February 13, 2003

SUBJECT:

ARKANSAS NUCLEAR ONE NRC SAFEGUARDS INSPECTION OF COMPLIANCE WITH ORDER INSPECTION REPORT 50-313/03-06; 50-368/03-06

Dear Mr. Anderson:

On January 10, 2003, the NRC completed an inspection at your Arkansas Nuclear One facility.

The enclosed report documents the inspection findings which were discussed on January 10, 2003, with you and other members of your staff. Additionally, on February 5, 2003, the inspectors conducted a final exit meeting with yourself and other members of your staff.

This inspection examined activities conducted under your license as they relate to safety and compliance with an Order issued on February 25, 2002, which required your site to implement specific measures related to security of your facility. The inspection utilized Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, to verify implementation of the Order as clarified in your responses dated March 15, May 9, and June 13, 2002. Within these areas, the inspection consisted of selected examination of procedures and representative records, observations of activities, and interviews with personnel.

The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. Therefore, the material will not be placed in the Public Document Room.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of

DOCUMENT CONTAINS Entergy Operations, Inc.

-2-DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

//RA//

Troy W. Pruett, Chief Plant Support Branch Division of Reactor Safety Dockets: 50-313 50-368 Licenses: DPR-51 NPF-6 Enclosure NRC Inspection Report 50-313/03-06; 50-368/03-06 cc without safeguards enclosure:

Executive Vice President

& Chief Operating Officer Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Vice President Operations Support Entergy Operations, Inc.

P.O. Box 31995 Jackson, Mississippi 39286-1995 Manager, Washington Nuclear Operations ABB Combustion Engineering Nuclear Power 12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852

DOCUMENT CONTAINS Entergy Operations, Inc.

-3-DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED County Judge of Pope County Pope County Courthouse 100 West Main Street Russellville, Arkansas 72801 Winston & Strawn 1400 L Street, N.W.

Washington, DC 20005-3502 Bernard Bevill Radiation Control Team Leader Division of Radiation Control and Emergency Management Arkansas Department of Health 4815 West Markham Street, Mail Slot 30 Little Rock, Arkansas 72205-3867 Mike Schoppman Framatome ANP, Inc.

Suite 705 1911 North Fort Myer Drive Rosslyn, Virginia 22209

DOCUMENT CONTAINS Entergy Operations, Inc.

-4-DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED cc with safeguards enclosure:

Vonna Ordaz (NSIR/DNS/RSS) (MS T4D8)

Juan Peralta (NSIR/DNS/SOS) (MS T4D8)

Elaine McNeil (NSIR/DNS/RSS) (MS T4D8)

RIV Docket File - File Room Custodian Security Inspector (Pick)

Senior Resident Inspector (RLB3)

Electronic distribution by RIV without safeguards enclosure:

Regional Administrator (EWM)

DRP Director (ATH)

DRS Director (DDC)

Branch Chief, DRP/D (LJS)

Senior Project Engineer, DRP/D (JAC)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

Scott Morris (SAM1)

Site Secretary (VLH)

Dale Thatcher (DFT)

W. A. Maier, RSLO (WAM)

DOCUMENT: R:\\ANO2003-06tlkSGI.wpd RIV:EMB PSB PBS NSIR/DNS/SOS DRP/D LEEllershaw*

PJElkmann*

TLKlug*

JDPeralta*

LJSmith*

/RA/

/RA/

/RA/

via T

/RA/

2/7/03 2/6 /03 2/7 /03 2/10 /03 2/7 /03 C:PSB TWPruett

/RA/

2/13 /03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

  • Previously concurred

DOCUMENT CONTAINS DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED ENCLOSURE U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Dockets:

50-313 50-368 Licenses:

DPR-51 NPF-6 Report Nos.:

50-313/03-06 50-368/03-06 Licensee:

Entergy Operations, Inc.

Facility:

Arkansas Nuclear One, Units 1 and 2 Location:

Junction of Hwy. 64W and Hwy. 333 South Russellville, Arkansas Dates:

January 6 - 10, 2003 Inspectors:

L. E. Ellershaw, Senior Reactor Inspector Paul J. Elkmann, Emergency Preparedness Inspector Thomas L. Klug, Physical Security Inspector Approved By:

Troy W. Pruett, Chief, Plant Support Branch Attachment:

Supplemental Information

DOCUMENT CONTAINS DOCUMENT CONTAINS ENCLOSURE(S) CONTAIN(S) UPON SEPARATION THIS PAGE IS DECONTROLLED SUMMARY OF FINDINGS Arkansas Nuclear One, Units 1 and 2 NRC Inspection Report 50-313/03-06; 50-368/03-06 IR 05000313-03-06; 05000368-03-06, Entergy Operations, Inc.; 01/06-10/03; Arkansas Nuclear One, Units 1 and 2; TI 2515/148, Verification of Compliance With Interim Compensatory Measures Order.

The inspection was conducted by one senior reactor inspector, one emergency preparedness inspector, and one physical security inspector.

Cornerstone: Physical Security



On February 25, 2002, the NRC imposed by Order, Interim Compensatory Measures to enhance physical security. The inspectors determined that, overall, the licensee appropriately incorporated the Interim Compensatory Measures into the site protective strategy and access authorization program; developed and implemented relevant procedures; ensured that the emergency plan could be implemented; and established and effectively coordinated interface agreements with offsite organizations.



The inspectors identified an unresolved item related to duties of the officer at the vehicle checkpoint required by Item B.2.(a).2 of the Order. This item remains open pending review by the Office of Nuclear Security and Incident Response (Section III.B).



The inspectors identified an unresolved item related to availability of supplementary equipment as required by Item B.4.f of the Order. This item remains open pending review by the Office of Nuclear Security and Incident Response (Section V.F)



The inspectors identified an unresolved item related to evaluation of the effects of a large area fire as required by Item B.5.b of the Order. This item remains open pending review by the Officer of Nuclear Security and Incident Response (Section VI.B)



The inspectors identified an unresolved item related to evaluation of hazardous cargo required by Item B.5.c of the Order. This item remains open pending review by the Office of Nuclear Security and Incident Response (Section VI.C)