Category:Letter
MONTHYEARIR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . ML24093A0912024-04-17017 April 2024 Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24106A1832024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24096A1372024-04-0505 April 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Limerick Generating Station – Holtec MPC-89CBS RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report IR 05000352/20244012024-03-19019 March 2024 Security Baseline Inspection Report 05000352/2024401 and 05000353/2024401 2024-09-06
[Table view] Category:License-Operator
MONTHYEARML24011A2112023-12-14014 December 2023 Post Examination Comments and List of Technical References ML24017A3022023-12-14014 December 2023 Post Exam Comments Resolution ML24011A1812023-12-14014 December 2023 Final QA Related Forms ML23249A1002023-09-0606 September 2023 Requalification Program Inspection RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21307A2872021-11-0303 November 2021 September 8, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML21231A1052021-08-19019 August 2021 Requalification Program Inspection ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) ML21105A5352021-04-20020 April 2021 March 10, 2021, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML20105A1472020-04-14014 April 2020 March 4, 2020, NRC Generic Fundamentals Examination Results for Limerick Generating Station, Units 1 and 2 (Cover Letter Publicly Available, Enclosures Withheld from Public) ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) 2023-09-06
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24011A1812023-12-14014 December 2023 Final QA Related Forms ML24011A2112023-12-14014 December 2023 Post Examination Comments and List of Technical References ML24017A3022023-12-14014 December 2023 Post Exam Comments Resolution RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23017A1122022-12-0505 December 2022 Final QA Related Forms RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations ML22045A9412022-02-14014 February 2022 Senior Reactor and Reactor Operator Initial License Examinations ML20115E4612022-02-14014 February 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML22025A3722022-01-25025 January 2022 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML21257A4462021-08-18018 August 2021 Final QA Related Forms (Folder 1) LG-21-019, 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2)2021-04-0909 April 2021 75-Day Letter Transmitting the Draft Written Examination and Operating Test Material (Folder 2) ML21062A1952021-03-0303 March 2021 Revised Written Examination (Parent Questions File) (Regional Audit Corrective Action)(Folder 2) ML21050A0842021-02-19019 February 2021 Final Qa/Related Forms (Folder 1) ML21050A1192021-02-19019 February 2021 Final Written Examination and Operating Test Outlines (Folder 3) ML21050A1812021-02-19019 February 2021 Revised NRC Comments on Draft Licensee-Developed Written Exam (Regional Audit Corrective Action)(Folder 2) ML21050A2272021-02-19019 February 2021 Revised Final Written Examination with Answer Key (401-5 Format)(Regional Audit Corrective Action)(Folder 3) ML21043A2072021-02-12012 February 2021 Handouts to Applicants (Folder 3) ML21043A2202021-02-12012 February 2021 Draft Written Examination and Operating Test Outlines (Folder 2) ML21040A4832021-02-0909 February 2021 Revised Form ES-401-4 (Regional Audit Corrective Action)(Folder 2) ML21040A4712021-02-0909 February 2021 Revised Form ES-301-5 (Regional Audit Corrective Action)(Folder 1) ML21012A2692021-01-12012 January 2021 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2021 ML19352D6572019-12-16016 December 2019 Announcement 0f Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2020 ML19325C1432019-11-19019 November 2019 Operator Licensing Examination Approval RS-19-053, Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations2019-05-16016 May 2019 Response to NRC Regulatory Issue Summary 2019-02, Preparation and Scheduling of Operator Licensing Examinations ML19107A3822019-04-17017 April 2019 Senior Reactor and Reactor Operator Initial License Examinations ML18323A3152018-11-19019 November 2018 Operator Licensing Examination Approval RS-18-057, Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations2018-04-25025 April 2018 Response to NRC Regulatory Issue Summary 2018-02, Preparation and Scheduling of Operator Licensing Examinations ML18116A0542018-04-25025 April 2018 Senior Reactor and Reactor Operator Initial License Examinations ML18088A6642018-03-27027 March 2018 Final Written Examination and Operating Test Outlines (Folder 3) ML18088A6622018-03-27027 March 2018 Draft Operating Test (Section a, Section B, Section C) (Folder 2) ML18079A5462018-03-27027 March 2018 Final Qa/Related Forms (Folder 1) ML18079A8122018-03-27027 March 2018 Final Qa/Related Forms - Form ES-401-6 and Form ES-401-9 (Folder 1) ML18067A4302018-03-27027 March 2018 NRC Comments on Draft Licensee-Developed Operating Test (Folder 2) ML18067A4172018-03-0808 March 2018 Draft Written Examination and Operating Test Outlines (Folder 2) ML18067A4162018-03-0808 March 2018 Draft Written Examination (Folder 2) ML18038B4362018-02-0606 February 2018 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML18038B4102018-02-0606 February 2018 Final Operating Test (Sections a, B, and C) (Folder 3) ML18005A4202018-01-0303 January 2018 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2018 ML17346A0492017-12-14014 December 2017 Operator Licensing Examination Approval ML17277A0752017-10-0303 October 2017 September 6, 2017 NRC Generic Fundamentals Examination Results for Limerick Generating Station (Cover Letter Publicly Available, Enclosures Withheld from Public) ML17242A0082017-08-29029 August 2017 Requalification Program Inspection - Limerick, Units 1 and 2 ML17151A9802017-05-31031 May 2017 Senior Reactor and Reactor Operator Initial License Examinations RS-17-070, Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations2017-05-0303 May 2017 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations IR 05000352/20173012017-03-13013 March 2017 Initial Operator Licensing Examination Report 05000352/2017301 and 05000353/2017301 ML17090A3652017-02-22022 February 2017 Final Qa/Related Forms (Folder 1) ML17018A2822017-01-17017 January 2017 Announcement of Generic Fundamentals Examination Section of the Written Operator Licensing Examination for 2017 ML17090A3662017-01-17017 January 2017 Final Qa/Related Forms - Form ES-401-6 (Folder 1) ML17075A3832017-01-16016 January 2017 Handouts to Applicants, Limerick (Folder 3) ML17075A3822017-01-16016 January 2017 Final Written Examination with Answer Key (401-5 Format) (Folder 3) ML17069A4202017-01-16016 January 2017 Draft Written Exam 2023-06-16
[Table view] |
Text
UNITED STATES May 14, 2015
SUBJECT:
LIMERICK GENERATING STATION, UNITS 1 AND 2 -
NRC INITIAL OPERATOR LICENSING EXAMINATION REPORT NOS. 05000352/2015301 AND 05000353/2015301
Dear Mr. Hanson:
On January 23, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed an examination at Limerick Generating Station, Units 1 and 2. The enclosed report documents the examination findings, which were discussed on March 12, 2015, with Messrs. M. Gillin, R. Ruffe, and other members of your staff.
The examination included the evaluation of seven applicants for reactor operator licenses, four applicants for instant senior operator licenses, and one applicant for upgrade senior operator license. The written and operating examinations were developed using NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
The license examiners determined that all 12 of the 12 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses were issued on March 12, 2015.
No findings were identified during this examination.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams/web-based.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Donald E. Jackson, Chief Operations Branch Division of Reactor Safety Docket Nos. 05000352; 05000353 License Nos. NPF-39; NPF-85 Enclosure:
NRC Initial Operator Licensing Examination Report Nos. 05000352 and 05000353/2015301 cc w/encl: via List Serv
SUMMARY
ER 05000352/2015301 and 05000353/2015301; January 12-23, 2015; Limerick Generating
Station, Units 1 and 2; Initial Operator Licensing Examination Report.
NRC examiners evaluated the competency of seven applicants for reactor operator licenses, four applicants for instant senior operator licenses and one applicant for upgrade senior operator license at Limerick Generating Station, Units 1 and 2. The facility licensee developed the examinations using NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1. The written examination was administered by the facility on January 23, 2015. NRC examiners administered the operating tests on January 12 -
16, 2015. The license examiners determined that all 12 of the 12 applicants satisfied the requirements of 10 CFR Part 55, and the appropriate licenses have been issued.
ii
REPORT DETAILS
OTHER ACTIVITIES (OA)
4OA5 Other Activities (Initial Operator License Examination)
.1 License Applications
a. Scope
The examiners reviewed all 12 license applications submitted by the licensee to ensure the applications reflected that each applicant satisfied relevant license eligibility requirements. The applications were submitted on NRC Form 398, Personal Qualification Statement, and NRC Form 396, Certification of Medical Examination by Facility Licensee. The examiner also audited three of the license applications in detail to confirm that they accurately reflected the subject applicants qualifications. This audit focused on the applicants experience and on-the-job training, including control manipulations that provided significant reactivity changes.
b. Findings
No findings were identified.
.2 Operator Knowledge and Performance
a. Examination Scope
On January 23, 2015, the licensee proctored the administration of the written examinations to all 12 applicants. The licensee staff graded the written examinations, analyzed the results, presented their analysis to the NRC on February 6, 2015, and presented additional post-exam comment supporting information on March 9, 2015.
The NRC examination team administered the various portions of the operating examination to all 12 applicants on January 12 - 16, 2015. The seven applicants for reactor operator licenses participated in two or three dynamic simulator scenarios, in a control room and facilities walkthrough test consisting of eleven system tasks, and an administrative test consisting of four administrative tasks. The four applicants seeking an instant senior operator license participated in three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of ten system tasks, and an administrative test consisting of five administrative tasks. The one applicant for upgrade senior operator license participated in three dynamic simulator scenarios, a control room and facilities walkthrough test consisting of five system tasks, and an administrative test consisting of five administrative tasks.
b. Findings
All 12 of the applicants passed all parts of the operating test. For the written examinations, the reactor operator applicants average score was 88.61 percent and ranged from 81.08 to 94.59 percent, the senior operator applicants average score was 89.18 percent and ranged from 85.71 to 91.84 percent. The overall written examination average was 88.85 percent. The text of the examination questions, the licensees examination analysis, and the licensees post-examination comments may be accessed in the ADAMS system under the accession numbers noted in Attachment 1.
In accordance with current NRC policy, the release of this written examination in ADAMS to the public will be delayed for two years.
Chapter ES-403 and Form ES-403-1 of NUREG 1021 require the licensee to analyze the validity of any written examination questions that were missed by half or more of the applicants. The licensee conducted this performance analysis for seven questions that met these criteria. This analysis concluded that two of the questions each had two correct answers the key for two other questions should reflect a different correct answer and that one question should be deleted from the exam.
The licensee submitted five post-examination question comments on February 6, 2015, and submitted additional supporting information on March 9, 2015. The NRC reviewed the facilitys post-exam comment submittal package and accepted facility recommendations on two of the five questions.
- For Q19 and Q28, the facility recommended and the NRC accepted two answers, Choices A and B, for each of these questions.
- For Q26 and Q93, the facility recommended changing the key answer (from A to D, and from B to A, respectively). The NRC did not agree and instead deleted both Q26 and Q93 from the exam.
- For Q81, the facility recommended question deletion. The NRC did not agree and instead accepted Choices C and D as correct answers.
The text of the examination questions, the licensees examination analysis, and the licensees post-examination comments with the NRC resolutions may be accessed in the ADAMS system under the accession numbers noted in the Attachment 1.
In accordance with current NRC policy, the release of this written examination will be delayed for two years.
.3 Initial Licensing Examination Development
a. Examination Scope
The facility licensee developed the examinations in accordance with NUREG-1021, Revision 9, Supplement 1. All licensee facility training and operations staff involved in examination preparation and validation were listed on a security agreement.
The facility licensee submitted both the written and operating examination outlines on October 17, 2014. The chief examiner reviewed the outlines against the requirements of NUREG-1021, and provided comments to the licensee. The facility licensee submitted the draft examination package on November 25, 2014. The chief examiner reviewed the draft examination package against the requirements of NUREG-1021, and provided comments to the licensee on the examination on December 5, 2014.
The NRC conducted an onsite validation of the operating examinations and provided further comments during the week of December 15, 2014. The licensee satisfactorily completed comment resolution on January 9, 2015.
b. Findings
The NRC approved the initial examination outline and advised the licensee to proceed with the operating examination development.
The examiners determined that the written and operating examinations initially submitted by the licensee were within the range of acceptability expected for a proposed examination.
No findings were identified.
.4 Simulation Facility Performance
a. Examination Scope
The examiners observed simulator performance with regard to plant fidelity during the examination validation and administration.
b. Findings
No findings were identified.
.5 Examination Security
a. Examination Scope
The examiners reviewed examination security for examination development and during both the onsite preparation week and examination administration week for compliance with NUREG-1021 requirements. Plans for simulator security and applicant control were reviewed and discussed with licensee personnel.
b. Findings
No findings were identified.
4OA6 Meetings, Including Exit
The chief examiner presented the examination results to Mr. M. Gillin, Director of Operations, and other members of the licensee's management staff on March 12, 2015.
The licensee acknowledged the findings presented.
The licensee did not identify any information or materials used during the examination as proprietary.
4OA7 Licensee-Identified Violations
No findings were identified.
ATTACHMENTS:
Supplemental Information
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee Personnel
- D. Molteni, Operations Training Manager
- J. Weissinger, Shift Operations Manager
K, Ryder, Exam Developer
- L. Stanford, Exam Developer
ITEMS OPENED, CLOSED, AND DISCUSSED
Opened
NONE
Opened and Closed
NONE
Closed
NONE
Discussed
NONE