June 27, 2008

Charles D. Naslund, Senior Vice President and Chief Nuclear Officer Union Electric Company P.O. Box 620 Fulton, MO 65251

SUBJECT: CALLAWAY PLANT - SITE-SPECIFIC IMPLEMENTATION OF B.5.B PHASE 2 AND 3 MITIGATING STRATEGIES TEMPORARY INSTRUCTION INSPECTION (NRC INSPECTION REPORT 05000483/2008007)

Dear Mr. Naslund:

In a telephone conversation on June 26, 2008, Messrs. Kevin Bruckerhoff and John Kirkland made arrangements for the NRC to inspect the site-specific implementation of B.5.b Phase 2 and 3 mitigating strategies at the Callaway Plant. The inspection is planned for the week of July 28, 2008.

In order for the NRC to adequately prepare for this inspection, please furnish the documents listed in Enclosure 1 to Mr. John Kirkland in electronic format no later than July 14, 2008. Please have available on site at the beginning of the inspection the arrangements and documents listed in Enclosure 2. Mr. Kevin Bruckerhoff has been advised of this request and provided with the name and address of the NRC lead inspector.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0011.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Union Electric Company - 2 - Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS.Resource@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0011), Office of Management and Budget, Washington, D.C. 20503-0001.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact John Kirkland at 402-426-9611, or me at 817 860-8159.

Sincerely,/RA/ Ryan E. Lantz, Chief Operations Branch Division of Reactor Safety Docket: 50-483 License: NPF-30

Enclosures:

1. Documentation Requested Prior to the Inspection

2. Arrangements/Documents Requested To Be Available Onsite during the Inspection Week cc w/enclosure:

H. Floyd Gilzow Deputy Director for Policy Missouri Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102-0176 Union Electric Company - 3 - Steve Petzel AmerenUE P.O. Box 620 Fulton, MO 65251

Jeffery Lancaster AmerenUE P.O. Box 620 Fulton, MO 65251

cc w/o enclosure: Scott A. Maglio, Assistant Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Les H. Kanuckel, Manager Quality Assurance AmerenUE P.O. Box 620 Fulton, MO 65251

Luke H. Graessle, Manager Regulatory Affairs AmerenUE P.O. Box 620 Fulton, MO 65251 Thomas B. Elwood, Supervising Engineer Regulatory Affairs/Licensing AmerenUE P.O. Box 66149, MC 470 St. Louis, MO 63166-6149 Daniel Trokey AmerenUE P.O. Box 620 Fulton, MO 65251 Union Electric Company - 4 - David S. Hollabaugh, AmerenUE P.O. Box 620 Fulton, MO 65251