une 25, 2003

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION NRC SAFEGUARDS INSPECTION OF COMPLIANCE WITH ORDER - INSPECTION REPORT 50-445/03-05; 446/03-05

Dear Mr. Terry:

From May 19 to June 5, 2003, the NRC completed an inspection of your Comanche Peak Steam Electric Station. The enclosed report documents the inspection findings which were discussed on May 23, 2003, during a pre-brief and on June 5, 2003, at a telephonic exit meeting with you and other members of your staff.

This inspection examined activities conducted under your license as they relate to safety and compliance with an Order issued on February 25, 2002, which required your site to implement specific measures related to the security of your facility. The inspection utilized Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, to verify implementation of the Order as clarified in your responses dated March 18, May 16, June 20, and August 30, 2002. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of the non Safeguards Information portions of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED

TXU Electric -2- DOCUMENT CONTAINS SAFEGUARD INFORMATION Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

//RA//

Michael P. Shannon, Acting Chief Plant Support Branch Division of Reactor Safety Dockets: 50-445 50-446 Licenses: NPF-87 NPF-89

Enclosure:

NRC Inspection Report 50-445/03-05; 50-446/03-05

REGION IV==

Dockets: 50-445 50-446 Licenses: NPF-87 NPF-89 Report No.: 50-445/03-05 50-446/03-05 Licensee: TXU Generation Company LP Facility: Comanche Peak Steam Electric Station, Units 1 and 2 Location: FM-56, Glen Rose, Texas Dates: May 19 through June 5, 2003 Inspectors: Gregory A. Pick, Senior Physical Security Inspector Frank L. Brush, Senior Resident Inspector Gilbert L. Guerra, Resident Inspector Accompanying Gregory Ahern, Intelligence Specialist Personnel: Jim Larsen, Physical Security Inspector Approved By: Michael P. Shannon, Acting Chief, Plant Support Branch Attachment: Supplemental Information DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED

DOCUMENT CONTAINS SAFEGUARD INFORMATION SUMMARY OF FINDINGS IR 05000445-03-05; IR 05000446-03-05; TXU Energy; on 5/19-6/5/2003; Comanche Peak Steam Electric Station, Units 1 & 2; TI 2515/148, Verification of Compliance With Interim Compensatory Measures Order.

The inspection was conducted by one senior physical security inspector, one senior resident inspector, and one resident inspector.

Cornerstone: Physical Security

  • On February 25, 2002, the NRC imposed by Order, Interim Compensatory Measures to enhance physical security. The inspectors determined that, overall, the licensee appropriately incorporated the Interim Compensatory Measures into the site protective strategy and access authorization program; developed and implemented relevant procedures; ensured that the emergency plan could be implemented; and established and effectively coordinated interface agreements with offsite organizations.
  • The inspectors identified an unresolved item related to the failure to evaluate the impact of a waterborne threat as specified in Item B.1.c of the Order. This item remains open pending review by the Office of Nuclear Security and Incident Response (Section II.C.2).
  • The inspectors identified an unresolved item regarding loss of microwave intrusion detection system zones as required by Item B.2.a.(1) of the Order. This item remains open pending review by the Office of Nuclear Security and Incident Response (Section III.A.2).
  • The inspectors identified an unresolved item related to the failure to harden a vital area structure as required by Item B.4.g of the Order. This item remains open pending review by the Office of Nuclear Security and Incident Response (Section V.G.2).
  • The inspectors identified an unresolved item relating to the failure to evaluate the consequences of hazardous material transportation as specified in Item B.5.c of the Order. This item remains open pending review by the Office of Nuclear Security and Incident Response (Section VI.C.2).

DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED

DOCUMENT CONTAINS SAFEGUARD INFORMATION ATTACHMENT SUPPLEMENTAL INFORMATION PARTIAL LIST OF PERSONS CONTACTED Licensee D. R. Alps, Security Manager B. Bird, Plant Support Manager M. R. Blevins, Vice-President, Nuclear Operations M. D. Bozeman, Emergency Planning Manager J. B. Britt, Corporate Security Manager K. B. Britt, Compliance Security Coordinator S. Chakrabarti, Senior Engineer C. Cotton, Shift Manager R. Flores, Vice-President, Nuclear Operations P. A. Gunderson, Applications Support Manager B. D. Hammer, Corporate Security N. S. Harris, Principle Regulatory Affairs Technologist T. Hope, Regulatory Performance Manager F. L. Powers, Project Manager C. L. Terry, Senior Vice-President and Principal Nuclear Officer NRC G. Ahern, Intelligence Specialist J. Buchanan, Physical Security Inspector D. Powers, Senior Technical Advisor A. Sanchez, Resident Inspector DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED

-2- DOCUMENT CONTAINS SAFEGUARD INFORMATION ITEMS OPENED URI 50-445; 50-446/03-05-001 Failure to evaluate the impact of a waterborne threat (Section II.C.2).

URI 50-445; 50-446/03-05-002 Loss of microwave intrusion detection system zones (Section III.A.2).

URI 50-445; 50-446/03-05-003 Failure to harden a vital area structure (Section V.G.2).

URI 50-445; 50-446/03-05-004 Failure to evaluate the consequences of hazardous material transportation (Section VI.C.2).

PARTIAL LIST OF DOCUMENTS REVIEWED Letter CPSES-200200716, Comanche Peak Steam Electric Station (CPSES) Docket Nos. 50-445 and 50-446, 20 Day Answer to NRC Order for Interim Safeguards and Security Compensatory Measures EA-02-026, dated March 18, 2002 Letter CPSES-200201936, Comanche Peak Steam Electric Station (CPSES) Docket Nos. 50-445 and 50-446, Supplemental Response to NRC Order for Interim Safeguards and Security Compensatory Measures, dated May 16, 2002 Letter CPSES-200202442, Comanche Peak Steam Electric Station (CPSES) Docket Nos. 50-445 and 50-446, Supplemental Response to NRC Order for Interim Safeguards and Security Compensatory Measures, dated June 20, 2002 Letter CPSES-200203021, Comanche Peak Steam Electric Station (CPSES) Docket Nos. 50-445 and 50-446, Final Response to NRC Order for Interim Safeguards and Security Compensatory Measures, dated August 30, 2002 Letter CPSES-200301064, Comanche Peak Steam Electric Station (CPSES) Docket Nos. 50-445 and 50-446, Response to Force-on-Force Pilot Open Items - Request for Additional Information, dated May 14, 2003 DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED