March 4, 2011

SUBJECT:

VOGTLE ELECTRIC GENERATING PLANT - NRC SECURITY INSPECTION REPORT 05000424/2011402 AND 05000425/2011402

Dear Mr. Tynan:

On February 4, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Vogtle Electric Generating Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed Inspection Report documents the inspection results, which were discussed on February 4, 2011, with Mr. R. Dedrickson and other members of your staff.

A re-exit meeting was conducted by telephone on March 1, 2011, with Mr. K. Taylor.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available SNC 2 electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety

Docket No.: 50-424, 50-425 License No.: NPF-68, NPF-81

Enclosure:

Inspection Report 05000424/2011402 and 05000425/2011402 w/Attachment: Supplemental Information (OUO)

cc: w/encl.: (See page 3) SNC 3 cc: w/Encl:

Jeffrey T. Gasser Chief Nuclear Officer Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway Birmingham, AL 35242

K. C. Dyar Security Manager Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

Keith Wooten Project Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway Birmingham, AL 35242

David Burford Manager Nuclear Fleet Security Southern Nuclear Operating Company, Inc.

40 Iverness Center Parkway Birmingham, AL 35242

Russ Dedrickson Plant Manager Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

ML110670664

X SUNSI REVIEW COMPLETE OFFICE RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRS/PSB2 RII: DRP/B3

SIGNATURE RA RA RA RA RA

NAME K. DAVIS J. GRAHAM J. SHEHEE M. ERNSTES S. SHAEFFER

DATE 02/28/2011 02/28/2011 03/01/2011 03/04/2011 03/04/2011