, and was prepared by a Bechtel Task Force, I
i
--
- ._
.
independent of STP, as a qualitative assessment of the findings l identified in the Quadrex Report. Questions asked of the task force l director by the NRC inspector were questions of clarification onl No assessment or conclusions regarding any findings were made by the NRC inspector. All questions were answered satisfactoril . Visit to Quadrex - Campbell, California Office On May 25, 1982, a visit was made to Quadre The NRC inspector met with Quadrex and licensee representatives, (identified in paragraph 1, above)
in order to obtain clarification of items noted during the NRC inoffice review of the Quadrex Report. No conclusions on the Quadrex Report items were made during the visit. Additional questions regarding the Quadrex Report will be submitted through HL&P. All questions were answered satisfactoril e
.**
- . .
l
-
.
l DETAILS SECTION C ,
l l
1. Persons Contacted l J. L. Hurley, Assistant Project Engine 2 ring Manager, Bechtel H. Friend, Project Manager, Bechtel K. R. Dotterer, Project QA Engineer, Bechtel J. McBride, Quality Engineer, Bechtel R. L. Rogers, Project Engineering Manager, Bechtel J. L. Quinnelly, Quality Engineer, Bechtel T. C. Smith, Records Manager, Bechtel B. Robertson, Purchasing Manager, Bechtel W. Melton, Project Engineering Coordinator, Bechtel D. Krisha, Project QA Manager, Bechtel S. Cozzens, Project Quality Engineer, Bechtel B. L. Lex, Project Manager, Bechtel J. L. Blau, Supervising Project Engineer, HL&P S. M. Dew, Manager Engineering, HL&P T. J. Jordan, Project QA Supervisor, HL&P J. M. LeBlanc, Records Manager, HL&P 2. Design Engineering Transition This section of the report details NRC activites with respect to surveillance / inspection of the Bechtel/B&R transition process. To assess the overall transition program and to keep track of exact status of the Bechtel review and assessment of the existing B&R engineering design and associated data; a NRC Region IV inspector was placed at the A/E facility on a full-time basis (Bechtel, Houston). For background information on transition activities prior to this report, refer to the details section of previous monthly report Phase A of the Bechtel/B&R transition process is the review and assessment of the South Texas Project design. This task has been broken down to discretely defined systems which are defined as work packages. As the initial Bechtel review and assessment of a certain work pa: age is complete, a draft final report is sent to HL&P for their review and comment. The HL&P comments are then incorporated into the generation of the work package final report. When all of the final reports have been completed for the designated work packages, Phase A of the transition will be complete Some Phase B activities are scheduled to commence prior to the completion of Phase A of the transitio .
.,~,----...y, .i _
-
.
The following draft final reports have been sent to HL&P for review and comment:
- EE-200 *EN-612 EJ-306 EJ-303 *EM-511
- EE-215 *EE-208 *EM-558 *EN-606 EC-150
- EE-202 *EJ-300 EJ-314 *EA-006 *EC-151
- EE-210 *EN-610 *EJ-361 *EJ-318 EM-410
- EJ-316 *EJ-364 *EA-002 EA-003 EJ-315
- EJ-310 *EN-609 *EE-205 EM-515 EJ-352
- EE-209 *EE-220 EN-605 EC-11 *EJ-366
- EA-007 *EJ-313 *EE-206 EJ-351 EC-155
- EM-557 *EE-214 *EC-174 EJ-369 EC-142
- EN-608 *EJ-362 *EM-506 *EJ-360 EE-219 EC-165 EJ-367 EA-005 *EM-455 EE-212 EN-607 EJ-301 EJ-358 EM-405 EJ-370 EJ-365 EM-452 EM-504 EC-104 EM-509 EC-186 EJ-317 EP-700 EN-603 EN-604 EE-216
- Final report sent to HL&P The present status of design documentation transmitted by B&R and received by Bechtel is as follows:
B&R Subpackages Total Scheduled Scheduled to date Received Engineering 872 872 833 Procurement 1538 1538 1446
.
B&R transmitted a general assessment of the Quadrex Report to HL& l HL&P seemed to be unaware that B&R was conducting this assessmen The NRC inspector's initial review of the report indicated that B&R detailed the circumstances and background to the assessment of certain Quadrex concerns. There are differing opinions between B&R and Quadrex on the report finding . Findings As the NRC inspector reviewed work packages final reports, it was observed that in the commercial assessment done by Bechtel Purchasing, there were items listed that could be viewed as open or followup item Bechtel was questioned as to how these items would be listed
.. .
- -
.
. .. _ _ _ .
,
-
.
for future followu These items will be closed under normal procurement activitie As defined in the Engineering Transition Procedures, only items that diverge from normal scheduled project activities will be tracked on an action item syste HL&P conducted a corporate audit of Bechtel's Engineering and QA activities for the transition phase during this mont The NRC inspector participated as an observer during this audit. The NRC inspector was briefed on the preparation and scope of the audi Audit checklists were reviewed to assure that the procedural scope was of a detailed nature as to assure proper implementation of procedural commitments. No major findings were identified during the audit, although some minor implementation discrepancies were foun These items were corrected promptly by Bechte During this month, the NRC inspector observed that the generation of work package draft final reports had declined. Allocation of Bechtel Engineering personnel for Phase B construction restart activities was cited as the cause. Reemphasizing to Bechtel Engineering personnel the importance of the orderly completion of Phase A activi-ties was made by Bechtel asanagemen In a letter dated May 14, 1982, transmitted from HL&P to the NRC Region IV office, HL&P provided the NRC with a program and schedule for resuming safety-related work. The NRC inspector was notified that construction of the ECW system piping is scheduled to begin in mid-Jul As the NRC inspector began reviewing the status of the Phase A assessment of critical ECW design documents, it became apparent that the Review Package Final Report was scheduled to b9. finished after the safety-related construction had resume HL&P had committed on May 14, 1982, that the related work package final reports would be issued prior to initiation of safety-related constructio Bechtel management informed the NRC inspector that they had rationalized one of three options: Generating an internal auditable subpackage for only the ECW buried service water documents that were critical for this construction restar Break EM-406 essential " Cooling Water System" into two package Step-up review activities of EM-406 and finish the final report prior to construction restar ..
-
-
.
From the review of Bechtel procedures relating to the South Texas Project transition activities, the NRC inspector found that the procedures adequately reflected the transition phase of design responsibility from B&R to Bechtel. Transitional activities are being implemented properly to Bechtel procedural commitment t