|
---|
Category:Inspection Report
MONTHYEARIR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 IR 05000220/20233032023-09-20020 September 2023 Retake Operator Licensing Examination Report 05000220/2023303 IR 05000220/20230052023-08-31031 August 2023 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2023005 and 05000410/2023005) IR 05000220/20234012023-08-0808 August 2023 Cyber Security Inspection Report 05000220/2023401 and 05000410/2023401 (Cover Letter Only) IR 05000220/20230022023-08-0101 August 2023 Integrated Inspection Report 05000220/2023002 and 05000410/2023002 IR 05000220/20230102023-06-29029 June 2023 Biennial Problem Identification and Resolution Inspection Report 05000220/2023010 and 05000410/2023010 IR 05000410/20233022023-05-15015 May 2023 Initial Operator Licensing Examination Report 05000410/2023302 IR 05000220/20230012023-05-0505 May 2023 Integrated Inspection Report 05000220/2023001 and 05000410/2023001 IR 05000220/20233012023-03-29029 March 2023 Initial Operator Licensing Examination Report 05000220/2023301 IR 05000220/20220062023-03-0101 March 2023 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022006 and 05000410/2022006) IR 05000220/20220042023-01-23023 January 2023 Integrated Inspection Report 05000220/2022004 and 05000410/2022004 IR 05000220/20220102022-11-22022 November 2022 Design Basis Assurance Inspection (Programs) Inspection Report 05000220/2022010 and 05000410/2022010 IR 05000220/20220032022-11-0404 November 2022 Integrated Inspection Report 05000220/2022003 and 05000410/2022003 IR 05000220/20220052022-08-31031 August 2022 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2022005 and 05000410/2022005) IR 05000220/20224012022-08-30030 August 2022 Security Baseline Inspection Report 05000220/2022401 and 05000410/2022401 IR 05000220/20220022022-08-0808 August 2022 Integrated Inspection Report 05000220/2022002 and 05000410/2022002 and Independent Spent Fuel Storage Installation Report 07201036/2022001 IR 05000220/20210042022-05-19019 May 2022 Reissued Integrated Inspection Report 05000220/2021004 and 05000410/2021004 IR 05000220/20220012022-04-29029 April 2022 Integrated Inspection Report 05000220/2022001 and 05000410/2022001 IR 05000220/20210062022-03-0202 March 2022 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021006 and 05000410/2021006) ML22026A3502022-01-26026 January 2022 Integrated Inspection Report 05000220/2021004 and 05000410/2021004 IR 05000220/20210122022-01-10010 January 2022 Biennial Problem Identification and Resolution Inspection Report 05000220/2021012 and 05000410/2021012 IR 05000220/20210032021-11-0909 November 2021 Integrated Inspection Report 05000220/2021003 and 05000410/2021003 and Independent Spent Fuel Storage Installation Report 07201036/2021001 IR 05000220/20215012021-10-14014 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2021501 and 05000410/2021501 IR 05000220/20210052021-09-0101 September 2021 Updated Inspection Plan for the Nine Mile Point Nuclear Station, Units 1 and 2 (Reports 05000220/2021005 and 05000410/2021005) IR 05000220/20214012021-09-0101 September 2021 Material Control and Accounting Program Inspection Report 05000220/2021401 and 05000410/2021401 (Letter Only) IR 05000220/20210102021-08-24024 August 2021 Triennial Fire Protection Inspection Report 05000220/2021010 and 05000410/2021010 IR 05000220/20210022021-08-10010 August 2021 Integrated Inspection Report 05000220/2021002 and 05000410/2021002 and Independent Spent Fuel Storage Installation Report 07201036/2021002 IR 05000220/20214022021-06-22022 June 2021 Security Baseline Inspection Report 05000220/2021402 and 05000410/2021402 IR 05000410/20213022021-05-12012 May 2021 Initial Operator Licensing Examination Report 05000410/2021302 IR 05000220/20210012021-05-0505 May 2021 Integrated Inspection Report 05000220/2021001 and 05000410/2021001 IR 05000220/20210112021-05-0404 May 2021 Temporary Instruction 2515/194 Inspection Report 05000220/2021011 and 05000410/2021011 IR 05000220/20200062021-03-0303 March 2021 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2020006 and 05000410/2020006) IR 05000220/20200042021-02-11011 February 2021 Integrated Inspection Report 05000220/2020004 and 05000410/2020004 and Independent Spent Fuel Storage Installation Report 07201036/202004 IR 05000220/20203012021-01-25025 January 2021 Initial Operator Licensing Examination Report 05000220/2020301 ML20343A0112020-12-0909 December 2020 Security Inspection Report Cover Letter 05000220/2020420 and 05000410/2020420 IR 05000220/20204202020-12-0909 December 2020 Security Inspection Report 05000220/2020420 and 05000410/2020420 2020 Report IR 05000220/20200102020-11-24024 November 2020 Design Basis Assurance Inspection (Teams) Inspection Report 05000220/2020010 and 05000410/2020010 2024-08-05
[Table view] Category:Inspection Report Correspondence
MONTHYEARIR 05000220/20184102018-10-16016 October 2018 Material Control and Accounting Program Inspection Report 05000220/2018410 and 05000410/2018410 (Letter Only) IR 05000220/20070012007-03-0202 March 2007 Annual Assessment Letter - Nine Mile Point Nuclear Station (Report 05000220-07-001 and 05000410-07-001) ML0527205072005-09-29029 September 2005 Requalification Program Inspection - Nine Mile Point Nuclear Station, Unit 2 ML0534600942005-09-12012 September 2005 Inspection Request, NMP PI&R - IR 2005-007 IR 05000220/20040052005-01-26026 January 2005 IR 05000220-04-005, 05000410-04-005; on 10/01/2004 - 12/31/2004; Nine Mile Point, Units 1 and 2; Licensed Operator Requalification Program and Operability Evaluations IR 05000220/20030082003-06-16016 June 2003 IR 05000220-03-008, IR 05000410-03-008, on 05/05/2003 - 05/08/2003, Nine Mile Point Nuclear Station Unit 1 and Unit 2, Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures. ML0308500772003-03-26026 March 2003 Notification of Conduct of a Triennial Fire Protection Baseline Inspection IR 05000220/20020042002-07-19019 July 2002 IR 05000220-02-004, IR 05000410-02-004, on 05/19-06/29/2002, Nine Mile Point Nuclear Station, LLC, Nine Mile Point, Units 1 & 2. Resident Inspector Report IR 05000220/20020032002-06-0707 June 2002 IR 05000220-02-03, IR 05000410-02-03, on 3/31-5/18/2002; Nine Mile Point Nuclear Station, LLC; Nine Mile Point, Units 1 & 2. Resident Inspector Report. No Violations Identified IR 05000220/20020022002-04-26026 April 2002 IR 05000220/2002-002, IR 05000410/2002-002, on 2/17-4/6/2002; Nine Mile Point Nuclear Station, LLC; Nine Mile Point, Units 1 & 2. Resident Inspector Report. No Violations Identified IR 05000220/20010112002-03-21021 March 2002 IR 05000220/2001-011, IR 05000410/2001-011, on 12/30/01-02/15/2002; Nine Mile Point Nuclear Station, LLC; Nine Mile Point, Units 1 & 2. Emergency Work Control. Non-cited Violations Identified IR 05000220/20010102002-01-24024 January 2002 IR 05000220/2001-010, IR 05000410/2001-010, on 11/11-12/29/2001; Nine Mile Point Nuclear Station, LLC; Nine Mile Point, Units 1 & 2. Resident Inspector Report. No Violations ML18018B0742000-03-27027 March 2000 ADAMS Distribution Notification ML17037C1621974-09-0404 September 1974 Letter Referring to Two Significant Matters Identified During the August 26 to 30, 1974 Inspection at Nine Mile Point-1 Reactor Facility ML17037C2091974-06-13013 June 1974 Letter Responding to the May 30, 1974 Letter Informing the Commission of the Corrective and Preventive Actions in Response to a May 15, 1974 Letter ML17037C2141973-11-14014 November 1973 Letter Responding to the September 13, 1973 Informing the Commission of the Action Taken to Correct the Items of Noncompliance Following the Recent Inspection and Advising That the Action Will Be Verified During the Next .. ML17037C2151973-10-25025 October 1973 Letter Responding to the September 10, 1973 Letter Informing the Commission of the Action Taken to Correct the Item of Noncompliance Brought to Attention Following the Recent Inspection and Advising That Corrective Action .. ML17037C1111972-08-10010 August 1972 Letter Regarding Action Taken in Response to a June 22, 1972 Letter Relating to Wall Thickness of Nuclear Service Valves ML17037C0991972-05-10010 May 1972 Letter Responding to an April 14, 1972 Letter Requesting Results of the Inspection on the Pressure Suppression Torus 2018-10-16
[Table view] |
Text
rch 21, 2002
SUBJECT:
NINE MILE POINT NUCLEAR STATION - NRC INSPECTION REPORT 50-220/01-11, 50-410/01-11
Dear Mr. Conway:
On February 16, 2002, the NRC completed an inspection of your Nine Mile Point Nuclear Station, Units 1 and 2. The enclosed report documents the inspection findings which were discussed on February 22, 2002, with you and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based upon the results of this inspection, the inspectors identified three issues of very low safety significance (GREEN). The issues were determined to involve violations of NRC requirements. However, because of the very low safety significance and because the issues were entered into your corrective action program, the NRC is treating these issues as Non-Cited Violations (NCVs), consistent with Section VI.A.1 of the NRC Enforcement Policy, issued on May 1, 2000, (65FR25368). If you contest the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; and the NRC Resident Inspector at the Nine Mile Point Nuclear Station.
Immediately following the terrorist attacks on the World Trade Center and the Pentagon, the NRC issued an advisory recommending that nuclear power plant licensees go to the highest level of security, and all promptly did so. With continued uncertainty about the possibility of additional terrorist activities, the Nations nuclear power plants remain at the highest level of security and the NRC continues to monitor the situation. This advisory was followed by additional advisories, and although the specific actions are not releasable to the public, they generally include increased patrols, augmented security forces and capabilities, additional security posts, heightened coordination with law enforcement and military authorities, and more limited access of personnel and vehicles to the sites. The NRC has conducted various audits of your response to these advisories and your ability to respond to terrorist attacks with the capabilities of the current design basis threat (DBT). On February 25, 2002, the NRC issued an Order to all nuclear power plant licensees, requiring them to take certain additional interim
John compensatory measures to address the generalized high-level threat environment. With the issuance of the Order, we will evaluate Nine Mile Point Nuclear Stations compliance with these interim requirements.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publically Available Records (PARS) component of NRCs document management system (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Michele G. Evans, Chief Projects Branch 1 Division of Reactor Projects Docket Nos. 50-220 50-410 License Nos. DPR-63 NPF-69 Enclosure: Inspection Report 50-220/01-11, 50-410/01-11 Attachment 1 - Supplemental Information
John