August 5, 2019

SUBJECT:

LIMERICK GENERATING STATION, UNITS 1 AND 2 - SECURITY INSPECTION REPORT 05000352/2019410 AND 05000353/2019410

Dear Mr. Hanson:

On July 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Limerick Generating Station, Units 1 and 2 and discussed the results of this inspection with Mr. Rick Libra, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

NRC inspectors did not identify any findings or violations of more than minor significance.

This letter and the enclosed report will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRCs Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Fred L. Bower, III, Chief Plant Support Branch

Division of Reactor Safety

Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85

Enclosure:

As stated

REGION I==

Docket Numbers:

50-352 and 50-353

License Numbers:

NPF-39 and NPF-85

Report Numbers:

05000352/2019410 and 05000353/2019410

Enterprise Identifier:

I-2019-410-0025

Licensee:

Exelon Generation Company, LLC

Facility:

Limerick Generating Station, Units 1 and 2

Location:

Sanatoga, PA

Dates:

July 8-11, 2019

Inspectors:

J. Cherubini, Senior Physical Security Inspector

K. Hussar, Physical Security Inspector

J. Rey, Physical Security Inspector

Approved By:

Fred L. Bower, III, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a baseline security inspection at Limerick Generating Station,

Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPE

Unless otherwise noted, baseline security inspections were conducted using guidance in the appropriate inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at: http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

SAFEGUARDS

71130.02 - Access Control

NRC inspectors evaluated the access control program through completion of the following IP elements:

Tier I All Requirements Tier II 8 Requirements (02.06 a - d, 02.07 a, 02.08 a, b, c)

Tier III 1 Requirement (02.09)

71130.04 - Equipment Performance, Testing, and Maintenance

NRC inspectors evaluated the security equipment testing and maintenance program through completion of the following IP elements:

Tier I All Requirements Tier II 4 Requirements (02.09 a, 02.11 a, 02.12 a, and 02.13 a)

Tier III 2 Requirements (02.14, 02.15 c)

71130.07 - Security Training

NRC inspectors evaluated the security training program through completion of the following IP elements:

Tier I All Requirements Tier II 6 Requirements (02.05 a, b, d and e, 02.06 a - b)

Tier III 5 Requirements (02.11 a - b, 02.13 a - c)

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification

The inspectors verified the licensees Protected Area Security Equipment Performance Index submittals for the period from 2nd quarter 2018 through 2nd quarter

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On July 11, 2019, the inspectors presented the inspection results to Mr. Rick Libra, Site Vice President, and other members of the licensee staff.

DOCUMENTS REVIEWED

71130.02

Procedures

SY-AA-101-132, Security Assessment and Response to Unusual Activities, Revision 32

SY-AA-101-112, Exelon Security Search Processes, Revision 36

SY-AA-101-112-1004, Protected Area Search Processes, Revision 2

SY-LG-101-119, Control of Receiving Warehouse at Limerick Generating Station, Revision 9

71130.04

Procedures

SY-LG-101-102, Security System Component Degradation Compensatory Measures, Revision

71130.07

Procedures

SY-AA-152, Tactical course of Fire, Revision 09

SY-AA-152, Tactical Couse Development, Approval and Conduct, Revision 6

SY-AA-150-103, Firearms Maintenance, Testing and Accountability, Revision 0

SY-AA-150-108, Firearm Training Simulator (FATS), Revision 1

SY-AA-150, Nuclear Security Training Program, Revision 4

Miscellaneous

Training Instructor Certifications

Range Course of Fire descriptions

Course of Fire certifications

Security Officer Training files

Performance Indicator Verification (71151)

Procedures

SY-AA-1024, Security Performance Monitoring, Oversight, and Indicators, Revision 11

Other Documents

PI Data 2nd Quarter 2018 through 2nd Quarter 2019