IR 05000445-06-007, IR 05000446-06-007, 11/27/2006 - 11/30/2006, Comanche Peak Steam Electric Station, Units 1 and 2, Access Control - Letter Only
ML063560365
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 12/21/2006
From: Shannon M
Plant Support Branch Region IV
To: Blevins M
TXU Power
References
IR-06-007
Download: ML063560365 (3)


Text

ber 21, 2006

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000445/2006007 AND 05000446/2006007

Dear Mr. Blevins,

On November 30, 2006, the US Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Comanche Peak Steam Electric Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 30, 2006, with Mr. R. Graham, Director, Plant Support, and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents one finding of very low security significance (i.e., Green, as determined by the Physical Protection Significance Determination Process). The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of the inspection before the inspector left the site. The finding was NRC-identified.

NRC is treating this violation as a noncited violation consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violation and because it TXU Generation Company LP -2-is entered into your corrective action program. If you contest this noncited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator Region IV; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Comanche Peak Steam Electric Station facility.

In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390. and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1).

Sincerely,

/RA/ Larry Ricketson for Michael P. Shannon, Chief Plant Support Branch Division of Reactor Safety Docket Nos.: 50-445; 50-446 License Nos: NPF-87; NPF-89 Nonpublic Enclosure: Inspection Report 05000445/2006007 and 05000446/2006007 w/Attachments: Supplemental Information TXU Generation Company LP -3-cc w/o enclosure:

Fred W. Madden, Director Regulatory Affairs TXU Power P.O. Box 1002 Glen Rose, TX 76043