IR 05000410/1990016

From kanterella
Jump to navigation Jump to search
Requalification Program Evaluation Rept 50-410/90-16OL on 900430-0504.Exam Results:All Reactor Operators & All Senior Reactor Operators Passed All Portions of Exam
ML17058A634
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/13/1990
From: Conte R, Pullani S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML17058A633 List:
References
50-410-90-16OL, NUDOCS 9007240102
Download: ML17058A634 (34)


Text

U.

S.

NUCLEAR REGULATORY COMMISSION

REGION I

Combined Report No.

Facility Docket No.:

Facility License No.

Licensee:

Faci 1 ity:

Examination Dates:

NRC Examiners:

Chief Examiner:

S.

90-16 (OL)

50-410 NPF-14 Niagara Mohawk Power Corporation 301 Plainfield Road Syracuse, New York 13212 Nine Mile Point Nuclear Station, Unit 2 April 30 May 4, 1990 S. Pullani, Senior Operations Engineer J. Williams, Senior Operations Engineer P. Bonnett, Operations Engineer G. Buckley, Examiner, PNL L. Larson Examiner, PNL Pull i, Senior Operations Engineer ate Approved By:

Ric ard Conte, Chief, BWR Section Operations Branch, DRS Date Summary:

See Executive Summary 9007240i02 9007i7 PDR ADOCK 050004i0 V

PDC

I

EXECUTIVE SUMMARY Written and operating examinations were administered to three crews consisting of nine Reactor Operators (ROs)

and six Senior Reactor Operators (SROs).

The examinations were graded concurrently by the NRC and the facility training staff.

The results of the NRC and the facility grading were identical.

All of the ROs and all of the SROs examined passed all portions of the examination.

All three crews that were evaluated performed satisfactorily on the simulator portion of the examinations.

During this examination process, the NRC team also reviewed the implementation of Niagara Mohawk's corrective actions to address the deficiencies identified during the July 1989 requalification examination which resulted in an unsatis-factory requalification program evaluation.

These corrective actions are documented in the Requalification Program Action Plan attached to Niagara Mohawk's letter dated January 10, 1990.

The team concluded that the corrective actions were essentially complete and generally effective and that a signifi-cant improvement in the requalification program was evident.

To return the program to a satisfactory status, Niagara Mohawk must complete all short term corrective actions and certify that all program deficiencies have been addressed.

The examination team also made an assessment regarding Niagara Mohawk's Restart Action Plan (RAP) Underlying Root Causes 2 (Problem Solving) and 4 (Standards of Performance/Self-Assessment.

A significant improvement in these areas was noted.

This report (Section 9) also documents a violation identified by Niagara Mohawk in its letter dated February 21, 1990, involving medical examinations of, licensed operators, In reviewing this matter, the NRC staff has determined that issuing a Notice of Violation is not appropriate.

The staff has chosen to exercise this discretion because the violation meets all of the criteria of Appendix C of 10 CFR Part 2, Section G, for a licensee identified violatio DETAILS l.

Introduction During the examination period, the NRC administered requalification exami-nations to 15 licensed operators (9 ROs and 6 SROs).

Ten of the 15 oper-ators belong to two regular plant operating shifts crews (five per shift)

and the remaining five belong to one licensed staff crew.

The 15 oper-ators were divided into 3 crews for the simulator part of the examination.

The examiners used the process and criteria described in NUREG 1021,

"Operator Licensing Examiner Standards,"

Revision 5, section ES-601,

"Administration of NRC Requalification Program Evaluations."

The exami-ners also reviewed the licensee's procedures for conducting licensed operator training and the results of the requalification examinations administered by the facility.

An entrance meeting was held with the licensee on April 9, 1990, at the site.

The purpose of this meeting was to brief the licensee on the requirements of the requalification program evaluation and to outline a

prospective schedule for the examination.

The licensee personnel contacted during the examination are listed in Attachment 1.

The members of the combined NRC/facility examination team, and the facility evaluators are also identified in Attachment l.

2.

Examination Results 2. 1 Individual Examination Results The following is a

summary of the individual examination results:

RO SRO TOTAL NRC Grading Written Simulator Walk-Through Overall 9/0 9/0 9/0 9/0 6/0 6/0 6/0 6/0 15/0 15/0 15/0 15/0 Pass/Fail Pass/Fail Pass/Fail Facility Grading Written Simulator Walk-Through Overall 9/0 9/0 9/0 9/0 6/0 6/0 6/0 6/0 15/0 15/0 15/0 15/0 RO SRO TOTAL Pass/Fail Pass/Fail Pass/Fail

2.2 Generic Stren ths and Weaknesses The following is a summary of generic strengths and weaknesses noted by the NRC from the preparation, administration, and grading of the requalification examinations.

This information is being provided to aid the licensee in upgrading the requalification training program.

No licensee response is required.

2.2.1 0 erator Stren ths and Weaknesses

~Stren the:

~

Teamwork among the crews has improved.

A chain-of-command, accountability, and improved communications has helped organize and co-ordinate crew actions.

~

Communication skills have improved since the previous examination.

Formal repeat backs, acknowledgement of reports/directions and use of precise language resulted in a professional atmosphere in the control room.

~

Station Shift Supervisor (SSS)/Assistant Station Shift Supervisor (ASSS) direction and control of the shift provided the operators a sense of priority and account-ability for their responsibilities and those of the other operators.

~

The crew's ability to identify and evaluate plant condi-tions enabled them to mitigate the effects of the event or failure on the plant.

This included timely response to alarms and awareness of changing plant parameters that occurred prior to the alarm annunciating.

~

The operators used procedures when appropriate, and went back to check the procedure if a task was performed without a procedure in hand.

~

The operators displayed a detailed knowledge of the control room panels.

~

Overall, performance of the Job Performance Measures (JPMs),

both in plant and simulator, was considered a

strength.

Weaknesses:

~

Although communication skills have improved, there are still a few weaknesses.

The operators did not always speak loudly enough to ensure all operators in the control room wqre aware of changes occurring in the plant.

During

emergencies, all of the operators were not always kept abreast of trends and changes in plant parameters concern-ing the reactor and containment.

~

The SSS/ASSS did not always ensure that the entire crew was aware of equipment that was declared inoperable; when the classification of an emergency event had occurred and the reason for it; and when reentry into the EOPs had taken place.

~

During emergencies, role identification was not consistent among the various crews examined.

Even though the work was completed in a timely manner, there was some confusion of who should perform a specific duty.

2.2.2 Pro ram Stren ths and Weaknesses

~Steen ths Clear and consistent briefings and instructions by evalu-ators were considered strengths.

The facility examines requalification candidates on Licensee Event Report (LER) based training.

The facility training personnel were very receptive and responsive to examination comments.

The facility personnel were very responsive to requests for additional reference materials.

The facility Simulator Instructor was very knowledgeable and versatile with the simulator as well as plant knowledge.

Written examination questions were applicable to an open reference examination with few exceptions.

Time validation of the written examinations was accurate.

Weaknesses:

~

Specific weaknesses with JPMs were identified There were no questions unique to SRO level.

It was not apparent that JPNs and questions had been given a thorough review by the facility.

This conclu-sion is based upon NRC ideptification of expected vs.

given answer s, typographical, and spelling error Weaknesses identified in the performance of the JPMs were not generally probed by additional questioning.

The method for identifying and obtaining procedures at the start of JPM was not clearly defined and therefore not always consistent.

Examination questions related to LERs were not identified as such.

One of the Section A scenarios had to be substituted with one of the alternate scenarios due to the similarity (of topics covered) with the other scenario selected for the exam.

There were some multiple choice questions with no stem other than a system category and choices that were

unrelated true/false statements.

There were some instances of distractors for multiple choice questions being obviously incor rect.

Several short answer questions had more than one correct answer; the stem of the question did not contain sufficient discriminating information.

This weakness was also identified by the Instructional Technologist Group (of the Niagara Mohawk Training Depart-ment)

and had been addressed by the facility (see Section 7.2 of this report for further details).

The written examination questions were supplied without a reference to learning objectives.

The process of assigning learning objectives to examination questions is in progress as part of the Systems Approach to Training (SAT) Program.

The written examination questions were supplied with only a K/A value and not with the K/A number from NUREG 1123.

The facility supplied a cross reference during the onsite preparation week which matrixes the facility task number to the applicable K/A number.

Incorrect facility task numbers were assigned to some questions.

There were some instances of questions written on tasks which were not applicable to the license held or with little safety significanc Note:

The facility resolved most of the above weaknesses for the current examination questions.

To address these weaknesses for the requalification examination question bank, the facility plans to review the entire bank by October 31, 1990.

3.

Re uglification Pro ram Evaluation Results The facility program for licensed operator requalification training met all criteria established in ES-601,

"Administration of NRC Requalification Program Evaluation."

Note:

The examination results for the individual who had failed two previous NRC requalification examination and was retested during this examination were not used in the evaluation of the facility requalification program.

The criteria in ES-601 are:

a.

Ninety percent pass/fail decision agreement between the NRC and the facility grading the written and operating examinations'here was 100% agreement on this criterion.

b.

At least 75% of all operators pass the examination; not including individuals selected who had previously passed the examination.

NRC grading is the only consideration for this criterion.

There were no individuals selected who had previously passed the examination.

All operators ( 100%)

passed the examination.

c.

There shall be no more than one crew failure during the simulator portion of the operating examination, although the failure of one crew MAY cause the program to be considered unsatisfactory.

NRC grading is the only consideration for this criterion.

Three crews were evaluated and all three crews passed the simulator portion of the operating examination.

d.

The program meets the requirements of 10 CFR 55.59 (c)(2), (3) and (4), or is based on systems approach to training.

The review of the licensee's procedures for conduct of licensed operator training indicated that the requalification program meets the requirements of 10 CfR 55.59(c)(2),

(3),

and (4) for lectures, on-the-job training, and evaluations.

In addition, ES-601 contains criteria that may contribute to a program being determined unsatisfactory.

None of these criteria were applicabl n

4.

Re uglification Examination Pre aration The licensee submitted reference materials, test items, and a Sampling plan approximately 60 days before the examinations were administered.

These materials were reviewed in the Regional Office and the specific test items proposed by the facility were reviewed on-site by the combined NRC/facility examination team.

The facility then revised the items and produced the examination that was administered to the examinees.

The test items that were administered to the operators are listed in Attachment 2.

The NRC-facility examination team spent a considerable amount of time in improving the quality of the simulator scenarios proposed for the examina-tion.

Some of unnecessary operator action evaluation steps and Individual Simulator Critical Task (ISCT) steps were deleted from the scenarios.

The ISCTs were reviewed against the "four-fold criteria" in the proposed ES-601, Revision 6, as additional guidance.

The team's effort in this area helped in identifying valid ISCTs for the examination.

Only minor revisions were required to the JPMs proposed for the examina-tion.

The JPMs were generally of good quality.

However, several JPM questions had to be replaced because they were simple "look up" types for which answers would be found easily by reading the related procedural precautions or steps.

The Sampling Plan submitted for the examination was adequate for the purpose.

The plan indicated the emphasis that each topic received during the most recent requalification cycle and included a

summary of the specific examination subject requirements.

The written examination questions submitted for NRC review were generally satisfactory.

However, the quality of the questions could be further improved as indicated by several weaknesses identified by the NRC

~

The facility has a general task listing with each task having assigned a

specific K/A and value.

When a specific task question (as opposed to a

general task) is written, the K/A and value assigned to the general task is transferred to the specific task.

In most instances the specific tasks are of a lower safety importance than the general task and the assigned K/A and value are not applicable.

In fact, there were several questions when compared with the specific item in NUREG 1123 which did not meet the 3.00 K/A value cut-off criteria for the requalification examinations.

However, the questions were retained in the examination to meet the sampling plan.

guality control was adequate for the examination materials that were submitted to the NRC following the review by the combined NRC/facility examination team.

The facility had a week to make changes and review the corrected materials prior to submittal to the NRC for final review.

The examination materials that were submitted contained the specific test items and the required revisions that had been agreed upon by the examination tea Refer to Section 2.2.2 for strengths and weaknesses identified during the preparation of the examinations.

5.

Re uglification Examination Administration The dedication of the facility training personnel during the extensive hours that were required for administration of the examinations was a

strength of the program.

The stress of the long hours did not affect the quality of the evaluations.

Training and operations personnel were very cooperative throughout the examination process.

Administration of the examinations was generally satisfactory.

Time validation'f the static simulator and open reference examinations appeared satisfactory.

The simulator portion of the examination was conducted smoothly and efficiently.

The scenarios required minimal setup time and the simulator operator did not allow any delays to occur during performance of the scenarios.

The time of introduction of malfunctions by the simulator operator during scenario was sufficiently flexible and coordinated by one facility evaluator to allow all evaluators to complete all required evaluations.

The team assessed the simulator's capabilities as limited.

The limited number of malfunctions, the high dependence on instructor overrides ( IOs),

and limited number of prepared scenarios restricts the flexibilityof training and evaluation.

Specific items related the simulator fidelity

'were discussed with the simulator instructors.

The facility representa-tives informed the team that many new simulator enhancements are being added, and a program to write additional scenarios has been established.

The simulator performed well during the examination, in that there were no delays due to simulator down time.

The logistics of the walk-through examinations (JPNs)

went smoothly.

The time validation of the JPMs was reasonably accurate, but could be improved using the data collected during administration of the examination.

Refer to Section 2.2.2 for strengths and weaknesses identified during the administration of the examination.

6.

Examination Gradin and Anal sis of Results Crew performance on the simulator portion of the examination was critiqued by the lead facility examiner immediately following completion of both scenarios.

These critiques were satisfactory and included input from the licensed operators.

The NRC and the facility evaluations discussed the results of the simulator examination and the followup questions to be asked the examinees following each individual scenario.

In the majority of instances, the NRC and the facility evaluator s agreed on all the areas that were evaluated.

Follow-up questions were asked as necessary to clarify operator action >I

The results of the individual JPMs were discussed immediately following administration of the walk-through examinations.

The NRC and the facility evaluators did not agree on the evaluation of an individual JPM in two cases and an individual JPM question in four cases, but the facility was more conservative.

I A summary of facility grading on all parts of the examination is included in Attachment 4 to this report.

Comparison of the NRC grading and the facility grading indicated general agreement between the two.

In general, the facility grading was found to be more conservative.

7.

Follow-u on Previousl Identified Re uglification Pro ram Deficiencies and Corrective Actions As a result of the requalification examination conducted during the weeks of July 17 and July 24, 1989, weaknesses in the individual operator performance and the Nine Mile Point 2 requalification program were identi-fied.

The results of the examination and the weaknesses were documented in the examination report 50-410/89-12(OL).

The program was determined to be unsatisfactory.

Based on that evaluation, Nine Mile Point Unit 2 implemented a Requalification Program Action Plan to correct these defi-ciencies.

The latest revision of the Requalification Program Action Plan (Revision 2) was attached to Niagara Mohawk's letter NMP2L 12223 to the NRC, dated January 10, 1990.

During the week of April 9, 1990, the NRC staff reviewed the corrective actions implemented by Niagara Mohawk to address the specific issues addressed by the Requalification Program Action Plan.

The results of this review are summarized below.

7. 1 Unsatisfactory Re uglification Pro ram Niagara Mohawk's corrective actions in this area listed in the Requal-ification Program Action Plan are essentially completely The only corrective action in this area which was open at the time of this review was Item 1.B. 10.

This item was subsequently closed on April 24, 1990.

This item is related a follow-up assessment of the Unit 2 Requalification program by an Independent Assessment Team (IAT).

At the time of the initial NRC review, the IAT had just completed their assessment and concluded that the Requalification Program Action Plan is being implemented and the original (October 27, 1989)

recommenda-tions by the IAT have either been implemented or are being addressed.

The IAT also concluded that significant improvements in management oversight, operations and training communication interface, and attention to detail are now evident, but continued management atten-tion is needed in some areas to ensure that improvements are completed.

Based on NRC review of a sample of the completed correct-ive actions in this area, the staff concludes that the corrective actions in this area are essentially complete and significant improve-ment in the requalification program is eviden The observations by the examination team in the course of preparation and conduct of the requalification examination administered during the week of April 30, 1990 support the above conclusion.

Based on this evaluation, Niagara Mohawk's corrective actions on this issue are considered satisfactory.

7.2 Written Examination Structure Four corrective actions were identified to satisfy the concerns with the 1989 written requalification examinations.

These concerns were:

1.

Test item construction was not clear.

2.

Point values for multiple part answers were not specified.

3.

Several double jeopardy questions were noted.

4.

guestions requiring multiple responses were not separated out.

The facility has formally closed out all four of the corrective acti ons.

The NRC's review of the corrective action files indicates that the corrective actions have been completed.

However, the NRC's review of the April 1990 requalification written examinations indi-cates that some double jeopardy questions (Item 3 above)

do exist in the examination question bank.

The facility plans to review all bank questions by October 31, 1990.

Niagara Mohawk's corrective actions and plans to re-review the exam bank are considered satisfactory.

7.3 0 erator Knowled e Deficiencies The licensee's evaluation of the 1989 written examination raised concerns about operator knowledge deficiencies.

Six corrective actions were established to correct those deficiencies.

The correct-ive actions for this issue included:

review of the written examination results for weaknesses in the requalification training program, and development and implementation of a remediation plan.

All corrective actions for this issue were complete and found to be satisfactory except for corrective action item 3.B.4.6 in the Requal-ification Program Action Plan.

One licensed operator had not completed the EOP training required by this corrective action.

The NMP-2 training department planned to train the one remaining indivi-dual by the end of May 1990.

Successful completion of -training by the remaining individual will close this issu.4 Weaknesses in Crew Communications Niagara Mohawk's corrective actions in the area of crew communica-tions weaknesses are essentially complete.

Niagara Mohawk has completed training in verbal communications for operators and instructors.

Observations of the operating crew and training instructors are being made by the plant management personnel during the simulator training sessions for identifying and correcting weak-nesses in the crew and the instructor performance.

Niagara Mohawk has also established a plan and a schedule to continue the required corrective actions on an ongoing basis, for preventing the recurrence of identified deficiencies in this area.

A significant improvement in verbal communication skills was noted during the simulator portion of the April 1990 requalification exami-nation.

Out of the three crews examined, one crew exhibited excell-ent communication skills, whereas performance of the other two crews was average and could be further improved.

The corrective actions in this area which were not fully complete at the time this inspection were Items 4.B.3, 4.B.4, and 4.B.5 involving crew communications.

Niagara Mohawk plans to complete and close out these items by May 14, 1990.

Subject to completion of these items, Niagara Mohawk's corrective actions on this issue are considered satisfactory.

7.5 STA Involvement in Plant Assessment and Event Control.

This issue deals with clarifying STA responsibilities (a collateral reponsibi lity of Assistant Station Shift Superintendent)

during emergencies and providing training in this area.

The STA responsi-bilitiess are described in N2-PDI-1.08, "Operations'olicy for Emer-gency Procedures,"

.Revision 3, dated October 1989.

STAs and instruc-tors have been trained on these responsibilities.

A program has been established by the licensee, and is ongoing, for management observa-tion of simulator training.

The NRC team reviewed the supporting documentation and discussed these activities with Niagara Mohawk's personnel.

In addition, the performance of the STA in the simulator during the April 1990 requalification examinations was observed, to identify any weaknesses associated with this issue.

No concerns were identified.

The Niagara Mohawk actions on this issue are considered sati s factory.

7.6 0 erator Actions for EOPs The specific issue was that operator actions were not always in accordance with the guidance provided in the Emergency Operating Procedures (EOPs).

The corrective actions were reviewed by the NRC team.

No discrepancies were note,

'I

Operational directives that establish management expectations have been developed and incorporated into plant operations and training.

Management has also established a formal review process in which management personnel will observe simulator training and identify weaknesses in the crews or training instructors.

The development of lesson plans covering Mitigation of Core Damage is continuing and expected to be completed by the end of the year.

The licensee's corrective actions on this issue are considered satisfactory.

7.7 0 erator Actions for Normal 0 eratin Procedures This issue deals with deficiencies in operator actions during emer-gency events when considering the requirements of normal operating procedures.

The licensee conducted training in the areas where deficiencies were noted during EOP refresher training.

The tasks that operators were expected to perform with a procedure were identi-fied and training is included in the 1990/1991 Requalification Program.

The licensee's document N2-0DI-1.09,

"EOP Users Guide,"

defines management expectations for verification of immediate actions taken during emergency conditions.

The NRC team reviewed the support-ing documentation and discussed these activities with licensee personnel.

Also, operator performance on the simulator during the April 1990 Requalification Examination was observed to identify any weakness in immediate actions taken by the operators.

No weaknesses were noted.

This issue is considered satisfactorily resolved.

7.8 D namic Simulator Scenarios The dynamic simulator scenarios previously used were not always realistic, manageable, and of approximately 50 minute duration as set forth in ES-601.

The corrective actions for this issue concerning the quality of the dynamic simulator scenarios were reviewed.

It was noted that all but three of the fifteen scenarios were one hour in length vice 50 minutest This is, however, consistent with ES-601 guidelines.

Ten new scenarios were to be developed and incorporated into the 1990/1991 Requalification Program.

Nine of the ten were completed and scheduled in the program.

This issue is considered satisfactorily resolved.

7.9 Teamwork Durin Emer enc Events The issue was that teamwork, including prioritization of crew actions, evaluation of plant conditions, and communications, was weak during emergency events.

The corrective actions for this issue concerning the weakness in teamwork, evaluation of plant conditions, and communications were reviewed and the following discrepancy was noted.

Item 9.B.3 states that operator crews and training instruct-orss will be trained to the latest revision of Operation Department Instruction, concerning verbal communications and EOP usage.

This training was completed; however, insufficient 'training records were

available to show that training was administered to all per sonnel concerned.

The training department has made a commitment to retrain-ing (by June 30, 1990) in this area to ensure all personnel have received this training (48% completed as of April 30, 1990).

Subject to the retraining of all personnel as discussed above and retention of sufficient training records, Niagara Mohawk's corrective actions on this issue are considered satisfactory.

F 10 Summar of Review The NRC review of Niagara Mohawk's actions indicates that the correc-tive actions were essentially complete and generally effective, and that a significant improvement in the requalification program was evident.

The NRC review identified certain incomplete actions (see Sections 7.2, 7.3, 7.4 and 7.9 of this report).

Niagara Mohawk has made a

commitment to complete the short term actions by July 13, 1990, and one long term action by October 31, 1990.

This is an unresolved item pending completion of the actions and their review by NRC (50-410/

90-16-01).

8.

Assessment Re ardin RAP Underl in Root Causes 2 and

Confirmatory Action Letter 88-17, dated July 24, 1988, required Niagara, Mohawk Power Corporation to perform a root cause analysis of why they had not been effective in recognizing and remedying problems..

In addition, Niagara Mohawk was required to develop and implement a Restart Action Plan which documented the underlying root causes of their management deficien-cies and their associated corrective actions.

During the weeks of October 9 and 16, 1989, an Integrated Assessment Team Inspection (IATI) reviewed the effectiveness of Niagar'a Mohawk's actions toward resolving the programmatic and technical issues addressed in their Restart Action Plan.

The IATI concluded that Niagara Mohawk's Restart Action Plan, with respect to the five identified underlying root causes was in place and well understood by the Nuclear Division personnel; how-ever, the plan was being implemented with varying degrees of effectiveness and performance.

Specifically, the IATI determined that progress on underlying root ca'uses (URCs)

1, 3 and S, (Planning and Goal Setting, Organizational Culture, and Teamwork, respectively)

showed clear improvement.

For URCs 2 and

(Problem Solving and Standards of Performance/Self-Assessment),

the IATI concluded that progress was slow as demonstrated by limited improvement in both of these areas.

Several team observations indicated that while problems were being identified, the problems were frequently not being resolved.

Further, although station personnel were cognizant of the new standards of performance, their actions did not demonstrate that they were incorporating them into their daily work activitie During the preparation and administration of the April 1990 requalifica-tion examination, the NRC team made the following assessment of Niagara Mohawk's performance under the areas of Problem Solving (URC2) and Standards of Performance/Self-Assessment (URC4) with respect to its Requalification Program for licensed operators.

8.1 Problem Solvin URC2 The NRC team reviewed the implementation of corrective actions in the Niagara Mohawk's Requalification Program Action Plan for the deficien-cies identified during the July 1989 requalification examination.

The team concluded that the corrective actions are essentially complete and generally effective and that a significant improvement in the requalification program was evident.

The team also found that Niagara Mohawk has made a concerted effort to complete the required corrective actions in a timely manner and to track the progress of these actions using its Nuclear Commitment Tracking System (NCTS).

8.2 Standards of Performance/Self-Assessment URC 4 One of the corrective actions in the Requalification Program Action Plan was to train all operators and instructors in verbal communica-tions during the Emergency Operating Procedure (EOP) simulator scenario training sessions.

Niagara Mohawk has completed this training.

A significant improvement in verbal communication skills was noted during the simulator portion of the April 1990 requalifi-,

cation examination.

Out of the three crews examined, one crew exhibited excellent communication skills, whereas the performance of the other two crews was considered average.

Observations of the operating crew and training instructors are being made by the plant management personnel during the simulator training sessions for identifying and correcting weaknesses in the crew and instructor performance.

Niagara Mohawk has also established a plan and a schedule to continue the observations on an ongoing basis for preventing the recurrence of identified deficiencies in this area.

The team also noted good procedural adherence by the operators during the performance of the simulator and Job Performance Measure (JPM)

portions of the April 1990 Requalification examination.

These observations were considered positive indications in the a'reas of self-assessment and implementation of the standards of perform-ance.

9.

Follow-u on Licensee-Identified Violation The purpose of this section is to document a licensee identified violation at Nine Mile Point involving medical examinations of licensed operators.

Niagara Mohawk is committed to Regulatory Guide (RG) 1. 134, Rev.

1 (March 1979), for meeting the requirements needed for medical certification of its licensed operators (10 CFR 55).

This revision of RG 1. 134 references

ANSI 546-1976, which is essentially identical to ANSI.

Regul-atory Guide 1.134 was revised in April 1987, to reference the later ANSI standard; and, since then, Niagara Mohawk has used the new revision as guidance.

The licensee's previous doctor apparently misinterpreted the guidelines on the need for laboratory testing as a part of the medical examination.

The misinterpretation resulted in some deficiencies in medical examinations; namely, laboratory work was not done.

The Certi-fication of Medical Examination (NRC Form 396) states that the guidance in ANSI 3.4-1983 was followed; and, as such, a licensee representative certi-fies, by signature, that the information on the Form 396 is true and correct.

Section 50.9 of 10 CFR Part 50 states, in part, that information provided to the Commission by a licensee shall be complete and accurate in all material respects.

Contrary to the above, not all medical examinations were complete and accurate.

This is a Severity Level IV violation.

In reviewing this matter, the NRC staff has determined that issuing a

Notice of Violation (NOV) is not appropriate.

The staff has chosen to exercise discretion because the violation meets all of the'riteria of Appendix C of 10 CFR Part 2, Section G as discussed below.

1.

The violation was identified by the licensee.

They discovered the inaccuracies during discussions between their physician and the license holders.

2; The violation is normally classified at Severity Level IV or V.

This is a Level IV.

3.

The violation was reported.

The licensee telephoned the Region I office and followed this up with a letter to the Region (Attachment 5 to this report) documenting the issues.

4.

The violation has been corrected.

As stated in a letter dated March 12, 1990, from Niagara Mohawk to the Regional Administrator, all licensed operators have been re-examined using the guidance of ANSI/

ANS 3.4-1983 (see Attachment 6 of this report).

It is expected that future medical certifications will continue to be accurate.

5.

The violation was not willful nor could it have been prevented by corrective action for a previous violation.

There are no indications of any deliberate falsification of documents nor are there any i'ndi-cations that the licensee was reluctant to promptly notify the Region once the errors were discovered.

Furthermore, these errors were the result of one doctor's interpretation of the guidance.

In summary, the NRC staff has determined that enforcement discretion is the correct response to this matter and that no further action is necessar "4

EE.

~Ei M

An exit meeting was held at the conclusion of the examinations on May 4, 1990.

The personnel in attendance are indicated in Attachment 1.

The preliminary NRC results of'he simulator and walk-through portions of the examinations were presented.

Examination preparation and administration were discussed along with the results of the facility administered exami-nations.

Attachments:

1.

Persons Contacted 2.

Requalification Examination Test Items 3.

Documents Reviewed 4.

Licensee Results, Licensee'

Letter to NRC, dated May 18, 1990 5.

Licensee's Letter to NRC, dated February 21, 1990 6.

Licensee's Letter to NRC, dated March 12, 1990