IR 05000321-13-503 & 05000366-13-503; on 11/11/2013 - 11/15/2013; Edwin I. Hatch Nuclear Plant, Units 1 and 2; Exercise Evaluation -Hostile Action (HA) Event; Exercise Evaluation - Scenario Review; Performance Indicator Verification
ML13337A565
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/03/2013
From: Bonser B R
NRC/RGN-II/DRS/PSB1
To: Madison D R
South Carolina Electric & Gas Co
Linda K. Gruhler 404-997-4633
References
IR-13-503
Download: ML13337A565 (11)


Text

December 3, 2013

Mr. Dennis Vice President Southern Nuclear Operating Company, Inc. Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC EMERGENCY PREPAREDNESS INSPECTION REPORT 05000321/2013503 AND 05000366/2013503

Dear Mr. Madison:

On November 15, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Edwin I. Hatch Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results that were discussed on November 15, 2013, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its Enclosure, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), which is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,/RA/ Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5

Enclosure:

Inspection Report 05000321/2013503 and 05000366/2013503

w/Attachment:

Supplementary Information cc: Distribution via Listserv

SUMMARY OF FINDINGS

Inspection Report (IR) 05000321/2013503, 05000366/2013503; 11/11/2013 - 11/15/2013;

Edwin I. Hatch Nuclear Plant, Units 1 and 2; Exercise Evaluation - Hostile Action (HA) Event; Exercise Evaluation - Scenario Review; Performance Indicator Verification. The report covered an announced inspection by two emergency preparedness inspectors, a senior health physicist, a senior physical security inspector, and a project engineer. The U.S.

Nuclear Regulatory Commission's (NRC) program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process."

A. NRC-Identified and Self-Revealing Findings No findings were identified.

B. Licensee-Identified Violations

None.

REPORT DETAILS

REACTOR SAFETY

Cornerstone:

Emergency Preparedness 1EP7 Exercise Evaluation

a. Inspection Scope

Title 10 of the Code of Federal Regulations (10 CFR) 50, Appendix E,Section IV.F.2.j, requires, in part, that nuclear power reactor licensees, in each 8 calendar year exercise cycle, provide the opportunity for their emergency response organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a hostile action (HA) directed at the plant site. Hatch designed the November 13, 2013, exercise to satisfy that requirement, and the NRC inspected the Hatch HA event exercise to assess their ability to effectively implement their Emergency Plan during a HA event, and adequately protect public health and safety. This overall exercise inspection activity represented the completion of one sample on a biennial cycle.

The exercise evaluation consisted of the following reviews and assessments:

  • The adequacy of the licensee's performance in the biennial exercise, conducted on November 13, 2013, was reviewed and assessed regarding the implementation of the Risk Significant Planning Standards (RSPS) in 10 CFR 50.47(b)(4), (5), (9), and (10) which address emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • The overall adequacy of the licensee's emergency response facilities with regard to NUREG-0696, "Functional Criteria for Emergency Response Facilities," and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, Technical Support Center (TSC), Operations Support Center (OSC),

Incident Command Post (ICP), and the Emergency Operations Facility (EOF).

  • A review of other performance areas such as: the emergency response organization's (ERO) recognition of abnormal plant conditions; command and control, including interactions with site security staff, intra- and inter-facility communications; prioritization of mitigation activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the emergency plan and its implementing procedures.
  • The adequacy of the licensee's post-exercise critiques, to evaluate Hatch's self-assessment of its ERO performance during the November 13, 2013, exercise to ensure compliance with 10 CFR 50, Appendix E, Subsection IV.F.2.g. The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using Inspection Procedure (IP) 71114.08, "Exercise Evaluation - Scenario Review," to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.

The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.

b. Findings

No findings were identified

OTHER ACTIVITIES

4OA1 Performance Indicator Verification

a. Inspection Scope

The inspectors sampled licensee submittals relative to the Performance Indicators (PI)listed below for the period October 1, 2012, through September 30, 2013. To verify the accuracy of the PI data reported during that period, PI definitions and guidance contained in NEI 99-02, "Regulatory Assessment Performance Indicator Guideline,"

Revision 6, were used to confirm the reporting basis for each data element.

Emergency Preparedness Cornerstone

  • Emergency Response Organization Drill/Exercise Performance (DEP)
  • Emergency Response Organization Readiness (ERO)

For the specified review period, the inspectors examined data reported to the NRC, procedural guidance for reporting PI information, and records used by the licensee to identify potential PI occurrences. The inspectors verified the accuracy of the DEP through review of a sample of drill and event records. The inspectors reviewed selected training records to verify the accuracy of the ERO PI for personnel assigned to key positions in the ERO. Since the licensee does not use a siren system for public alert and notification, the inspectors reviewed records and interviewed personnel associated with maintenance of the tone-alert radio system. Licensee procedures, records, and other documents reviewed within this inspection area are listed in the Attachment. The inspectors reviewed various documents which are listed in the Attachment. This inspection activity satisfied one inspection sample for each of the two Emergency Preparedness PIs, (i.e., DEP and ERO) on an annual basis.

b. Findings

No findings were identified.

4OA6 Meetings, Including Exit

On November 15, 2013, the lead inspector presented the inspection results to Mr. D. Madison, Site Vice President, and other members of the plant staff. The inspectors confirmed that proprietary information was not provided during the inspection.

ATTACHMENT:

SUPPLEMENTARY INFORMATION