IR 05000321/2013406

From kanterella
Jump to navigation Jump to search
Hatch NRC Material Control and Accounting Inspection Report 2013406 (OUO removed)
ML13255A010
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 09/12/2013
From: Ehrhardt F J
NRC/RGN-II/DRP/RPB2
To: Madison D R
Southern Nuclear Operating Co
References
IR-13-406
Download: ML13255A010 (5)


Text

Enclosures transmitted herewith contain SUNSI. When separated from the Enclosure this document is decontrolled. September 12, 2013 Mr. Dennis R. Madison Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513

SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000321/2013406 AND 05000366/2013406

Dear:

Mr. Madison:

On August 29, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed a material control and accounting inspection at your Edwin I. Hatch Nuclear Plant, Units 1 and 2. The enclosed inspection report documents the inspection results, which were discussed on August 29, 2013, with Mr. Cory Lane and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings were identified during this inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. D. Madison 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/Jannette Worosilo RA for/

Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No.: 50-321, 50-366 License No.: DPR-57 and NPF-5

Enclosure:

NRC Material Control and Accounting Inspection Report 05000321/2013406 and 05000366/2013406

w/Attachment:

Supplemental Information (Official Use Only - Security Related Information)

cc w/o encl.: (via listserv) D. Madison 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/Jannette Worosilo RA for/

Frank Ehrhardt, Chief Reactor Projects Branch 2 Division of Reactor Projects Docket No.: 50-321, 50-366 License No.: DPR-57 and NPF-5

Enclosure:

NRC Material Control and Accounting Inspection Report 05000321/2013406 and 05000366/2013406

w/Attachment:

Supplemental Information (Official Use Only - Security Related Information)

cc w/o encl.: (via listserv) X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: Yes ACCESSION NUMBER:_________________________ X SUNSI REVIEW COMPLETE OFFICE RII:DRP RII:DRP SIGNATURE Via email JGW /RA/ NAME DHardage JWorosilo DATE 09/11/2013 09/10/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRPII\RPB2\HATCH\REPORTS\2013 IRS\2013-406\HATCH MCA REPORT 2013406 -PUBLIC .DOCX D. Madison 3 cc w/o encl: listserv D. Madison 4 Letter to Dennis R. Madison from Frank Ehrhardt dated September 12, 2013

SUBJECT: EDWIN I. HATCH NUCLEAR PLANT- NRC MATERIAL CONTROL AND ACCOUNTING INSPECTION REPORT 05000321/2013406 AND 05000366/2013406 Distribution: RidsNrrPMHatch Resource C. Evans, RII L. Douglas, RII B. Westreich, NSIR E. McNiel, NSIR RIDSNRRDIRS OE Mail PUBLIC