IR 05000373/1989022

From kanterella
Jump to navigation Jump to search
Partially Withheld Insp Rept 50-373/89-22 on 891018-19 (Ref 10CFR73.21).Violation Noted.Major Areas Inspected:Licensee Access Control Measures to Assure That Only Authorized Personnel Permitted Into Containment During Outage
ML19325F376
Person / Time
Site: LaSalle Constellation icon.png
Issue date: 11/09/1989
From: Belanger J, Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19325F375 List:
References
50-373-89-22, NUDOCS 8911200255
Download: ML19325F376 (1)


Text

i

w

.

'

.,;,

%

'

4..

.

U.S. NUCLEAR REGULATORY COMMISSION

.

REGION III

Report No. 50-373/89022

.

Docket No. 50-373 License No. NPF-11 Licensee:

Commonwealth Edison Company Post Office Box 767

'

>

Chicago, IL 60690 Facility Name:

LaSalle County Station, Unit 1 Inspectio.: At:

LaSalle County, Illinois

Type of Inspection: Announced Reactive Physical Security Inspection Inspection Conducted:

October 18-19, 1989

Inspector:

&Jr /,

///9/Pf n

James /l/. Belanger l'

D6te'

Plant Protection Analyst

Approved By: (

^[7/87 games R. Creed, Chief Data safeguards Section Inspection Summary

.

Inspection on October 18 19, 1989 (Report No. 50-373/89022(DRSS))

Areas inspected:

Included a review of the licensee's access control measures to assure that only authorized personnel and material are permitted into containment during the refueling outage.

Results:

The licensee was found to be in violation of requirements as note below.

Access Control - Personnel:

The licensee's access control measures to control access to coni.ainment were inadequate due to openings in the barrier.

L I

,

,

l'

l:

l-Enclosure Contains i

8911200255 891109 cAFEGUARDS INFORMATION :

!

{DR iJpon Separation This ADOCK 0500

!

Page is Decontrolled

,

l (;

\\\\'

_

., - -