IR 05000456/1980005

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-456/80-05 & 50-457/80-05
ML19321A888
Person / Time
Site: Braidwood  
Issue date: 07/16/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19321A889 List:
References
NUDOCS 8007240340
Download: ML19321A888 (1)


Text

'

UNITED STATES

>* "UOg'o NUCLEAR REGULATORY COMMISSION

[

g a

REGION ill

~ 'f 799 ROOSEVELT ROAD

,,

'

%UL161980 Docket No. 50-456

-

Docket No. 50-457 Con.monwealth Edison Company ATTN:

Mr. Cordell Reed Vice President Post Office Box 767 Chicago, IL 60690 Gentlemen:

Thank you for your letter dated July 9, 1980, informing us of the steps you have taken to correct the items of noncompliance which we brought to your attention in Inspection Reports No. 50-456/80-05 and No. 50-457/80-05 forwarded by our letter dated June 5, 1980.

We will examine these matters during a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely, o

M Gaston Fiorelli, Chief Reactor Construction and Engineering Support Eranch cc:

Mr. D. L. Peoples, Director of Nuclear Licensing Mr. R. Cosaro, Project Superintendent cc w/1tr dtd 7/9/80:

Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General

_

8007240