SALP Rept 50-353/86-99 for 860101-870731
ML20236S470
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/19/1987
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20236S462 List:
References
50-353-86-99, NUDOCS 8711250189
Download: ML20236S470 (44)


Text

_ _ _ - _ - _ _ _ _ _.

l

-

'

Philadelphia Electric Company

-

!

U. S. NUCLEAR REGULATORY COMMISSION

REGION I

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE INSPECTION REPORT NO. 50-353/86-99 PHILADELPHIA ELECTRIC COMPANY

!

i LIMERICK GENERATING STATION UNIT 2 ASSESSMENT PERIOD: January 1,1986 - July 31,1987

{

0711250189 871119 PDR ADOCK 05000353 G

PDR

,

- - - - - - - _ _ _ _ _ _ _ - - _

- _ - _ _ _ _ __

. _ _ - _ _ _ - - _

-

Philadelphia Electric Company

-

SUMMARY (1/1/86 - 7/31/87)

Actual-Annualized Percent A.

Containment, Safety-related Structures, Major Steel Supports, Soils and Foundations 261 164

B.

Engineering 200 126

C.

Piping Systems and Supports 814 514

D.

Safety-related Components -

Mechanical 489 308

E.

Auxiliary Systems 126

4 F.

Electrical Equipment and Cables 562 355

G.

Instrumentation and Control Systems 158 100

H.

Licensing Activities

--

--

--

I.

Assurance of Quality 293 185

J.

Preoperational Testing

27

_

TOTAL 2,946 1,859 100 NOTE - Hours expended in facility licensing activities and operator license activities are not included with direct inspection effort statistics.

- _ _ _ _ - _ _ -

.__ -

-_-____- _ _ - _____ _ _

.

-

TABLE 3 ENFORCEMENT ACTIVITY A.

Violations Versus Functional Area by Severity Level Functional No. of Violations in Each Severity Level Area Dev.

V IV III II I Total-A.

Containment, Safety-related Structures, & Major Steel Supports, Soils and Fc-undations B.

Engint.ering

1

C.

Piping Systems &

2

Supports D.

Safety-related

1

Components -

Mechanical E.

Auxiliary Systems F.

Electrical Equipment and Cables

2 G.

Instrumentation and Control Systems H.

Licensing Activities I.

Preoperational Testing J.

Assurance of Quality

1*

TOTAL

7

13

  • Violation composed of four examples from functional areas:

C, D and F.

j

,

_. _ _.. _ _.. - _ - - - - - _ - - _ _ _. - - _ - -. - - - -

- _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

_

_

- ___ _ ____ _

__

. _ _ _ _ _

.

___

__.

__.

.

-

Table 3 - continued j

Violation Summary Inspection Severity Functional Report No.

Level Area Violation 86-07 IV C

Stainless steel tools not color coded.

IV C

Radiographic indications not properly documented and investigated 86-12 V

C Pipe support not properly installed.

IV D

Diesel Generator governor preventive maintenance not performed.

86-15 V

C Field weld not examined during conduct of hydrostatic test.

86-21 V

F Use of unverified cable data for tension calculations.

V B

RHR heat exchanger support welds not in accordance with design.

87-02 IV Examples from C, Inprocess work D and F activities not properly performed: rod ovens de-energized, unauthorized rigging, closure weld not inspected, and

unauthorized raceway support removal.

l

_ _ _ _ _ _ _ _ - - - _ _

_.

- -.

_ _ _ -

. _ _ _ _ -

_ - _ _ _ _

l

..

)

Table 3 - continued

_ Violation Summary Inspection Severity Functional j

Report No.

Level Area Violation 87-04 V

D Relief valve lock wire j

for blowdown adjustment ring access plugs was i

broken.

87-06 Deviation J

Design changes and equipment installations to assure class 1E circuit voltages not completed within.

committed timeframe.

87-11

IV B

General Electric provided unverified design information.

V F

Undersized fillet weld on a raceway support.

V D

Preventive maintenance records not properly filled out.

  • An enforcement conference has been scheduled to provide PECO the opportunity to di.scuss their 10 CFR 50.55(e) deportability review for the standby diesel generator interaction with the fire protection system instrumentation.

l

- _ _ _ _ - _ _____ _ _. _ _.

- _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _.

. _ - - - _ _ _ _ _ - _ _

_ _ _ _

.__-- _ -

- -.

_

.

i

.

TABLE 4 CONSTRUCTION DEFICIENCY (CDRs) REPORTS l

A.

CDRs Correlated by Functional Area i

i Number by Cause Code J

2

4 s

g

Functional Area A.

Containment, Safety-related Structures, and Major Steel Supports, Soils and Foundation B.

Engineering

1 C.

Piping Systems and Supports 0.

Safety-related Components -

Mechanial E.

Auxiliary Systems F.

Electrical Equipment and Cables G.

Instrumentation and Control Systems

H.

Licensing Activities I.

Preoperational Testing J.

Assurance of Quality TOTAL T

I

~

~

l I

~

Cause Codes:

1 - Personnel Error 2 - Design Error 3 - External Cause 4 - Defective Procedures 5 - Component Failure 6 - Fabrication Error 7 - Other

!

i