ML20151E519
| ML20151E519 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 07/14/1988 |
| From: | Mallett B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20151E522 | List: |
| References | |
| NUDOCS 8807260105 | |
| Download: ML20151E519 (2) | |
See also: IR 05000454/1988010
Text
, .. N e
'
D
,
p -n.,.nnn
, . , - n c. . .. , v i r a ,
.
tu 11 LO UdlT!Ks li'ti U Fi f u r 6 : Ivis
/
JUL 14 1E
-
o
Docket No. 50-454
,
Docket No.-50-455
.
' Commonwealth Edison Cenpany
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Sox 767
'
Chicago, IL 60690
Gentlemen:
This refers to the routine safeguards inspection conducted by Mr. G. L. Pirtle
of this office between June 23 and July 1,1988, of activities at Byron Nuclear
Power Station, Units 1 and 2, authorized by NRC Operating Licenses No. NPF-37
1
and No. NPF-66 and to the discussion of our findings with Mr. R. Pleniewcz and
other members of your staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
,
interviews with personnel,
i
During this inspection, certain of your activities appeared to be in violation
1
of NRC requirements, as described in the enclosed Notice. The inspection
'
showed that action had been taken to correct the identified violation and
to prevent recurrence.
Our understanding of your corrective actions is
described in Paragraph 6 of the enclosed inspection report.
Consequently, no
reply to the violation is required and we have no further questions
regarding this matter at this time.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Part 73, Title 10, Code of Federal Regulations,
Section 73.21(c)(2).
This information must be handled and protected in
!
accordance with the provisions of 10 CFR 73.21.
Consequently, the enclosure
to this intter and our report of this inspection will not be placed in the NRC
Public Document Room.
l
V
s$
\\
.
8807260105 880714
s !
!
ADOCK 05000454'
EncTosure contains
,
G
PNU (
Sl#EGUARDS I pca aTIC"
Upon reparation thi;
page is DecontrolicJ
p r r- n e i n - ~
em e s n my
vanLOV/M UD
hJ VistVittliVis #
s
f
. ..
..
p ni,.nnn
.
Ot il L U v, .. s vu . . . , ~ n . , a % },y,
e e u v i s , ,,, , , , p
-
Commonwealth Edison Company
2
JUL 14 1303
/
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
!
htNY/ht
Bruce' S. Mallett, Ph.D. , Chief
Nuclear Materials Safety
and Safeguards Branch
Enclosures:
1.
2.
Inspection Reports
No. 50-454/88010(DRSS);
No. 50-455/88010(DRSS)
(UNCLASSIFIEDSAFEGUARDSINFORMATION)
cc w/ enclosures:
T. J. Maiman, Vice President,
PWR Operations
H. Bliss, Nuclear
,
Licensing Manager
R. Pleniewicz, Station Manager
NRR/DRIS/SGB
NRR/DRIS/ SIB
NRR/DLPQ/PEB
cc w/ enclosures, w/o
UNCLASSIFIED SAFEGUARDS
INFORMATION:
DCD/DCB(RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
i
D. W. Cassel, Jr., Esq.
i
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
Diane Chavez, DAARE/ SAFE
L. 01shan, NRR LPM
H. S. Taylor, Quality Assurance
i
Division
)
l
RIII
RII
RIII
RIII
,
P
e b
Creed
Ma ett
Ol d' ' N
TsAI
Enclosure contains
,
sytcu;RDS INFORMATION
t'p':n separation this
J
f g
p .,f g is Decontrolled
G
r ru n a % y __
g
'Ur0 Lu UM t uO
v.m
n ,
a sir
s
-
-
-
-