IR 05000387/1992020

From kanterella
Jump to navigation Jump to search
Forwards Combined Insp Repts 50-387/92-20 & 50-388/92-20 on 920714-0817.NRC Concerned Re Deficient Understanding & Communications Among Staff
ML20127D406
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/04/1992
From: Wenzinger E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Keiser H
PENNSYLVANIA POWER & LIGHT CO.
Shared Package
ML17157B995 List:
References
NUDOCS 9209150030
Download: ML20127D406 (3)


Text

- __ _ ___ __ __- _ _ _ _

..

.g .

w .

,

.

SEP 0 41992 Docket Nos. 50 387 50-388 Mr. H. Senior Vice President - Nuclear Pennsylvania Power & Light Company 2 Narth Ninth Street Allentown, Pennsylvania 18101

Dear Mr. Keiser:

Subject: NRC REGION I COMBINED INSPECTION 50-387/92-20; 50-388/92-20 The enclosed report documents a resident safety inspection conducted by Messrs. G. S.

Barber and D. J. Mannai, and others from July 14, 1992 through August 17,1992, at the Susquehanna Steam Electric Station (SSES), Salem Township, Pennsylvania, The inspection covered plant operations, surveillance, and maintenance for both units. At the conclusion of the inspection, Mr. G. S. Barber. Senior Resident Inspector, summarized the inspection findings with Mr. H. G. Stanley and other members of your staff.

Though licensed activities were performed generally well in this period, we are concerned about the deficient understanding and communications among your staff that allowed a determination that the High Pressure Coolant Injection system was operable prior to the completion of a ASME code required visual inspection of the system upon the completion of maintenance activities. Accordingly, we are interested in your corrective actions and resolution of this matter. .

Your cooperation with us in this matter is appreciated.

Sincerely, Edward C. Wenzinger, Chief, Reactor Projects Branch 2 Enclosure:

1. Combined NRC Inspection Report 50-387/92-20; 50-388/92-20

'

$[$00N O O '

fu h['. i

- _. -___ _-______ ________-__ __ -____-_-______ _ - .-

- _ _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ - _ _ _. . . _ _

-

.

I 4 SEp 0 41992

cc w/ encl:

R. G. Byram, Vice President, Nuclear Operations H. G. Stanley, Superintendent of Plant - SSES J. M. Kenny, Supervisor, Nuclear Licensing R. M. Peal, Supervisor, Nuclear Compliance II. D. Woodeshick, Special Ofnce of the President J. C. Tilton III, Allegheny Electric Cooperative, Inc.

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

K. Abraham, PAO (2) Inspection Reports NRC Resident Inspector Commonwealth of Pent;ylvania

,

h

- _ _ - - _ _ - - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ - _ _ _ . ______ __

-_ ,---

-

.

i .

Stp 0 4 ;933

bec w/ encl:

Region I Docket Room (with concurrences)

J. White, DRP E. Wenzinger, DRP J. J. Raleigh, NRR Project Manager J. Noggle, DRSS R. Lobel, OEDO J. Trapp, DRS bec w/ Executive Summary Only:

W. Hehl, DRP W. Hodges, DRS W. Lanning, DRS R. Cooper, DRSS C. Miller, POI-2, NRR D. Holody, EO RI: - R' . R- I G. a J , te , az'iger Y / 92 92 / 2 OFFICIAL , CORD COPY