March 9, 2009
SUBJECT:
LIMERICK GENERATING STATION - NRC SECURITY INSPECTION REPORT 05000352/2009402 AND 05000353/2009402
Dear Mr. Pardee:
On March 4, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Limerick Generating Station, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC=s Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 4, 2009, with Mr. Christopher Mudrick and other members of your staff.
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission=s rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified.
A licensee-identified violation which was determined to be of very low safety significance is listed in this report. However, because of the very low safety significance and because it is entered into your corrective action program, the NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1 of the NRC Enforcement Policy. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.:
Document Control Desk, Washington DC 20555-001; with copies to the Regional Administrator Region I; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington DC 20555-001; and the NRC Resident Inspector at Limerick Generating Station.
When separated from its Enclosure, this document is DECONTROLLED. In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC=s document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-erm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390 and 10 CFR 73.21, a copy of this letter=s enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related Information - Withhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Sincerely,
/RA/
James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety
Docket Nos.
50-352, 50-353 License Nos. NPF-39, NPF-85
Nonpublic Enclosure: NRC Inspection Report Nos. 05000352/2009402, 05000353/2009402
w/Attachment: Supplemental Information (OUO-SRI)